Loading...
HomeMy WebLinkAboutContract 46412-FP4 Departure TP&W Const. Services DOE# Dat Project anage ,T WORTH. ClTlf SECRET Risk Management Canad ,� D.O.E. Brotherton COAITI�ACT No. V q P LI CFA Westerman/Scanne The Proceeding People have beenCo pay„e„t&have rot P cted concern ng the request for final eased this ro1 ect for such payment ANION AND PUBLIC WORKS clearance Conducted By Shameka Kennedy F PROJECT COMPLETION D.O.E.Ns: 7250 e-PA/oZZ99 Regarding contract 117250 for THOMAS CROSSING PH 6-STORM DRAIN as required by the G'S#IWO 4/2 TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $104,997.90 Amount of Approved Change Orders: NQ Revised Contract Amount: Total Cost Work Completed: 5104,997.90 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $104,997.90 Less Previous Payments: $0.00 Final Payment D e $104,997.90 ?5� t3• /!-zo- Recomm nded for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction av(2c' (,A..)� V I(A Accepted J Date MW Direct r, TRANSPORTATION & UBLIC WORKS Ass . Manager Date Comments: C205-541200-206760229983 -E MA$.Z.En OFFICIAL RECORD MAR 7 2a16 CITY SECRETARY FT. WORTH, TX 81t w-1` FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name THOMAS CROSSING PH 6 Contract Limits Project Type STORM DRAIN City Project Numbers 02299 DOE Number 7250 Estimate Number I Payment Number I For Period Ending 2/17/2016 CD City Secretary Contract Number 117250 Contract Time 40;D Contract Date Days Charged to Date 270 Project Manager Long Contract is 1114.10 Complete Contractor VENUS CONSTRUCTION COMPANY 1426 S.MAIN P O BOX 90 MANSFIELD, TX 76063 Inspectors LAYER I ODEN Wednesday,February 17,2016 Page 1 of 4 City Project Numbers 02299 DOE Number 7250 Contract Name THOMAS CROSSING PH 6 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 2/17/2016 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ------------------- ----------------- - - 1 ------------------ -- ----- 1 21"RCP 36 LF $6125 $2,205.00 36 $2,205.00 2 24"RCP 208 LF $45.90 $9,547.20 208 $9,547.20 3 30"RCP 208 LF $56.90 $11,835.20 208 $11,835.20 4 5X3 BOX CULVERT 177 LF $164.82 $29,173.14 177 $29,173.14 5 6X3 BOX CULVERT 149 LF $196.14 $29,224.86 149 $29,224.86 6 10'CURB INLET 7 EA $3,287.50 $23,012.50 7 $23,012.50 Sub-Total of Previous Unit $104,997.90 $104,997.90 Wednesday,February 17,2016 Page 2 of 4 City Project Numbers 02299 DOE Number 7250 Contract Name THOMAS CROSSING PH 6 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 2/17/2016 Project Funding Contract Information Summary Original Contract Amount $104,997.90 r Chance Orders Total Contract Price $104,997.90 j Da tc _ F Total Cost of Work Completed $104,997.90 Contrsl r Less %Retained $0.00 Date Net Earned $104,997.90 i Earned This Period $104,997.90 Inspection S /� Retainage This Period $0.00 ( aaa Date �� Less Liquidated Damages Project Men /! Days® Day $0.00 ate 3 LewPavement Deficiency $0.00 Ass rector n -Infinstructure Design and Construction Less Penalty $0.00 w1- L-J'-'\ Date 3 Less Previous Payment $0.00 Director ontracting Deparun Plus Material on Hand Less 15% $0.00 Balance Due This Payment $104,997.90 Z,Z Wednesday,February 17,2016 Page 3 of 4 City Project Numbers 02299 DOE Number 7250 Contract Name THOMAS CROSSING PH 6 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 2/17/2016 Project Funding Project Manager Long City Secretary Contract Number 117250 Inspectors LAYER / ODEN Contract Date Contractor VENUS CONSTRUCTION COMPANY Contract Time 40 CD 1426 S.MAIN P O BOX 90 Days Charged to Date 270 CD MANSFIELD, TX 76063 Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $104,997.90 Less %Retained $0.00 Net Earned $104,997.90 Earned This Period $104,997.90 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0,00 Balance Due This Payment $104,997.90 Wednesday,Febmary 17,2016 Page 4 of 4 FoRTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Thomas Crossing Phase 6 PROJECT NO.: 02299 CONTRACTOR: Venus construction DOE NO.: 7250 PERIOD FROM:05/08/15 TO: 03/11/16 FINAL INSPECTION DATE: 16-Feb-16 WORK ORDER EFFECTIVE:5/8/2015 CONTRACT TIME: 90 0 VA* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. IL 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 0 270 270 PERIOD PREVIOUS 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 270 270 TO DATE *REMARKS: - -IT zszs �6 CONTRACTOR DATE INSPECTOR DATE ENGINEERING DEPARTMENT The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941•Fax:(817)392-7845 FORTWORTHREV:00/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor e.-1 vS Project Name =91RAility Contractors,Inc. Thomas Crossing Ph 6-Storm Drain DOE Inspector DOE Number Weyman Oden 7250 DoE Lupector Project Manager [] Water❑ Waste Water❑ Storm Drainage Pavement Mike Domenech Initial Contract Amount Project Difficulty $104,997.90 0 Simple (g) Routine 0 Complex Final Contract Amount Date 1$104,997.90 2/25/2016 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING 0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 341 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 341 IID CONTRACTOR'S RATING Maximum Score(MS)=448 lu sum of applicable element score maximums which= 448 Rating(ITS/MSI•100%) 341 / 448 - 76% Performance Category Good <20%=Inadequate 2056 to<40%-Dejclent 40%to<60%—Staid wW 60%to<80%—Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature ContractorJ O N& `l Signature DOE Inspector's Supervisor _ CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS I The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTHImo:°2f22/0' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I PROJECT INFORMATION Date: 2252016 Name of Contractor Project Name Venus Construction Thomas Crossing Ph 6-Storm Drain DOE/nspector Project Manager Weyman Oden Aaron Lon DOE Number ProjectDjffieu4 Type of Contract 7250 10 Simple Oe Routine 0 Complex ❑ water El Waste WaterO Stam DrainagC Pavement Initial Contract Amount Final Contract Amount $104,997.90 $104,997.90 11)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION IPLANS&SPECIFICATIONS 1 Availability of inspector 1 Accuracy of Plans to Existin Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicabil!ty of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 1A 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts Ei:- 3 Bid Opening to Pre-Con Meeting Timeframe "COMMENTS&SIGNATURES COMMENTS Signature ContractorC Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS ! The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941-Fax:(817)392-7845 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority,a notary public in the state and county aforesaid,on this day personally appeared Sam McAda, President Of Venus Construcion Co,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons,firms,associations,corporations,or other organizations famishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Thomas Crossing Phase 6 BY Sam McAda Subscribed and sworn before me on this date 23rd of February,2016. J"" e�/ EgRIMY VANESSA RENFROW Notary PublicNotary Public State of TexasTarrant County,Tx Comm.Exp.07.28.2019 CONSENT OF OWNER o SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Bond No.PB02253100353 OTHER PROJECT: Thomas Crossing Phase 6 PROJECT NO. 02299 TO: City of Fort Worth CONTRACT FOR: 1000 Throckmorton Street Construction Fort Worth,TX 76102 CONTRACTOR: Venus Construction Company CONTRACT DATE:February 1,2015 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the Philadelphia Indemnity Insurance Company SURETY, on Bond of Venus Construction Company CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to City of Fort Worth ,OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety has hereunto set its hand this 23rd day of February ,2016 Philadelphia Indemnity Insurance Company Surety Company —�` Signature of Authorized Representative Attess — � Charles K.Miller,Attorney-In-Fact Title (Seal) 1 CO;1S_P+'OFSUREI'YCCWANYTOFINALPAYNEW ONE PAGE 2580 PHILADELPHIA INDEMNITY INSURANCE COiNIPANY One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint: Clint Norris,Steven J.Zinecker,Jessica Luna Montgomery, Shannon Letvis and Charles K.Miller of Southwest Assurance Group,Inc.. Its true and lawful Attorney(s)in fact with full authority to execute on its behalf bonds,undertakings,recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$25.000,000 This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I'day ofJuty,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1) Appoint Attorney(s) in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof and to attach die seal of the Company thereto; and (2) to remove, at any time, any such Attomey-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 7T1 DAY OF FEBRUARY 2013. 111-1927 (Seal) ^" Robert D.O'Leary Jr.,President&CEO Philadelphia Indemnity Insurance Company On this 7"day of February 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duty sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. COMMONWEAL OPPE7WSYI.VAN7A NOTARIAL SEAL DANIELLE PORATH,Notary PUM Lower Mtxiat T .,Mongan C Wrty �/ Cammiesiott MarUt�2019 Notary Public: residing at: Bala Cvmvyd,PA (Notary Seal) My commission expires: March 22,2016 I,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto are true and correct and are still in full force and effect.I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date Df execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of/eachh Company this 23rd day of Februaf}L 2016 Craig P.Keller,Executive Vice President,Chief Financial Officer&Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY 1927r IMPORTANT NOTICE ADVISO IMPORTANTE To obtain information or make a complaint: Para obener informacion o para someter You may call the Surety's toll free telephone una queja: Usted puede Ilamar al numero number for information or to make a de telefono gratis de para informacion o complaint at: para someter una queja al: 1-877-438-7459 1-877-438-7459 You may also write Philadelphia Indemnity Usted tanbien puede escribir a Philadelphia Insurance Company at: Indemnity Insurance Company at: One Bala Plaza, Suite 100 One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 Bala Cynwyd, PA 19004 Attention: Senior Vice President and Attention: Senior Vice President and Director of Surety Director of Surety You may contact the Texas Department of Puede comunicarse con el Departamento Insurance to obtain information on de Seguros de Texas para obtener companies, coverage, rights or complaints information acerca de companias, at: coberturas, derechos o quejas al: 1-800-252-3439. 1-800-252-3439 You may write the Texas Department of Puede escribir al Departmento de Seguros Insurance at: de Texas: P.O. Box 149104 P.O. Box 149104 Austin, TX 78714-9104 Austin, TX 78714-9104 Fax# 512-475-1771 Fax# 512-475-1771 Web: http://www.tdi.state.tx.us Web: http://www.tdi.state.tx.us Email: ConsumerProtection(a-)_tdi.state.tx.us Email: ConsumerProtectionC�tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should DISPUTAS SOBRE PRIMAS O you have a dispute concerning your RECLAMOS: Si tiene una disputa premium or about a claim, you should concerniente a su prima o a un reclamo, contact the Surety first. If the dispute is not debe comunicarse con el Surety primero. Si resolved, you may contact the Texas no se resuelve la disputa, puede entonces Department of Insurance. comunicarrse con el departamento (TDI). ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este This notice is for information only and does aviso es solo para proposito de informacion not become a part or condition of the y no se convierte en parte o condicion del attached document. documento adjunto.