HomeMy WebLinkAboutContract 47639 CITY SECRETAW CONTRACT No. Developer and Project Information Cover Sheet: Developer Company Name: Bailey Boswell Marketplace LP Address, State,Zip Code: 7001 Preston Road,Suite 410,Dallas,TX 75205 Phone&Email: 214-224-4644 Authorized Signatory,Title: Robert Dorazil,Manager of UCD Bailey Boswell GP LLC,general partner Project Name and Brief Boswell Marketplace SW 576-Water,sewer and drainage improvements to Description: serve the development Project Location: NW corner of Bailey Boswell Rd and Old Decatur Rd Plat Case Number: FP15-032 Plat Name: Boswell Marketplace Mapsco: 33K Council District: 7 City Project Number: 02624 CFA Number: 2015-091 DOE Number: 7486 To be compl ed y stqfi' Received by: ate: (% � 3 0 City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 OFFICIAL RECORD Page 1 of 11 CITY SECRETARY FT. WORTH, TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Bailey Boswell Marketplace, LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Boswell Marketplace SW 576 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. WHEREAS, the City acknowledges that Developer has collaterally assigned Developer's rights, titles and interests under this Agreement to PlainsCapital Bank("Lender") in connection with the development of the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 2 of 11 B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) ❑. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 3 of 11 City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 4 of 11 H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with any negligence or willful misconduct in the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, neglect or willful misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused. in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. Further, Developer will require its contractors to indemnify, City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 5 of 11 and hold harmless the City for any losses, damages, costs or expenses for damage or repairs to the Improvements or damage to other Property suffered by the City or caused as a result of said contractor's failure to complete the work and construct the Improvements in a good and workmanlike manner, free from defects, in conformance with the Policy,and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of four percent (4%) of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of six percent (6%) of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 6 of 11 ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. In the event of any breach of this Agreement by Developer, the City agrees to give written notice to Developer and Lender and reasonable opportunity to cure such breach (at least seven (7) days after such written notice) before a default shall occur under this Agreement. Notwithstanding the foregoing, the City acknowledge and agrees that Lender shall have the right, but not the obligation, to cure any breach. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Boswell Marketplace SW 576 CFA No.: 2015-46 DOE No.: 7486 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 328,777.00 2.Sewer Construction $ 143,068.00 Water and Sewer Construction Total $ 471,845.00 B. TPW Construction 1.Street $ 66,446.87 2.Storm Drain $ 8,475.00 3.Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ 74,921.87 Total Construction Cost(excluding the fees): $ 646,766.87 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 9,436.90 D. Water/Sewer Material Testing Fee(2%) $ 9,436.90 Sub-Total for Water Construction Fees $ 18,873.80 E. TPW Inspection Fee(4%) $ 2,996.87 F. TPW Material Testing(2%) $ 1,498.44 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 4,495.31 Total Construction Fees: $ 23,369.11 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% $ 546,766.67 Completion Agreement=100%/Holds Plat $ 546,766.87 Cash Escrow Water/Sanitary Sewer- 125% $ 589,806.25 Cash Escrow Pavin /Storm Drain=125% $ 93 652.34 Escrow Pledge Agreement=125% Is 683 458.59 1 X Letter of Credit=125%w/2yr expiration period I $ 683,458.59 City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER BAILEY BOSWELL MARKETPLACE LP, a Texas limited partnership By: UCD Bailey Boswell GP LLC, Jesus J. Chapa a Texas limited liability company, Assistant City Manager General Partner Date: 3 v , Recommended by: Name: Robert Do it Title: Manager ' 1 ` Date: �0/ Wendy Chi-13bulal,EMBA,P.E. ATTEST: (Only if required by Developer) Development Engineering Manager Water Department aj2,6L✓A Signature Douglas W Wiersig,P.E. Name: Director Transportation& Public Works Department Approved as to Form & Legality: Flo ATTEST: A. Assistant City Attorney $4q}((JJ � M&C No. N(i4 O 100*00p0�� XA'% Date: Z,Zte/l tt J. er City Secretary City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 0126.2016 CFA Official Release Date: 10.07.2015 OFFICIAL RECORD Page 9 of 11 CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Attachment l -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments ® Water Cost Estimate �I Exhibit A-]: Sewer Improvements Sewer Cost Estimate ® Exhibit B: Paving Improvements Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT 111" Changes to Standard Agreement Community Facilities Agreement City Project No. <City Project#> None. City of Fort Worth,Texas Standard Community Facilities Agreement—Modified by the Parties 01.26.2016 CFA Official Release Date: 10.07.2015 Page 11 of 11 �o s� a SOUTH WATER TOWER y936 FORT WORTH SAGINAW 8287 o � BAILEY— BOSWELL z ti CLOVER m o William V CREEN WAY C) Houston 3 to COLE o Park z z FOX Y PARK ORMANOY i V�CMMTY MAP N.T.S. MAPSCO NO. 33K COUNCIL DISTRICT #7 CFA MINITY MAP »r �l �ffi]1T®Il>Imis1ffiffi BOSWFLL MARKETPLACE SW576 Aoom>Ymo� II�o. FORT WORTH, TARRANT COUNTY, 7X SHEET w«suu�nc am cecu�tcns swrvcroRs HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 1 (972)490-7090 FAX(974)490-7099 CITY OF FORT WORTH TARRANT COUNTY, TEXAS of Scale 1' = 250, Date :08/25/2015 UCD Dwq. Fite : 19999 — CFA — COV.DWC 7001 PRESTON ROAD, SUITE 410 5 Proiect No. : 19999.00 DALLAS. TEXAS \ \ N LEGEND \ \ \ \ W E PROPOSED WATER LINE \ \ EXISTING WATER LINE \ \ S PROPOSED FIRE H YDRAN T ►� PROPOSED VAL VE i \ 1 i xi �i AUTOMATIC —� FLUSHER T EXISTING 36" WATER LINE PROPOSED 12" WATER LINE PROPOSED r 12" WATER LINE p PROPOSED I EWA TER INE I I WATER LINE 8" WATER tWE SED PROPOSED PROPOSED EXIS77NG PROPO 8" WATER LINE 30" WATER LINE 12" WATER LINE 8" WATER LINE PROPOSED — — — — — 8" WATER LINE — — EXISTING 30" WATER LINE EXIS77AIG 8" W. BAILEY SWELL kOAD EXISTING _ — WA TER LINE ( ROAD /4040 aY1 8" WATER LINE 0 m CFA EXHIBIT A — WATER w'.mv�IIffiIli®ILIisIIl®ffiffi BOSWELL MARKETPLACE SW576 LTm a A a aistom, nag. FORT WORTH, TARRANT COUNTY, TX SHEET avt[NGIwt9s . supvcroas HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 2 (972)490-7000 FAX(972)490-7099 CITY OF FORT WORTH Scale 1" 250' Date :08/25/2015 TARRANT COUNTY, rLXAS DFU CD 5 Dwa. File 19999 - CFA -WTR.DWG 7001 PRESTON ROAD, SUITE 410 Project No. : 19.Q.9900 TFXAS 75205 KROGER SW576 EXHIBIT A CFA WATER COST ESTIMATE ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2 3 415 WATER 1 Remove 30"Water Line LF $540.00 ' 2 Ductile Iron Water Fittings w/Restraint TON X 16 $2,000.00 $32,000.00 3 6"Water Pie LF 130 $25.00 $3,250.00 4 6"Water Pipe,CSS Backfill LF 130 $12.00 $1,560.00 5 8"Water Pie LF X 148 33.00 $4,884.00 6 8"Water Pi e,CSS Backfill LF X 148 $12.00 $1,776.00 7 12"Water Pipe LF I I X 1964 $36.00 $70,704.00 8 12"Water Pipe,CSS Backfill LF X 1964 $12.00 $23,568.00 9 30"Water Pipe LF X 28 $1,085.00 $30,380.00 10 Fire Hydrant EA 5 $2,500.00 $12,500.00 11 Connection to Existing 30"Water Main EA X4 1 2 $5,650.00 $11,300.00 12 1"Water Service EA X1 1 1 5 $1,820.00 $9,100.00 13 2"Water Service EA 8 $2,915.00 $23,320.00 14 6"Gate Valve EA A 1 10 $905.00 $9,050.00 15 8"Gate Valve EA 4 $1,340.00 $5,360.00 16 12"Gate Valve EA 17 $2,415.00 $41,055.00 17 30"x 8"Tapping Sleeve&Valve EA A 1 1 $12,660.00 $12,660.00 1 T- 18 30"x 12"Tapping Sleeve&Valve EA 1 $14,750.00 $14,750.00 19 36"x 12"Tapping Sleeve&Valve EA 1 $14,750.00 $14,750.00 20 Trench Safety LF 2270 $1.00 $2,270.00 21 9999.0001 Automatic Flusher EA 1 $4,000.00 $4,000.00 SUBTOTAL $328,777.00 I LEGEND \ ` N •�����• PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE W �-- E •• — EXISTING SANITARY SEWER LINE C EXISTING SANITARY SEWER MANHOLE — — \ S \\ \ V o \ a \\ \ o q - - - - - - - - - -- - - - PROPOSED 10" ®\\\ SANITARY SEWER _04 o / PROPOSED 10" \ SANITARY SEWER PROPOSED 10" 1 PROPOSED 10" I SANITARY SEWER I SANITARY SEWER \ _ do PROPOSED SANITARY SEWER - - - - ExrsnNc 8" W. BAILEY SWELL ROAD SANITARY SEWER (CO. ROAD ,#4040) (mriable width right-a/-woy) oo - C) $a �$ffiIk®IlIIrm®ffiffi CF EXHIBIT WELL SEWER MARKETPLACE SW576 BOS Aoe®cimtes, Inc. FORT WORTH, TARRANT COUNTY, TX SHEET COWSULT910 CML EN"EE95 - M HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 3 (972)490-7090 FAX(972)410-701/ CITY OF FORT WORTH TARRANT COUNTY, TEXAS OF Scale 1" = 250' Date .08/25/2015 UCD 5 Dwg. F;a 19999 — CFA — SWR.DWG 7001 PRESTON ROAD, SUITE 410 Project No. 19999.00DALLAS. TFYAS 75205 KROGER SW576 EXHIBIT A-1 CFA SANITARY SEWER COST ESTIMATE ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2 3 415 SANITARY SE R -A I 1 8"Sewer Service LF 46 $27.0 $1.215.00 2 Ductile Iron Sewer Fittings TON X 0.5 $2,000.00 $1,000.00 3 8"Sewer Pi e,CSS Backfill LF X 45 $12.00 $540.00 4 10"Sewer Pie LF I X 1994 $38.00 75,772.00 5 10"Sewer Pir,CSS Backfill LF X 1994 $12.00 $23,928.00 6 4'Manhole EA X 9 $3,503.00 $31,527.00 7 4'Drop Manhole EA X 1 $5.008.00 $5,008.00 8 Post-CCTV Inspection LF X 1 2039 $1.00 $2,039.00 9 Trench Safety LF20391 $1.00 $2,039.00 SUBTOTAL $143,068.00 \ \ N W E Y o S \ 11 \ 1 � .20 iii 1 b70 1 1 ®® \ PA VEMEN T REPAIR 1 $ FOR WTR CONNECTION c 1 0 1 ® ® \ \ — - CONCRETE DRIVEWAY , f — CONCRETE DRIVEWAY � -LL m pp- 30. O - -u - - =—rte PAVEMENT REPAIR — — — — — FOR SAN SWR CONNECTION W. BAILEY SWELL ROAD II I (CO. ROAD #4040) - - (variable width right—of—FA woyJ CFA EXHIB II% till Q m - - W �11ffiIl,i®IlIlsdlffiffiffi 6 PAVING ROSWELL MART KETPLACE SW576 FORT WORTH, TARRANT COUNTY, TX SHEET cawsuu9a avn cw9lrucas . swvcraes HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 4 (977)490-7090 FAX(977) 490-7099 CITY OF FORT WORTH Scale : 1" = 250 Date :08/25/2015 TARRAN t COUNTY, TEXAS OF UCD Dwo. File : 19999 — CFA — PAV.DWC 700'1 PRESTON ROAD, SUITE 410 s P.o'ect No. : 19999.00 TE-XTE-XaS 75205 KROGER SW576 EXHIBIT B CFA PAVING COST ESTIMATE ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 12131415 1 Remove Fence LF $4,21670— I 2 Remove Asphalt Pvmt SY X 677 $10.00 $6,770.00 3 8"Cement Treatment SY X 246 $4.40 $1,082.40 4 3"Asphalt Pvmt Type D SY X 492 $47.25 $23,247.00 5 7'Concrete Driveway SF I xi 5613 $5.19 $29,131.47 6 Traffic Control MO I X I 1 1 $1,000.00 $1,000.00 7 Traffic Control Details EA X I 1 1 $1,000.00 $1.000.00 SUBTOTAL 66,446.87 I N W " E S \ 20 - - - - - - - - - _ - - \ $\ INSTALL 1 SET o \ ® ® \ \ 18" RCP r OD 'p Q q �' \\ INSTALL 1 SET I: — - - ir -�' — - - - - - fr W. BAILEY SWELL ROAD II I — — � � (CO. ROAD ,/4040) — — — —— — — (w�lob/e width right—of--woy) ZM 0,"M'j"MCFA EXHIBIT B-1 — STORY SEWER ffi BOSWELL MARKETPLACE SW576 ]��, FORT WORTH, TARRANT COUNTY, TX SHEET cowsuu9w uv9 c�ar+cca 9u9+naws HEIRS OF BENJAMIN THOMAS SURVEY, ABSTRACT NO. 1497 5 (972)490-7099 FAX(972) /90-7099 CITY OF FORT WORTH TARRANT COUNTY, TEXAS of Scale : 1' = 250' Date :08/25/2015 UCD Dwq. file : 19999 — CFA — STM.DWG 7001 PRESTON ROAD, SUITE 410 5 Project No. : 19999.00 A Ar TEXAS 7 KROGER SW576 EXHIBIT B-1 CFA DRAINAGE COST ESTIMATE ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2131415 I8"RCP,Class III LF Ix 137 $43.00 $5,891.00 l8"SET,l pipe EA X 2 $1,155.00 $2,310.00 Post-CCTV inspection LF Ix 137 $1.00 $137.00 4 Trench Safety LF X 1371 $1.00 $137.00 SUBTOTAL $8,475.00