Loading...
HomeMy WebLinkAboutContract 46291-FP1 Department of TP&W Const.Services DOE#� Date R AW Project Manage � '(S� @J 6L I g J. 'T WORTH® 6 e i�� ��i, -f-- Risk Management J. Pae D.O.E. Brotherton *44 CFA Westerman/Scanne The Proceeding people have been Cojdded concerning the request for final �� lYQ _. v�` payment&have released this project for such payment ATION AND PUBLIC WORKS J Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION D.O.E. Ns: 7330 Regarding contract 46291 for WATER SERVICES CONTRACT 2014 A as required by the WATER DEPARTMENT as approved by City Council on 12/9/2014 through M&C C-27125 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $705,050.00 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $484,218.05 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $484,218.05 Less Previous Payments: $484,218.05 Final Payment Due $0.00 l t3 as zoi (,p Recom endefd orAcce tan -- - -- p ce Date Asst. Director, TPW - Infrastructure Design and Construction - - - - --=_ Accepted Date Asst, Director, WATER DEPARTMENT Asst. City Manager -- ----- - — Date ---- -- - - -- Comments: P265-541200-601150239883 ®FF1���� RE i® oR CITY SECRErAR MAR 3 2016 " � '' C � ml D RJ (�Sq � � l MAR 2 8 2016 City Project Numbers 02398 DOE Number 7330 Contract Name WATER SERVICES CONTRA lhtn a Estimate Number 17 Contract Limits Payment Number 17 Project Type WATER For Period Ending 8/15/2015 Project Funding Project Manager Underwood City Secretary Contract Number 46291 Inspectors DICKINSON / HORTON Contract Date 12/9/2014 Contractor TEJAS COMMERCIAL CONSTRUCTION Contract Time 365 CD 1613 LAURA ROAD Days Charged to Date 187 CD RIVER OAKS, TX 76114 Contract is .000000 Complete PO # CITY OF FORT WORTH !".iVOICE # SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net ------------ Funded WATER DEPARTMENT ----- Total Cost of Work Completed $484,218.05 ENGINEERING AND FISCAL SERVICES Less %Retained $0.00 Contact Person- Net Earned $484,218.05 I)epar}Tnep4Approval Signature for: Earned This Period $0.00 etainage This Period $0.00 DEPARTMENT CHEC P CK-UP YES Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $484,218.05 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $0.00 Monday,August 24,2015 Page 5 of 5 17 ,(o )— 02393 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WATER SERVICES CONTRACT 2014 A Contract Limits Project Type WATER City Project Numbers 02398 DOE Number 7330 Estimate Number 17 Payment Number 17 For Period Ending 8/15/2015 CD City Secretary Contract Number 46291 Contract Time 36ED Contract Date 12/9/2014 Days Charged to Date 187 Project Manager Underwood Contract is 69.000 Complete Contractor TEJAS COMMERCIAL CONSTRUCTION 1613 LAURA ROAD RIVER OAKS, TX 76114 Inspectors DICKINSON / HORTON Monday,August 24,2015 Page 1 of 5 City Project Numbers 02398 DOE Number 7330 Contract Name WATER SERVICES CONTRACT 2014 A Estimate Number 17 Contract Limits Payment Number 17 Project Type WATER For Period Ending 8/15/2015 Project Funding WATER SERVICES CONTRACT 2014 A Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ----------------------------------------- 1 1 inch Water Service,0'-10'Lengt 15 EA $2,300.00 $34,500.00 22 $50,600.00 2 1 inch Water Service,0'-IO'Lengt 15 EA $2,600.00 $39,000.00 5 $13,000.00 3 1 inch Water Service,0'-10'Lengt 15 EA $2,800.00 $42,000.00 2 $5,600.00 j 4 1 inch Water Service,10.1'-25'Le 15 EA $2,600.00 $39,000.00 4 $10,400.00 5 1 inch Water Service,10.P-25'Le 15 EA $3,700.00 $55,500.00 7 $25,900.00 6 1 inch Water Service,10.1'-25'Le 15 EA $4,000.00 $60,000.00 10 $40,000.00 7 1 inch Water Service,25.P-40'Le 5 EA $4,800.00 $24,000.00 5 $24,000.00 8 1 inch Water Service,25.1'-40'Le 5 EA $5,200.00 $26,000.00 7 $36,400.00 9 1 inch Bored Water Service,25.1'- 1 EA $5,900.00 $5,900.00 3 $17,700.00 IO 1 inch Water Service,40Y-60'Le 5 EA $6,300.00 $31,500.00 2 $12,600.00 11 1 inch Water Service,40.1'-60'Le 5 EA $6,900.00 $34,500.00 1 $6,900.00 12 1 inch Bored Water Service,40.1'- 1 EA $7,500.00 $7,500.00 13 1-1/2 inch Water Service,0'-1 O'L 2 EA $3,100.00 $6,200.00 3 $9,300.00 14 1-1/2 inch Water Service,0'-10'L 2 EA $3,400.00 $6,800.00 15 1-1/2 inch Water Service,0'-10'L 2 EA $3,600.00 $7,200.00 16 1-1/2 inch Water Service,10.1'-25 2 EA $3,500.00 $7,000.00 17 1-1/2 inch Water Service,10.1'-25 2 EA $4,600.00 $9,200.00 18 1-1/2 inch Water Service,10.P-25 2 EA $5,000.00 $10,000.00 2 $10,000.00 19 1-1/2 inch Water Service,25.1'-40 1 EA $5,800.00 $5,800.00 3 $17,400.00 20 1-1/2 inch Water Service,25.1'-40 1 EA $6,300.00 $6,300.00 1 $6,300.00 21 1-1/2 inch Bored Water Service,25.I 1 EA $7,200.00 $7,200.00 22 1-1/2 inch Water Service,40.1'-60 1 EA $7,400.00 $7,400.00 1 $7,400.00 23 1-1/2 inch Water Service,40.1'-60 1 EA $8,000.00 $8,000.00 24 1-1/2 inch Bored Water Service,40.1 1 EA $8,900.00 $8,900.00 25 2 inch Water Service,0'-10'Lengt 2 EA $3,200.00 $6,400.00 7 $22,400.00 26 2 inch Water Service,0'-1 O'Lengt 2 EA $3,500.00 $7,000.00 3 $10,500.00 27 2 inch Water Service,0'-10'Lengt 2 EA $3,800.00 $7,600.00 1 $3,800.00 28 2 inch Water Service,10.P-25'Le 2 EA $4,000.00 $8,000.00 1 $4,000.00 29 2 inch Water Service,10.P-25'Le 2 EA $4,800.00 $9,600.00 4 $19,200.00 30 2 inch Water Service,10.1'-25'Le 2 EA $5,400.00 $10,800.00 3 $16,200.00 31 2 inch Water Service,25.1'-40'Le I EA $6,400.00 $6,400.00 6 $38,400.00 Monday,August 24,2015 Page 2 of 5 City Project Numbers 02398 DOE Number 7330 Contract Name WATER SERVICES CONTRACT 2014 A Estimate Number 17 Contract Limits Payment Number 17 Project Type WATER For Period Ending 8/15/2015 Project Funding 32 2 inch Water Service,25.P-40'Le 1 EA $6,800.00 $6,800.00 33 2 inch Bored Water Service,25.1'- 1 EA $7,600.00 $7,600.00 34 2 inch Water Service,40-l'-60'Le 1 EA $8,100.00 $8,100.00 35 2 inch Water Service,40.1'-60'Le 1 EA $8,700.00 $8,700.00 36 2 inch Bored Water Service,40.1'- 1 EA $9,400.00 $9,400.00 1 $9,400.00 37 Terminate Existing Water Services,3 5 EA $2,400.00 $12,000.00 4 $9,600.00 38 Terminate Existing Water Services,3 5 EA $2,800.00 $14,000.00 2 $5,600.00 39 Terminate Existing Water Services,3 5 EA $3,300.00 $16,500.00 2 $6,600.00 40 Imported Embedment/Backfill CLSM 10 CY $100.00 $1,000.00 41 3 inch Extra Width Asphalt Pavement 250 SY $30.00 $7,500.00 42 Concrete Pavement Repair,Residentia 250 SY $60.00 $15,000.00 159.92 $9,595.20 43 Concrete Pavement Repair,Arterial/ 250 SY $65.00 $16,250.00 17.19 $1,117.35 44 Brick Pavement Repair 15 SY $75.00 $1,125.00 45 6 inch Concrete Curb and Gutter 50 LF $30.00 $1,500.00 84.5 $2,535.00 46 4 inch Concrete Sidewalk 75 SF $7.00 $525.00 201.5 $1,410.50 47 6 inch Concrete Driveway 75 SF $8.00 $600.00 48 Traffic Control,Residential 30 EA $250.00 $7,500.00 66 $16,500.00 49 Traffic Control,Arterial/Industri 10 EA $1,000.00 $10,000.00 7 $7,000.00 50 Traffic Control,Major Arterial/In 10 EA $1,200.00 $12,000.00 51 Street Use Permit 50 EA $75.00 $3,750.00 72 $5,400.00 52 BULLHEAD SETUP IN ADDITION TO 1" 0 EA $365.00 $0.00 4 $1,460.00 SERVICE Sub-Total of Previous Unit $705,050.00 $484,218.05 --------------------------------------- Monday,August 24,2015 Page 3 of 5 City Project Numbers 02398 DOE Number 7330 Contract Name WATER SERVICES CONTRACT 2014 A Estimate Number 17 Contract Limits Payment Number 17 Project Type WATER For Period Ending 8/15/2015 Project Funding Contract Information Summary Original Contract Amount $705,050.00 Change Orders Total Contract Price $705,050.00 Date 9 Total Cost of Work Completed $484,218.05 Contracttoorr�� r Less %Retained $0.00 Net Earned $484,218.05 Date Earned This Period $0.00 Inspection upe "isor / Retainage This Period $0.00 Date 3 14 1a Less Liquidated Damages roject Manager / Days @ /Day $0.00 LessPavement Deficiency $0.00 7�Z-FC=2t r/TPW-Infrure Design and Construction Less Penalty $0.00 Date Z/ Less Previous Payment $484,218.05 Irv—Director/Contracting De ent Plus Material on Hand Less 15% $0.00 Balance Due This Payment $0.00 Monday,August 24,2015 Page 4 of 5 i FORT WORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:17 NAME OF PROJECT: Water Services Contract 2014 A PROJECT NO.: P265-601150239883 CONTRACTOR: Tejas Construction DOE NO.: 7330 PERIOD FROM 08 n 1 15 TO: 08/15/15 FINAL INSPECTION DATE: 31-Jul-15 WORK ORDER EFFECTIVE:1"15,'2015 CONTRACT TIME: 365 O WDO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTHCHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. SA 1' 0 16. 2. SUN 0 t7. 3. UION U 18. 4. TUE (1 19. 5. AA ED u 20. 6. 1-1-IL U 21. -r. I•R l 0 22. 8. SAT 0 23. 9. SIIN (1 24. 10. IVION a 25. 11. TUE n 26. 12. U ED 11 27. 13. I'Hl' 28. 14. 1•R I 0 29. 15. S.A F n 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS PERIOD 0 0 PREV IOL S PERIOD 18; 187 1OTALs 1-10 DATE IS- 187 -RE\MARKS: Project Complete. ga. 02 n `t-dl I j &7. CO\1-R:ACTOR DATE INSPECTJ39, DATE fop > NGINEERING DEPARTMENT'`f % -Che Cur of I•ort Worth• 10(10 Throckmorton Street•Fort Worth,Tl-6012-6311 (81-�39^-'941 •Fas: (817)392--845 FORT WORTH r TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Water Services Contract 2014 A PROJECT NUMBER: 2398 DOE NUMBER: 7330 WATER PIPE LAID SIZE TYPE OF PIPE LF FIRE HYDRANTS: VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: ]" Copper 1,315' 1.5" Copper 260' 2" Copper 660' SEWER PIPE LAID SIZE TYPE OF PIPE LF 1 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 1 i TRANSPORTATION AND PUBLIC WORKS i ORTWFORT g�1REV:02/20/07 =��11-� . x TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Vmne ol'C'onn•actor Project Xame Tejas Commercial Construction,LLC Water Services Contract 2014 A DOE 117a'peelor DOE Number Randy Horton 7330 DOE In Ypector Project Manager Water ❑ Waste Water ❑ Storm Drainage❑ Pavement Chris Underwood Initial C'onlract,-lmount Project Difficulty $705,050.00 O Simple O Routine O Complex Final C'onn-crcl,4mount Date $484,218.05 9/5/2015 11) PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent ELEiNIENT WEIGHT(x) APPLICABLE(Y!N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 I D Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 4 1 20 20 12 Alter flours Response 5 1 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 438 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 438 j 111)CONTRACTOR'S RATING Maximum Score(M S)=448 or sum of applicable element score maximums which= 448 Rating( ITS/MSI x 100%) 438 / 448 = 98% Performance Category Excellent 20%=-Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=F-xcellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector 4Signature Contractor Q } Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS i TRANSPORTATION AND PUBLIC WORKS The Cirir of Fort Worth•1000 Throckmorton Street•Fort Worth,TY 76012-6311 (817)392-7941 •Fax:(817)392-7845 i SURETEC INSURANCE COMPANY OWNER ❑ ARCHITECT ❑ CONSENT OF SURETY CONTRACTOR ❑ TO FINAL PAYMENT SURETY lel OTHER ❑ BOND NO.: 5190014 TO OBLIGEE: (Name and Address) CONTRACT FOR: City of Fort Worth 1000 Throckmorton Fort Worth,TX 76102 City Project No. 02398,DOE No. 7330 PROJECT: CONTRACT DATED: (Name and Address) I Water Service Contract 2014 A I PRINCIPAL:Tejas Commercial Construction,LLC P.O.Box 10395 River Oaks,TX 76114 At the request of the Obligee and the Principal indicated above,(Insert nanre and address of Surety) SureTec Insurance Company 1330 Post Oak Blvd.,Suite 1100 Houston,TX 77056 SURETY, on bond of (Insert name and address of Contractor) Tejas Commercial Construction,LLC P.O.Box 10395 River Oaks,TX 76114 CONTRACTOR, and conditioned on the representation by Obligee that all Contract provisions relating to the payment of final payment under the Contract have been satisfied by Principal as of the date of final payment, and that no claims by Obligee or any third party are known or believed by Obligee or its representatives to exist as of the date of final payment, representations as to the truth and accuracy of the foregoing conditions being deemed to have been made by Obligee in connection with this request for Consent of Surety, hereby approves of the final payment to the Principal,and agrees that final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to (Insert name and address of Obligee) City of Fort Worth 1000 Throckmorton Fort Worth,TX 76102 OBLIGEE, as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: September 9,2015 (Insert in writing the month followed by the numeric date and year) SureTec Insurance Company (Suret�) (Signature �autized epresentative) Attest: Kimberly Morrissette Attomey-in-Fact (Seal): (Printed name and title) SURETEC CONSENT TO FINAL PAYMENT REV. 1.1.2004 i 5190014 SureTec Insurance Company LDUTED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Kimberly Morrissette its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge and deliver any and all bonds,recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Principal: Tejas Commercial Construction, LLC Obligee: City of Fort Worth Amount: S 484,218.05 and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President,any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute,acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved,that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 206 of April, 1999.) In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this 21st day of March,A.D.2013. SURETEC 'OMPANY 5x}RANC�� X 'ok :tom By: John ox , resident State of Texas ss: County of Harris ..•"'.• ` AllueiH0* On this 21st day of March,A.D.2013 before me personally came John Knox Jr.,to me known,who,being by me duly swom,did depose and say,that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he signed his name thereto by like order. JACQUELYN MAIDONADO Notary Public State of Texas " z My Comm.Exp.5/18/2017 acquelyn Maldonado,Notary Public My commission expires May 18,2017 L M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect Given under my hand and the seal of said Company at Houston,Texas this 9th day ofSepte be`r 2015 ,A.D. Brent Beaty,Assistant S cretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pm CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint:You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099.You may also write to the Surety at: SureTec Insurance Company 9737 Great Hills Trail, Suite 320 Austin, Tx 78759 You may contact the Texas Department of Insurance to obtain information on companies,coverage,rights or complaints at 1-800-252- 3439.You may write the Texas Department of Insurance at PO Box 149104 Austin,TX 78714-9104 Fax4:512-490-1007 Web:http://www.tdi.state.tx.us j Email:ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES:Should you have a dispute concerning your premium or about a claim,you should contact the Surety first. If the dispute is not resolved,you may contact the Texas Department of Insurance. ` ---------------------------------------------------------------------------------------------------------------------------- I I I I i Texas Rider 06042014 1 i AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me,the undersigned authority,a notary public in the state and county aforesaid, on this day personally appeared Charles Allen,Vice President Of Tejas Comm. Const.,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; i That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Water Service Contract 2014A No. 46291 I BY Charles Allen Vice President Subscribed and sworn before me on this date f of 5V ,6,015. Notary Public Texas Wary PU44,.%wmi'6 SAV CommiSs,QP Ery, {f 6ctober 03, 2¢1% FT T REV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY t) PROJECT INFORMATION Date 9/5/2015 \'ame q/Comractor I Project Nanre i 'reias Commercial Construction,LLC Water Services Contract 2014 A l ,)OF Ina/terror iProject Alanager Randy Horton iChris Underwood I ___ ----- -- - --»_._-i !)Ol:.\7unbc r Prglr ct Dffcu/h tTvpe of contract l 7330 n Simple O Routine O Complex !0 Water ❑ Waste Water❑ Storm Drainage❑ Pavement Initial Contract:tnrount iFinal Contract i,_onnt 5705,050.00 i$484,218.05 ! 11) PERFORMANCE EVALUATION 0- Inadequate I -Deficient 2-Standard 3-Good 4-Excellent GLI,\I}:NT RATING IELEMENT ' RATING ' (0-4) ° (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector — 1_Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector (— 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 1 4 Display Of Professionalism 4 Accuracy of Plan Quantities I 5 Citizen Complaint Resolution ! % iPROJECT MANAGER EVALUATION 6 Perfor mance-_Setting up Valve Crews Labs I Knowledge And/Or Problem Resolution L( ADMINISTRATION 12 Availability of Project Manager I Change Orderro Pcessinme n g Ti �/ ',3 Communication -- _--- _- -._ 2 Timliness ofContractor Payments i 41 M Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe j �( 111) COMMENTS&SIGNATURES CONIMENTS - __ --— -- —— — - —-— —— _.__,_ —---- i Signature Contractor C Signature DOE Inspector1-5 _ Signature DOE Inspector's Supervisor /7 IN'SPECTOR'S COMMENTS i TRANSPORTATION AND PUBLIC WORKS f The Cit}'of Fort Worth• 1000 Throckmorton Street•Fort`Forth,TZ 76012-6311 (817)392-7941 •Fax: (817)392-7845