HomeMy WebLinkAboutContract 47644 e,V SECRETAW
coNTRAM NO. L�����
Contract No.46-51LF7017
THE STATE OF TEXAS §
THE COUNTY OF TRAVIS §
INTERLOCAL AGREEMENT
THIS CONTRACT is entered into by the Contracting Parties under Government Code, Chapter 791.
I. CONTRACTING PARTIES:
The Texas Department of Transportation TxDOT
City of Fort Worth Local Government
II. PURPOSE: Perform material inspection and testing services.
III. STATEMENT OF SERVICES TO BE PERFORMED: TxDOT will undertake and carry out services
described in Attachment A, Scope of Services.
IV. CONTRACT PAYMENT: The total amount of this contract shall not exceed$ 10,000 and shall conform to
the provisions of Attachment B, Budget. Payments shall be billed monthly.
V. TERM OF CONTRACT: This contract begins when fully executed by both parties and terminates on
8/31/2017 or when otherwise terminated as provided in this Agreement.
VI. LEGAL AUTHORITY:
THE PARTIES certify that the services provided under this contract are services that are properly within the
legal authority of the Contracting Parties.
The governing body, by resolution or ordinance, dated tzzeiw6 r fits, has authorized the Local
Government to obtain the services described in Attachment A.
This contract incorporates the provisions of Attachment A, Scope of Services, Attachment B, Budget,
Attachment C, General Terms and Conditions, Attachment D, Resolution or Ordinance and Attachment E,
Location Map Showing Project.
SIGNATURES ON NEXT PAGE
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH TX
Interlocal—Interlocal—TxDOT Page 1 of 2 Revised 02123/2015
Contract No.46-51LF7017
CITY OF FORT WORTH
By Date
.!esus J. Chapa
Assistant City Manager
APPROVAL]RECOMMENDED": �
By ` GJ. (,✓ Date
Douglas W iersig
Director,TiVhsportation and Public Vorks Department
APPROVED AS TO FORM AND LEGALITY
BY y G S Date $
Dougla'sT4. Black 2- F S- if
Assistant City Attorney
FOR THE STATE OF TEXAS
Executed for the Executive Director and approved for the Texas Transportation Commission for the purpose
and effect of activating and/or carrying out the orders,established policies or work programs heretofore
approved and autjorlzed by the Tex ,Transportation Commission_
By - Date
neth Stewart
Director of Contract Se
�C F 0�1°
Afteded by: 0
V
Mdiy YKajjr, Citypea&q
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
Interlocal—Interlocal TxDOT Page 2 of 2 Revised 02123
Contract No.46-51LF7017
ATTACHMENT A
Scope of Services
The Texas Department of Transportation (TxDOT) agrees to perform material inspection and testing services
as requested by the Local Government, and subject to the terms set forth below. Material inspection and
testing services to be performed by TxDOT consists of the following:
• Various inspected materials fabricated off-site (structural steel bridge components, pre-cast concrete
stressed/non-stressed products,and miscellaneous fabricated products).
• Other materials inspection and testing as agreed upon in writing by TxDOT and the Local Government.
Inspections will be performed in compliance with the specifications and instructions supplied by the Local
Government and are subject to the terms and conditions described below. Written inspection or test reports
will be provided to the Local Government in accordance with TxDOT's existing policies as inspection and
testing services are performed by TxDOT.
Prior to the commencement of material inspection and testing services, the Local Government shall provide
TxDOT with a single point of contact for this scope of services. TxDOT will direct all invoices, test reports,
questions and other issues to this point of contact. The Local Government shall provide an email address to
which invoices will be sent. The Local Government shall provide written notification of a change to the point of
contact
INSPECTED MATERIALS
The Local Government will provide TxDOT a list of the materials requiring inspection. Estimated quantities of
each material will also be provided. The types of products and the extent of the inspections will be as agreed
upon prior to commencement of any inspections. The level of inspection and documentation furnished for
Local Government inspections will be as provided for typical TxDOT projects.
TxDOT will only perform inspection services for the Local Government at structural steel fabrication plants,
commercial precast prestressed and non-stressed concrete products plants, and other miscellaneous
fabrication plants where TxDOT routinely provides such inspection and testing services for its own highway
materials or for others. Out-of-state inspections for Local Government will be performers only when TxDOT has
employees scheduled to conduct inspections for TxDOT projects at the requested locations, unless agreed
upon otherwise. All out-of-state inspections will require reimbursement of the additional costs for travel
(airfare, lodging, per diem, vehicle rentals, and other miscellaneous costs). Reimbursement will be requested
through invoices from TxDOT.
TxDOT reserves the right to prioritize or reschedule any inspection and testing services according to the
following:
• Inspection and testing services may be cancelled or deferred due to unavailability of TxDOT personnel
to perform the necessary inspection
• Inspections for the Local Government will be given lower priority than inspections performed by TxDOT
for TxDOT projects
• Inspections for the Local Government may be rescheduled to coincide with the inspection of products
for TxDOT projects.
The Local Government and its fabricators will abide by the Nonconformance Report(NCR) process utilized by
TxDOT for disposition of products that do not meet the requirements of the Local Government's specifications
provided.
Interlocal—interlocal TxDOT Page 1 of 2 Attachment A
Contract No.46-51LF7017
WORK REQUESTS
A minimum of two(2)weeks prior to TxDOT performing any inspections, the Local Government will submit
Work Requests to TxDOT. Submit one Work Request per Fabricator and include the following:
• Project information(i.e. contract number, CSJ,etc.)
• Work description
• Type and estimated quantity of material(s)to be inspected
• Fabricator information(Name,contact person, phone number,physical location)
• Desired date of inspection
• Name,title,signature, and telephone number of the Local Government's authorized representative.
• Specification Item or Special Specification to be used for inspection
• List of the Local Government's amendments to Specification Item
• Local Governments Special Specifications
• Complete set of necessary design drawings, material specifications, and shop drawing files in Adobe
.pdf format to perform inspection of the material.
Incomplete Work Requests will not be accepted. E-mail completed Work Requests, with attachments, as an
Adobe .pdf format to GST—Structuralcorrespandence@bcdot.gov and include "Work Request" in the subject
line.
TEST REPORTS
TxDOT will send test reports and pertinent information to the Local Government's designated point of contact
for services performed as attachments to invoices for services.
Interlocal-Interlocal—TxDOT Page 2 of 2 Attachment A
Contract No.46-51LF7017
ATTACHMENT B
Budget
Texas Department of Transportation Inspection&Testing Rates
TxDOT will only perform inspection and testing services outlined in Attachment A.
Charges will be based on rates in effect at the time inspection and testing services are performed.
Current Inspection and Testing Rates are published at:
http://fto.dot.state.tx.us/12ubbdot-info/cstlnsaection testina.odf
Invoices will be sent to the Local Government on a weekly basis.Payments are due within 30 days of date of
invoice and will be mailed to the following address:
Texas Department of Transportation
P. O. Box 149001
Austin,Texas 78714-9001
Interlocal-Interlocal TxDOT Page 1 of 1 Attachment B
Contract No.46-51LF7017
ATTACHMENT C
General Terms and Conditions
Article 1. Amendments
This contract may only be amended by written agreement executed by both parties before the
contract is terminated.
Article 2. Conflicts Between Agreements
If the terms of this contract conflict with the terms of any other contract between the parties, the most
recent contract shall prevail.
Article 3. Disputes
TxDOT shall be responsible for the settlement of all contractual and administrative issues arising out
of procurements entered in support of contract services.
Article 4. Ownership of Equipment
Except to the extent that a specific provision of this contract states to the contrary, ail equipment
purchased by TxDOT under this contract shall be owned by TxDOT.
Article 5. Termination
This contract terminates at the end of the contract term, when all services and obligations contained
in this contract have been satisfactorily completed, by mutual written agreement, or 30 days after
either party gives notice to the other party, whichever occurs first.
Article 6. Gratuities
Any person who is doing business with or who reasonably speaking may do business with TxDOT
under this contract may not make any offer of benefits, gifts, or favors to employees of TxDOT. The
only exceptions allowed are ordinary business lunches and items that have received the advanced
written approval of the Executive Director of the Texas Department of Transportation.
Article 7. Responsibilities of the Parties
Each party acknowledges that it is not an agent, servant, or employee of the other party. Each party
is responsible for its own acts and deeds and for those of its agents, servants, or employees.
Article 8. Compliance with Laws
The parties shall comply with all federal, state, and local laws, statutes, ordinances, rules, and
regulations and with the orders and decrees of any courts or administrative bodies or tribunals in any
manner affecting the performance of this agreement.
Article 9. State Auditor's Provision
The state auditor may conduct an audit or investigation of any entity receiving funds from TxDOT
directly under the contract or indirectly through a subcontract under the contract. Acceptance of
funds directly under the contract or indirectly through a subcontract under this contract acts as
acceptance of the authority of the state auditor, under the direction of the legislative audit committee,
to conduct an audit or investigation in connection with those funds. An entity that is the subject of an
audit or investigation must provide the state auditor with access to any information the state auditor
considers relevant to the investigation or audit.
Interlocal—Interlocal TxDOT Page 1 of 2 Attachment C
Contract No.46-51LF7017
Article 10. Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this agreement on
behalf of the entity represented.
Article 11. Notices
All notices to either party shall be delivered personally or sent by certified U.S. mail, postage prepaid,
addressed to that party at the following address:
Local Government: City of Fort Worth Transportation and Public Works Department
Attention: Project Manager—Dirks, Project Support Division
100 Throckmorton Street
Fort WorthTX 76102
TxDOT: Texas Department of Transportation
Attention: Director, Contract Services
125 East 11 m Street
Austin, TX 78701-2483
All notices shall be deemed given on the date delivered in person or deposited in the mail. Either
party may change the above address by sending written notice of the change to the other party.
Either party may request in writing that notices shall be delivered personally or by certified U.S. mail,
and that request shall be carried out by the other party.
Interlocal—interlocal TxDOT Page 2 of 2 Attachment C
A Resolution
NO. 4557-12-2015
AUTHORIZING THE EXECUTION OF AN INTERLOCAL AGREEMENT
WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN THE TOTAL
AMOUNT OF $10,000.00 FOR MATERIALS TESTING AND INSPECTION
SERVICES TO BE PROVIDED BY THE STATE
WHEREAS, the City of Fort Worth ("City") entered into a Local Project Advance
Funding Agreement (City Secretary No. 43466) with the Texas Department of Transportation
("State") to provide funding for construction of the Dirks Road Phase 2 Project (City Project
Number 00768); and
WHEREAS, the terms of the said funding require inspections and testing of various off-
site fabricated materials by the State to insure the quality of materials and workmanship
incorporated into the construction of Dirks Road Phase 2; and
WHEREAS, the State desires that the City provide compensation for inspection oversight
for said materials through the Interlocal Agreement recommended herein; and
WHEREAS, the State and City intend for this agreement to be for one year, in the amount
of$10,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY ^F FORT WORTH, TEXAS:
The City Manager or his designee is authorized to execute an Interlocal Agreement with
the Texas Department of Transportation in the total amount of $10,000.00 for the purpose of
funding State inspections of off-site fabricated materials (Structural steel bridge components,
pre-cast concrete stressed and non-stressed products) related to the Dirks Road / Altamesa
Boulevard Phase II Project.
Adopted this 160- day of December, 2015.
�,00-a�a�gn
.o" FORT >2�
ATTEST: p� p,0�Q0Obp°0� d
d�
By: �v0 00
°°
Mary "ays ity Secretary aa °°°O°c°o°�°°� *a
aannaX
oRTWORT
MAYOR AND COUNCIL COMMUNICATION MAP
ALTAIWESA BOULEVARD PHASE 2 CONSTRUCTION SERVICES
LCX V1, 3
Aw/Ziot� E4'! �-I—
E EDE$
J" OVERTO
"
Ix
r
a
LT&
OAKMONT
1-4
>
LA� A
MESA(
J
_J ,nm
9 ay,
Senbrook J,
Lakb
X
-)11
r
4?cp
N
71,-it
z= 4000
DETAIL OF PROJECT CATIO
"Owls aviel-lian com"kam.kw*,
TAsprodu Is =0 May sol bave been p,spwedfarer be wilmWe hwigp% ,Qke,*a w*ur"ykvpp"", City Project#00768
NdeeenWnprwntenonaha-piouMsuaveyaaduThe DOE# 6793
M&C Review Page 1 of 4
Official site of the City of Fort W�onhh,,Texas
CITY COUNCIL AGENDA r �
Rni
COUNCIL ACTION: Approved on 12/15/2015 -Ordinance No. 22012-12-2015, 22013-12-2015 &
Resolution No. 4557-12-2015
DATE: 12/15/2015 REFERENCE C-27570 LOG NAME: 20ALTAMESA PHASE 2
NO.: PROJECT AMENDMENTS
CODE: C TYPE: NOW PUBLIC NO
CONSENT HEARING:
SUBJECT: Adopt Resolution Authorizing an Interlocal Agreement with the Texas Department of
Transportation in the Amount of$10,000.00 to Provide Material Inspection and Testing
Services Related to the Construction of Altamesa Boulevard f/k/a Dirks Road from
Granbury Road to the Chisholm Trail Parkway,Altamesa Boulevard Phase 2, Authorize
Execution of Change Order No. 4 to City Secretary Contract No. 45378 with Austin
Bridge & Road, LP, for Construction of Altamesa Boulevard Phase 2 in the Amount of
$181,000.60 for Additional Work Related to the Fort Worth and Western Railroad Bridge,
Authorize Settlement of Claims in the Amount of$690,443.36 with Austin Bridge& Road,
LP, and Authorize Execution of Release Agreement, Adopt Ordinance Allocating
$3,350,000.00 of Impact Fee Funds to the Altamesa Boulevard Phase 2 Project, Thereby
Increasing the Total Project Cost to$27,317,082.74 and Adopt Appropriation Ordinance,
Project No. C00768 (COUNCIL DISTRICT 6)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Transportation Impact Fund in the amount of$3,350,000.00;
2. Authorize the transfer of funds in the amount of$3,350,000.00 ($1,400,000.00 from Unspecified Service
Area Wand $1,950,000.00 from Unspecified Service Area Y)to the Alta Mesa Boulevard Phase 2 Project
in the Transportation Impact Fund and adopt the attached ordinance increasing appropriations in the Alta
Mesa Boulevard Phase 2 Project of the Transportation Impact Fund in the amount of$3,350,000.00 for the
construction of Alta Mesa Boulevard Phase 2 Project and decreasing fund balance in the Unspecified
Centers of the Fund by the same amounts;
3. Adopt the attached resolution authorizing the execution of an Interlocal Agreement with the Texas
Department of Transportation in the amount of$10,000.00 to provide materials inspection and testing
services for various structural elements fabricated off-site for the construction of Altamesa Boulevard Phase
2;
4. Authorize the execution of Change Order No. 4 to City Secretary Contract No. 45378, with Austin Bridge
& Road, LP, in the amount of$181,000.60 for the Altamesa Boulevard Phase 2 Project, thereby increasing
the contract amount to $11,407,506.76; and
5. Authorize the settlement of claims related to delays as settled at mediation between the City of Fort
Worth and Austin Bridge &Road, LP, in the amount of$690,443.36 and authorize the execution of
Releases and Agreements necessary to complete the settlement.
DISCUSSION:
This project provides for the construction of Altamesa Boulevard Phase 2, as a six-lane divided principal
arterial under two separate phases. Phase 1 was completed in 2007 and extended from Bryant Irvin Road
to Chisholm Trail Parkway (SH 121). Phase 2 is currently under construction and extends from Chisholm
Trail Parkway (SH 121)to Granbury Road. Phase 2 includes a new railroad bridge structure, retaining wall,
sidewalk, water main adjustments, traffic signal modifications and street lights.
http://apps.cfwnet.org/council_packet/mc review.asp?ID=21773&councildate=12/15/2015 4/4/2016
M&C Review Page 2 of 4
Material Testing: On October 22, 2013, M&C C-26513 authorized an Interlocal Agreement with Texas
Department of Transportation (TxDOT) in the amount of$5,004.00 for inspections and testing required to
insure the quality of materials and workmanship incorporated into the construction of the project. The
subject Interlocal Agreement provides additional inspections and testing associated with Phase 2, including
the cost for staff from the Construction Division of the TxDOT to provide services for various structural
elements fabricated off-site (i.e., structural steel bridge components, pre-cast concrete stressed/non-
stressed products and miscellaneous fabricated products).
Change Order: The subject change order is necessary to replace existing FWWRR Rail and Railroad
TIES within the work zone to accommodate replacement of the existing bridge. In addition, elevated levels
of arsenic, lead and selenium were detected within the railroad right-of-way during construction, which
required additional testing as requested by Texas Commission on Environmental Quality (TCEQ).
Groundwater and Contaminated Soils: Two primary issues occurred during the early stages of
construction which resulted in significant delays for the construction contractor. Unusually high
groundwater levels were encountered during excavation for the bridge components resulting in a project
delay while the City and its Engineer formulated revised groundwater management strategies which the
contractor then implemented. Contaminated soils were also encountered within the construction site, which
required suspension of certain work tasks to allow time to test, analyze and prepare a response
plan. These items compromised the project critical path and eventually prevented the contractor from
continuing construction of the bridge structure. The City and Contractor engaged in a mediation process to
arrive at a settlement for the expenses associated with these unanticipated delays. A Mediation Agreement
was reached to settle the claim for$690,443.36 subject to City Council approval. This settlement will add
165 days to the contract completion date.
Appropriation of Impact Fees: The attached ordinances will provide $3,350,000.00 of impact fees
associated with capacity improvements for this project or approximately 12 percent of the total project
costs. M&C C-26676 which awarded the construction contract for Phase 2, indicated that impact fees will
be necessary to provide full project funding and that Staff will seek City Council approval for this additional
funding prior to final completion of the project. This additional funding is necessary to cover Phase 2
change orders, FWWRR charges, final utility relocations, project management and contingencies and other
project costs as outlined in the following table. This funding is not being used for the mediated settlement.
The construction start date for Phase 2 was April 2014 and the anticipated completion date is now June
2016.
The total project budget for Altamesa Boulevard Phase 1 and 2 is shown below:
DESIGN - PHASE 1 and 2 AMOUNT
Design Contract $ 2,096,726.00
Project Management, Design Coordination $ 1,160,480.00
TxDOT Design Review $ 83,492.00
FWWR Right-of-Way Agreement $ 3,500,000.00
Right-of-Way and Easement Acquisition $ 850,054.00
Coordination
DESIGN PHASE BUDGET $ 7,690,752.00
CONSTRUCTION AMOUNT
Construction Contract-Phase 1 $ 2,948,026.66
Construction Contract-Phase 2 $10,742,244.51
Change Order No. 1 (M&C C-27227 3.17.15) $ 404,044.61
Change Order No. 2 Administrative 6.17.15 $ 48,699.04
Change Order No. 3 Administrative 9.22.15 $ 31,518.00
http://apps.cfwnet.org/council_packet/mc review.asp?ID=21773&councildate=12/15/2015 4/4/2016
M&C Review Page 3 of 4
Change Order No. 4 (Pending) $ 181,000.60
TxDOT Construction Oversight $ 97,635.00
TxDOT Material Inspection -1St Interlocal $ 5,004.00
Agreement(City Secretary Contract No.
45333
TxDOT Material Inspecton -2nd Interlocal $ 10,000.00
Agreement (Pending)
Time Impact Analysis Settlement with ABR $ 690,443.36
FWWR Construction Services Reimbursement $ 269,831.00
FWWR Additional Construction Services $ 250,000.00
Reimbursement (Pending)
Time Impact Analysis for Utility Relocations $ 450,000.00
(Pending)
Utility Relocation Costs $ 158,804.32
Inspection, Survey, Material Testing, Project $ 3,339,079.64
Management, Contingencies
TOTAL CONSTRUCTION BUDGET $19,626,330.74
TOTAL PROJECT BUDGET $27,317,082.74
The funding sources for the project are as follows:
PROJECT FUNDING SOURCE AMOUNT
TxDOT, LPAFA, Phase 2 $
6,509,000.00
Tarrant County, Phase 1 $2,007,444.42
City Funding, 2007 CO (39001) 14,952,193.32
City Funding, 1998 Bond $498,445.00
(39409)
Requested Impact Fee Funding, 1,400,000.00
Service Area W
Requested Impact Fee Funding, 1,950,000.00
Service Area Y
TOTAL PROJECT FUNDING $27,317,082.74
MIWBE OFFICE -Austin Bridge & Road, LP, is in compliance with the City's DBE Program by committing to
an additional 10 percent DBE participation on Change Order No. 4. The City's DBE goal on this change
order or extra work is 10 percent.
Authorizations provided with this Mayor and Council Communication will result in no additional annual
operating impacts to the Transportation and Public Works Department's operating budget beyond those
previously identified.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations,
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated in this action,within the 2007 Critical Capital Fund and the Impact Fee Fund.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
2 39008 0200431 4413001 C00768 CO2383 $3,350,000.00
2 39008 0200431 5740010 C00768 CO2383 $3,350,000.0
http://apps.cfwnet.org/council_packet/mc review.asp?ID=21773&councildate=12/15/2015 4/4/2016
M&C Review Page 4 of 4
1 390081 0060419 1 4413001 1 UN9925 I I UN2300 I 1 1 $1,400,000.00
1 39008 0060419 5740010 UN9925 UN2300 $1,400,000.00
1 39008 0060419 4413001 UN9927 UN2300 $1,950,000.00
1 39008 0060419 5740010 UN9927 UN2300 $1,950,000.00
FROM
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
3 39001 0200431 5740010 C00768 CO2383 $10,000.00
4 39001 0200431 5740010 C00768 CO2383 $181,000.60
5 39001 1 0200431 5740010 C00768 CO2383 $690,443.36
2 39008 0060419 4413001 UN9925 UN2300 $1,400,000.00
2) 390081 0060419 5740010 UN9925 UN2300 ($1,400,000.00)
39008 0060419 4413001 UN9927 UN2300 $1,950,000.00
2 390081 0060419 5740010 UN9927 UN2300 $1950,000.00
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Douglas Wiersig (6157)
Additional Information Contact: Leon Wilson (8883)
ATTACHMENTS
20ALTAMESA PHASE 2 PROJECT AMENDMENTS A016 39008 REC 1(Rev).docx
20ALTAMESA PHASE 2 PROJECT REC 2 AO(Rev12.08.15).docx
ALTAMESA BLD PH-2 MAP.pdf
Resolution TXDOT ILA Materials Testing Services (Rev12.07.15).doc
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=21773&councildate=l2/15/2015 4/4/2016