HomeMy WebLinkAboutContract 46606-CO3 FORT WURTH City of Fort Worth CITY SECRETARY
Change Order Request CONTRACT W. (D(&
Project Namel Northside II 48-inch Phase I,Part 2 1 City Sec No. 46606
Project No.(s) P266-702140208283 and P266-602140208283 7068 1 City Proj.No. 2082
Project Description: Northside II 48-Inch Water Main,Phase I,Part 2 from Old Denton Road to Heritage Trace Parkway.
Contractor: Oscar Renda Contracting, Inc. Date: 3/24/2016
City Project Mgr.1 Roberto C. Sauceda —J Raymond Brice
Phone Number:1 817-392-2387 817-223-2269
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $10,109,900.00 $336,310.00 $10,446,210.00 260
Extras to Date $175,910.82 $175,910.82 60
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $10,285,810.82 $336,310.00 $10,622,120.82 320
Amount of Proposed Change Order $49,502.81 $49,502.81 030
Revised Contract Amount $10,335,313,63 $336,310.00 $10,671,623.63 350
Original Funds Available for Change Orders $303,300.00 $16,820.00 $320,120.00
Remaining Funds Available for this CO $127,389.18 $16,820.00 $144,209.18
Additional Funding(if necessary)
ANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.16%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $13,057,762.50
Due to the direct conflict with a previMlsly unknown gas inain and AT A' fiber optic cable: it was
necessary to construct a temporary road to maintain traffic and to connect a project 36-inch water
main to an existing 48-inch water main.
'}�' , cli
f.
0
Staff c curs with the contractor's request for 30 additional calendar days on the cl7a eye
OFFICIAL RECORD
CITY SECRETA
SECRETARY .�C ►
FT. WORTH,TX
It is understood and agreed that e a tame of this Change Order by the qKrarto rr s an accord and satisfaction and represents
payment in full(both time and money)for all costs arising out of,ornciden to,the v Chan Order.
ar!Renda,;9TATadng,Inc. Rudy V.Renda
034 5-116 f to
ate ci �uciw�n uorvispr �6' ter Drjpt I pate
T s. 3 3 .0 Il 3 �r
DWI
M&C Number N/A M&C Date ApproveE AIA
1e I
FORT WURTH City of Fort Worth
Change Order Additions
Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606
Project No.(s) P266-702140208283 and P266-602140208283 DOE No.= City Proj. No. 2082
Project Northside II 48-Inch Water Main,Phase I,Part 2 from Ofd Denton Road to Heritage Trace Parkway.
Description
Contractor Oscar Renda Contracting, Inc. Change Order: 0 Date: 3/24/2016
City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice
ADDITIUNS
ITEM DIESCUTION DIEPT Unit Unk 06A Total
10 1 Remove Asphalt Pvmt Water 443.00 SY $2.00 $886.00
12 10'Wide Asphalt Pvmt Repair, Residential Water 443.00 SY $40.00 $17,720.00
16 Conc Pvmt Repair,Arterial/Industrial Water 9.00 SY $45.00 $405.00
18 6"Flexible Base,Type A, GR-1 Water 443.00 SY $10.00 $4,430.00
48 Traffic Control Water 1.00 LS $1,000.00 $1,000.00
56 Asphalt Curb and Gutter Water 245.00 LF $25.00 $6,125.00
57 Temporary Stripping Water 1.00 LS $700.00 $700.00
58 Temporary HMAC Road Water 1.00 LS $18,236.81 $18,236.81
Water $49,502.81
Sewer
Page 2 of 4 Additions Sub Total 1$49,502.81
FO?RT WORTH City of Fort Worth
W so- Change Order Deletions
Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606
Project No.(s) P266-702140208283 and P266-602140208283 DOE No. 7068 City Proj.No. 2082
Project Description Northside II 48-Inch Water Main, Phase 1,Part 2 from Old Denton Road to Heritage Trace Parkway.
Contractor Oscar Renda Contracting, Inc. Change Order: EEDate 3124/2016
City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Sewer
Page 3 of 4 Deletions Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4