Loading...
HomeMy WebLinkAboutContract 46606-CO3 FORT WURTH City of Fort Worth CITY SECRETARY Change Order Request CONTRACT W. (D(& Project Namel Northside II 48-inch Phase I,Part 2 1 City Sec No. 46606 Project No.(s) P266-702140208283 and P266-602140208283 7068 1 City Proj.No. 2082 Project Description: Northside II 48-Inch Water Main,Phase I,Part 2 from Old Denton Road to Heritage Trace Parkway. Contractor: Oscar Renda Contracting, Inc. Date: 3/24/2016 City Project Mgr.1 Roberto C. Sauceda —J Raymond Brice Phone Number:1 817-392-2387 817-223-2269 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $10,109,900.00 $336,310.00 $10,446,210.00 260 Extras to Date $175,910.82 $175,910.82 60 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $10,285,810.82 $336,310.00 $10,622,120.82 320 Amount of Proposed Change Order $49,502.81 $49,502.81 030 Revised Contract Amount $10,335,313,63 $336,310.00 $10,671,623.63 350 Original Funds Available for Change Orders $303,300.00 $16,820.00 $320,120.00 Remaining Funds Available for this CO $127,389.18 $16,820.00 $144,209.18 Additional Funding(if necessary) ANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.16% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $13,057,762.50 Due to the direct conflict with a previMlsly unknown gas inain and AT A' fiber optic cable: it was necessary to construct a temporary road to maintain traffic and to connect a project 36-inch water main to an existing 48-inch water main. '}�' , cli f. 0 Staff c curs with the contractor's request for 30 additional calendar days on the cl7a eye OFFICIAL RECORD CITY SECRETA SECRETARY .�C ► FT. WORTH,TX It is understood and agreed that e a tame of this Change Order by the qKrarto rr s an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,ornciden to,the v Chan Order. ar!Renda,;9TATadng,Inc. Rudy V.Renda 034 5-116 f to ate ci �uciw�n uorvispr �6' ter Drjpt I pate T s. 3 3 .0 Il 3 �r DWI M&C Number N/A M&C Date ApproveE AIA 1e I FORT WURTH City of Fort Worth Change Order Additions Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606 Project No.(s) P266-702140208283 and P266-602140208283 DOE No.= City Proj. No. 2082 Project Northside II 48-Inch Water Main,Phase I,Part 2 from Ofd Denton Road to Heritage Trace Parkway. Description Contractor Oscar Renda Contracting, Inc. Change Order: 0 Date: 3/24/2016 City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice ADDITIUNS ITEM DIESCUTION DIEPT Unit Unk 06A Total 10 1 Remove Asphalt Pvmt Water 443.00 SY $2.00 $886.00 12 10'Wide Asphalt Pvmt Repair, Residential Water 443.00 SY $40.00 $17,720.00 16 Conc Pvmt Repair,Arterial/Industrial Water 9.00 SY $45.00 $405.00 18 6"Flexible Base,Type A, GR-1 Water 443.00 SY $10.00 $4,430.00 48 Traffic Control Water 1.00 LS $1,000.00 $1,000.00 56 Asphalt Curb and Gutter Water 245.00 LF $25.00 $6,125.00 57 Temporary Stripping Water 1.00 LS $700.00 $700.00 58 Temporary HMAC Road Water 1.00 LS $18,236.81 $18,236.81 Water $49,502.81 Sewer Page 2 of 4 Additions Sub Total 1$49,502.81 FO?RT WORTH City of Fort Worth W so- Change Order Deletions Project Name Northside II 48-inch Phase I,Part 2 City Sec No. 46606 Project No.(s) P266-702140208283 and P266-602140208283 DOE No. 7068 City Proj.No. 2082 Project Description Northside II 48-Inch Water Main, Phase 1,Part 2 from Old Denton Road to Heritage Trace Parkway. Contractor Oscar Renda Contracting, Inc. Change Order: EEDate 3124/2016 City Project Mgr. Roberto C.Sauceda City Inspector Raymond Brice DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Page 3 of 4 Deletions Sub Total M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4