HomeMy WebLinkAboutContract 46784-CO1 CITY SECRETAW,
CONTRACT NO.
FORT WORTH City of Fort Worth
1� Change Order Request Breakdown
Project Namel Forest Park Improvements City Sec# 1 46784
Client Project#(s)l CO2088(DOE 7410)
Contractorl Northstar Construction,LLC I PM Bryan Lyness,RLA Inspectorl Randy Horton
Change Order Submittal# Date 1/25/2016
Dept. PARD Contract Time
Totals (CD)
Original Contract Amount $972,962.00 $972,962.00 120
Extras to Date $0.00
Credits to Date $0.00
Pending Change Orders(in M&C Process) $0.00
Contract Cost to Date $972,962.00 $972,962.00 120
Amount of Proposed Change Order $52,446.42 $52,446.42 80
Revised Contract Amount $1,025,408.42 $1,025,408.42 200
Original Funds Available for Change Orders $53,452.27 $53,452.27
Remaining Funds Available for this CO $53,452.27 $53,452.27
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5,39%
MAXALLOWABLECONTRACTAMOUNT(ORIGINAL CONTRACTCOST+25%) $1,216,202.50
MI[��—
IC11t
The change of,and addition of, pavement and/or drainage improvements noted as necessary during the course of construction.Included is the
construction of pavement and electrical improvements at Log Cabin Village(which is located within Forest Park).
234ss
N� ECEIVED �o
PR-5 2016
WORTH
EfARY �a
Maty J. e , City Secrt~tary
�tiez �
or,
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
•1 ii: 1• 1
- .�MEEL:$x,:1:1:1I,11I1:1]MEWIN I`I •1'1
ITP,f119 MEW' •Y:fl • .1'l
-�- .,i^+ lR. ••-1��i1C111:lil:laI11�'' .�..PI . 4.1'1
:': �MMM NONE 1:C,1:IDI1:1]MEW—001211..11moon+ 'fl fl
�l'V Flaxillia
` ■'. •����11."11,;(la:,JU:,IPII_'a �,-, :ll PI
�� •� � � .�, ••�i��x>!:x_(1at,ll:e� � r,�iEir�ul,ur�
jL2=Zw_skucr&_pVaYS_pe_ed Bump
�MMMiL222,I1:11MEW' t lY11'l
• i��b!(,a8YaU2I0�y' + f1 1 .f1
' -----
�MMM NOONfl'1'fI'1,1 MEWIM :•1 fl :.1 P,
l�Wti- :1'1'1'1,•111 MMW' y. fl moons&,""
�� �i�il,hY:C1AAI11�� .: •rl .: •r1
—i11loNaCnGria-FPa ma-y-SiT?^1lxlndPe stri-an.idpeFn3FiiF- -----
� �MMMM••[la:caal: MMUHNMNIME ;l��il SN111
�1 �MMMikYB,:I',I",IM'LHIM INEWAII1] 1 Y
1 e �•l SI iF17:17�'7t13F11FS 1rmrrr.e171f nTTiiia—• MiLgrf fl I IlI1� .4,1�}wv1e1.1,I11
�1 S� 'INIMMU'a:Pllf1 r,ME r'MMU.W,fl •Ifl
1Type 4,2 Ba-m—er Free Ramp 'iLI A11IC, MEWIM lfl ,P,
�MMMWI NOWNEMMIR1=1
Sm. -iMEN ME=cl:ala:PuMyNE�MMM N 0 0 1 LiBxlxafil
rY311YNIYWi 1'1.1•I'l 1 PI ':1 1'1 {..1 I'1
010
0E• i�
N0=jQLM-PEAW79 m�MMM MIMEMAll"ll"r,"MEWIN ELMS,"ll,EMER26%Uri,
��•. . . .'i[QgCQ1AIl:11�� 1 f1mmmu=lfl
farr 4-South Forest Onve and Rogers Road ParkingGoff#l)
:f,. �MMMMMMU a.+.1Ur,lNOy_ I r, A. 1 l r1
--�--
MMMMMl__ —Forest Park-Log Cabin lribpe -----
�S� -n. • ��i�1:1:1:1aI1:1I1]� '. ,•'PI 11 1••1'1 1'1
NOON
-��, �.�i�1:1:111:1A:Q11� ' ••,11 , "1 I.1
----
ti117fSF.1I_GGr1'���i69#•R5[YJ
Fq1MTVAMH City of Fort worth
Change Order Deletions
Project Name I Forest Park Improvements City Sec# 46784
Client Project# I CO2088 7410
North-W Coro& .,LLC PMJ Bryan Lyness,RLA Inspector Randy Horton
Change Order Submittal# O Data 1/25/2016
DELEHUNS
ITEM DESCRIP11ON DEPT QtY Unit Unit Total
Uolonial Parkway Reconstruction
exr a e, ype 5.
Colonial Parkway Vehicular Bridge Reconstruction
emove spose ewa
Remove0spose EX.Concrete&GroutedRip Rap
Conc.Pavement PARD 44.00000000 SY $58.00 $7,552.UU
Flexible e,Type A,
nsta esonnect
ume wiBaffle Block
Concrete Pip Rap
Colonial Parkway Parking Lot
7 psi Concrete avementSY PARD 260.00000000 $42.00 $10,920.00
Colonial Parkway Parking Lot
Parking Lot Subgrade PreFrWn
psi Concrete Pavement
South orest Drive and Rogers Road Parking Lot
1.14-1 Remove/Dispose Ex.Asphaltep
Remove/Dispose Ex.Concrete Curb&Gutter PNM-74T.MOMM
Remove/Dispose Ex.Conrete Pavement
emov age Ex.Post (;able
Remove/Dispose Ex.Gate 5
Subgrads Preparation
psi Concrete Pavement1,055.00000000 $42.00 $44,3113,00
1.14-10 Connect to Ex.Asphalt Pavement
Adjust SSMH Rim
lust SDMH Rim
Re "MM ate
Grading-Unclassified Excavation
Grading-Haul
PARD 99,788.00
Sub o elebons
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Chan a Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
City of Fort Worth
Departmental Request for Waiver
Of MBE/SBE Subcontracting/Supplier Goal
Park OW RWM&m(PARO) $52.446.42 012512016
DEPARTMENT NAME: ESTIMATED COST / PROPOSAL DATE
Forest Park Improvements 74101 002088
NAME OFqx%OJECT/BID: DOE/PROJECT NO.
<VA 5781 03/032016
1110NAT / 11CT MANAGER EXTENSION DATE NIGP CODE
age—
.----entent. the eontractinghnanaging department shall determine whether the bid/proposal is one which MBFJSBE
requirerneats should not be applied. MBE/SBE requirements may be waived upon written approval of the M/WBE Manager. If one
of the conditions listed below exists,the eontracting/mansging department shaft notify the Manager vis this form,stating the specific
reason(s)for requesting a waiver.
If the contracting/managing department and the Manager are in conflict over the granting of a waiver,either
may appeal to the City Manager,or designee, and hie/her decision is final.
Please Check Applicable Reason:
A. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office,in accordance with the M/WBE or BDE
Ordinance,because the public or administrative emergency exists which requires the goods or
services to be provided with unusual immediacy;or
B. MWBE Office: A waiver of the goal for MBE/SBE subcontr ting requirements was requested
by the Department and approved by the MWBE Office,in accordance with the M/WBE or SDE
Ordinsnee, because the purchase of goods or services from source(s)where subcontracting or
supplier opportunities are negligible;or
C. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office,in accordance with the M/WBE or BDE
Ordinance, because the application of the provisions of this ordinance will impose an economic
risk on the City or unduly delay acquisition of the goods or services; or
D. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office,in accordance with the M/WBE or BDE
Ordirisnce, because the MWBE Waiver is solicited based on the sole source information
provided to the MWBE Office by the managing department's project manager.
Justify►Commodity or Service Waiver Request:
The dww wdar to the contract reduced tiro amimt of MBE partfdpatlon odpba8y oomm tted to by the contractor.
There was no other reglatemd MBE participant used on the pro)sct.The project did not require anoUnr participant the contradw was unable to
runt WE participation winn Ura dwas order.
Please uae additional sheers,if needed
M/W P9 OFFICE USE ONLY: 1+U
Approved Si ature�of M/WBE Authorize raoranel Date
Not Approved Signature of M/WBE Authorized Personnel Date
aft.1:0.17
CFW Change Order Approval Pa-COApp01 Page 2 of 3
FORT WORTH,, city of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: COI
Change Order No.: Pa - COApp01 Date Started: 2/9/2016 _a
City Sec. No.: 46784 Date Due: 2/20/2016
Project Name: 02088 - Forest Park Improvements
02088 DOE Numbers:
Project Numbers:
7410
Project pavement rehabilitation and installation within Forest Park
Description:
City Project Mgr.: Bryan Lyness City Inspector: Randy Horton
Contractor: Northstar Construction LLC
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date: l
COST AND DAYS SUMMARY:
Department: Cost($) Fund Account Center: Requested Days:
Park and Recreation Dept. $ 36,446.02 39302-0800450-5740010--0O21 80
Park and Recreation Dept. $ 16,000.00 39801-0800450-5740010--0O2,
Total: $ 52,446.02 Total Requested Days: 80
Approval Status:
Moz- 0900 #,o - opolo- - enoso -
L---* 31bOI - 080016-0 -61400% -- co;127-Co0
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 3/29/2016
CFW Change Order Approval Pa-COApp01 Page 3 of 3
Approved: Yes
Comments:
User: Randy Horton
Date: 2016-02-20 9:49 AM
Approved: Yes
Comments:
User: Mike Heimlich
Date: 2016-02-22 8:39 AM
Approved: Yes
Comments:
User: Bryan Lyness
Date: 2016-02-22 10:45 AM
Approved: Yes
Comments:
User: Joel McElhany
Date: 2016-03-22 10:14 AM
Approved: Yes
Comments:
User: Richard Zavala
Date: 2016-03-25 1:39 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-03-28 2:55 PM
Approved: Yes
Comments:
User: Susan Alanis
Date: 2016-03-28 8:04 PM
Action Required:
https:Hprojectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessI... 3/29/2016