HomeMy WebLinkAboutContract 46895-A1 1�11 12ZCITY SECRETAIty, CONTRACT NO. RECEIVED T FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 46895 MlMN�di Ifl AGREEMENT BETWEEN THE CITY OF FORT WORTH AND SEDRICK HUCKABY FOR FINAL DESIGN OF PHASE 1 AND PHASE 2 OF PUBLIC ART FOR STOP SIX TRIANGLE This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 46895 ("First Amendment") is made and entered into by and between the City of Fort Worth ("City"), a home- rule municipal corporation of the State of Texas, acting by and through Fernando Costa, its duly authorized Assistant City Manager, and Sedrick Huckaby,an individual,residing at 4800 Williams Road, Fort Worth, Texas 76116. The City has designated the Arts Council of Fort Worth and Tarrant County, Inc., to manage this agreement on its behalf. The Contract Manager shall act through its designated Public Art project manager. WHEREAS, the Project was included in the Fort Worth Public Art Fiscal Year 2015 Annual Work Plan and Budget,adopted by the Fort Worth City Council on October 14, 2014 as (M&C C-27031)as part of the City's agreement with the Contract Manager for administration of the public art program; WHEREAS, City and Artist acknowledge that Artist's Preliminary Design (City Secretary Contract 944597) was approved by the FWAC on December 8, 2014, as the basis for executing this Agreement with the Artist; WHEREAS, on July 30, 2015, the City entered into a contract with Artist for Final Design of the Work for the Site(Fort Worth City Secretary Contract No.46895); WHEREAS, while during Final Design it was recommended that the Artist obtain a survey of the Site and consult with an electrician in order to locate the Work properly on the Site and create an accurate budget,and that this requires additional funding beyond the provided engineering allowance; and WHEREAS, City and Artist wish to set out the terms and conditions under which this additional consulting and survey work shall be undertaken; NOW, THEREFORE, City and Artist for and in consideration of the covenants and agreements hereinafter set forth, the sufficiency of which is hereby acknowledged, agree as follows: I. Article 2.2, "Scope of Services," is hereby amended to add a provision for Artist to consult with an electrician and contract with a surveyor for the purpose of determining how to provide electricity to the Site for the Work and locate the Work away from overhead and underground utilities. Alaced in its entirety to be and read as follows: OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX Amendment#1,CSO46895Agreement Between the City of Fort Worth and Sedrick Huckaby Page ! of 5 For Final Design of Public Art for the Stop Six Triangle Execution Copy March 16,2016 "2.2. Scope of Services. a. Artist shall perform all services and will furnish all supplies and materials as necessary for developing the Final Design of the Work and for providing the Final Design Deliverables. Services shall be performed in a professional manner and in strict compliance with all terms and conditions set forth in this Agreement. b. Artist shall determine the artistic expression, scope, design, color, size, material, and texture of the Work,subject to review and input from Project Stakeholders and approval by City as set forth in this Agreement. C. Artist shall present the Final Design in two phases, as described below, for purposes of budgeting under this Agreement: i. Phase I of the Final Design shall include the train car, footing and rails, internal lighting of the train car, figurative painting on the train car and site work to create a small paved plaza/stage area adjacent to the train car; and ii. Phase II of the Final Design shall include digital animation and gathering of audio community oral histories and the equipment to support it, as well as a low perimeter seat wall and plaza lighting. d. Artist shall explore possibility of acquiring an actual historic Interurban Train car that is within the budget for Phase I. e. Artist shall contract with a qualified surveyor and provide the City with a boundary survey of the Site that is prepared by a surveyor acceptable to the City, so that the locations of all utilities and easements can be identified before siting the Work. f. In order to meet the electrical requirements for the Work, Artist shall consult with a qualified electrician to determine the costs and means of providing electricity to the Site. g. Upon completing items 2.2(e) and 2.2(f), Artist shall meet and coordinate with City staff and others, as necessary, to explore the feasibility of integrating the Work into the Site in terms of structural support,lighting,electricity,or other infrastructure needs to support the Work and to avoid existing easements. h. Upon request of City, Artist shall consult with a qualified art conservator and shall provide written maintenance recommendations for the Work from said conservator to the Contract Manager. j. The location at the Site on which the Work shall be installed shall be mutually agreed upon by City and Artist. Amendment#1,CSO46895Agreement Between the City of Fort Worth and Sedrick Huckaby Page 2 of 5 For Final Design of Public Art for the Stop Six Triangle Execution Copy March 16,2016 J. Artist shall present both phases of the Final Design to the appropriate City committee, City staff, Project Stakeholders and other City boards or commissions, as appropriate, for input and to the FWAC for review and approval at dates and times mutually agreed upon." II. Article 2.3, "Implementation Budget Total,"subsection(a),is hereby amended to add a provision for Artist to revise the budget to reflect the addition of the services under 2.2(e) and 2.2(f) during the Final Design of Phase I. Article 2.3(a)is replaced in its entirety to be and read as follows: "2.3. Implementation Budmet Total. a. Artist shall develop a Final Design of Phase I that is financially feasible relative to the budget for implementation of Phase I. It is understood that the total budget for implementation of Phase I of the Final Design is estimated to be ONE HUNDRED TWO THOUSAND, TWO HUNDRED EIGHTEEN DOLLARS AND NO CENTS ($102.218.00), which includes all costs for survey, engineering and consulting, materials, labor, fabrication, delivery, installation, insurance, transportation, remaining Artist's fee, and all other associated costs for the Work. Artist shall provide a detailed budget, on the budget form attached hereto as Exhibit "C," for implementation of Phase I of the Work through a possible artwork commission contract with City." III. Article 2.5, "Final Design Deliverables," subsection (a), is hereby amended to add a provision for Artist to contract with a surveyor so that the locations of all utilities and easements can be identified before siting the Work,and to consult with an electrician to determine how to supply electricity to the Work and the Site. Article 2.5 is amended by changing subsection (a)(iii) and adding subsections (a)(iv) and (a)(v) to be and read as follows: "iii. A final budget for the Work detailing what is included in Phase I of the Work, with written estimates attached for supplies and services to be provided by Artist, Artist's subcontractor, or others in an amount not to exceed$102,218.00 for Phase I. iv. A boundary survey of the Site that is prepared by a surveyor acceptable to the City. Amendment#1,CSO46895Agreement Between the City of Fort Worth and Sedrick Huckaby Page 3 of 5 For Final Design of Public Art for the Stop Six Triangle Execution Copy March 16,2016 v. An electrical plan for electricity to the Work and the Site." IV. Article 3, "Compensation and Payment Schedule," subsections 3.1, "Compensation," and 3.2(f), "Payment Schedule," are hereby amended to allow for payments for surveying and electrical consulting as well as engineering for the Work to be and read as follows: "11. Compensation. Total compensation to Artist under the Agreement shall not exceed TWENTY TWO THOUSAND DOLLARS AND NO CENTS($22,000.00),which shall constitute full compensation for any and all costs associated with this Agreement, including, but not limited to, artist's fee, survey, engineering, electrical and other consulting fees as needed, all travel expenses and services performed and materials furnished by Artist under this Agreement. Artist and City may amend this Agreement to allow for additional payment if additional services are required. 3.2. Payment Schedule. f. City may pay Artist for actual costs in an amount up to TWELVE THOUSAND DOLLARS AND NO CENTS ($12,000.00) for a survey, engineering, electrical and other appropriate consulting fees and a conservator's consultation to fulfill the terms of this Agreement. Such payment shall be made upon receipt of an invoice from Artist with the original invoice (a retainer fee of up to 50% is allowed) for such services attached." V. Funds previously paid to the Artist prior to this First Amendment shall apply toward the total compensation paid to the Artist. VI. All terms and conditions of the Agreement that are not expressly amended pursuant to this First Amendment shall remain in full force and effect. Amendment#1,CSO46895Agreement Between the City of Fort Worth and Sedrick Huckaby Page 4 of 5 For Final Design of Public Art for the Stop Six Triangle Execution Copy March 16,2016 IN WITNESS WHEREOF the parties hereto have executed five copies of this First Amendment in Fort Worth, Texas, this day of ' 2016. CITY OF FORT WORTH ARTIST by: by:�u� �� _ _ by: Fernando Costa edrick Huc y Assistant City Manager APPROVED AS TO FORM AND LEGALLY: Jessica Sangsv Assistant City A �rney ATTESTED BY: Ob ®��� O 70 ° ity SecrAcS $ o No M&C Required :. ,;. y OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX P Scanned by Camicanner