HomeMy WebLinkAboutContract 40164-A10 CITY SECRETAW
CONTRACT NO. qO)wt/-
TENTH ADDENDUM TO CITY SECRETARY
CONTRACT NO. 40164
This Tenth Addendum to City Secretary Contract Number 40164 ("Eighth Addendum")
is by and between the City of Fort Worth ("City"), a home-rule municipality organized under the
laws of the State of Texas,acting by and through its duly authorized Assistant City Manager, and
Unified Fine Art Services, L.L.C. (the "Contractor"). The City has designated the Arts Council
of Fort Worth&Tarrant County,Inc.,to manage this contract on its behalf.
WHEREAS, on May 7, 2010, the City and Contractor entered into City Secretary
Contract Number ("CSC No.") 40164, as amended ("Agreement")whereby Contractor agreed to
provide professional art related services for the City on an as-needed basis, including art
transportation, large install and deinstall, exhibition installation, minor cleaning and repairs, and
installation consultation;
WHREEAS, the City and Contractor have entered into several addenda related to the
services provided under the Agreement, including CSC Nos.40164-A1, 40164-A2, 40164-A3;
40164-A4,40164-A5,40164-A6, 40164-A7,40164-A8,and 40164-A9;
WHEREAS, the parties amended CSC No.40164 on February 150', 2012, to, among
other things, increase the total amount of compensation under the agreement, the same being
CSC No. 40164-1A;
WHEREAS, the agreement provided for an initial three-year term and for the possibility
of three,one-year renewals,with the primary term expiring on May 1,2013;
WHEREAS, on April 24`x', 2013, the parties executed and renewed the contract for the
first one-year renewal period, effective beginning on May 2, 2013, and expiring on May 1, 2014,
the same being CSC No. 40164-R1;
WHEREAS, on May 2, 2014, the parties executed and renewed the contract for the
second one-year renewal period, effective beginning on May 2, 2014, and expiring on May 1,
2015,the same being CSC No. 40164-R2;
WHEREAS, on June 1, 2015, the parties executed and renewed the contract for the third
one-year renewal period, effective beginning on May 2, 2015, and expiring on May 1, 2016, the
same being CSC No. 40164-R3;
WHEREAS, the parties now desire to enter into a new addendum for the provision of
services associated with an artwork by David Keens titled Chroma Refraction pictured in the
attached Exhibit "O" ("Artwork") and located at the Northpark YMCA located at 9100 North
Beach Street, Fort Worth, TX 76244;
OFFICIAL RECORD
CITY SERRETARY
Tenth Addendum to CSC 40164 10
Execution Copy(3.21.16) FT. WORTH, TX
WHEREAS, the City and Contractor wish to set out the additional Services to be
provided per the Agreement that will be specific to this addendum and this Artwork with the
intent that further Services may be requested by the City through future addenda;
NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter set
forth,the sufficiency of which is hereby acknowledged,the parties agree as follows:
SERVICES
1.1 The Services to be performed by the Contractor for this Tenth Addendum are set forth in
the Contractor's Proposal ("Contractor's Proposal"), which is attached hereto as Exhibit
"P" and incorporated herein for all purposes, and includes all labor, travel, and any other
expenses required to complete the Services for this Artwork.
1.2 Contractor covenants and agrees to fully perform, or cause to be performed, with good
faith and due diligence, as needed services ("Services") to be performed at the direction
of the Contract Manager and in accordance with written addenda, which shall be
executed to this Agreement and incorporated herein for all purposes. Services shall be
performed in a professional,workman-like manner and in strict compliance with all terms
and conditions in this Agreement.
1.3 Existing conditions hidden or concealed and not available for reasonable visual
observation discovered during Services will be reported promptly to the Contract
Manager prior to commencing any further Services.
1.4 Services to be performed under this Agreement include the following:
General cleaning of the Artwork titled: Chroma Refraction by David Keen. The
installation includes forty-six (46) glass forms which hang from 1/16" diameter
steel cables using suspension brackets fitted through a single hole drilled in each
of the glass elements. The cables are suspended from a Unistrut grid hung inside
the skylight well. Thin steel cable is connected to the grid using industry standard
swagged metal cable clamps, and attached to the glass using Arakawa SR 35
hanging glass shelving supports inserted through the drilled holes in each piece of
glass and cushioned with silicone adhesive. These fixtures are rated to support 65
lbs. each, easily exceeding the support strength required for the estimated 5-12 lb.
glass forms.
Cleaning must include all elements of the installation including glass forms and
steel cables.
Team may consult with original artist as necessary.
1.5 In consideration of the Services to be performed under this Tenth Addendum, the City
agrees to pay the Contractor the actual costs for services in an amount up to Two
Thousand, Five Hundred Dollars and No Cents ($2,500.00) in accordance with the terms
Tenth Addendum to CSC 40164 2 of 5
Execution Copy(3.21.16)
of Article 3 of the Agreement. Any amounts paid in this Tenth Addendum shall be
credited towards the total amount paid under the current Agreement renewal term.
1.6 Contractor shall coordinate with the City to coordinate the required schedule and
availability to access the Site.
1.7 Contractor shall take such measures as are necessary to protect the Artwork from loss or
damage, including, without limitation, purchasing and maintaining the insurance required
in Article 6 of the Agreement.
1.8 All terms and conditions of the Agreement not specifically addressed herein remain in
full force and effect and are binding upon the parties.
1.9 All terms and conditions of the Agreement that are not expressly referenced pursuant to
this Tenth Amendment shall remain in full force and effect.
IN WITNESS W1HE F,the es hereto ave executed five copies of this Tenth Addendum in Fort
Worth,Texas,on �y of 2016.
CITY OF FORT WORTH UNIFIED FINE ARTS RVICES,LLC
By: By:
Fernando Costa Victor Bi%Gno to 31 6Sovivp77F,
Assistant City Manager Principle
APPROVED AS TO FORM
AND LEGALITY:
Jes Ica svan
AssistaM City Attorney
ATTEST:, of F��
V
�C8OX
City Se tary >�
o �y
No M&C required
OFFICIAL RECORD
CITY SECRETARY
Tenth Addendum to CSC 40164 FT.MORTH,TX
Execution Copy(3.21.16)
EXHIBIT O
The Artwork
r
i
Chroma Refraction by David Keens
Tenth Addendum to CSC 40164 4 of 5
Execution Copy(3.21.16)
EXHIBIT P
Contractor's Proposal
Unified FM Arts Staid%,UZ U � I � I ` a
14105 hwood fiord
Dale'TR 752W391E FIN E A R T 5
91 vi E- 1�1
Estimate
Date �
03/11/216 3752
oast
Fat Wash P*&Arts Couoal
ienmdlr Cana
1300 Gerdy St
Fat Wads,TX 76107 USA
— RaW Amount
03111!2016 l.aba-drydmaklen Laos scalpm at Natttpatt YMCA iaFat 9 ?,5.00 2,025.00
Worth TX.
Was will tate place ovem g*appa=numly from 9.45p=4:45=L
2 fire at handlers(4 9 Maas(anion nes)
03111!2016 Bgttipmeot ReoW-IV a3awic a®or lift 1 425.00 425.00
03/11!2016 Materials-Dattel,tape(b cots tae reception desk) 1 50.00 50.00
PAY TERMS ARE NUT 15.Estmaae valid foe 60 drys
A home ctnBe of 2%per mom&well be c>Kpad as iavatces ant pod sorbin
30 drys of nwwa date. If ahamma pay terms ate aernsary d"amu be
approved a1 time of Waken&The final atvwace will be baud an actual the and
eateoals need so complele Ilse ptopa Pose sign and return if you wish to
P
Amprd sP Aaepd lar.
Tenth Addendum to CSC 40164 5 of 5
Execution Copy(3.21.16)