D.O.E. Brotherton
CFA Westerman/Scanned
The Proceeding people have been Cy acted Concerning the request for Anal
paymS-1 ( C®a 5errt b have released this project for such payment kTION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION d4e�j+</D 253.5
D.O.E.N4: 7420
cs#y759
Regarding contract 117420 for SEVENTEEN LAKES PHASE 3-WATER&SEWER as required by the
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project as complete.
�w. r=
Original Contract Prices: D �w $1,557,471.99
Amount of Approved Change Orders: APR U 4 2'016 N41
Revised Contract Amount:
Total Cost Work Completed: $1,557,471.99
Less Deductions:
Liquidated Damages: Days(e3$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $1,557,471.99
Less Previous Payments: $0.00
Final Payment Due $1,557,471.99
J.0 waw&z7-- 414/-49/ zo 40
Rec omme ded for AccePtance Date
Asst. Director,TPW - Infrastructure Design and Construction
4-11-16
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
Comments: FUND ACCT.P265-607140253583/P275-707130253583
RMAAA1I-eE.►
APR 0 16
t l uo
MJ
Fro59 (001 - C� a53S
APR 0 4 2016
City Project Numbers 02535 p., DOE Number 7420
Contract Name SEVENTEEN LAKES PHASE 3 "�...-.� - . ._ Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/15/2016
Project Funding
Project Manager Loug City Secretary Contract Number 117420
Inspectors LAYER/ TAEZAZ Contract Date
Contractor KODIAK TRENCH NG 7 BORING,LLC Contract Time 75 CD
P O BOX 93929 Days Charged to Date 3.24 CD
SoUnU AKE, TX 76092 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,557,471.99
Less %Retained $0.00
Net Earned $1,557,471.99
Earned This Period $1,557,471.99
Retainage This Period $0.00
Less Liquidated Damages
0 Days® $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,557,471.99
Wednesday,March 16,2016 Page 5 of 5
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SEVENTEEN LAKES PHASE 3
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02535
DOE Number 7420
Estimate Number 1 Payment Number 1 For Period Ending 3/15/2016
CD
City Secretary Contract Number 117420 Contract Time 7ED
Contract Date Days Charged to Date 3.24
Project Manager L-9 Contract is 100.00 Complete
Contractor KODIAK TRENCHING 7 BORING,LLC
P O BOX 93929
SOUTHL AKE, TX 76092
Inspectors LAYER/ TAEZAZ
Wednesday,March 16,2016 Page 1 of 5
City Project Numbers 02535 DOE Number 7420
Contract Name SEVENTEEN LAKES PHASE 3 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 3/15/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---- -------------- - ---------
1 16"DIP WATER 402 LF $78.22 $31,444.44 402 $31,444.44
2 8"PVC WATER PIPE 12691 LF $22.75 $288,720.25 12691 $288,720.25
3 6"PVC WATER PIPE 48 LF $19.45 $933.60 48 $933.60
4 8"WATER CARRIER PIPE 30 LF $16.50 $495.00 30 $495.00
5 20"CASING BY OPEN CUT 30 LF $90.00 $2,700.00 30 $2,700.00
6 DUCTILE IRON WATER FITITNGS 6 TN $5,730.00 $34,380.00 6 $34,380.00
W/RESTRAINT
7 16"GATE VALVE,WNAULT 1 EA $18,145.00 $18,145.00 l $18,145.00
8 8"GATE VALVE 36 EA $1,100.00 $39,600.00 36 $39,600.00
9 6"GATE VALVE 12 EA $790.00 $9,480.00 12 $9,480.00
10 FIRE HYDRANT 12 EA $3,000.00 $36,000.00 12 $36,000.00
11 2"WATER SERVICE 1 EA $1,730.00 $1,730.00 1 $1,730.00
12 1 1/2"WATER SERVICE 1 EA $1,705.00 $1,705.00 1 $1,705.00
13 1"WATER SERVICE 241 EA $670.00 3161,470.00 241 $161,470.00
14 CONNECTION TO EXISTING 16"WATER MAIN 3 EA $1,825.00 $5,475.00 3 $5,475.00
15 CONNECTION TO EXISTING 4"-12"WATER 2 EA $490.00 $980.00 2 $980.00
MAIN
16 TRENCH SAFETY 13171 LF $0.20 $2,634.20 13171 $2,63420
Sub-Total of Previous Unit $635,892.49 $635,892.49
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 12"DIP SEWER 60 LF $84.55 $5,073.00 60 $5,073.00
2 12"DIP SEWER,CLSM BACKFILL 440 LF $110.75 $48,730.00 440 $48,730.00
3 10"SEWER PIPE 1504 LF $29.95 $45,044.80 1504 $45,044.80
4 10"SEWER PIPE CSS BACKFILL 20 LF $185.00 $3,700.00 20 $3,700.00
5 10"SEWER PIPE CLSM BACKFILL 416 LF $29.95 $12,459.20 416 $12,459.20
6 8"SEWER PEPE 10373 LF $25.05 3259,843.65 10373 $259,843.65
7 8"SEWER PIPE CSS BACKFILL 465 LF $25.05 $11,64825 465 $11,648.25
8 IMPORTED EMBEDMENT BACKFILL CSS 1110 CY $57.35 $63,658.50 1110 $63,658.50
9 8"SEWER CARRIER PIPE 266 LF $64.25 $17,090.50 266 $17,090.50
Wednesday,March 16,2016 Page 2 of 5
City Project Numbers 02535 DOE Number 7420
Contract Name SEVENTEEN LAKES PHASE 3 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 3/15/2016
Project Funding
10 20"CASING BY OPEN CUT 266 LF $90.00 $23,940.00 266 $23,940.00
11 4'MANHOLE 60 EA $2,660.00 5159,600.00 60 $159,600.00
12 4'DROP MANHOLE 3 EA $3,800.00 $11,400.00 3 $11,400.00
13 4'EXTRA DEPTH MANHOLE 202.9 VF $235.00 $47,681.50 202.9 $47,681.50
14 EPDXY MANHOLE LINER 62 VF $220.00 $13,640.00 62 $13,640.00
15 4"SEWER SERVICE 239 EA $564.00 5134,796.00 239 $134,796.00
16 6"SEWER SERVICE I EA $650.00 $650.00 1 $650.00
17 POST CCTV INSPECTION 13544 LF $1.20 $16,252.80 13544 $16,252.80
18 MANHOLE VACUUM TESTING 63 EA $150.00 $9,450.00 63 $9,450.00
19 TRENCH SAFETY 13544 LF $0.20 $2,708.80 13544 $2,708.80
20 REMOVE FENCE 80 LF $6.00 $480.00 80 $480.00
21 5'STEEL TUBE FENCE 80 LF $10.00 $800.00 80 $800.00
22 CONCRETE COLLAR 5 EA $200.00 $1,000.00 5 $1,000.00
23 CONCRETE ENCASEMENT FOR UTILITY PIPES 2.5 CY $125.00 $312.50 2.5 $312.50
24 MEDIUM STONE RIP-RAP DRY 23 SY $80.00 $1,840.00 23 $1,840.00
25 TRA MANHOLE I EA $10,000.00 $10,000.00 1 $10,000.00
26 24"DIA CONCRETE PEIR 4 EA $4,200.00 $16,800.00 4 $16,800.00
27 CONCRETE BLOCKING 2 EA $180.00 $360.00 2 $360.00
28 FLANGED JOINT 2 EA $1,310.00 $2,620.00 2 $2,620.00
Sub-Total of Previous Unit $921,579.50 $921,579.50
Wednesday,March 16,2016 Page 3 of 5
1
City Project Numbers 02535 DOE Number 7420
Contract Name SEVENTEEN LAKES PHASE 3 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER dt SEWER For Period Ending 3/1516
Project Funding
Contract Information Summary
Original Contract Amount $1,557,471.99
Chanee Orders
Total Contract Price 51,557,471.99
Q1
LX(Ales Total Coat of Work Completed 51,557,471.99/
Contractor Less %Retained 50.00
Date Net Earned (1,557,471.99
Earned This Period 51,557,471.99
Retainage This Thin Period 50.00
Date Less Liquidated Damages
Project Manager
Days® /Day 50.00
/It LessPavement Deficiency 50.00
Asst&=weiFw-whstructure Design ao construction Less Penalty SO.00
Less Previous Payment 50.00
Director/Contracting Department Plus Material on Hand Less 15% 50.00
8X16 Balance Due This Payment 51,557,471.99
s
Wednesday,March 16,2016 Page 4 of 5
I
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
i
PROJECT NAME: Seventeen Lakes Phase III
PROJECT NUMBER: 2535
DOE NUMBER: 7420
WATER
PIPE LAID SIZE TYPE OF PIPE LF
16" DIP 402 g
8" PVC 12,691 i
6" PVC 48
FIRE HYDRANTS: 12 VALVES(16"OR LARGER) I
PIPE ABANDONED SIZE TYPE OF PIPE LF
NONE
DENSI TIES:
NEW SERVICES: 2" Copper 1 EA
1-1/2" Copper 1 EA
I" Copper 24lea
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
12" DIP 60
12" DIP(CLSM)Backfill 440
10" PVC 1504
10" PVC(CSS Backfill) 20
10" PVC(CLSM Backfill) 416
8" PVC 10373
8" PVC(CSS Backfill) 465
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES: 6" PVC 1 EA
4" PVC 239 EA
A01N, TRANSPORTATION AND PUBLIC WORKS
FORTWORTH REV:0
2/2
0
/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Kodiak Trenching&Boring,LLC. Seventeen Lakes Phase[i[
DOE Inspector DOE Number
Tommy McKinnon 7420 CPN#02535
DOE Inspector Project Manager
21 Water O Waste Water ❑Storm Drainage O Pavement Aaron Long
Initial Contract Amount Project Difficulty
$1,557,471.99 0 Simple O Routine ® Complex
Final Contract Amount Date
,$1,557,471.99 13/16/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 396
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 396
111)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(QTS/MSI*100%) 396 / 448 — 88%
Performance Category Excellent
<20%—Inadequate 20.16 to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_8090=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
1 t (Col Signature DOE[nspectar L%v. S'gnatureCantractar � <tL, l
Signature DOE Inspector' upervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Thxockmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
CONSENT OF SURETY OWNER
TO FINAL PAYMENT ARCHITECT °
CONTRACTOR
AIA/arxuntertt G707 St SRM
(Instructions on reverse side) Bond#1038049 O MEN
TO OWNER: ARCHITFC7"S PROJECT NO.:
rYi»ra•nrrAaddn�vi
17FW Limited Partnership
218 West Wall Strut CONTRACT'FOR: Construction
Grapevine,TX 76051
PROJECT: CONTRACT DAT[iD: April 13,2015
t:�il»arrror rrrldna�l
Seventeen Lakes,Phase 3,City Project Number 02535
Fort Worth,TX
In accurtlarue with the linw sions of the Contract between the Own(Y anti the 0miratlor as indicated alw mwl IIle
dim-a Nmwand addrem 4%Pnmi
The Hanover Insurance Company
5910 N Central Expy,Suite 300
Dallas,TX 75206
til'NF:11'.
on btmd of
rrAwn"amerarrrr,dra o'ry 0-ann'rurl
Kodiak Trenching&Boring,LLC
P.O.Box 93929
Southlake,TX 76092
CONTRACTOR.
here)•al"wes 11f the final(taptutnit to the Contrwior..ind agrees that final lxn'ment to the Contractor shall not rclww the Sueety of
am•(if its ohligatftms to
dn*"r8mw atjd atkbkw of oetwr,t
17FW Limited Partnership
218 west wall street
Grapevine,TX 76051
„ OVU'NTiK.
as set forth in saki Surety's Fond.
IN%%nl NFSS 1r11F.RF.OF.the Sunni.hx%hereunto set its hand on this date March 15,2016
t hvwP1 in a,,*AW A,»rtrrabfiAmt-.vl In-the rnmied,ika,•and f cw,r
The Hanover Insurance Company _
&GZor
Attes -ill-Fact Ltada K 'Attoy
t1rima/rn'»».•and rnbvr
CAUTION: You should sign an original AIA document that has this caution printed in red. An
' I original easures that changes will not be-obscured as may occur when documents are reproduced.
See Instruction Sheet for Umited Llraense for Reprodu02fi o1 this ctocpin1'nj.
AIA DOCUMENT(3707•(1tN4N-1 DFM WIN 1'0 MAI PAN NFNT•IW4 F7 H11t lit• Ake
•191k-n IE AMMAN MSTITt It(W Aw..Hn1d:rs.Iii NUM YORK AWN1 I:.Nu'.Nk MA I
t"KTON.n 2wrin-5192•WARPaNG:Unlicensed photocopying violates U.S.copy G7d7-199A
right laws and will=Moet the violator to Wo prosecution.
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWERS OF ATTORNEY
CERTIFIED COPY
KNOW ALL MEN BY THESE PRESENTS: That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being
corporations organized and existing under the laws of the State of New Hampshire,and CITIZENS INSURANCE COMPANY OF AMERICA,a corporation
organized and existing under the laws of the State of Michigan,do hereby constitute and appoint
Steven B.Siddons,Shirong Chen,Holly A.Gravenor,Lorrie Scott and/or Linda K.Edwards
of Frank Siddons Insurance Agency of Fort Worth,TX and each is a true and lawful Attomey(s)win-fad to sign,execute,seal,knowledge and
deliver for,and on its behalf,and as its act and deed any place within the United States,or,if the following fine be filled in,only within the area therein
designated any and all bonds,recognizonoes,undertakings,contracts of indemnity or other writings obligatory in the nature thereof,as follows:
Arty such obligations in the United Stages,not to exceed Ten Million and Noll 00($10,000,000)in any single instance
and said companies hereby ratify and confirm all and whatsoever said Attomey(s)-in-fad may lawfully do in the premises by virtue of these presents.
These appointments are made under and by authority of the following Resolution passed by the Board of Directors of said Companies which resolutions
are still in effect:
"RESOLVED,That the President or arry Vice President in conjunction with any Vice President be and they are hereby authorized and empowered to appoint
Aftomays-in4act of the Company,in its name and as its acts,to execute and acknowledge for and on Its behalf as Surety any and all bonds.recognizanoes.
contracts of indemnity,waivers oi citation and all other writings obligatory M the nature thereof,with power to attach thereto the seal of the Company.Any such
writings so executed by such Attomey*-in-fact shat be as binding upon the Company as it they had been duly executed and acknowledged by the regularly
elected officers of the Company in their own proper persons (Adopted October 7,1981-The Hanover insurance Company,Adopted Ape 14,1982-
Massachusetts Bay Insurance Company;Adopted September 7,2001-Citizens Insurance Company of America)
IN WITNESS WHEREOF,THE HANOVER INSURANCE COMPANY,MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vloe Presidents,
this 4th day of December 2014.
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
s e
PANY OF AINPRICA
�r� Qa,kfq CITIZENS URANCE OM
t
> t 1974
J aj
Robed Thomas.Vice President
THE COMMONWEALTH OF MASSACHUSETTS
COUNTY OF WORCESTER )ss. Joe�rsrel rIL Presidentv
On this 4th day of December 2014 before me came the above named Vice Presidents of The Hanover insurance Company,Massachusetts Bay Insurance
Company and Citizens Insurance Company of America,to me personalty known to be the individuals and officers described herein,and acknowledged thatthe
seals affixed to the preceding instrument are the corporate-seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens
Insurance Company of America, respectively,and that the said corporate seals and their signatures as officers were duly affixed and subscribed to sold
instrument by the authority and direction of said Corporations.
BARBARA A.GARLICKNotary Public
wjdlgoma ye 7ht"ss'd°"�' �.
dy cort+axr Ex7ti'gM.7t.2^ke
Barbara A.Garlick,Notary Public
My Commission Expires September 21,2018
I,the undersigned Vice President of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens insurance Companyof America,
hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney issued by said Companies,and do hereby further
certify that the said Powers of Attorney are still in force and effect.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of The Hanover insurance Company,
Massachusetts Bay Insurance Company and Citizens Insurance Company of America.
'RESOLVED,That cry and all Powers of Attorney and Certified Copies of such Powers of Attorney and aertifleation in respect thereto,granted and executed
by the President or any Vice President in conjunction with any Vice President of the Company,shall be bung on the Company to the same extent as if all
signatures therein were manually atlbied,even though one or more of any such signatures thereon may be facsimile." (Adopted October 7,1981-The
Hanover Insurance Company;Adopted April 14,1982-Massachusetts Bay Insurance Company;Adopted Septernber7,2001-Citizens Insurance Comparyof
America) , , (�,,_�
GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this day of-�`t 20A�.—.
THE HANOVER INSURANCE COMPANY
MA SA NUS BAY CECOMPANY
CIT EN I SU CE OF AMERICA
Vice es eni
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Tim Crawford,
COO Of Kodiak Trenching and Boring,LLC,known to me to be a
credible person, who being by me duly sworn,upon his oath deposed and
said;
That all persons, fn-ms,associations,corporations,or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Installation of Water,Storm and Sewer.
Tim Crawford,COO
Subscribed and sworn before me on this date 25th of February,2016.
1
am /ami C7rPUtM:1]r1C'
Notary Public - %*tanCounty, State � ,(al(1 - "'SExpires:
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 3!16/2016
Name of Contractor Project Name
Kodiak Trenching&Boring,LLC. Seventeen Lakes Phase III
DOE inspector Project Manager
Tommy McKinnon Aaron Long
DOE Number Project Diffilcu4 Type Of Contract
7420 10 Simple O Routine O complex 121 Water O Waste Water ❑ Storm Drainage ❑ Pavement
Initial Contract Amount Final Comma Amount
S 1,557,471.99 $1,557,471.99
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 4 1 Accuracy of Plans to Existing Conditions 4
2 Knowledge of Inspector 4 2 Clarity&Sufficiency of Details 4
3 Accuracy of Measured Quantities 4 3 Applicability of Specifications 4
4 Display Of Professionalism 4 4 Accuracy of Plan Quantities 4
5 Citizen Complaint Resolution 4 PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 4 1 Knowledge And/Or Problem Resolution 4
ADMINISTRATION 2 Availability of Project Manager 4
1 Change Order Processing Time 4 3 Communication 4
2 Timliness of Contractor Payments 4 4 Resolution of Utility Conflicts 4
3 Bid Opening to Pre-Con Meeting Timeframe 4
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor (k GVXC,\1,.0
/,6 L
Signature DOE Inspector
Signature DOE Inspector's Superviso
/4
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941-F2x:(817)392-7945
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: SEVENTEEN LAKES PHASE III
PROJECT NO.: 2535 CONTRACTOR: Kocruh Trenching&Boring
DOE NO.: 7420
PERIOD FROM:04/27/15 TO: 03/15/16 FINAL INSPECTION DATE: 15-Mer;16
WORK ORDER EFFECTIVE:4/27/2015 CONTRACT TIME: 75 O WD 0 CD
DAY OF DAYS CHARGED REASON FOR DAYS DAY OF DAYS CHARGED REASON FOR DAYS
MONTH DURING CREDITED MONTH DURING CREDITED
I. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
IL 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS' CHARGED DAYS
THIS
324
PERIOD
PREVIOUS
PERIOD
TOTALS
324
TO DATE
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
ENGINEERINGIDEPARTMENT
The City of Fort Worth•1000 Thmckmorton Street�Fort Worth,TX 76012-6311
(817)392-7941•F=(817)392-7845