Developer and Project Information Cover Sheet:
Developer Company Name: First Texas Homes,Inc
Address, State,Zip Code: 500 Crescent Court Suite 350,Dallas TX 75201
Phone&Email: 214-613-3400,khardesty@firsttexashomes.com
Authorized Signatory, Title: Keith Hardesty, DFW Division President
Project Name and Brief Primrose Crossing,Phase 3B
Description:
Project Location: West Risinger Road& Sweet Flag Lane
Plat Case Number: FP-015-070 Plat Name: Primrose Crossing
Mapsco: <102U> Council District: 6 City Project Number: 02703 .
CFA Number: 2015-127 DOE Number: None
To be complete ' toff.
Received by: a
G
�g10
� 8 ,o
a' REG
EIVED
App-7 2016
City of Fort Worth,Texas N
w
Standard Community Facilities Agreement LOFFICIAL RECORD MYCHW t
CFA Official Release Date: 07.30.2015 �b
Page 1 of 11 RETARY RTH,TX dYd
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, First Texas Homes, Inc, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Primrose Crossing Phase 3B
("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas
("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights &
Signs (C) Z.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
Ili. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers,servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4%of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Primrose Crossing Phase 3B
CFA No.: 2015-127 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 170,140.86
2.Sewer Construction $ 195,988.24
Water and Sewer Construction Total $ 366,129.10
B. TPW Construction
1.Street $ 524,071.45
2.Storm Drain $ 124,784.56
3.Street Lights Installed by Developer $ 67,595.08
4. Signals $
TPW Construction Cost Total $ 716,451.09
Total Construction Cost(excluding the fees): $ 1,082,580.19
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 7,322.58
D. Water/Sewer Material Testing Fee(2%) $ 7,322.58
Sub-Total for Water Construction Fees $ 14,645.16
E. TPW Inspection Fee(4%) $ 25,954.24
F. TPW Material Testing(2%) $ 12,977.12
G. Street Light Inspsection Cost $ 2,703.80
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 41,635.16
Total Construction Fees: $ 56,280.33
Choice
Financial Guarantee Options,choose one Amount Mark o
Bond=100% $ 1,082,580.19
Completion Agreement=100%/Holds Plat $ 1,082,580.19
Cash Escrow Water/Sanitary Sewer=125% $ 457,661.38
Cash Escrow Paving/Storm Drain=125% $ 895,563.86
Letter of Credit=125%w/2yr expiration period I $ 1,353,225.24
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
First Texas Homes Inc.
Jesus . Chapa
Assistant City Manager Name: Keith Hardesty
I Title: DFW Division President
Date: '� -( to
Date:
Recommended by:
ATTEST: (Only if required by Developer)
Wendy Chi abulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name: 'V\-eA(csGa,-
Douglas W iersig, P.E.
Director
Transportation&Public Works Department
Approved as to Form &Legality: ATTEST:
C, -&- --L-1
uelas w. 136" 1Z:c(a>t. A. Aca. , ary J K r
Assistant City Attorney City Secr to fl
M&C No. vi�p �° o
0
Date: y k ( V$ 8�
�$o°mo000
F*CW4. Q05 C.4-iid.�'C^0V+-: WOO- 00000°o
0 OZ.
City of Fort Worth,Texas
Standard Community Facilities Agreement OFFICIAL CFA Official Release Date:07.30.2015 CIAO RECORD
Page 9 of 11 CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvments
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No.02703
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
¢ _
COLUMBUS Lo w BARHE RY
b
m STARRY DE
U W DROP
MORNING
ti
ti 4
N
PROJECT
L LOCATION SCALE:1 = 2000
3 -- RISINGER
a ~~
00
t ti
Lp
pp v
0
N
� clTr FRANCIS VILLAGE
N
O�
3 H
v
Ui U
� y
x
W I :3
c im
a
N ROCKY
a
L C x
z
W D
m04
3
o VICINITY MAP
0
............._
PRIMROSE CROSSING
0
FST PHASE 3B
Y LOCATION MAP TM
W
0 1 "=2000' JACOBS
0
Y
x 777 MAIN STREET
MAPSCO N0. 102U FORT WORTH, TX 76102
COUNCIL DISTRICT 6 PHONE 214-920-8323
�\ FUTURE j
I 1 I L _ I �� �� / % PRIMROSE I I I
1 1 I 1 I I ai ,� / CROSSING 1 I F
i FUTURE 1 1 I 1 1 I 1 I I i r-� �J / PHASE 2 1
PRIMROSE 1 I 1 k 1 I �i / /�� / � I
\< / CROSSING 1rl`r``
\\ i //\r\ �" CONNECT
CONNECT TO EXISTINGTO
EXISTING
(^T
SCALE:1" = 200'
_ / 3 m m
c —i
-�� OLENWICK ORNE a wL-a
CONNECT TO
EXISTING
EL
I Ww
N _'r _LI I o
N I/ 7
FUTURE
z EXISTING
I I _
PRIMROSE PRIMROSE I I
CROSSING I I CROSSING
6 —L— — i
v 8" WL-9 8"WL-9
BELHAVEN DRIVE
-
-r--r-- ---r-
-�--
x I
wF
I I I I I I ____
a I I I I I I I f
r1—T-1T--Ll--11---�--� --- I
WATER
x I I t I I I I I I I I
w I I I I I I I I I I I I r----- EXHIBIT 'A'
N I I I I I I I I I I
--L--1--1--J_--I---� ��--L--1--1--J---I---L--1--1--J---I---L--1--/
PRIMROSE CROSSING
PHASE 3B
0
N
Ln
LEGEND TM
0 PROPOSED WATER LINE EXISTING WATER LINE JACOzap%
0
X PROPOSED GATE VALVE EXISTING GATE VALVE 777 MAIN STREET
PROPOSED FIRE HYDRANT # EXISTING FIRE HYDRANT FORT WORTH, TX 76102
o PHONE 214-920-8323
N LIMITS OF PROJECT
Project Item Information Bidder's Proposal
Bidlist Item No. Description Unit of Specification Section BID QTY Bid Unit Price Bid Value
Measure No. PGA Quantity
3305.0109 Trench Safety for Water LF 33 05 10 3614 3614 $0.251 $903.50
3311.0001 Ductile Iron Water Fittings w/Restraint TN 3311 11 2.258 2.258 $4,020.17 $9,077.54
3311.0241 8"Water Pie LF 33 11 10 33 11 12 3614 3614 $20.23 $73,111.22
3312.0001 Fire Hydrant EA 33 12 40 6 6 $3,852.10 $23,112.60
3312.0117 Connection to Existing 4"-12"Water EA 33 12 25 4 4 $300.00 $1,200.00
3312.2003 1"Water Service JEA 1331210 82 82 $645.00 $52,890.00
3312.3003 8"Gate Valve ILF 1331220 1 91 9 $1,094.00 $9,846.00
TOTAL WATER IMPROVEMENT BID $170,140.86
CRY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Forth Revised 20120120
FUTURE L
t 11 I 11 1 I L PRIMROSE 1 I I
i FUTUREter_ \ / e CROSSING I, I I I I
PRIMROSE 1 1 I 1 1 I i� PHASE 2 _ I 1-
\� CROSSING 1 1 1 I I r� / / �� / \� �rl I I I
l
0
\\ rr r^\ OER ROP
/ \ \<
CONNECT TO
\ EXISTING 8" SS / r^T
/ I �j SCALE:1" = 400°
� I
c L CL0 CK ORNE
8"S' CONNECT i0
EXISTING 12" SS
I I =
I S
FUTURE I I EXISTING
PRIMROSE PRIMROSE
s yl CROWING L- — CROSSING
8"SS-2 gELHAVEN 8"SS-2
a r--r-- ---r---I
x I I I
I
Q I I I I I I I �'----
U I I I I IL I I j I
d -1-r-1T-'L1---I---r---I -- --; L----- WASTEWATER
r I I I I I I I I I I I I I I I I I I I
'tS00 r___--
c� EXHIBIT 'A1'
I I I I I I I I I I I I I I I I I I I
p --L--1--1--J---I-_-r '---L--1--1--J---L--L--1--1--J---I---L--1--� I
Q
V
LEGEND PRIMROSE CROSSING
PHASE 311
PROPOSED SANITARY SEWER
3 PROPOSED MANHOLE
� EXISTING SANITARY SEWER _......._................................._...
JACOBSY
EXISTING MANHOLE .....................U......_......................... 777 MAIN STREET
oFORT WORTH, TX 76102
LIMITS OF PROJECT PHONE 214-920-8323
Project Item Information Bidder's Proposal
Bidlist Item No. Description Unit of Specification Section No. BID QTY BID QTY BID QTY Bid Quantity Unit Price Bid Value
Measure PG.5 PG.6 PG.7
3301.0002 Post-CCN Inspection LF 1330131 1386 1173 2870 $1.10 $3,157.00
3301.0101 IManhole Vacuum Testing EA 33 01 30 5 6 11 $70.00 $770.00
3305.0109 Trench Safety LF 33 05 10 1386 1173 2870 $0.25 $717.50
3311.0242 B"Water Pie CSS Backfill LF 3311 10 88 66 154 $68.50 $10,549.00
3331.3101 4"Sewer Service SDR-26 EA 33 31 50 83 83 $474.91 $39.417.53
3331.4115 8"Sewer Pio SDR-26 LF 33 11 10 33 31 12 33 31 20 1386 1176 2562 $37.33 $95,639.46
3331.4208 12"Sewer Pie LF 33 11 10 33 31 12 33 31 20 308 308 $46,91 $14,448.28
3339.1001 4'Manhole EA 33 39 10 33 39 20 51 6 11 $2,513.52 $27,648.72
3339.1003 4'Extra Depth Manhole VF 33 39 10 33 39 20 18 151 33 1 0.00 0.00
9999.0013 lConnect to Existing Sanitary Sewer EA 00 00 00 21 2 1 $300.30 $600.60
3339.0001 1 Epoxy Liner VF 33 39 60 19.11 19.1 159.17 $3.040.151
TOTAL SANITARY SEWER BIB $195,988.24
CITY OF FORT WORTH
STANDARD CONM RI'CTION SPECIFICATION DOCUMENTS
Forth R-i.d 20120120
FUTURE I I I I L
PRIMROSE I I
II 1 1 I 1 1 1 II I I — .� CROSSING
FUTURE l 1 1 I l , 1 I I . r– �./ / PHASE 2 I I
PRIMROSE 1 1 I I _1__� –J--1� `_ I i / /� / J I
\ / CROSSING 1 1 1 `–J– I .� / / ��\ (\ /� / ,/ 7--L /I L
�^ \ / .� •(\ , / � / Tom\ C� / ��
\ <
4�
SCALE:1" - 200'
c
DRNE
EXISTING
w FUTURE I I
PRIMROSE I / PRIMROSE
CROSSING I I I CROSSING
.. —
BELMAVN DRW
I I I I I I
F--'--
' PAVING
I I
00I I I V 1 I I I I I I I I I I I 1 I I 1 EXHIBIT1B1
r-----
�
U I
LEGEND PRIMROSE CROSSING
N PHASE 3B
Ln
X
PROPOSED 29'B-B ; PROPOSED ADA RAMPS
x ROADWAY/50'ROW , (BY DEVELOPER)
0
11
BS
JACO
PROPOSED ROADWAY „
LIMITS OF PROJECT
Y ROW VARIES
�
' 777 MAIN STREET
3 PROPOSED SIDEWALK FORT WORTH, TX 76102
9
(BY DEVELOPER) PHONE 214-920-8323
Project Item Information Bidder's Proposal
Bidlist Item No. Description Unit of Specification BID QTY BID QTY BID QTY BID QTY BID QTY BID QTY Bid
p Measure Section No. PG.25 PG.26 PG.27 PG.28 PG 79 PG.35 Quantity Unit Price Bid Value
0241.1300 lRemove Concrete Curb 8r Gutter LF 0241 15 69 69 $10.21 $704.49
3137.0104 Medium Stone Riprap,dry SY 31 3700 15 15 15 15 60 $76.44 $4,586.40
3137.0105 Medium Stone Riprap,grouted SY 31 3700 4 4 4 4 16 $98.28 $1,572.48
3211.0400 Hydrated Lime 32 LBSISY TN 3211 29 20 52 46 34 49 200 $134.32 $26,864,00
3211.0501 6"Lime Treatment SY 3211 29 1269 3253 2845 2122 3042 12531 $2.39 $29.949.09
3213.0101 6"Conc Pvmt 3,600 psi a 28 days SY 32 13 13 1206 3073 2673 1990 2867 11809 $35.99 $425,005.91
3213.0301 4"Conc Sidewalk SF 1321320 56 56 $9.38 $525.28
3213.0501 Barrier Free Ramp,Type R-1 EA 32 13 20 8 2 10 $1,298.28 $12,982.80
3213.0506 Barrier Free Ramp,Type P-1 EA 32 13 20 2 2 $1,153.84 $2,307.6B
3441.4006 Install Alum Sign Ground Mount EA 34 41 30 10 10 $354.90 $3,549.00
3471.0001 Traffic Control MO 3471 13 1 $1,365.00 $1.365.00
9999.0004 Remove and Relocate Existing Barricade EA 00 00 00 11 1 $1.318.54 $1,318.54
9999.0005 Install Standard Barricade EA 00 00 00 1 1 1 3 $1,218.40 $3,655.20
9999.0006 Pavement Header LF 1000000 37 29 29 29 1 124 $8.24 $1.021.76
9999.0007 4"Double Yellow Buttons Elbows LF 00 00 00 79 79 79 237 $2.46 $583.02
9999.0008 Signs W1-1L EA 00 00 00 2 2 $382.20 $764.40
9999.0009 Signs W1-1R EA 000000 2 2 $382.20 $764.40
9999.0010 Signs W13-1P EA 00 00 00 2 2 $382.20 $764.40
9999.0011 Stop Sign Only EA 00 00 00 8 8 1191.10 $1,528.80
9999.0012 IName Blade Only EA 00 00 00 1 1 10 10 $425.88 $425880
TOTAL PAVING BID $524,071.45
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120
FUTURE 1 I L
I I I I L _ 1 �\ PRIMROSE I I I I
ice^ FUTURE 1 11 I 1 1 1 I II II -1 �i \/ \\\�` / !/ CROSSING I I I I
I J PHASE 2 I
PRIMROSE 11 I 11i1`.1_-1J I
\ i CROSSING
IROPD
\\ C� 21 / / WT
1 -1 !
1\
CONNECT TO /
! ! a EXISTING 48" 4
!/ /! RCP
SCALE:1" = 200'
E y I
/ 21
V
CONNE T TO
/ I EXISTING 42'
'E 1_ —i— 1 RCP
GLENWICK DRIVE ; SD-A 24
Co
I z
FUTURE EXISTING
I a PRIMROSE
PRIMROSE I
o CROSSING I I CROSSING
ui BELHAVEN DRIVE
w I I I I I 1 I
I I I I I 1 1
4x4 F---__
I I I I I
I I I I I I "�y ----
STORMI I I I I I I I
W
m I I I I I I I I I I I I I I I I I I I I r-----
EXHIBIT 'B1'
I I I I I I I I I I I I I I I
i I 1 I 1 I 1 I I I I I I I V I 1 V 1 I 1 I
0 --L--1--"1--J---I---� �.�--L--1--1--J---1•--L--1--1--J---I---L--1--� .,,,. -.
Q
0
PRIMROSE CROSSING
E
LEGEND PHASE 3B
ll
N
Y PROPOSED STORM DRAIN LINE n
PROPOSED INLET T JCOB
0
0 A
PROPOSED MANHOLE
X 777 MAIN STREET
EXISTING STORM DRAIN LINE FORT WORTH, TX 76102
o PHONE 214--920-8323
LIMITS OF PROJECT
Project Item Information Biddet's Proposal
Bidlist Item No. Description Unit of Specification BID QTY BID QTY BID QTY I Bid Unit t Price Bid Value
Measure Section No. PG.30 PG.31 PG.32 I Quantity
4
A<
3305.0109 Trench Safety LF 33 05 10 6101 360 196 1166 $0.25 $291.50
3341.0201 21"RCP,Class III LF 3341 10 50 21 196 267 $50.05 $13,363.35
3341.0205 24"RCP,Class III LF 3341 10 560 560 $57.50 $32.200.00
3341.0309 36"RCP,Class III LF 3341 10 66 66 $92.00 $6,072.00
3341.0402 42"RCP,Class III LF 3341 10 — 273 273 $118.56 $32,366.88
3349.0002 5'Storm Junction Box EA 33 49 10 1 1 $5,200.00 $5,200.00
3349.5001 10'Curb Inlet EA 33 49 20 2 2 4 $3.355.00 $13,420.00
3349.5002 15'Curb Inlet EA 33 49 20 41 4 $4,290.00 $17,160.00
3349.7001 4'Drop Inlet EA 33 49 20 1 1 $2,285.00 $2,285.00
9999.0002 Remove 48"Headwall EA 00 00 00 1 1 $775.83 $775.83
9999.0003 Inlet Protection Sta e 1 EA 00 00 00 6 3 9 $150.00 $1.350.001
1-9999 0015 IStorm Drain Concrete Collars EA 00 00 00 2 1 3 $100.00, $300.00
1 TOTAL STORM DRAIN BID $124,784.56
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
F.—Revised 20120120
�\ FUTURE 1 I I..
LI ^ �� / ! / PRIMROSE I I I I I
1 �� CROSSING I I
/ FUTURE I 1 1 1 I I I I 1 1 I / /r— �./ j PHASE 2 I I F
\ / PRIMROSE I 1 I l__L_ _1J���.' 1 �� / !�� / �� 1 I 1 I
\ / / CROSSING 1 `
>
bb
!
!
!
t // !! SCALE:1' = 200
GLENWICK DRIVE
S '
�,-
' TL-1--'—r--I
w I I I I I ��•.
\ FUTURE I I SEXISTING
PRIMROSE
PRIMROSE I CROSSING
6 CROSSING I I
V
vi BELHAVEN DRIVE
D
I I I I I I I I
a I f I I I I I H—_---
i I I
-----
STREET LIGHTS
L _1T--ti--1`--_�---4 L I 1 I 1 I I I I I I I I 1 I
w I I I I I I I I I I I I I I _.. EXHIBIT 'C'
co I 1 1 1 1 I 1 I I 1 I I I I I I I I I r-----1
n I I I I I I I I I I I I I I I I I I I I
a
PRIMROSE CROSSING
0
LEGEND PHASE 311
X PROPOSED SINGLE STREET LIGHT n
a EXISTING SINGLE STREET LIGHT ��
JACOB.
0
Ln
Y STREET LIGHTS BY OTHERS 777 MAIN STREET
3
FORT WORTH, TX 76102
o LIMITS OF PROJECT PHONE 214-920-8323
J
i
Project Item Information Bidders Proposal
Bidlist Item No. Description Unitof I Specification BID QTY Bid Quantity Unit Price Bid Value
Measure Section No. PG.35
Omw
7777-777 7 7777
2605.3015 2"CONDT PVC SCH 80 LF 26 05 33 1684 1684 $9.42 $15,863.28
3441.1502 Ground Box Type B w/A ron EA 3441 10 5 5 $362.00 $1,810.00
3441.3001 Rdwy Ilium Assmbl Ty D25-6 EA 3441 20 15 15 $1 292.00 19 380.00
3441.3201 LED Lighting Fixture 70W EA 34 41 20 15 15 $510.00 $7 650.00
3441.3301 Rdwy Illum Foundation TY 4 EA 35 41 20 15 15 $1,223.00 $18345.00
-6 Triplex AlumElec Conductor-6 LF 3441 20 1684 1684 $2.701 $4,546.80
TOTAL STREET LIGHTS BID $67,595.08
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Farm Revised 20120120
�� ^.—tet✓—r 1 1 1 1 1 FUTURE 1 I L
l 1 11 11 1 1 1 1 I L _ I / /� / PRIMROSE
`�` CROSSING 1 1 I 1
FUTURE 1 11 `I/ PHASE 2 ` Ti` r ADD STREET NAME
PRIMROSE 1 1
�< moi' CROSSING I 11 1 I / ,/ / / ,/ / r L_� , BLADE TO EXISTING
\ \ � <
� �� \ r 1 / // // // jam\ ,/ /, /� ^` STOP SIGN
< 00
SCALE:1" = 200'
o
GLENWICK
0
l 1 I I
DRIVE
ADD STOP SIGN
TO EXISTING LIGHT
c'l / 1
/ � �' POLE
to
io i I T1_1---r--I---
I I I I I
FUTURE I 1 Q
EXISTING
04 PRIMROSE I I Q PRIMROSE
CROSSING I I ICROSSING
68J AVEN DRNE
r I 1 1 I I
I I I 1'-----
w I I I I I I I I
I I I I 1 I I 1
yb —1I II I I II II
1I I I I II I I 1 I I I I
STREET SIGNS
W EXHIBIT 'C1'
co
_— L--1--1--J---L--� 1.---L--1--1--J---I---L--1--1--J---I---L--1--/
o I
O
LEGEND PRIMROSE CROSSING
o Q PROPOSED STOP SIGN PHASE 3B
N
X 0 STOP SIGN WITH STREET NAME BLADE � � ""
LL J Ca S
o
S STREET LIGHT TO INCLUDE STREET NAME SIGN
Y : C STREET LIGHT TO INCLUDE STOP SIGN & STREET NAME SIGN 777 MAIN STREET
3 FORT WORTH, TX 76102
J
EXISTING SIGN PHONE 214-920-8323