Change Order Request Breakdown
Project Namel Old Decatur Road and Angle Ave Roundabout City Sec# 1 —2044 t/11r1 e
Client Project#(s)l 3123
Contractorl Jackson Construction, Ltd PM Lissette Acevedo Inspectorl Michael Collier
Change Order Submittal# Date 2/22/2016
Dept. TPW WATER SEWER Contract TimeTotals CD
Original Contract Amount $1,620,708.86 $148,215.00 $205,457.00 $1,974,380.86 150
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process) $73,060.90 $5,464.26 $11,136.33 $89,661.49 30
Contract Cost to Date $1,693,769.76 $153,679.26 $216,593.33 $2,064,042.35 180
Amount of Proposed Change Order $5,694.00 $32,168.77 $1,657.04 $39,519.81 7
Revised Contract Amount $1,699,463.76 $185,848.03 $218,250.37 $2,103,562.16 187
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00 $0.00 $0.00
Additional Funding(if necessary) $5,694.00 $32,168.77 $1,657.04 $39,519.81
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.57.
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,467,976.08
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Lowering 8"waterline as it is in the lime subgrade. Control points are for redesigning the sewer alignment. Gate valve is to get water to
apartment complex when working on the line. Multiple water valve test shutoffs to determine the cause of the apartment complex not getting
water delayed the contractor from moving on to liming and paving over the waterline needing to be lowered. Solar panels are for portable
message boards to last longer than 5 days,city to own message boards post construction.
a
Mary L Kay ity
Y
4 51
2 89
ECEIVED
APR 12 2016 �I
OFFICIAL RECORD WY OF FORTWORTH ,
CITY SECRETARY o
CITY SECRETARY �a
FT.WORTH, TX ,�s8 9 9 V £!
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Old Decatur Road and Angle Ave Roundabout City Sec# 2014
Client Project# 3123
Contractor Jackson Construction,Ltd PMJ Lissette Acevedo InspectorF Michael Collier
Change Order Submittal# 0 Date 2/22/2016
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Units ota
TRENCH SAFETY WATER 200.00000000 LF $1.F0
TEST,CHLORINATE WATER 1.00000000 LS 3,066.85
CONNECT TO EXISITING 8' WATER 2.00000000 EA 37544.99
REMOVE EXISTING 8'WATER WATER 240.00000000 LF 6.50
EXTRA CONTROL POINTS FOR SANITARY SEWER SEWER 1.00000000 LS $1,657.04
8'CUT IN GATE VALVE WATER 1.00000000 LS 3,951.94
SOLAR PANELS FOR PORTABLE MESSAGE BOARDS TPW 3.00000000 EA 1,898.00
Change Order Additions Page 1 of 2
TPW $5,694.00
WATER $32,168.77
SEWER $1,657.04
Sub Total Additions $39,519.81
Change Order Additions Page 2 of 2
FoRr Wo City of Fort Worth
T Change Order Deletions
Project Name Old Decatur Road and Angle Ave Roundabout CitySec# 2014
Client Project# 3123
Contractor Jackson Construction,Ltd PM Lissette Acevedo Inspector Michael Collier
Change Order Submittal# 0 Date 2122/2016
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW $0.00
WATER $0.00
SEWER $0.00
Sub Total Deletions
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
$0.00
Total $0.00
Previous Change Orders
co# DATE AMOUNT
co#1 1/7/2016 $4,483.07
Total $4,483.07
CFW Change Order Approval St-COApp02 Page 2 of 4
FORT WORTH. city of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 2
Change Order No.: St-COApp02 Date Started: 2016-03-28
City Sec. No.: 47192 Date Due: 2016-05-17
Project Name: Old Decatur Rd and Angle Ave Roundabout TPW-2014-000089
Project Numbers: 02014 DOE Numbers:
6938
Project Re construction of Old Decatur Road from IH 820 to Angle Ave.
Description: including construction of a roundabout at the intersection of
Old Decatur at Angle Ave. (phase 1)
Project Manager: Lissette Acevedo City Inspector: Michael Collier
Contractor: Jackson Construction, Ltd
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
Water $ 32,168.77 34014 0200431 5740010 CO2380 2 7
TPW $ 5,694.00
Sewer $ 1,657.04
Total Cost: $ 39,519.81 Total Requested Days: 7
Approval Status:
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 4/12/2016
CFW Change Order Approval St-COApp02 Page 3 of 4
Approved: Yes
Comments:
User: Tara Fishback
Date: 2016-03-28 1:18 PM
Approved: Yes
Comments:
User: Tara Fishback
Date: 2016-04-07 11:01 AM
Approved: Yes
Comments:
User: Carmen Estep
Date: 2016-04-07 11:05 AM
Approved: Yes
Comments:
User: Lissette Acevedo
Date: 2016-04-07 11:10 AM
Approved: Yes
Comments:
User: Todd Estes
Date: 2016-04-07 11:35 AM
Approved: Yes
Comments:
User: Todd Blomstrom
Date: 2016-04-08 4:20 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2016-04-10 8:11 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-04-12 12:31 PM
Approved: Yes
Comments:
User: Jay Chapa
Date: 2016-04-12 1:28 PM
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 4/12/2016
CFW Change Order Approval St-COApp02 Page 4 of 4
Action Required: please approve