HomeMy WebLinkAboutContract 47675 ITV 8ECWV
Developer and Project Information Cover Sheet:
Developer Company Name: D.R. Horton-Texas ,Ltd.
Address, State,Zip Code: 6751 N. Freeway,Fort Worth,TX 76131
Phone&Email: 817-230-0800, mpallen@drhorton.com
Authorized Signatory,Title: Mark Allen,Assistant Secretary
Project Name and Brief Augusta Meadows
Description:
Project Location: 1700 Eastchase Pkwy
Plat Case Number: Plat Name: Augusta Meadows
Mapsco: 67X Council District: 5 City Project Number: I Do 33
CFA Number: 2016-019 DOE Number: <DOE#>
To be completed by s aff.
Received by: Date:
E: ki 7 v4
��-7r
City of Fort Worth,Texas VMNINI RECORD
Standard Community Facilities Agreement 0( V `;(� lTRM RV
CFA Official Release Date: 07.30.2015 YX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, D.R. Horton- Texas, Ltd., ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Augusta Meadows ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good andworkmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A)`®', Sewer(A-1) M', Paving(B) ®, Storm Drain(13-1) , Street Lights & Signs
(C) D.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured,licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
iii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253,Texas Government Code.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City,its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Augusta Meadows
CFA No.: 2016-019 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 317,895.50
2.Sewer Construction $ 392,096.00
Water and Sewer Construction Total $ 709,991.50
B. TPW Construction
1.Street $ 636,880.00
2.Storm Drain $ 177,806.00
3.Street Lights Installed by Developer $ 47,148.75
4. Signals $ -
TPW Construction Cost Total $ 861,834.75
Total Construction Cost(excluding the fees): $ 1,5719826.25
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 14,199.83
D. Water/Sewer Material Testing Fee(2%) $ 14,199.83
Sub-Total for Water Construction Fees $ 28,399.66
E. TPW Inspection Fee(4%) $ 32,587.44
F. TPW Material Testing(2%) $ 16,293.72
G. Street Light Inspsection Cost $ 1,885.95
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 50,767.11
Total Construction Fees: $ 79,166.77
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,571,826.25 x
Completion Agreement=100%/Holds Plat $ 1,571,826.25
Cash Escrow Water/Sanitary Sewer=125% $ 887,489.38
Cash Escrow Paving/Storm Drain=125% $ 1,077,293.44
Letter of Credit=125%w/2yr expiration period $ 1,964,782.81
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
D.R.Horton-Texas,Ltd,a Texas Limited
Partnership
By: D.R.Horton,Inc.,A Delaware Corporation,
Its Authorized Agent
Jesus J. Chapa
Assistant City Manager
Date: V"/>, —/�
Name: Mark Allen
Recommended by: Title: Assistant Secretary
Date: 7/10/Z o1,6
ATTEST: (Only if required by Developer)
Wendy Chi-Babulal, EMBA, P.E.
velopment Engineering Manager
Water Department
Signature
// '' Name: N `< <• oTt `T
(„J., W� L
Douglas W. Wiersig, P.E.
Director
Transportation &Public Works Department
Approved as to Form &Legality:
ATTEST:
Assistant City Attorney
M&C No. IJjA y se
City SeIF
etar
Date: �'���cc ®e0003,joa,
Fx%,
City of Fort Worth,Texas
Standard Community Facilities Agreement CITY SECRETARY( � AS,
CFA Official Release Date: 07.30.2015
Page 9 of 11 ��° ®���'��
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
®, Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100033
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
z
,TRFFT
O
F 60
ob
gSFAq
Z
D
� m
�O o
to
0G
smopeey4 ejsn6ny
J C,
d
W N (n
�
LU ^
z €wo
c SQ
. p
UW
� Q
g --
4� �\
- - -� r� -- - �-
� � I
I
6+D-1 F'P3 ca�eM tl1J\W!Et�aJJ`.»1�s'e�f aeeya)co3 t0'6f0{Y02\c9N�l
�P Hi Hof Z/f0/90i
smopeaw ejsn6ny
J
ti
J �
� C
6�a"o F- Q
o N dS e e w W 3 W
Z zhti Z n J 0 W S 9
� � v c=
yam$ a ctn��:°m
R.
2�u. �— �noa Jnr»• n — —'--
a = 8tm os I kga <e
s+oi;z�,n ss vior�xwz..a�v�•.narmz s a,ea��.o3�oeeonozuwrvi
moo,nem arzoimoz
sMopeaW e}sn6ny
J
J t'
ct
Q. P
T
3 2 N (n
OO N o
W �g E O
0 Q 2
w cco `O e K W �p"„ �
ca
Z W—a ala' m2
O
U N Wd 1 LL
Otfz
N t LL V
I9 U R
r _
�77
0
68J
gra? Ha-8
/
\ 'S..91
`$g, /
all
4Sffi " �erS ge. b'g ta
g
davnosd — —
e.c�rfv+a aronva vn�.ii¢L+3 vs��nrw3�vo��ad r=+mi.oa�oe>onoz�:xrvi
w la.�ryd CRS tt/LO/qa2
Smopea(N easn6ny
J
J C,
T
O Z o N U) e
o oHt
m zh�x� Om
w
a C
a U a a a
U
rc ¢ ¢ ¢ Le a ¢ w N— 3oa LL W y m
w N o in 7 2 O N 'n :�'ou.� U O
O V)d G U U�.e.
J uJ uJ N N N U~l K _ t
0
Hft
Aga
:_ _ € 31
3
I
6sOl!TIc3 Nll015 tld]\s'.wGt+O\Y.0]9dtlIIad d5 asryatco3 10'66uapZ�caer\l
•1 >Nd tit(6/20/40L
smopeaw e}snbny
J
J C'
d a
3 O T
O
C-9 = 2
$ $ w v � w Q w
N v u
�-
N
t oLLr, v p 5 0
/
V)o
o � �
U ¢ ig
66
sz
_gm u2 d3dv
/
9¢8
le LX
id
B
A
'I N §g eo
tt__ll O.D'3Rr1fi5 W!iNMt 133y15 tll]\izu£1W\VlJ`Jta\daf i5 acc�»co3 10"6f64102\*3=f\l
uwga Ifl 2Q6 4/20/402
00 42 43
DAP-BID PROPOSAL
Page 1 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BI® Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. I Measure Quantity
UNIT I:WATER IMPROVEMENTS
1 3311.0241 8"Water Pie 3311 10 LF 4,265 $34.00 $145,010.00
2 3312.0001 Fire Hydrant 33 12 40 EA 5 $3,500.00 $17,500.00
3 3312.2003 1"Water Service 33 12 10 EA 118 $800.00 $94 400.00
4 Water Meter Box 99 99 99 EA 118 $50.00 $5,900.00
5 3312.3003 8"Gate Valve 33 12 20 EA 13 $1,150.00 $14,950.00
6 3312.0105 Connection to Existing 12"Water Main 33 12 25 EA 2 $1,000.00 $2,00000
7 3311.0001 Ductile Iron Water Fittings 3311 11 TON 0.86 $4 500.00 $3,870.00
8 3305.0109 Trench Safety 33 05 10 LF 4,302 $0.25 $1,075.50
9 3312.4107 12"x 8"Tapping Sleeve&Valve 33 12 25 EA 1 $3,500.00 $3,500.00
10 3305.0006 16"Waterline Lowering 33 05 12 LF 37 $180.00 $6,660.00
11 Installation of 8"Carrier Pipe in Casing 33 05 24 LF 67 $140.00 $9,380.00
12 3305.1101 20"Casing By Other Than Open Cut 33 05 24 LF 65 $160.00 $10,40000
13 Remove Ash Pvmt 31 01 29 SY 65 $10.00 $650.00
14 Asphalt Pvmt Repair Beyond Defined Width 32 01 29 SY 65 $40.00 $2,600.00
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34 _
35
36 _
37
38
39
40
41
42
43 _
4441 1
TOTAL UNIT I:WATER IMPROVEMENT_N $317,895.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September I,2015 00 42 43—Bid PmposM_DAP_2016.03.04
00 42 43
DAP-BID PROPOSAL
Page 2 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BI® Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 8"Sewer Main(SDR-35) 33 31 20 LF 4724 $36.00 $170,064.00
2 4'Manhole 33 39 10 EA 24 $3,000.00 $72,000.00
3 Connect to Existing SS 33 31 50 EA 1 $1,000.00 $1,000.00
4 4'Diameter Manhole Over Existing Line 33 31 50 EA 1 $4,500.00 $4,500.00
5 4"Sewer Service(SDR-26) 3331 50 EA 118 $600.00 $70,800.00
6 Post-CCN Inspection 33 01 31 LF 4744 $2.00 $9,488.00
7 Manhole Vacuum Testing 33 01 30 EA 25 $50.00 $1,250.00
8 Trench Safety 33 05 10 LF 4744 $1.00 $4,744.00
9 SSMH Extra Depth 33 39 10 VF 8 $175.00 $1,400.00
10 8"SDR 26 3331 20 LF 20 $40.00 $800.00
11 Concrete Encasement 03 30 00 LF 20 $50.00 $1,000.00
12 Cement Stabilized Backfill 33 05 10 LF 320 $20.00 $6,400.00
13 Epoxy Manhole Liner 33 39 60 EA 4 $1,600.00 $6,400.00
14 Construction Entrance 31 2500 EA 2 $1,000.00 $2,000.00
15 Traffic Handling 3471 13 MO 1 $4,000.00 $4,000.00
16 Sanitary Line Grouting 0241 14 LF 80 $20.00 $1,600.00
17 Remove Cones and Fill w/Sand 0241 14 EA 2 $1,000.00 $2,000.00
18 Remove 4'Sewer Manhole 0241 14 EA 1 $1,200.00 $1,200.00
19 Remove 8"Sewer Line 0241 14 LF 200 $20.00 $4,000.00
20 Remove Conc Pvmt 0241 15 SY 300 $20.00 $6,000.00
21 6"Conc Pvmt Repair 32 01 29 SY 300 $50.00 $15,000.00
22 3216.0101 6"Conc Curb and Gutter 32 16 13 LF 90 $20.00 $1,800.00
23 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 270 $15.00 $4,050.00
24 SSMH Concrete Collar 33 05 24 EA 2 $300.00 $600.00
25
26
27
28
29
30
31
32
33
34 _
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $392,096.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 004243 Bid Proposal_DAP_2016.03.04
00 42 43
DAP-BIDPROPOSAL
Page 3 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BI® Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT 111:DRAINAGE IMPROVEMENTS
1 21"RCP,Class III 3341 10 LF 300 $48.00 $14,400.00
2 24"RCP,Class III 3341 10 LF 1046 $50.00 $52 300.00
3 27"RCP,Class III 3341 10 LF 279 $55.00 $15,345.00
4 30"RCP,Class III 3341 10 LF 108 $60.00 $6,480.00
5 33"RCP,Class III 3341 10 LF 273 $75.00 $20,475.00
6 4'Storm Junction Box 33 49 10 EA 6 $3,500.00 $21,000.00
7 6'Storm Junction Box 34 49 10 EA 1 $6,000.00 $6,000.00
8 10'Curb Inlet 33 49 20 EA 15 $2,200.00 $33,000.00
9 15'Curb Inlet 33 49 20 EA 1 $3,000.00 $3,000.00
10 10'Recessed Inlet 33 49 20 EA 1 $2,800.00 $2,800.00
11 Trench Safety 33 05 10 1-F 2006 $1.00 $2,006.00
12 Remove 10'Recessed Inlet 0241 14 EA 1 $1,000.00 $1 000.00
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
OTAL UNIT III:DRAINAGE IMPROVEMENT $1777806.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fonn Version September 1,2015 00 42 43 Bid Proposal_DAP_2016.03.04
00 42 43
DAP-BID PROPOSAL
Page 4 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BICC Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT IV: PAVING IMPROVEMENTS
1 6"Conc Pvmt 32 13 13 SY 15,155 $33.00 $500,115.00
2 4"Conc Sidewalk 32 13 20 LF 795 $12.00 $9,540.00
3 6"Lime Treatment 3211 29 SY 16,125 $2.50 $40,312.50
4 Lime(401 SY) 3211 29 TON 323 $165.00 $53,212.50
5 Ramps(Type R-1 32 13 20 EA 16 $1,000.00 $16,000.00
6 Ramps(Type M-1 32 13 20 EA 6 $1,200,00 $7,200.00
7 Construction Entrance 31 25 00 EA 1 $1 500.00 $1,500.00
8 Traffic Handling 3471 13 MO 1 $2,5W00 $2,500.00
9 Street Signs Assemblies incl.Name Blades 31 41 30 EA 10 $650.00 $6,500.00
10
11
12
13
14
15
16
17
18
19
20
21
22
_ 23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT IV: PAVING IMPROVEMENTS1 $636,880.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Proposal_DAP_2016.03.04
00 42 43
DAP-BID PROPOSAL
Page 5 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BI® Bidder's Application
Project Item Information Bidder's Proposal
BidlistItem Specification Unit of Bid
No. Description Section No. I Measure Quantity Unit Price Bid Value
UNIT V:STREET LIGHT IMPROVEMENTS
1 Relocate Street Light Pole 31 41 20 EA 1 $3,299.00 $3,299.00
2 3441.3301 Rdwy Illum Foundation TY 1 2 and 4 .344120 EA 10 $1,535.00 $15,350.00
3 3441.3002 Rdwy Illum Assmbly TY 8,1 1 D-25 and D-30 34 41 20 EA 10 $2,182.00 $21,820.00
4 2"Condt PVC 80(T) 3441 20 LF 385 $13.78 $5,305.30
5 #8 Aluminum Cable 35 41 20 LF 385 $3.57 $1,374.45
6 4"PVC Sleeve 99 99 99 LF 865 no bid
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
_ 23
24
25
26
27
28
_ 29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT V:OTHER CONSTRUCTION COS $47,148.75
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Verson September I,2015 00 42 43 Bid Proposal_DAP_2016.03.04
00 42 43
DAP-BID PROPOSAL
Page 6 of 6
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
Bid Summary
UNIT I:WATER IMPROVEMENTS $317,895.50
UNIT II:SANITARY SEWER IMPROVEMENTS $392,096.00
UNIT III: DRAINAGE IMPROVEMENTS $177,806.00
UNIT IV:PAVING IMPROVEMENTS $636,880.00
UNIT V:STREET LIGHT IMPROVEMENTS $47,148.75
Total Construction Bid $1,571,826.25
Contractor agrees to complete WORK for FINAL ACCEPTANCE within !d;t>� calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 00 42 43—Bid Proposal_DAP_2016.03.04