Loading...
HomeMy WebLinkAboutContract 47676 vI. Developer and Project Information Cover Sheet: Developer Company Name: BYD Talon Hill Development Address, State,Zip Code: 1203 S White Chapel Blvd Ste. 250 Phone&Email: 214-626-8590, www.grahamhart.com Authorized Signatory, Title: Shawn Goff, Manager Project Name and Brief Talon Hill Phase 1 Description: Project Location: Eagle Ranch Boulevard and Lake Country Drive Plat Case Number: FP-15-044 Plat Name: FP-15-044 Mapsco: Council District: 7 City Project Number: 02649 CFA Number: 2016-007 DOE Number: 7505 To be complete by taff` Received by: WA a City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 ciTy SECRE1�AM Page 1 of 11 ^�Ifs P1 nR ' 9,II l STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, BYD Talon Hill Development, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Talon Hill Phase 1 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ©, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infi•astructure for a period of two (2) years fi-om the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 11 �n maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 11 v Cost Summary Sheet Project Name: 02649 CFA No.: 2016-0007 DOE No.: 07504> An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 404,762.20 2.Sewer Construction $ 590,514.75 Water and Sewer Construction Total $ 995,276.95 B. TPW Construction 1.Street $ 999,207.69 2.Storm Drain $ 64,617.00 3.Street Lights Installed by Developer $ 97,075.12 4. Signals $ - TPW Construction Cost Total $ 1,160,899.81 Total Construction Cost(excluding the fees): $ 2,156,176.76 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 19,905.54 D. Water/Sewer Material Testing Fee(2%) $ 19,905.54 Sub-Total for Water Construction Fees $ 39,811.08 E. TPW Inspection Fee(4%) $ 42,552.99 F. TPW Material Testing(2%) $ 21,276.49 G. Street Light Inspsection Cost $ 3,883.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 67,712.49 Total Construction Fees: $ 107,523.56 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,156,176.76 Completion Agreement=100%/Holds Plat $ 2,156,176.76 x Cash Escrow Water/Sanitary Sewer= 125% $ 1,244,096.19 Cash Escrow Paving/Storm Drain= 125% $ 1,451,124.76 Letter of Credit= 125%w/2yr expiration period $ 2,695,220.95 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER BYD Talon Hill Development LC Jesus J. Chapa Assistant City Manager Name: Shawn Goff Title: Manager Date: Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi- bulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: 00 � �a Dou rsig, P.E. Dire �® Transportation&Public Works Department M J Approved as to Form &Legality: ATTEST: ' (�v�7 � e,,J ,,Q A- 4 laty J. Assistant City Attorney City Secre ary M&C No. h)1A Date: H L611Lt Fa l Z15 Carl �.'c •b,. : 44 City of Fort Worth,Texas Standard Community Facilities Agreement OFFICIAL RECORD CFA Official Release Date: 07.30.2015 Page 9 of 11 CITY SECRETARY FT.WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments ® Water Cost Estimate © Exhibit A-1: Sewer Improvements © Sewer Cost Estimate ® Exhibit B: Paving Improvements © Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate © Exhibit C: Street Lights and Signs Improvements © Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 02649 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 10— Page 11 of 11 Z Z QQ® Q 3 QGN n Lake Country cn �' Golf Club z 0 oN Ul n GOLF w o � a 0 o F'Qpo CLUB n �' M n2 O-o 'V DALHART!� �NCN MULE SHQ. --az Ep,GL 8 VO- CHALK_ RIVER p SIERRA MAD = o a I� 2 ROBERTSON °J I I TALON HILL ADDITION 112124- VICINITY -..VICINITY MAP N. T. S. N COUNCIL DISTRICT 7 MAPSCO 32 - L, M La �er U J Cj J a � N URS w > a, J O 7 6 S 0 O w �s • o p[ W QoXm 14 N LLJ > 2'n W cO z W UWP(col 13 - N _ � Lin J = JN - 122 LE 171 RANCNO LLJ = � _ EAGzUS /W BOOLEVA----- -i o 0 L) < N 10 \ m .9 O P SUE EVpS1oN DR. ,�.. 20 �0 7 I to it Ili \__.. -' i 6 _ WCN 17 13 I K • z J W cr II 1 11 1s I z t4 7 I o 3__ -----' � J W W 111 _ __ z Q La O I 14 16 S t c0 C9 eL a s a m —W c03 I, I Ur 13 --- 4 PROP.B" � � a 1 . —� 17 a a a Z = 11�.--- ----r--- NULAVU T. U10 1, I1►� 12 le 3 O -- zz ► 11�- ._— ----�---- -- —� W n3 �'�� 19 2 ------ O 1 I 2 3n 20 , 3 1aJ W ~ JJ;iz 1 RELIANCE ST. i ./ 11 . 10 i 9 i e 7 6 S ` 11 W ` n ----- Q g & LL LL LLP CL -------------- ------------------ Q � LLP OLL ■ OJ W W W W J 1U 120 ------------------ — ------------- -- -- c �0 ROBERTSON ROAD ------ ' -------EXIS--T.-1- L W----------�- }--- i ,��•�1�'ri2" ----------------------------------------------------------- ------ \ �— M W I.- LLP W J 0 J H Z W J o Ln —W 003 WCY Cl wW O w <. = N LlJ > _s w F- W U NP W z�T ' wLz FLLI ZZ J = J K= � _ � jN Z u) Q N uu)i W 3 W \ W I4:3 � Z '•` m S \ r \ ,a •`. ,p ` POS r— LU 3 LLP i LLP 19 IX 4 --- I --- — Q 1 � I aLa = Q . ' OD 0 w ► - ? -i --� -� -- -r 0 0 0 pp _-pip �- w _ .� J •`'• �M" doad WEATHERLY ST. ze• Q no m 0: X IX i lid LLP LLI 0. ♦ �, TALON DRIVE Q Q LLJ LO . EIgo e� / _ Q s e / , I ♦ I ,� •�! In VI to•1 ` X X X O W W W J W U F I I Y r J E AVIV ad EAGLE RANCH BOULEVARD ' 1, i , i i � T 1 1 1 i � i C SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT I: WATER IMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10 LF 9,022 $ 0.1 $ 902.2 2 3311.0001 Ductile Iron Water Fittings w/ 33 11 11 TON 2.0 $ 2,830.0 $ 5,660.0 Restraint 3 3311.0261 8"PVC Water Pipe 33 11 12 LF 7,304 $ 20.0 $ 146,080.0 4 3311.044112"PVC Water Pipe 33 11 10 LF 1,718 $ 40.0 $ 68,720.0 $ 13312.0001 Fire Hydrant 33 1240 EA 11 $ 3,700.0 $ 40,700.0 6 3312.0117 Connection to Existing 4"-12" 33 1225 EA 2 $ 1,000.0 $ 2,000.0 Water Main 7 3312.2003 1"Water Service 33 1210 EA 116 $ 700.0 $ 81,200.0 g 3312.3003 8"Gate Valve 33 1220 EA 28 $ 1,250.0 $ 35,000.0 9 3312.3005 12"Gate Valve 33 12 30 EA 4 $ 2,150.0 $ 8,600.0 10 0241.2001 Water Line Grouting/Abandonment 0241 14 LS 1 $ 3,700.0 $ 3,700.0 11 3312.4107 12"x8"TS&V 33 1225 EA 2 $ 3,700.0 $ 7,400.0 12 3313.4109 12"x12"TS&V 33 12 25 EA 1 $ 4,800.0 $ 4,800.0 TOTAL UNIT I:WATER IMPROVEMENTS $404,762.20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS e Form Version April 2,2014 CFA Bid Proposal—DAP L) J \ \ TpJO w > rn J O m � ' ��• •\ • �/ 7 a O O W �O \ ' V W is N , J Lia IZ O --- O m Z) J N co O E3 W 10 m \ Ir2 19__3 20 �11 1 tO 19 --I .�'6 - W ` 4J �- I I .1 �• •r 9 I V) w �-'— 0 1 t7 p1 13 LU Z 1 11 1 7 CD 0 14 3 Ldw = 1 11 's 1 '� I a W0 I• I I "`— ��aa zz 14 to 5 n-x 1 -- �-- --- Z 7 m 11 is 4 L ENDEAVOR ST. O wN 1 11 —� 17 y1 NW 1 ,1•1 12 d ..— to I S � J V J /\ z l �z 1 1 1`" .---`---- .. -- w �'►� 19 2 U) ----- . 2 \ a --—- ------ �20t l 0 IL l , cr \ \\ RELIA•CE ST. LLJ 11 , LLJ IL 10 9 E 7 , a 9 � LLPLd 0 y $ e i --- - co2W2o : pj O m m xx x o / I W a a W I (j ROBERTSON ROAD y�Nr, •��, M LLI W (, l• J W > rn GDN �O'\ off_. ro � 4JW ,\•\ dC� b O W UQl CS O 0C W N w > w IO Lu 0141-14 zz = gN JO / /•/' LaJ Lain Wo G JZ / / / /tntn / \ �\ I'/' 10 N cl cl N 10 Iff .,x 71 LULUVatN cn to 1414 -pip SRO'dM4 Q w /o • �/ I 1 W r 30 I1 W at I _5 0 OR —7l1WkL pRLYE 1- - 2 d a � ./1 n Q F H ■ of L / /� ry1� /• 0 0 N N ~ o LL m . 0 . -+ BOWEVARD [E RANCH• �`� I (\�A I / co I l l 1 i---- T----i - 1 1 1 I I Z '- 1U vv SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT II: SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 3301 31 LF 9896 $ 1.00 $9,896.00 2 3301.0101 Manhole Vacuum 3301 30 EA 45 $ 130.00 Testing $5,850.00 3 3305.0109 Trench Safety 33 05 10 LF 9896 $ 1.00 $9,896.00 4 3339.0001 Epoxy Manhole Liner 33 39 60 VF 170.00 $200.00 $34,000.00 5 3305.0202 Imported Embed/CSS 33 05 10 LF 162 $ 43.00 $6,966.00 6 3331.5304 8"PVC Sewer Pipe (0-8) 3331 20 LF 6146 $ 27.50 $169,015.00 7 3331.5307 8"PVC Sewer Pipe(8-10) 3331 20 LF 2021 $ 30.25 $61,135.25 8 3331.5310 8"PVC Sewer Pipe(10-12) 3331 20 LF 729 $ 33.50 $24,421.50 9 3331.5313 8"PVC Sewer Pipe(12-14) 3331 20 LF 530 $ 37.50 $19,875.00 10 3331.5316 8"PVC Sewer Pipe(14-16) 3331 20 LF 470 $ 43.00 $20,210.00 11—9999.0001 Connect to Exist MH/Pipe 3331 20 EA 2 $ 3,100.00 $6,200.00 12 3331.3101 4"Sewer Service 3331 50 EA 116 $ 650.00 $75,400.00 13 3339.1001 4'Manhole 33 39 10 EA 41 $ 3,000.00 33 39 20 $123,000.00 14 3339.1002 4'Drop Manhole 33 39 10 EA 3 $ 7,000.00 33 39 20 $21,000.00 15 3339.1004 4'Shallow Manhole 3339 10 EA 1 $ 1,970.00 33 39 20 $1,970.00 16 0330.0001 Con.Encasement 03 30 00 LF 48 $ 35.00 $1,680.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $590,514.75 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 CFA Bid Proposal_DAP \ '\ U J Z p N •\ `� W JCL m � m O W U)C) s o z w c>W�� W�ui \ ,\ F U) 13 \ �- • •/� LJ O o m 12 • E ` 1 d. \ • 10 • \� 20 LU L.0 10 CN 1 I I .19 .I r -tz 9 �i r s = L.L. 0 17 I �.1- 13 I e 1... f4 -14 I i-3 LCL co 1S I IS I ° I '� I 2 .. - I En 14 1 X11' 1S V ---� I 17 OZ x �, -r---- _ LU VOR 1: 1D i—, -- - > I '1 �'►� .19 2 ------ 20 J \s �...J.. ..� s i 0 --9EUAfQCC9T', lot a. S ----- Z CRO W 0 0 W J / II W 8 J � n • O co -------------------------- — . 0 ROBERTSON ROAD --------------------------------------------------------------------------------------- U J F z ❑ N W J O fD O w U)o J a w > =N Lu O O Z W UWHto N 0 rU)Y� O J = ¢� > 2" _ z U5 ~ W OJ o C) Q F- U � i N m It .. Z c* - : • � ?, � ;� Quo =tow .,.� .� > CN ,/ 'tom' 'e • .� ?► _\ q 3,vp �0 O ID zo rn LU k3j •q: E y ERL'[ f" fog�,«qq �—•, '::T.:^.--(• e� __"� ; IIto Ic o r. 1 1 O W r � c WO fig TALON.'•DRLVF' $ l W u e• / / e 3 ♦ J c � a . I z tl J ' 1Q I • WX J EAGLE NANCH SOULEVARD m / ! ----------------------- 1 1 \ \`��!,_ I i 1 i i i i '� it jl l- `✓.� SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT IV: PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime 32 11 29 TON 330 $ 173.00 $57,156.69 2 3211.0501 6"Lime Treatment 3211 29 SY 24473 $ 3.00 $73,419.00 3 3213.0101 6"Cone Pvmt 32 1313 SY 23079 $ 31.00 $715,449.00 4 3213.0301 4"Cone Sidewalk 32 13 20 SF 9360 $ 3.80 $35,568.00 5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 27 $ 1,400.00 $37,800.00 6 9999.0001 Install Type III Barricade 00 00 00 EA 5 $ 2,475.00 $12,375.00 7 3212.0304 4"Asphalt Pvmt Type D(including 32 1216 SY 1106 $ 40.00 base) $44,240.00 8 999.0002 Install Type R-1 Stop Sign and EA 16 $ 1,450.00 thermoplastic Stop Bar per Plan $23,200.00 TOTAL UNIT IV: PAVING IMPROVEMENTS1 $999,207.69 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 CFA Bid Proposal_DAP.xls U J J 1-- O`_ LL m p0 , 1 a 5 �o / I �Q( ` 14 N W > 2W� LLI N z WHW C• 12 O m J p O to /•- V) ~ 0 10 _ m 1 oDR. 20 CONSTEl1AT1_,..� 10 1 11 'te .� 12 .r—_9.�i r.5 --- Z k o -�. -- ---- Q a .�• w _.�-r .�.. 0 14 1 7 I O I 3 z z _ z - --- J I I I 15 I 15 I 1 a I N I •2 O ------ 3 J W SS -- a .. -P� �.-� Y W a' 1 j 1 14— t6 s._I .. g ------ a N I --- Z O m I 11 .tS—J I 17_ I •_—I ENDEAVOR ST. ------ a W I--- O V) = 1 1��•12 1a 3 BLOCK 0 -- J 1 11 - -�---- -- w `1 19 2 ------ , 20 t l ' 1 RELIANCE ST. ..� W 10 9 e 7 a 5 ----- p z v in iI I - W G W O '� ~ C9 > W / ------- W cc I.- 2 DC J O 1'.t W / I I o: a: C: g n O -------------- ----j------ I a a a .-1 O II i W J I � II ® F, II m -- --- ------- -----�- 1� – – – --------------- ---- ---- – O --------_--------------------- ------------ =-- o ROBERTSON RO D ----------------------------------------- ----------- U J H Z N w J (D m O W U)C, O J QXm N w j 2' Wm �j Z w C)Lu LJ = FIN ZUS O m p N N U) to 20.g0 \ \ •� o .� PO`s?' \ "•� �� ,6 ?i • w N 'f ,v O O CN or r .% •� r- I g J m _ o s I a W Z O m Pip O V _ 9�A(b p WEATHERLY ST. f < LU It ?9 JA J J x L Z 13 Ld J •� o ', L,J o L,, -11 -i Cox 0 CL ♦ �• G "TALON DRIVE r Q ' J I- a L` e r ! o LL • /• ? m I s 1 ? O O O 1O as as as -i v ci 0 J !a I 1 W J EAGLE RANCH BOULEVARD ' ----------------s--- ----------- Z SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of No. Description Section No. Measure Bid Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3305.0109 Trench Safety 3305 10 LF 619 $ 1.00 $619.00 2 3341.0205 24"RCP, Class III 3341 10 LF 619 $ 61.00 $37,759.00 3 3349.0001 4'Storm Junction Box 3349 10 EA 2 $ 4,250.00 $8,500.00 4 3349.5001 10'Curb Inlet 3349 10 EA 2 $ 3,300.00 $6,600.00 5 3349.5002 15'Curb Inlet 33 49 20 EA 1 $ 3,750.00 $3,750.00 6 3349.1003 24"Flared Headwall 33 49 40 EA 3 $ 1,700.00 $5,100.00 7 0241.3015 Remove 24"Stm Line 0241 14 LF 53 $ 18.00 $954.00 8 0241.3104 24"Stm.Aband. Plug 0241 14 EA 1 $ 635.00 $635.00 9 0241.4401 Remove Hdwl 0241 14 EA 1 $ 700.00 $700.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $64,617.00 CITY OF FORT NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 CFA_Bid Proposal_DAP.xls U J Z c� - LU > o 1 � m � g\� o U) m a i s i w W =mo w C) Z W U N F- 14 ,% ' I NJ w LL, 13 f N 2 FN /- o W Q N O ca 12 `n 10 oom IMP 20 C LU Is �.s 17 13 I 11 ttsce 15 2 z - m 11 t4 i t6 sa I—� 1 I I I 13 -� I 17 +__, ENDEAVOR ST. - O W X i II ,s �---- r Q LU to - -�-3 �------- 1 I I 19 Z I - I \ ^---- _ _ \\ J RELIANCE ST. I C7W. 11 R.•10 9 0 7 6 �• S I Q W W 1-- Ao W a. V 1[ o o�i a W J N� LL J �0 / In O tt 9J0 LL ( ( ti C j II 0 x W co I � v ROBERTSON ROAD U J H z O c) W J O ID � o LU CO O J dLO W Q4 m LLI > =N W N � 0 UW~CO �T J ;gam 1V _ FN z vi � Om O W J N to 4 j U 0 i N m m \ • 1. to to / to ��? w � ��r 'e .� a. •.•mar q.�`v ^� �� -llb* Q w EATHEItLY ST,..,.— /o zo r = 8IL c� --T- -�� / J / 3 W W F- 0: W t g LALONURIVk---: •' /..� 4J W a 8 j —1 3 -�. 8 lo • � 1 a cc W J z J � I W Q ' m EAGLE RANCH SOULEVARD �-f' \ a U J 00 Z > N _--T—f w ao 7 �i j L LJ > -E n W� / ® z W UN F-tNo ` 14 CN W F ui �• W a O = > JN �- 13 •� d 1V _ > �v �• ` Q 12 W. N 0 m '. 10 3 .:� 1 -oNSTEupT10N I 20 C , •7 W I--I 1- 18 •1 12 'r-9 el •r S '- 17 I G �•t3 I E 14 I ---- 16 Z 14 7 O I 3 19 ` t0 I 6 ....... CID_ �I li— I I 16 -�—S--I ' -- z LT LLL 1 13—� I 1 7 I 7 I-4 I E DEAVOR T --- J X ---: -- Q w W L.- ,a 3 � 19 2 ------ H �----ti M RELIANCE ST. ,.� I O e 11lp 9 0 7 B S �______ Z Z h a ui - --- r r � o --- LL ta La a 3 / O '° W (n LL / 0 N I � oo O - lu c ______________________1 a 4J -1 J Z W J i — — - - _ m --------- — ------------- o ROBERTSON ROAD --------------------------------------------------------------------------------------- U J Z N W >> rn J m o W tiO �C) a QQ � W QoXm W > 2M,w� 0 Z � C) c" J F-;gd J = r z 7 c7 O W J O Q N / \ N } CO \ ,yLn P is '• d to e to LU 10 19 --------F-T. z �--1 22 Re Oma = W w O WEATHERLY ST.it 'Oslo . CL . ate —' mO d n Ld I j j l •Jo �, "'j, � . /• r ac r d ILL. LLI LLP ♦ �''` d TALON DRIVE j 1 t! o2S 1` W I Z AGLRANCH, T--- LEVARD 1 1 \ t ca j 11 1 Z -__ � SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Description Bid Quantity Unit Price Bid Value No. Section No. Measure UNIT V: STREET LIGHTING IMPROVEMENTS #REF! 3441.3002 Rdy ILL Assembly Ty 8, 3441 20 EA 27 11, D-25 and D-30 $ 1,666.00 $44,982.00 #REF! 3441.3201 LED Lighting Fixture 34 41 20 EA 27 $ 512.00 $13,824.00 #REF! 3441.3301 Rdwy III Foundation TY 1,2 3441 20 EA 27 and 4 $ 1,032.00 $27,864.00 #REF! 2605.3015 2"CONDT PVC SCH 80 26 0533 LF 1478 T $ 5.14 $7,596.92 #REF! 3441.3401 6-6-6 Triplex Alum Elec 3441 20 LF 1478 Conductor 1 $ 1.90 $2,808.20 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $97,075.12 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 CFA Bid Proposal_DAPaIs SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit of Description Bid Quantity Unit Price Bid Value No. Section No. Measure UNIT VI: STREET NAME SIGNS IMPROVEMENTS 1 Street name signs EA 1 16 $245.00 $3,920.00 TOTAL UNIT V: STREET NAME SIGNS IMPROVEMENTS1 $3,920.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 CFA Bid Proposal_DAP.sIs