Loading...
HomeMy WebLinkAboutContract 43361-A4 aU' JfY SECRETAW <„ CONTRACT W. APR 2 Q 2016 AMENDMENT No. 4 Alt �GI�YSC ,- TO CITY SECRETARY CONTRACT No. 43361 WHEREAS, the City of Fort Worth (CITY) and URS Corporation, (ENGINEER) made and entered into City Secretary Contract No. 43361, (the CONTRACT) which was authorized by M&C No. C-25611 on the 15th day of May, 2012 in the amount of $485, 932 . 58; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $28, 660 . 00 which was administratively authorized on the 7th day of January, 2013; and Amendment Number 2 in the amount of $74, 500 . 00 which was authorized by M&C C-26487 on the 7th day of October, 2013; Amendment Number 3 in the amount of $125, 500 . 00 which was authorized by M&C C-27095 on the 11th day of December, 2014; and WHEREAS, the CONTRACT involves engineering services for the following project: GARDEN ACRES BRIDGE PHASE 11; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 10, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $104,077. 95. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase- in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $818, 677. 53. 3 . All other provisions of the Contract, which are not expressly City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 rOFFICIAL RECORD Page 1 of 3 SECRETAR WORTH,TX amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Po a t ' n Jesus J. Chapa ar bel h vez, PE Assistant City Manager Vice President DATE: 1 a'b /(� DATE: APPR AL RECOMMENDED:. tj\ W L^ .. - Douglas W. Wiersig, PE Director, Department o Transportation And Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C:�L - � Date : Douglas Black Assistant City Attorney ATTEST: 11,h 0 0 ary J erg City Sec etar b 8`y °a000�aoo10,060 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 f Page 2 of 3 ��p��1���ry�+�g ��+ �A� �EGiCA9d�'U��9N��1� F 67py U� fIA� � 9T61U FUNDING BREAKDOWN SHEET City Secretary No. 43361 Amendment No. 4 Department Fund-Account-Center Amount 20 C204 531200 206230180230 $104, 077 . 95 Total : $104, 077 . 95 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 URS February 10, 2016 Ms. Wilma Smith, P.E. City of Fort Worth Transportation & Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 RE: Garden Acres Bridge Phase II —City Project No. 01802, DOE #6749 Additional Roadway, Survey, Environmental, Landscape Design and Bid Phase Services Dear Ms. Smith: As discussed on the telephone, URS and its sub-consultants have reviewed the latest comments received from the City, the existing scope of services and evaluated the current status of TxDOT's approval for this project. The design team has identified the following items as additional scope of work for the project. Noise Analysis As discussed on the telephone, it has come to our attention that a Traffic Noise Analysis is required as part of the environmental documentation for the project per TxDOT. Below is an excerpt from TxDOT's January 2015 Environmental Handbook— Traffic Noise where the requirement for a Traffic Noise Analysis is cited (underlining added to identify the portions affecting this project). "Type I Projects A traffic noise analysis Tin accordance with 2011 TxDOT's Guidelines for the Analysis and Abatement of Roadway Traffic Noisel is required for all Type I proiects, re- ardless of funding source If any portion of a proiect is determined to meet the definition of a Type I project,then the entire proiect is a Type I project. Therefore, the first step of the compliance process is to determine whether a proposed project is a Type I project. A Type I roadway project is one that involves: • The construction of a highway on new location or, • The physical alteration of an existing highway where there is either: - Substantial horizontal alteration which occurs when a project halves the distance between the traffic noise source and the closest receiver between the existing condition and the future build condition; or, - Substantial vertical alteration which occurs when a project removes shielding thereby exposing the line-of-sight between the receiver and the traffic noise source. This is done by either altering the vertical alignment of the highway or by altering the topography between the highway traffic noise source and the receiver; or, - The addition of a through-traffic lane(s). This includes the addition of a through-traffic lane that functions as a high-occupancy vehicle (HOV) lane, high-occupancy toll (HOT) URS Corporation 1200 Summit Avenue,Suite 600 Fort Worth,TX 76102 Tel:817.698-6883 Ms. Wilma Smith, P.E. February 10, 2016 Page 2 lane, bus lane, or truck climbing lane; or, - The addition of an auxiliary lane, except for when the auxiliary lane is a turn lane; or, - The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial interchange; or, - Restriping existing pavement for the purpose of adding athrough-traffic lane or an auxiliary lane; or, - The addition of a new or substantial alteration of a weigh station, rest stop, ride-share lot, or toll plaza." With the addition of the new bridge and restriping of the existing bridge, the project creates new eastbound and westbound through lanes making it a Type I roadway project and, thus, necessitating a Traffic Noise Analysis. The Traffic Noise Analysis will be performed in accordance with TxDOT's January 2015 "Environmental Handbook for Traffic Noise" and TxDOT's March 2011 "Guidance for the Analysis and Abatement of Roadway Traffic Noise". Landscape Design Also, as discussed at the July 23, 2015 meeting with TOOT the extension of the left turn storage lane on eastbound McPherson Boulevard requires the existing landscape feature (a raised planter and planting bed) located in the median to be removed. A new raised planter and planting bed will be constructed to replace the existing feature. The plantings and materials utilized for the new landscape feature will mimic, as close as practical, the existing landscape feature. The landscape design services will be performed by a Landscape Architect licensed in the State of Texas who will sign and seal the final landscape drawings. Design Revisions 20-inch Water Line At the 60% review stage of the project, the design team did not receive comments regarding the proposed in-line replacement alignment for the existing 20-inch water main crossing at Garden Acres Drive on the east side of IH35W. The in-line replacement of the water main was proposed so as to minimize impacts to numerous other existing utilities in the area. The design of the in-line water line replacement alignment was further developed to the 90% design level. During a review of the 90% design-level relocation plans for the existing 20-inch water main Mr. Kasavich, City Water Department, requested the proposed in-line replacement alignment be changed to an off-set replacement alignment. A permanent utility easement and a temporary construction easement will be required on the Turning Point Metroplex Fellowship property (northeast quadrant of Garden Acres/IH35W intersection) in order to construct the 20-inch water line replacement in an off-set alignment and minimize impacts to other existing utilities. Additionally, Mr. Kasavich requested the northern isolation valve for the 20-inch water line replacement be moved approximately 700 feet north of the location proposed in the 90% design submittal. The relocation of the isolation valve is beyond the area of existing survey information for the project and will require additional topographic survey for the design of the isolation valve. TOOT Schematic and Roadway Plans Comments on the Design Schematic were received on January 11, 2016 and February 2, 2016 from the TOOT Design Division in Austin requiring further evaluation, revisions and submittals to TxDOT. The Design Division's comments include the following: URS Corporation 1200 Summit Avenue,Suite 600 Fort Worth,TX 76102 Tel:817.390.1000 Ms. Wilma Smith, P.E. February 10, 2016 Page 3 • Changing the design speed of the Temporary Connection Road from 25 mph to 30 mph, adjusting the vertical profile to increase the vertical curve K-values to accommodate the 30 mph design speed and adjust the horizontal curvature to accommodate the 30 mph design speed. • Increasing the shoulder width on the Temporary Connection Road to four feet. • Consider providing pedestrian accommodations on the south side of the eastbound Garden Acres Road east of the IH35W northbound frontage road. • Increase the eastbound taper length of the two-lane to one-lane transition of Garden Acres Drive. • Revise the traffic analysis to evaluate changing the northernmost westbound lane of Garden Acres Road from a through/right turn lane to a right turn only lane and adjust the length of said lane all the way to Old Burleson Road if appropriate. These changes will require revisions of the design drawings upon TxDOT's approval of the Design Schematic. Environmental Document Revision Due to construction of the 20-inch water line replacement in an offset alignment, the environmental documentation will require revision to address the increased area of disturbance within the easements discussed in the Design Revisions, 20-inch Water Line paragraphs above. Bid Phase Services Upon review of the existing scope of services, it has come to our attention the current bid phase services do not include addressing questions submitted by prospective bidders and preparation of any addenda to associated with the same. The supplemental fee for this scope of services is $104,077.95. A summary of the total project is as follows: BASIC FEE M/WBE Provided Original Contract $485,932.58 29.4% Supplemental Agreement No. 1 $28,660.00 0.0% Supplemental Agreement No. 2 $74,500.00 3.9% Supplemental Agreement No. 3 $125,500.00 1.6% Supplemental Agreement No. 4 $104,077.95 36,1% TOTAL BUDGET(City M/WBE Goal=20.0%) $818,670.53 22.6% Please do not hesitate to contact us if you have any further questions or require any additional information. Sincerely, URS Corporation C. 41a',CMikewoth P Sr. Project Manager URS Corporation 1200 Summit Avenue,Suite 600 Fort Worth,TX 76102 Tel:817.390.1000 4/13/2016 M&C Review Oficial site of the City of Fort Woith,Texas CITY COUNCIL AGENDA FORTTWORT_II COUNCIL ACTION: Approved on 4/12/2016 - Ordinance No. 22165-04-2016 & Resolution No. 4616-04-2016 DATE: 4/12/2016 REFERENCE NO.: C-27677 LOG NAME: 20GARDEN ACRES CODE: C TYPE: NON-CONSENT PUBLIC HEARING: NO SUBJECT. Adopt a Resolution Authorizing Execution of a Funding Agreement with the Texas Department of Transportation in the Total Amount of$7,494,489.00, with City Participation in the Amount of$1,438,227.00, for the Widening of Garden Acres Bridge Over IH-35W, Authorize Execution of Amendment No. 4 to City Secretary Contract No. 43361, an Engineering Services Agreement with URS Corporation, in the Amount of$104,077.95 for Engineering Design Thereby Increasing the Total Contract Amount to $818,670.53 and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 6 and 8) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached resolution authorizing execution of a Funding Agreement with the Texas Department of Transportation in the total amount of$7,494,493.00, with City participation in the amount of$1,438,227.00, for the widening of the bridge connecting McPherson Boulevard and Garden Acres Drive, Garden Acres Bridge over IH-35W from three lanes to six lanes to include lighting, bike lanes, signals, sidewalks and Americans with Disabilities Act ramps; 2. Authorize payment to the Texas Department of Transportation in the amount of$1,438,227.00 for construction of the Garden Acres Bridge according to the Agreement; 3. Authorize the execution of Amendment No. 4 to City Secretary Contract No. 43361, an Engineering Agreement with URS Corporation (n/k/a AECOM), in the amount of$104,077.95 for design of the Garden Acres Bridge over IH-35W Phase 2, thereby increasing the total contract amount to $818,670.53; and 4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Garden Acres Bridge project in the amount of$3,045,011.00 and reduce funds from funds reserves by the same amount in the Street Improvements 2008 Fund (City Project No. 01802). DISCUSSION: The 2008 Bond Program includes proposed capacity improvements to the existing bridge connecting McPherson Boulevard and Garden Acres Drive (Garden Acres Bridge) over IH-35W through the addition of a new separate three-lane bridge, creating a total of six lanes crossing the Interstate. This Mayor and Council Communication (M&C) provides for additional design and construction partnership funding with the Texas Department of Transportation (TXDOT) for this new three-lane bridge at Garden Acres Drive. Capacity improvements are being provided through a two phased work effort. Phase 1, which occurred in 2013, provided additional turn lanes on the existing three-lane bridge along with a new traffic signal. The current Phase 2 improvements involve the design and construction of a new, parallel, three-lane bridge— producing a complete six-lane bridge crossing with traffic signals. The 2008 Bond Program identified $6,000,000.00 for this capacity improvement project. To date, a total amount of$2,144,529.00 has been appropriated to this project. Phase 1 capacity improvements were performed by the City without TxDOT participation for a total cost of $578,218.00. Phase 2 improvements are estimated to cost $10,758,827.00, resulting in a total project cost for both Phase 1 and 2 of in the amount of$11,337,045.00. http://apps.cfwnet.org/council_packet/mc—review.asp?[D=9292 &counci(date=4/12/2016 1/4 4/13/2016 M&C Review The TxDOT Funding Agreement will provide additional federal and state funding for the project in the amount of$6,056,266.00 for a total amount, when combined with the balance from the Phase 1 Funding Agreement (City Secretary Contract (CSC) No. 43606, M&C C-25787), of$6,147,505.00. The City will fund the difference of the total project costs for Phase 1 and Phase 2 in the combined amount of$5,189,540.00. Under Amendment No. 4, URS Corporation (URS) will perform additional engineering design, surveying and design plan modifications as necessary. Funds for this amendment will be provided from the 2008 Capital Improvements Program Fund. Previous Council Actions: On March 11, 2011 (CSC No. 41583), an Agreement was administratively authorized with Kimley-Horn & Associates, Inc., in the amount of$14,500.00 to identify traffic operational improvements to the Garden Acres Bridge and intersection approaches to reduce congestion under Phase 1 preliminary design. On December 6, 2011 (M&C C-25307), the City Council authorized execution of a Professional Services Agreement with Kimley-Horn & Associates, Inc., in the amount of$66,000.00 for Phase 1 final design, public involvement and implementation. On May 15, 2012 (M&C C-25611), the City Council authorized execution of a Professional Engineering Services Agreement with URS in the amount of$485,933.00 for Phase 2 engineering, environmental, right- of-way and utilities. In addition, $134,000.00 was authorized for contingencies project management and TxDOT design review under Phase 2. On August 14, 2012 (M&C C-25787), the City Council adopted Resolution No. 4117-08-2012 authorizing a Funding Agreement in the amount of$1,408,989.00 with the state for engineering, environmental, right-of- way and utility review for Phase 2. On October 9, 2012 (M&C C-25905), the City Council authorized execution of a contract with McClendon Construction Company in the amount of$306,266.00 for Phase 1 construction improvements. Upon completion of construction, change orders and invoices for Phase 1 total in the amount $75,419.00 resulting in a Phase 1 total in the amount of$381,685.00. The following table summarizes URS design contract actions and amendments: - Amount Project Description M&C No. Approved Initial $485, Contract 933.00 i DesExpansion of Garden Acres Bridge over 1-35W i C-25611 05/15/2012 1 Amendment ; $28,660.00 Add sidewalks to the plans,specification and cost Approved 01/02/2013 1 estimates Administratively j i Amendment Level of service Analysis,preparation of design + 2 $ 74,500.00 schematic and surveying required by TxDOT C-26487 ! 10/07/2013 I I Amendment $125,500.00 Additional bridge design as required by TxDOTfor C-27095 12/02/2014 3 the new and existing bridges j Amendment E Noise Analysis as required by TxDOT and 4 $104,078.00 additional Traffic Analysis Landscaping, Pending Pending Environmental and Construction Services I l Total $818,671.00 - URS proposes to complete Amendment No. 4 for a fee not to exceed the amount of$104,078.00. Staff considers this fee to be fair and reasonable for the additional scope of services. Project Budget/Costs are as follows: http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22222&councildate=4/12/2016 214 4/13/2016 M&C Review FEDERAL STATE CITY TOTAL � I PHASE 1-CITY COSTS ONLY-NOT PART OF LPAFA Engineering(Consultant) $ 0.00 $ 0.00 1 $ 76,450.00 1 $ 76,450.00 l Admin/Legal/Project Management i $ 0.00 $ 0.00 $ 119,993.00 $ 119,993.00 G , Construction $ 0.00 $ 0.00 1 $ 381,685.00 1 $ 381,685.00 PHASE 1 SUB-TOTAL $ 0.00 $ 0.00 1 $ 578,218.00 $ 578,218.00 i PHASE 2-TxDOT-CITY OF FORT WORTH PARTNERSHIP i Engineering $ 0.00 $ 0.00 1 $ 818,671.00 f _$ 818,671.00 Admin/Legal/Project Management $ 0.00 $91,239.00 $ 550,000.00 1 $ 641,239.00 Environmental $ 0.00 I $ 0.00 i $ 189,000.00 $ 189,000.00 Right-of-Way $ 0.00 $ 0.00 $ 255,000.00 00 $ 255,000.00 i Utilities $ 0.00 $ 0.00 $ 236,250.00 ' $ 236,250.00 Construction $5,752,894.00 $303,372.00 4 $1,438,227.00 $7,494,493.00 Contingency i $ 0.00 $ 0.00 1 $1,124,174.00 $ 1,124,174.00 PHASE 2 SUB-TOTAL $5,752,894.00 $303,372.00 # $4,611,322.00 $10,758,827.00 ! F TOTAL FOR PHASE 1 &2 $5,752,894.00 $394,611.00 $5,189,540.00 $11,337,045.00 The contingency amount identified above includes an additional 10 percent over the current construction estimate based on recent bids and an additional five percent for contract change orders which the City will be responsible for based on the terms of the Agreement with TxDOT. Construction will be managed by TxDOT and is programmed to begin in November 2016 with a completion date of March 2018. This project will have a $62,599.00 annual impact on the Transportation and Public Work's operating budget per year. The Park and Recreation Department annual maintenance budget will be $340.00 a year. Annual Cost Net € Operating Impact Department/Division Increase Street Lights(Add 10) $2,000.00 ?'TPW/Traffic Management I I Traffic Signs(Add 29) $7,250.00 f TPW/Traffic Management Pavement Markings(Add 10278-117 $56,529.00 ` TPW/Traffic Management I Inlets(8) $ 480.00 TPW/Storm Water Median, ROW Mowing (38609-sf) $ 340.00 j PARD t Total -i $62,599.00 M/WBE OFFICE: URS is in compliance with the City's M/WBE Ordinance by committing to an additional 36 percent M/WBE goal on this Amendment No. 4. The City's M/WBE goal on this Amendment or extra work is 36 percent. This project is located in COUNCIL DISTRICT 6, Mapsco 119A and 11913. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached Appropriation Ordinance, funds are available in the current capital budget, as appropriated, of the http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22222&councildate=4/12/2016 3/4 4/13/2016 M&C Review Street Improvements 2008 Fund. Description Appropriations to Pending Expenses/ Remaining date I Encumbrances I Balance Garden Acres Bridge over 1-35 Project No. C01802 $5,189,540.00 $3,388,346.00 $1,801,194.00 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 39407 0200431 4905100 C01802 CO2380 $3,045,011.0_0 39407 0200431 5740010 C01802 CO2380 $3,045,011.00 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 2 39407 0200431 5740010 C01802 CO2380 $1,438,233.00 3 39407 0200431 5740010 C01802 CO2380 $104,077.9 39407 0200431 4905100 U N S P EC U N 2300 $2,831,069.46 39407 0200431 5740010 U N S P E C U N 2300 $2,831,069.46 394071 020431 4905100 U N S PEC U N 7100 1 $213,941.54 394071 0200431 4905100 U N S P EC U N 7100 $213,941.54 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (6157) Additional Information Contact: Todd Estes (5448) ATTACHMENTS 01802 Garden Acres Bridge Phase II Costruct Resolution (Rev 4.07.16).doc 01802 20 GARDEN ACRES BRIDGE PHASE 2 MAP2 pdf 20GARDEN ACRES 39407 A016(Rev4.07.16).docx AECOM Technical Services Inc Form 1295(Rev).pdf http://apps.cfwnet.org/counciI packet/mc_review.asp?ID=22222&counci(date=4/12/2016 4/4 n�i OAKMONT IMPK , oil �j X11�� _I' '�,.�'rY`�r � ,.��,•,"'.=+�.� _��� urs u• ON .� Elm OWN OMNI "'i Signal LEI �j�i����N Poll � C�� � � �• .fit. LETTE ji 44 Wool LT o ! _ AY '•VLl3i� 0 1 J ' GARDEN ACRES e• o , CERTIFICATE OF INTERESTED PARTIES FORM 1295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-27539 AECOM Dallas,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 03/17/2016 being filed. City of Fort Worth,Texas Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. 43361 City Secrtary Contract No.43361-To provide engineering services to develop plans,specifications,and estimate for GARDEN ACRES BRIDGE PHASE II in Fort Worth,TX. 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary Gan, David Los Angeles,CA United States X Hopson,Preston Los Angeles,CA United States X Kinley,,John Corona Del Mar, CA United States X Sweet, Frank Boxborough, MA United States X Penny,Jane Berkeley Lake, GA United States X Mitchell,James Natick,MA United States X 5 Check only if there is NO Interested Party. ❑ 6 �. IT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. TISHA ANN EAMES My Commission Expires January 28,2018 f,�If7 M1��1 signature of authorize gent of on acting business entity AFFIX NOTARY STAMP/SEAL ABOVE ,� . . I ,, Sworn to and subscribed before me,by the said i��1�JC�/I W�Q Z this the day of 4y 1 , 20I_t,to certify which,witness my hand and seal of officle. tamev r / ` c l c�is Signature of officer adn ii tering oath Printed name of officer administering oath Title of officer 4iinistering dath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.312