Loading...
HomeMy WebLinkAboutContract 46789-CO2 CA TV 8ECRrM W _ qP z, FORT WORTH City of Fort Worth COMPACT ,_�"►� Change Order Request Project Name I Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4 City Sec No. 46789 Project No.(s) P266-707170146889 DOE No. 7453 City Pro.No. 01468 Project Description 24-inch Sanitary Sewer Main Installation on Montgomery Street Contractorl S.J.Louis Construction of Texas, Ltd. Change Order# 0 Date: 4/4/2016 City Project Mgr. John Kasavich City Inspector Don Watson Phone Number: 817-392-8480 Phone Number: 817-392-8306 Dept. Water Sewer Totals Contract Time (Calendar days) Original Contract Amount $1,645,417.20 $1,645,417.20 150 Extras to Date $49,330.00 $49,330.00 21 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,694,747.20 $1,694,747.20 171 Amount of Proposed Change Order $31,570.48 $31,570.48 Revised Contract Amount $1,726,317.68 171 Original Funds Available for Change Orders $50,000.00 $50,000.00 Remaining Funds Available for this CO 1 1 $670.001 $670.00 Additional Funding(if necessary) 1 1 $30,900.48 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.92% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,056,771.50 JUSTIFICATION (REASONS)FOR CHANGE ORDER The change order will provide compensation for increased and additional pay item quantities of 41'inch -� sewer service,concrete collar, 48-inch tunnel liner plate, pavement marking and 4-inch bored se JeV�[1( ) "i!, L21CORID that were necessary to complete the project.There are sufficient available funds to pay for the cf�atfl j� F" order. ARY B',( PZECEIVED APR 2 0 2016It V � 0 CITY FORT WORTH ® ° CIOF TY SECRETARY Qmoo �r J. er, ity Seere 000 ' It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satis ac ion and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name ontractor Signature Date S.J.Louis Construction of Texas, Ltd. Adam Lunsford Inspector Date Project Manager Date Assistant Director(Water Dept) Date on ction Supervisor(TM Dept) Date Assistantttor Date Assistant City Manager Date Council Action(if quired) M&C Number N/A M&C Date Approved N/A FORT WORTH City of Fort Worth Change Order Additions Project Name Cultural District/Will Rogers Sanitary Sewer Improvements,Part 4 City Sec No. 46789 Project No.(s) P266-707170146889 DOE No.= City Pro. No. 01468 Project 24-inch Sanitary Sewer Main Installation on Montgomery Street Description Contractor S.J. Louis Construction of Texas, Ltd. Change Order# =2 Date: 4/4/2016 City Project Mgr. John Kasavich City Inspector F Don Watson ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 2 48"Tunnel Liner Plate by Other Than Open Cut Sewer 7.00 LF $1,009.00 $7,063.00 4 24"Fiberglass Sewer Pipe Sewer 1.00 LF $466.00 $466.00 11 6"Concrete Driveway Sewer 2.00 SF $10.00 $20.00 12 Con PVMT Repair W/Asphalt overlay Sewer 39.00 SY $93.00 $3,627.00 14 4"SLD PVMT Marking Sewer 1776.00 LF $1.50 $2,664.00 24 Concrete Collar Sewer 7.00 EA $600.00 $4,200.00 40 Redo 5"Dia Manhole Base Sewer 1.00 LS $1,250.00 $1,250.00 41 4"Bored Sewer Service Under Box Culvert w/Cleanout&Plug Sewer 1.00 LS $17,500.00 $17,500.00 42 18" Plug for Slubout Sewer 1.00 LS $1,000.00 $1,000.00 43 Additional 4"Sewer Services on Line A-3 Sewer 1.00 LS $7,500.00 $7,500.00 Water Sewer $45,290.00 Additions Sub Total $45,290.00 Page 2 of 4 FORT WORTH City of Fort Worth Change Order Deletions Project Name Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4 City Sec No. 46789 Project No.(s) P266-707170146889 DOE No. 7453 City Pro. No. 01468 Project Description 24-inch Sanitary Sewer Main Installation on Montgomery Street Contractor S.J. Louis Construction of Texas, Ltd. Change Order#=2 Date 4/4/2016 City Project Mgr. John Kasavich City Inspector Don Watson DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 3 24"Sewer Carrier Pipe Sewer 1.00 LF $360.00 $360.00 6 12"Sewer Pipe CSS Backfill Sewer 7.00 LF $163.00 $1,141.00 10 4"Conc Sidewalk Sewer 26.00 VF $6.00 $156.00 15 4" BRK PVMT Marking Has Sewer 150.00 LF $1.50 $225.00 16 SEFL Raised Marker TY II A-A Sewer 30.00 EA $4.00 $120.00 17 REFL Raised Marker TY II C-R Sewer 15.00 EA $4.00 $60.00 18 Seeding Hydromulch Sewer 1.00 SY $15.00 $15.00 19 Pre CCTV Inspection Sewer 150.00 LF $2.50 $375.00 20 Post CCTV Inspection Sewer 172.00 LF $1.00 $172.00 22 Trench Safety Sewer 552.00 LF $0.01 $5.52 29 5" Extra Depth Manhole Sewer 1.00 VF $144.00 $144.00 34 Contaminated Material Handing Sewer 746.00 LF $1.00 $746.00 35 Contaminated Material Loading, Transporting&Disposal Sewer 100.00 EA $52.00 $5,200.00 36 Specified Remobilization Sewer 1.00 EA $5,000.00 $5,000.00 Water Sewer $13,719.52 Page 3 of 4 IDeletions Sub Total 1$13,719.52 k MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total 00 Previous Change Orders 0#", DATE AMOUNT Total $0;00