HomeMy WebLinkAboutContract 44255-CO4 CITY SECRETAWYYZ5T-1�-FORT WORTH, City of Fort Worth CONTRACT NO. Change Order Request Project Namel Paving, Drainage and Utility Improvements Old Denton Rd. City Sec# 44255 Client Project#(s)l CPN#01724 FAC C291 541200 202230172483 Project Description Construction of Old Denton Rd from Heritage Trace to Golden Triangle Contractor FMcMahon Change Order# ® Date 2/26/2016 City Project IVIgr.1 Leon Wilson City Inspector Joseph Rogers Dept. TPW Water Sewer Contract TimeTotals (CD) Original Contract Amount $5,539,918.39 $116,989.11 $93,486.58 $5,750,394.08 280 Extras to Date $757,732.42 $10,683.15 $768,415.57 191 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $6,297,650.81 $127,672.26 $93,486.58 $6,518,809.65 471 Amount of Proposed Change Order $285,138.32 $0.00 $0.00 $285,138.32 167 Revised Contract Amount $6,582,789.13 $127,672.26 $93,486.58 $6,803,947.97 638 Original Funds Available for Change Orders $794,532.00 $5,849.00 $4,674.00 $805,055.00 Remaining Funds Available for this CO $36,799.58 $0.00 $4,674.00 $41,473.58 Additional Funding(if necessary) $248,338.74 $248,33 — —� -- CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 18.3 ECC1 Lt 1) MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,187,992.60L Jf L, JUSTIFICATION(REASONS)FOR CHANGE ORDER o ( This change order includes additonal streetlights necessaryto be relocated to the outside of roadway due to conflicts with-theexistin terpin -- y � in the median,additional cost to change roadway signage to match Hillwood Alliance standards,additonal cost for brick pavers,water tap and concrete. r 11 -L Al toi►'F�S Y+M1s �Qri4 44 T11wi,r► %oke dcyA►� +lwiyq-KwN ftv weU Ab q rr 13* J't tC, �q y Ce�'►Sint�: g'"1St�'�'+�3 . ��{ � �� ,��Mbr�'�x'1.3�� j 4}d���c.�Inl�; �3� Ott, VA J � a It is understood and agreed that the acceptance of this Ch 0 moo n or con itutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out oi; s ,' a above hange Order. Contractor's Company Name Contractor(Name) I I C t i u Date McMahon IrlIC.14AGL A Zi G0 Ins ector/Inspection Sue ' or Date Projec' na er/Program Manager Date tGistanf Director(D pt) D A 571FNr,Con ac mg Departm nt(Dept Date A 'stan C' tt eyDa ' 'Assistan y Manager Date Council Action(if required) M&C Number M&C Date Approved L[ 15-114 12 U 4U16 r!IYOFFORTWp� ` C(T TY SE�REtARY � �a O (A &I of -1, W W W N N —• 8 .A N N N -OP W N V Om Co m m CO V m Nm N W d7 V (A CP ? CO N O O O (7 O CD ;U ZQ .o —1 �-7I X —' d2 O? W m X 00 �? 0 �A W 6) CO Oo m X —I = N 0 = °' v D O -rnn W j77 C7 'U n r -u m D q o CD CD C) CD rt o o 1l D D �7 o r n O n 0 c-) z r 0 -U 0 n CD O (n _m - 00 -nO cn O � T z � z OO c N << o < mpO7` n Om < �7 z mm nm c � mmrnn Cbz -I � mDDoo CD' w O x v ao < DC7 Z G� O �7 cn < < -i :L7 < :U C7 �7 cn r cQ c) < C7 o D C7 0 cn � = p O m � � m m � m � rn -I N m r z o � � m n� o � � -IOOm G -� Dp � � � -� jmDO = = < r -. Q D -zl n R' �) � W Cn 0 m � --j -ri Z j �D -Irr- Omn z0nD D0 -0mm0mm m oX r m m p T z rn m n < O m v n' D �7c mzzz � D z � o � � D CmG) ZZQ G) G) G) � y � DZ � o c o (p z m � p m -I p D D S. < -I m o G) W = -u -u D O v � 0 C7 m rn z O -n �. CD G) m z O -* D co O c -n -n O 0 CD -^ -� m cn m Q n n m z 0 x o Q CD m � Cn c o D z o = N `G C Q O 3 r O O Cl) 3 N CD < ^ 0 3 ` V O (D 00 O (D N W 0 O O Sz o CL (DD 00 ;u (D D p CL Q- -s CD D C. CL Gn cQ _« CD O vn svrr m (n c) N (n m o D =3 o CD N p CL (D ` N W 0000 � � N N N �? -W-� W N W 10 -A N A CO cOn it aV —� V CJt —� OD N CO N 8 W OD N O V N C3) �I V ? CA CTt N CD O Cr 0 0 N 0 0 0 m O O O O O O N CA V V m 0 0 0 0 m O 0' O O O O A Oo O O O C n 0 0 0 0 0 0 41 Cn V W N m O O O V O n -< -N< -n D - T D -n -n -n --n -< -n -< D --n -nn -n D a P m m m r 0 m C) 4.9m - _ 4a CD W 50 N .69 A — n t0 V -? N V V N *k CA N Cl) W CO N W ? Cn _ W W Cn N -P N 00 O N W O N jV W 0 C37 W co V Ch W O W CO W cn CJ) (T N O W C3) O U7 � C)) CJ7 C" O N CW O C71 W M ? O O M 0 M CA N P N -� O � O W O N O 00 O O O C3) 0 0 0 0 0 0 0 C31 O O O W O O � O Cn O Cn CDool _O CA 4� 4�-- N U9 C77 co d, Cr O N < < < < < < < < G G < < < < G < < < CT N O W N -' C n A W N O CD 000 OV M UU N N X iv X 0 N X 4A n Cn D -u 0 Cn m x 0 CL OL ' CD - C .m. Q d � CD O � O * �= 3 3 < O O N o CD -I (� CD O D O 'P Cn -n N• 0 = v O W Q D n Cn O CD v CCD O' N — -(ni, �' 0 me -a ��„ Cf) o Q n Cl) Q = �. o o = CD CD B C) -{ CD m m v, -n Q. X 3 v = _ =- 00 Cn = _ C7 0 cn z = _ cn _ t 'L 90 CD 0 > n n n� m � � m O n a 0 a- Q = m Z !V � CO v n o cn Q0CL a O a < n E' FL o co w cn (a CD 0 -acCD 72 (n Ca 0 m CD N cn w _ a CD CD Q n l7 CQ v ao m O a. rD D sz fl' _0 —u —u —t —u — — - m — -0 -0 -u -0 -u -u -u �* � v � -o � � � vm-n -v -o -o -o -o -o -o � -u Sv as m N O N N W _CT N O CT �l N 6> O CT �I O — O O U7 O N O _ O CO CT N O CT -4 O O O C.fl N �P O O O O O O O O O O O O O O N O O O O O O O O O O O O O O O O O N O O O O O O r- m M r m M r r r 0 m Cn r- r- r- Cn n D D m D D -Ti -n G D < cn Cf) co Cn C: i a 0 v CD Co j W o' lz� _ O OOO N O 69 CD O W O N - - WCTOCTO �1NOD O U7 O •P O Ut W N O v DD O O O CS7 -0 co coW �1 O O CW N N �I O O O A O Cb -P, -GS CO CO ()7 EA 4A CT O O O O -P O O � O O O CA - - - - - - - - - - - - - - - - - - - - - - - - - - - G G < < G G < G < G < G < < < G G < _ _ _ _ _ _ _ _ _ �I 4! N - 07 -P, O CO Cr W O �I O Ul 4� W O A M W - O CO M Cll N -U Cn X E�:: X Cn --�A Cn rnCD r r r oo p w G co = _ CD J r D m m D � m - D D D 02 N -- x - - N D - m rn m (D o D r y � r- ---j m � --i -I Z z Z C/) C/) W C/) Cn 0 C) D D S o n m 2. .� DO n O D p D D m m m rp o m o c c O p p D m o c„ o .� < r G D Z r r r r r p p W n C Z z o O m D m O z n r r m m m -U -0 0 = Cn c7 > > = v o z y - m z m p O D D C) G) C) < < C O C-) r D O -I o p m D = Z r r m m m < D D r r m m r F- > �7 z D m z °° -< p c C z z z -i U) p D x < m it CD mp �nCl)nnp � p � � � ppp � � � � � m cnC� m M D m oo m W O D Z D D < m z D m p m m m 0 < z D 0 � � z = D < m z r � c� C7 0 r m z D C) G7 G7 m r �7 T7 T� -I G7 CD O O -U v O D D Cn C C z z < O z D� z z n O c 4t > m N D m = = m G7 m G7 G7 = Z m = O cO rn C) r m 41 -o O D D m y o N p m Cn m o O z m m °� m � o= � m 70 x -1 z -� m m m x M m � m � -moi _O n co G) rn G7 Oc O z n � D z z G7 p w Q m c O m m Q O 3 m U) N a z o O o n N C rn = w O 3 n CD o CD =r /^1 z cQ N U CIQ -I w n CD 'C CD O p CL Q 0 =3 Q (D m Li G) �Q CD 0 m 2- CD v � Q O O _0U� v m -o m _0 m -U _0� m m -0 m m m -o -o -U -Um -Um� m m -n o CA �_ rt `^ CD O vrrC) 3 oa (D 5 C) cn _ v o CD C) co o CD N O Q N Cn 4�1 co (nC- 41 41 W -j W CO w N co W CO -A O -p co W `G O W O �I CT N -P Co O WW �I O ? (37 W 00 CO O (D O O O O O O O N O O O O O O O O O O O O O O O O O - O _0 O O O m O O O N O O O O O O O O O O O O O O O O O 00 O = ;O A O CO CD MI r rn m r m r w r m m m m m r- r r r m m r r m w Cn r m D T D D m D T -< T D D D D D T m T T D D T m D -< T T D - p (D C7 rn - -G9 =3 fA �» �» w �, fa w n �I ffl -P � Ul � W (b Cr) Efl CO H3 H3 N N it 0 CO N fA fA EA W ff3 <;G -P Cb 0) C)7 N En 69 �l CO O W Cr �I N O -P p N O CTi O N U'7 CT 0 0 0 0 0 0 CJl Ul W CO N W O Cr O � CP O W 0) O O O Cb co O O O O O O O W M O Ul CT O CO O O W Ul O N O O W O O O w CT �I 0 0 0 0 0 0 0 0 0 0 0 0 Cb O O Ul O O rQ O_ 07 A N Ul CJI O w C) Ul cy) Cl) 00 C-ri w cc Cc -j IQ 00 Ul oo w -A r\j GGv 6.1. C-:)l I (=_-,d d A A 4 C:) rl) < C « G G < G « G o rn rn cO cc m co 'P O W N O co 00 v C3> N = u ( CD D D D �[7 v, z —_ - a z m m m r- > D o C 0 m r m m m D3 ZD'° ?rDmmmu) W 0 D N W z z z m M =, = 0 o ' m000 � 0 CD N 0 m m m D C o D ami C W r r z z D o o m D Q D o z z rt O C z -o' m cn CD n S N 0'4 0 Q (D (D Ln _0 v 0'C (D N O -h N O O N O O N W -� W O O � � 4? O N O O O O O CJI W O O O O O O O O O O �I 0 0 0 0 0 mmmmmCnmmmmm D D D D D G D D D D D ca o_ CD m m m CD o' -4 cn -P W119 <we N -1. co N N CL) N � O GLI W W N 10;O W O O O N O O N OO O O O O �I 0 0 0 0 CO CO Cb Cb _a fp �,q 00O O W IIIIJ O O � O O ? MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO C. Greenscaping Brick Pavers $32,050.00 C. Greenscaping Fencing $7,564.50 Total $39,614.50 Previous Change Orders CO# DATE AMOUNT Total $0'.00 MFC Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY CIL AGENDA FoRTWORTN COUNCIL ACTION: Approved on 4/5/2016 - Ordinance No. 22153-04-2016 REFERENCE ** 20OLD DENTON DATE: 4/5/2016 NO.: C-27659 LOG NAME: CONSTRUCTION CHANGE ORDER#4 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 4 to City Secretary Contract No. 44255 with McMahon Contracting, LP, in the Amount of$285,138.32 for the Construction of Old Denton Road from Heritage Trace Parkway to Golden Triangle Boulevard, Thereby Increasing the Total Contract Amount to $6,803,947.97 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$15,000.00 from available funds; and 2. Authorize the execution of a Change Order No. 4 to City Secretary Contract No. 44255 with McMahon Contracting, LP, in the amount of$285,138.32 for the construction of Old Denton Road from Heritage Trace Parkway to Golden Triangle Boulevard, thereby increasing the total contract amount to $6,803,947.97. DISCUSSION: This project provides for the construction of Old Denton Road from Heritage Trace Parkway to Golden Triangle Boulevard as a four-lane divided arterial roadway. This roadway improvement provides an important north/south arterial connection within the rapidly developing area east of IH- 35W. The project was substantially complete on June 23, 2015 and opened to traffic. Construction is approximately 99 percent complete. This proposed change order will provide for additional work items necessary to complete the project that include roadway signage, irrigation repair, tree removal, pavement markings, fencing, median backfill and streetlights. Additional Water Capital Projects funds are also necessary to balance project overruns for water improvements. DATE TPW WATER SEWER TOTAL Original Contract Amount(M&C C- 26139 03/5/2013) $5,539,918.39 $116,989.11 $93,486.58 $5,750,394.08 Change Order No. 1 Relocate Utilities Underground 8/26/2013 $ 484,743.46 $ 0.00 $ 0.00 $ 484,743.46 Change Order No. 2 Additional Utility Relocations 1/13/2014 $ 31,004.00 $ 0.00 $ 0.00 $ 31,004.00 Change Order No. 3 Additional Left Turn Lanes and http://apps.cfwnet.org/council_packet/mc review.asp?ID=21638&councildate=4/5/2016 4/12/2016 M&C Review Page 2 of 3 Crawford u dab utrms R ( 7/15/2014 I $ 241,984.96 I $ 10,683.15 I $ 0.00 I $ 252,668.11 Change Order No.4 Pending $ 285138.32 $ 0.00 $ 0.00 $ 285138.32 Revised Contract Amount - $6,582,789.13 $127,672.26 $93,486.58 $6,803,947.97 The total budget for Old Denton Road from Heritage Trace Parkway to Golden Triangle Boulevard is shown below: DESIGN AMOUNT Design Contract $ 797,047.00 Project Management, Design Coordination $ 216,9%91 Right of Way and Easement Acquisition Coordination $ 607,450.00 DESIGN PHASE BUDGET $ 1,621,407.91 CONSTRUCTION - Construction Contract $ 6,803,947.97 Utility Relocation Costs $ 1,566,482.00 Construction Inspection, Survey, Material Testing, Project $ 489,939.36 Management, Project Contingencies TOTAL CONSTRUCTION BUDGET $8,860,369.33 TOTAL PROJECT BUDGET $10,481,777.24 Funding for the project is shown below: Pending Remaining Fund Appropriation Encumbrances/ Balance Expenditures Water Capital Projects $ 158,090.42 $ 151,460.95 $ 6,629.47 Sewer Capital Projects $ 115,661.00 $ 107,075.65 $ 8,585.35 Specially Funded Capital Projects $8,985,949.82 $8,758,268.33 $227,681.49 Transportation Impact Fee $ 587,076.00 $ 587,076.00 $ 0.00 Street improvement 11 $ 635,000.00 $ 635,000.00 $ 0.00 11 $10,481,777.24 -$10,238,880.93 11 $242 896.31 M/WBE Office- McMahon Contracting, LP, is in compliance with the City's BIDE Ordinance by committing to 15 percent MBE participation on this Change Order 4. The City's MBE goal on this Change Order is five percent. This project is located in COUNCIL DISTRICT 4, Mapsco 21 L, 21 Q, 21 U and 21Y. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund and the Specially Funded Capital Projects Fund. TO Fund Department Account Project Program Activity Budget Reference# Amount ID I I ID I I Year Chartfield 2 1 59601 0600430 4956001 C01724 I C01783 $15,000.00 1 59601 0600430 C01724 I C01783 1 $15,000.00 FROM Fund I Department I Account Project Program I Activity I Budget Reference# Amount http://apps.cfwnet.org/council_packet/mc review.asp?ID=21638&councildate=4/5/2016 4/12/2016 M&C Review Page 3 of 3 ID ID Year Chartfield 2 39007 0200431 5740010 C01724 CO2383 1 $285,138.32 1 59601 0600430 1 UNSPEC I I UN15001 1 $15,000.00 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Leon Wilson (8883) ATTACHMENTS 20OLD DENTON CONSTRUCTION CHANGE ORDER 4 water AO.docx Form 1295 Certificate 100018445 signed MCLP.pdf Location Map.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=21638&councildate=4/5/2016 4/12/2016 CERTIFICATE OF INTERESTED PARTIES FORM 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-18908 McMahon Contracting LP Grand Prairie ,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 02/26/2016 being filed. City of Fort Worth Date Acknnoowledgedd: ` `l / g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. 01724 General Contractor-Paving& Utility/ Old Denton Road from Heritage Trace Pkwy to Golden Triangle Blvd 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary Mcmahon, Shawn Grand Prairie,TX United States X McMahon ,Jayce Grand Prairie,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Bit€LL€Y Mate of of T N Notary Public,State Texas My Commission Expires August 04, 2018 " Signature of autho ized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE 4' �A Sworn to and subscribed before me,by the said ��L MW- M" this the IA day of k4AWAAA(mt 20_�� ,to certify which,witness my hand and seal of office. A( nl�l,I�Q A4 Sl�c�t�M=Mtt�csy� . llmini . Signature officer administ ring oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www_ethics.state.tx.us Version V1.0.312