Loading...
HomeMy WebLinkAboutContract 47723 CITY SECRET CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: WR Meadows of Texas Address, State,Zip Code: 2555 NE 33rd Street,Fort Worth,Texas Phone&Email: 817-834-1969, atam@wrmeadows.com Authorized Signatory,Title: Andrew Tam, General Manager Project Name and Brief W.R. Meadows Description: Project Location: 1290 Cantrell Sansom Rd Plat Case Number: FS-15-134 Plat Name: W.R.Meadows Addition Mapsco: <Mapsco> Council District: <CD#> City Project Number: 100110 CFA Number: 2016-021 DOE Number: None To be complet d by aff Received by: ate: OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement �Tu bV®RTH X CFA Official Release Date:07.30.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, WR Meadows of Texas, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as W.R. Meadows ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ❑, Sewer(A-1) ®, Paving (B),©, Storm Drain (B-1) 0, Street Lights & Signs (C) 0 E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section Il, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 3 of 11 iii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7of11 Cost Summary Sheet Project Name: W.R.Meadows CFA No.: 2016-021 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 35,970.00 2.Sewer Construction $ 98,743.70 Water and Sewer Construction Total $ 134,713.70 B. TPW Construction 1.Street $ 69,044.53 2.Storm Drain $ 80,061.30 3.Street Lights Installed by Developer $ - 4. Signals $ _ TPW Construction Cost Total $ 149,105.83 Total Construction Cost(excluding the fees): $ 283,819.53 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 2,694.27 D. Water/Sewer Material Testing Fee(2%) $ 2,694.27 Sub-Total for Water Construction Fees $ 5,388.55 E. TPW Inspection Fee(4%) $ 5,964.23 F. TPW Material Testing(2%) $ 2,982.12 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 8,946.35 Total Construction Fees: $ 14,334.90 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 283,819.53 Completion Agreement= 100%/Holds Plat $ 283,819.53 Cash Escrow Water/Sanitary Sewer=125% $ 168,392.13 ✓ Cash Escrow Paving/Storm Drain=125% $ 186,382.29 Letter of Credit=125%w/2yr expiration period $ 354,774.41 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER W.R.Meadows of Texas esus J. Chapa + r Assistant City Manager Name: Andrew Tam � Title: General Manager Date: Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Ba al,EMBA, P.E. Development Engineering Manager Signature Water Department Name: Douglas . Wiersig, P.E. Director Transportation &Public Works Department Approved as to Form &Legality: ATTEST: Boughts ke 'Z,1Chs4 -A• McMary J y r ® �_ °awe Assistant City Attorney City Secretary o o M&C No. tj $ 4 at `f Date: 000 00 ' Fecv�ti t Z9y' LcrV,�.`ta+�+ti�.. = N�itL City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date:07.30.2015 FT.WORTH, TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ©' Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map �I Exhibit A: Water Improvments Water Cost Estimate ®' Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ®' Exhibit B: Paving Improvements ®' Paving Cost Estimate ®' Exhibit 13-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100110 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 11 of 11 N o GLEN Z �-- oCORRIN FAGAN o J GILL Q w 35 m TYSON (3~ K o 81 AMERICANA �_ 3 CONTINENT L J o w SWEETWO D 287 Wm Z U Q o tx ��CHADWICK 9 o y o MOADDD �� o �N _�3 LITI(f 3 DANCY o C NTRELL FORT WORTH CITY LIMIT CANTRELL ANSOM RD FOSSIL CREEK z EAST INDUSTRIAL 0 a LAWSON z 3 �Ossj< 15 a SITE m ce m * 820 0 �0 9a 820 �9 w NORTHEAST NORTHEAST r o N °oy o�jy W r N Z MELODY rn > HILLS Ix Y Q 15 0� a to G W GREAT SOUTHWEST ro zmO 0 0 zo n. FRANKLIN J�LEAMSISE ARI [®►:e� ► ., ®® ® - ® PROJECT MEN jONE �j,,®® W.R. MEADOWS 1OEM ® /i, t. 1OEM 00 OU 1MEN Wqmr.a 1ASTER-QUINTANILLA DALLAS,LLP LOCATION MAP 100 GLASS STREET DALLAS,TEXAS 75207 111214.752.9098 JQENG.COM SCALE: REV: 1" = NTS JQJOB N0:3150098 TEXAS REGISTERED ENGINEER FIRM F-1294 Legend PROPOSED WATER - - -- EXISTING WATER p u Q ----- PROPOSED GATE VALVE - - EXISTING GATE VALVE PROPERTY LINE I I Ii < IN 1 PRIVATE FIRE HYDRANT ASSEMBLY ° 4� 0 0 — I EXISTING u ! 48" WATER LINE �g I I I I I ( fM I 4d_ 41 „..� M m v INSTALL 1–BACKFLOW PREVENTER Jm ( r – — (PRIVATE) J�. • — IO .. ' INSTAL 1-8"X4"TE 4" DOMESTIC METER ULT t: % 00 42 43 DAP-BID PROPOSAL Page 101`7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT 1:WATER IMPROVEMENTS 1 3311.0001 Ductile Iron Water Fittings w/Restrainl 3311 11 TON 0.1 $8,000.0 $800.00 2 3311.0261 8"PVC Water Pipe 33 11 12 LF 40 $55.00 $2,200.00 3 3312.2802 4"Water Meter and Vault 33 12 11 EA 1 $18,500.00 $18,500.00 4 3312.4209 24"x 8"Tapping Sleeve&VaIVE 33 12 25 EA 1 $11,000.00 $11,000.00 5 3305.0109 Trench Safety 33 05 10 LF 40 $5.00 $200.00 SUBTOTAL $32,700.00 10%CONTENGENCY $3,270-00 TOTAL UNIT 1:WATER IMPROVEMENTS1 $35,970.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foran Version September 1,2015 Bid Proposal_DAP hs� Legend o PROPOSED SEWER — 0 Q EXISTING SEWER -- PROPERTY LINE S �ry�l o00 STA: O+OD.00 LINE 55-1= I BEGIN 8' SAN. SEWER ( I IC STA: 1+58.02 LINE SS-1= �{ CONNECT TO EXIST. 4' DU. SEWER MANHOLE STA: 0+00.00 LINE SS-2 INTERIOR CORROSION PROTECTION ( I S 4' DIA.INSTASEWER MANHOLE RIM=652.95 RIM=857.98 \W� PRIVATE SEWER 10 3 g � q n w STA: 4+57.74 n LINE SS-1 Q INSTALL: LL n g w 4' DIA, SEWE MANHOLE I o o a o RIM=659.58 1 • ✓i m N M- LL�md� I Qc_ M � • M.N.. 3 • o • rc z g� s S 3 NZW 3 YoIn =z N K d M LL3w00 : " I g PUBLIC SEWER Tit g 3 ® 3 STA: 7+53.52 LUNE SS-1 4' DIA. SEWER MANHOLE I STA: 8+15.41 d LINE RIM=665.88 INSTALL: O O 4' DIA. SEWER MANHOLE 10 LF 8' SEWER STUBOUT RIM=867.12 --------------- PRO —————————————— c/> ►, `2 ®0 ® - ® PROJECT 1 FA, 00 W.R. MEADOWS 1 1111001111 I► ®. - • 1 00 ON 1 EXHIBIT B JASTER-QUINTANILLA DALLAS,LLP SEWER IMPROVEMENTS 100 GLASS STREET DALLAS,TEXAS 75207 P)214.752.9098 1QENG.COM SCALE: REV: 1" = 100' NORTH 111108 NO:3150098 TEXAS REGISTERED ENGINEER FIRM F-1294 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BidlistoItem Description Specification Section No. Meas a Quantity Unit of Bid Unit Price Bid Value UNIT 11:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCN Inspection 33 01 31 LF 826 $3.00 $2,478.00 2 3301.0101 Manhole Vacuum Testing 33 01 30 EA 4 $500.00 $2,000.00 3 3305.0109 Trench Safety 33 05 10 LF 826 $5.00 $4,130.00 4 3331.4115 8"Sewer Pie 3311 10 33 31 12 33 3120 LF 806 $39.00 $31,434.00 5 3331.4116 8"Sewer Pie CSS Backfill 3311 10 33 31 12 33 3120 LF 20 6 3339.1001 4'Manhole 33 39 10 33 39 20 EA 4 $5,900.001 $23,600.00 7 13339,1003 4'Extra Depth Manhole 33 39 10 33 39 20 VF 55 $475.00 $26,125.00 SUBTOTAL $89,767.00 10%CONTENGENCY $8,976.70 TOTAL UNIT 11:SANITARY SEWER IMPROVEMENTS $98,743.70 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Version September 1,2015 Bid Proposal_DAP_2016-22-02 Legend PROPOSED RCB ° — PROPERTY LINE INSALL 24* x 36' I ff Q Q FLARED HEADWALL 24' x CONCRETE Box W/ROCK RIPRAP CULVERT I __ 15' W x 10' L I ( I Il I I I � I I g I I I nI I I I ro I I I d I wZNW 3 W KV_,� 80� ® : �O M, W Z I • aLIE I • I g ( g g yz� I g �0cn =Z0 �of LL3w� ( I 0 g I g ® g INSTALL 24'x 48' I d CONCRETE BOX CULVERT O o� OR og i [®► W2 s, ®® ® - ® PROJECT I ONErMEL _ _ W.R. MEADOWS ISEE 11110011111, I SEE 001111110ri NONE EXHIBIT C JASTER-QUINTANILLA DALLAS,LLP DRAINAGE IMPROVEMENTS 100 GLASS STREET DALLAS,TEXAS 75207 PI 214.752.9098 JQENG.COM SCALE: REV: 1" = 100' NORTH JQJOB NO:3150098 TEXAS REGISTERED ENGINEER FIRM F-1294 00 42 43 DAP-BIDPROPOSAL Peg.3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT 111:DRAINAGE IMPROVEMENTS 1 0241.3014 Remove 21"Storm Line 0241 14 LF 66 $150.00 $9,900.00 2 0241.4401 Remove Headwall/SET 024114 EA 2 $1,500.00 $3,000.00 3 3137.0102 Large Stone Riprap,dry 31 37 00 SY 65 $89.00 $5 785.00 4 3341.1001 3x2 Box Culvert 3341 10 3341 10 110 $210.00 $23,100.00 5 3341.1101 4x2 Box Culvert 33 41 10 3341 10 53 $230.00 $12,190.00 6 3349.3007 36"Straight Headwall,1 pipe .334940 334940. 1 $5,238.001 $5,238.00 7 3349.3107 36"Straight Headwall,2 pipes 13349 40 33 49 40 2 $6,785.001 $13,570.00 SUBTOTAL $72,783.00 10%.CONTENGENCY $7,278.30 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $80,061.30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foran Version September 1,2015 Bid Proposal_DAP 2016-22-02 00 42 43 DAP-BID PROPOSAL Page 3 o1`7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal BidistoItem Description Specification Section No. Measure Unit of QBid.nanfiUnit Price Bid Value Nun UNIT III:DRAINAGE IMPROVEMENTS 1 0241.3014 Remove 21"Storm Line 02 41 14 LF 66 $150.00 $9,900.00 2 0241.4401 Remove Headwall/SET 02 41 14 EA 2 $1,500.00 $3,000.00 3 3137.0102 Large Stone Riprap,dry 31 37 00 SY 65 $89.00 $5,785.00 4 3341.1001 3x2 Box Culvert 3341 10 3341 10 110 $210.00 $23,100.00 5 3341.1101 4x2 Box Culvert 3341 10 3341 10 53 $230.00 $12,190.00 6 3349.3007 36"Straight Headwall,1 pipe 33 49 40 33 49 40 1 $5,238.001 $5,238.00 7 3349.3107 36"Straight Headwall,2 pipes 33 49 40 13349401 2 $6,785.00 $13,570.00 SUBTOTAL $72,783.00 10%CONTENGENCY $7s278.30 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $80,061.30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Forth Version September I,2015 Bid Pmposal_DAP_2016-22-02 Legend 010" CONCRETE PAVEMENT a a INSTALLQ —-- CONCRETE DRNa -0 0 E (-��� � PROPERTY LINE APPROACH 1 I I'T I I I I I I I I I I I I I I Pjj'�7� I I ( I I I I I I g I � I � P P < 9EmI P WNW 3 e ® : LLOmN1N m 1 Z • In 3 3 yzW 3 �owN =Z In INSTALL CONCRETE DRNE APPROACH i —————————————— [®e:! ►i ,oNMI NO %�i W.R. MEADOWS OEM NM 111100115 0 MEN 00111marl 1 ONE FAZIEFF14159 EXHIBIT D 1ASTER-QUINTANILLA DALLAS,LLP PAVING IMPROVEMENTS 100 GLASS STREET DALLAS,TEXAS 75207 P)214.752,9098 JQENG,COM SCALE: REV: 1" = 100' NORTH �� JQ10B N0:3150D98 TEXAS REGISTERED ENGINEER FIRM F-1294 00 42 43 DAP-HIDPROPOSAL Page of7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Bid No. Description Specification Section No. Measure Quantity Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 0241.0401 Remove Concrete Drive 02 41 13 SF 1721 $3.00 $5,163.00 2 3110.0101 Site Clearing 31 1000 LS 1 $11,500.00 $11,500.00 3 3110.0102 6"-12"Tree Removal 31 1000 EA 3 $4,500.00 $13,500.00 4 3125.0101 SWPPP i 1 acre 31 25 00 LS 1 $150.00 $150.00 5 3211.0501 6"Lime Treatment 32 11 29 SY 450 $7.00 $3,150.00 6 3213.0105 10"Conc Pvmt 32 13 13 SY 435 $60.75 $26,426.25 7 3213.0700 Joint Sealant 321373 LF 355 $1.00 $355.00 8 3292.0400 Seeding,Hydromulch 32 92 13 SY 2450 $1.03 $2,523.50 SUBTOTAL $62,767.75 10%CONTENGENCY $6,276.78 TOTAL UNIT IV:PAVING IMPROVEMENTS $69,044.53 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Foam Version September 1,2015 Bid Pwpwai_DAP_2016-22-02