Loading...
HomeMy WebLinkAboutContract 47731 CITY SECRETARY D.O.E. FILE r,-rry 55CRUAW CONIT ACT Moa CONTRACTOR'S BONDING CO. CONSTRUCTION'S COPY FORT WORTH CLIENT DEPARTMENT PROJECT MANUAL FOR THE CONSTRUCTION OF Heritage Trace Parkway at Tehama Ridge Parkway Roundabout City Project No.02529 Betsy Price David Cooke Mayor City Manager Douglas W. Wiersig, P.E. Director, Transportation and Public Works Department OFFICIAL RECORD CITY SECRETARY FT,NORTH,TX Prepared for The City of Fort Worth Transportation and Public Works Department 2016 Kirnley ))) Horn 'ZE,OF tF, ►1 * * Texas Registered Engineering Firm F-928 / SAM J. DELMQTTE j IU-1A No. 061018141 /................................� Cj`1ED r /Y 120413 : VQ G���i Zg 2016 ENSED : �oN i EN _� \�� •`C'� k'e � �a FORT WORTH. City ofFort Worth Standard Construction Specification Documents Adopted September 2011 I0a00W-I STANDARD CONSTRUCTION SPECIECATION DOCUMENTS Page I of A SECTION 00 44 00 TALE OF CONTENTS 11"ion 00- General Conditluos 0005 10 Mayor arul Council Oommunicatiou 0005 15 Addenda 00 it 13 Invitation to 13idders 0021 13 ImtructLons to Bidders 0015 13 Conflict of Interest Affidavit 004100 Bid Form 004243 Proposal 1=orrn Unit price 0043 13 Bid Bond 0043 37 'vendor C ninplianoe to Mate Lawf Nonfesi dent Bidder 0045 11 Bidders Prequaiificati+ol.ts 0045 12 PrNualification Statement 0045 13 Bidder Prequalificatian Application 00 45 26 Contractor Compliance with Workers` Compensation Law 00 45 40 Minority Business Enterprise Goal 09 45 Q Small Btisqinem EFAefpizise Goal 00 52 43 Agreement 0061 13 Performance Band 0061 14 Payment Bond 006; 19 Mauitenancz Bond U4 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary CDnditions Division U1 -General RNuirements 01 11 00 Summary of Work 01 2500 Substitution Procedures 01 31 19 Prceorrstraction Meeting 01 31 20 Project Meetings 01 3216 Construction Progress Schedule 01 32 33 Preconstraction Video 01 33 00 Submittals 01 35 13 Special Project Procedures 014523 Testing and Inslaeetion S ervices U.1 50 00 Ternperary Facilities and Controls C[ 55 26 Street Use Permit and Modifications to'I'rafl-ac Control 01 57 13 Storm Water Pollution Prevention Plan U1 58 13 Temporary Project Signage 41 60 00 Product Requirements 016600 Product Stowage and Handling R.eyUIM11cnts 01 70 00 Mobilization and Remobilization 017123 Construction Stakine and Survey Was Been Modified O l 74 23 Cloning 01 77 19 Closeout Requirements 017923 Operation and Maintenance Data 017839 Project Record❑ocunnents CITY OF FORT WORTH F wOm Se Trace Nrkvmy at Tehama Ridge.Parkway Itouidabout STANDARD CON5'MUCTIONSPCC]PICATION nOCUMENTS Pr0jcct'Kumbcr-02529 Reyjm4 JarmAry 27.2010 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 -Existing Conditions 0241 13 cele^+:.,^ Site r e ffi lift,r 02 4 4 r ilib,U,,, , e-. ..i A}.,.,,.1.,,-m^r+ 0241 1S Paving ReffiEwal Division 03 - Concrete 033000 Cast in Place Gonero+^ 033413Goi#r-olled Low-Stretig*1crri at fiat( 03 34 16 Goner-ete Base NIffterial far T-reneh Re 033513 p (/�� Integral Concations+ret�"e Color / Digin 26—Eleetrieal �05 nn C6i? }0n W6ic Results bI-Ell ctr-IC 260533 Raeeways and Boxes for-Eleetrieal Systems 2605 43 1ndefg-eund Due4s and Rivccayf^oiErcct fie c1 Systems Division 31 -Earthwork 31 1000 Site Clearing 3123 16 Unclassified Excavation 312323 Borrow 312400 Embankments 31 nc nn Erosion and Sediment Gepp fel 313600 Gabions 3i 37 00 Ripfap Division 32-Exterior Improvements 320129 Gonefe4e Paving Repair- 321123 Fledble Base Courses 32 11229 rime Tricat^ed Base Geufaca 321216 Asphalt 1'-a�i�g 32 1273 Asphalt Paving Gr-aek SealapAs 32 13 13 Concrete Paving 32 1320 G onefete Sidewalks,Dr-i-ye<vv'ays aizd Ba r-ie Flee Raffip3 32 14 16 Br-iek Unit Paving 3216 13 Gone^+^n .1. d t4 and Valley Gutters liLli U1 V Ulll[V LILLvnn 321725 G""'n1 ressPaif t-iag 3231 113 ChainFenees-a-nd Qates 323126 ,ireFenees and Gates CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised January 27,2016 00 119 QQ- S7AiNDARD CONSTRUCTION SPFCIFIC'11T10N WrTjMFNT5 Fagg 3 OFS 3a 34-29 Wood Fe!fiues a i i l3a4us 3294110 Irrigation System 3291 19 Topsail Placement and Finishing of Parkways 329213 Hyrdrn-NT"lching, Seeding, and Sadding 32 93 43 Trees and Shrubs 329345 Tree Prateetion 33 03 1D va 04 1-0 Bonding and Electfical isoiation 3944-_-1 1 C vmsiv:rGo«i ,1 T es! Stations 1304. 12 Magnesium Ana-die,Calt-ho-dis Pmtei-Aiaii SystBin 23 X04 lah d 4 T_esfi ` Ia.iey 1.d �svr�� �'di#i�l��f##�cr:'-s+�E� uncc'-raccm�-ism 330450 Cleaning of Sewer Mins 13 n- 14 1ie"Ilr„T. fihrx n 1�g., v� �a oeic�cici�vEa o.ica11�196Yi:�l'111"I �t#��t��i uGO W 39 Q'L1tatuf 6iN gags i-4 -„,-Am. r-t.yef sad n,teae n..,,,,,. _ _ eg, ;aks, , aeW Grade 33 Ai 33 0524) AugeT Boring 33 05 .e�..4 -- insiailalion,=.P arfie Pipe in Cam u Tunmi L iEer Dln+-e 33 �3 i i Q� Belts,1 uA and GaAel-s 33 11 10 guot44e!pan Pipe 33 11 11 Ductile!ran Fittiftgo Pipe 33 1210 Water 5ervic.esm 1-inch to 7,inch .44 IQ Q39 R sm, tit e. .to 33 12 21 AWWA Rub eF-Seal-a4-Aal4 -s 3 2� Genai•cetiesi te # h�d 33 1240 Fii-e fiydr-a4s 33 1256 w'"er-saffirle st6fiBA!+ 33 1260 Standwd Blow-off Valve-Assemnbvi- 1i-AF t 1 33 M 20 lo CITY 4F FORT WORTH Heritage Tract;PBTL--"y rat Tchanla Ridpc Parkway Rauridahoul. STANDARD CONSTRUCTION S PEC IF]C KT]ON DOCUMENTS Proj ea Nurn he r-02529 Rev45jc�JalwiTy 27,211I 6 WMW-4 5I-ANDARD CONSTRUCT10N SPECIFICATION DOCu MENTS Pcga 4 uf8 3 -13 } �rt.inw: r 411T4T3SC4rgf-trioseaP fier .n.; „SmiturySewer-Pipe 9331 22 — b 3a123vuir'rraf Y 8 ewer Pipe Fin la"RkU4 99 Ai ' 9t .. 9 ems}=ere Llai 333920 393930 mallh6es P,41 IV 33 4i 11 High Demity + 4&PE+Apid SOI tE]Cfl l jri �,rsr-atesowminaw -39-46-91 alone ,-f msi 434 6 02 T.,e fteh Druiffi f y. 39 49 10 G FTTTI�"'leeeT1� d juige4ion 13e4e5 Division 34-Transportation 3441 19 T+&ffl6-mgF,&6 gpl r Rapid Flasbing Deaeel; 3,441 16 Q,-U4�trI;a a=Hybri`l�c''r-Fa Signal 3 �TC17 --Roix'a-`r'wis'7'--! Iumim en Msn...mbliies 34 4129.01 Arterial LED Roo dwav Luminaires 344130 Aluminum Signs 3471 13 Traffic Control Technical Specifications listed below are included for this Project by reference and can be viewedldowntuaded From the CON 13urrsavEsite at: 11Ips;�+�Y O j E�tp0 i t�t.�U2.?S��'4.C lTlil.r�I i�1111�r)eR!}C4t�11 LIQ k�Et C5�3,1I TSL e51�1�r� o2UCoiistructioli%ZODocurncxtis/Suecifcations Division 02 -Existing Conditions 0241 13 Selective Site Vemolilian 0241 14 Utility Removal/Abandonment 0241 15 Paving Removal Division 03 - Concrete 03 (Has Veen l4'lurllfied) 0334 13 Controlled Gave Strength Material(CLSM) 0334 16 Concrete Kase Material for Trench Repair (His Veen Modified) 03 8000 Modifications to Existing Concrete Structures Division 26- Tleeirieal MY or,1.Dtrr WOA71`11 IferApTracc NrRway BLTizhama Ridge[ark-+riyRmundabolit STANDARD CONSTRIICTIO N S RE CI FICAT 10 N Docui'w Eyr5 Project Na1 bm-42529 R4n,md anuguy 27,2015 COcc Q9-5 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Face-S oro 26 05 00 Commun Work Results far Electrical 26-05 10 Dmuolition for Electrical Systems 26 05 33 Raceways and Boxes for Flectr cal Systems ' 6rNe Division 31 -Earthwork 31 1000 Site Clearing 3123-46 Uiielassified-Rxea ate (I3as Seen Modified) 312323 Bof�ew Has Been Modified) 34 2�-.00. -RInh-aak ents(Has.Been Modified) 31 25 00 Erasion and Sediment Control 94-36.00 Gabio s Division 32 -Exterior Improvements 32 0i i 8 32 11 23 Flexihle Base Courses 3+2 iy i 2�9yy �a'siim Treal a G4yses ment'Fnfflied Base 32 12 16 Asphalt Paving 34 2 11 11 GenaretePaviRg (-Has Been Modifled) 32 13 20 Concrete Sidewalks, Driveways and barrier Free Ramps 32 13 73 Concrete Paving Joint Sealants 3214 16 Briek URA I?Ewhig 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 1723 Pavement Marlki.ngs 32 1725 Curb Addy= Fainting 3231 13 Chain Fences and Gates 32 31 26 Wire Fences and Gatcs 32 31 29 Wood Fences and Gates 3232 13 Cast-in-Place Concrete Retaining Walls 32 90 10 (Has Been Added) 3291 19 (Has Been Modified) 32 92 13 iiydra Muliahing, Seeding, (Has Been Modified) 32,9343 (Has Been Modified) 32 93 45 '1T-ec Pret # (Has Been Added) Division 33 -Utilities ��� 33 Zn Ii� Sewer �LJ FIYLa?At..1 nT.,,z.c Test-.rsr- .._� 93 3904 4- . r..:«a noiidiq and R leett,ioal 1soI.,+9* 33 04 40 Cleaning and Acceptance Testing of Nater Mains 330450 Cie guf Sewer Mains CITY OF FORT WORTH Ileri[ageTrace Parkway at ?ehnnla Ridge Parktiaay Ruugdabout S'T`ANDAkl)CON ST'RUCrIONSMCH� CATION 00CCIMENTS ff8l"CENUtlfii�r-02524 Revised January 27,2916 000000-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 8 33 05 10 Utility Trench Excavation, Embedment, and Backfill 33 05 13 Frame, Cover and Grade Rings 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 05TConer-ete-..-atef Vaults 33 05 17 Concrete Collars 330520 Auger-Bor-ing 330521 TunnelLiner-Plate 330522 330523 23 a eling 33 0524 installation Orf rarirc"nr" Casing isei a'"crAc+ c 33 05 26 Utility Markers/Locators 3305 30 Location of Existing Utilities 33 11 05 Bolts,Nuts,and Gaskets 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride(PVC)Pressure Pipe 33 11-1-3 Gonerete Pressure Pip -Bar Wrapped, Steel Cylinder-T-.,pe 33 12 10 Water Services 1-inch to 2-inch 33 1220 Resilient Seated Gate Valve 33 1225 Connection to Existing Water Mains 33 1230 Combination Ail Valve Assemblies Pota W tef Systems 3312 40 Fife Kydraets 33 1250 Watef Sample Stations 33 1260 Standafd Blow eff Valve Assembly 33 31 12 Cur-ed in Plaee Pipe(GIPP) 33 31-13 Fibefg4ass PcE'i3.68az-ip ezorvizrvTcyournrary-oc v v cr-S' 3331 15 High Tlensit.,Polyethylene(HDPE)Pipe f«San a7;Sewer- 33 31 20 Po t (PVC) Gravity Sanit„ >S f Pif iy'Tviu�'i c�uChivriva�.r 33 31 21 Polyvinyl Ehlaride(PrGClose a Profile r-...,.,ity Saa tary Se,4pe- 33 31 22 Sanitar-y Sewer- Slip Lining 33 31 23 Sanitar-5, Sewer Pipe Enlargement 33 31 50 Sanitafy Sewer Sef-,4ee CenReGaans-a^nd Ser-vieeLine 33 31 70 Combination Air Valveze, ociitafy SevcrTvrce rxi csrs 3339 20 Precast GenefeteManh 333930 Wastewater- ra.,,,t eles Y 33 39 40 asteci ter-eeess Chamber('rAG) 33 39 60� Ip""`'Liners nfor-Sanitary-Sewer Stfuet ares 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 3341 11 High Density Polyethylene(HDPE)Pipe for Storm Drain 33 4600 Subdfainage 33 46 01 Slotted Star-mDfains 33 4602 Tfeneh Df ahis, 3349 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised January 27,2016 00 CO 00-7 STANDARDCONSTRUCTION SPECIFICATION DOMMENTS Page?of Division 34-Transportation 3^ 41 to 1• ai 241 11 T-ew«.. ar- m,,..ffle Sigp..15 14 dt 11 aefnevingTraf4e Signals 3441 15 Reef.ngular-Rapid IFlas-in Bea,,...n 3441 20 Roitdway Mufninmien Assemblies 34 41;$.01 A cC , (Hwi Seen Mod!fled) ftRS �4-; 44-a4ie Uentr..1 (Has Been Modined) Technical Specifications listed below are TxDOT Specifications Needed for the Construction of the TxDOT BW Items. See TXVOT Website for SpeciTiications IxQQ1'Standard Stiecificatigns: Adepted by the Texas Department of Transprartation Novernber 1,2014, Steridsrd spmifimlloas are ilx uporated into the caneract by refemice, Item 450 Railing(421X444)(44I)(442X445)(5 0) Itetr 540 MW] Beam Caruu Fence Item 644 Srnal7 Roadside Sigh Assemblirs(421)4440)(44.1)(442)(445)(616)(643)(fi56) Appendix GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Uiderground Facilities GG 4.06 u..z,....aeus >;,....kei .,tal r-eiidifie.at c:�.,. GC-G.O6.D Minority and Women Owned business Enterprise 0ampliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GC-6,24 1*1ondiscrimination GR-01 60 00 Product Requirements END OF SECTION CITY 4F FORTNORTH HediugeTraccN&; eyatTcharna Ridge Farkvmy Rmmde6rnn STANDARD COIw1MUC.TION SPECIFICATION DOCUMENTS Project Number-02524 Revised dailuary 27,:RO16 M&C Review Official srhe of the City or Fort Worth, Tis CITY COUNCIL AGENDA FoR 11 COUNCIL ACTION: Approved on 312912 16 DATE: 3129/2016 REFERENCE C-27654 LOC NAME- 20HERITAGE TRACE NO.: ROUNDABOUT-02529 CODE: C TYPE; CONSENT HEARIING: NO SUBJECT: Authorize Execution of a Contract with Reyes Group, Ltd, in an Amount up to $2,181,663.34, Including Potential Incentives, for Construction of a Roundabout at the Intersection of Heritage Trace Parkway and Tehama Ridge Parkway, Provide for Fight of Nay Acquisition, Engineering, Project Management, Illumination and Contingencies for a Total Project Budget of $3,401,699,00 (2014 BOND PROGRAMfTIF H7, CPM 02529) (COUNCIL DISTRICT 7) RECOMMENDATION-. It is recommended that the City Council authorize the execution of a contract with Reyes Group, Ltd., in an amount up to $2,181,653.31, including potential incentives, for the construction of a roundabout at Heritage Trace Parkway at Tehama Ridge including sidewalks and storm drain improvements. DISCUSSION: This project provides for the construction cf a twe-lane roundabout, sidewalks and storm drain improvements at the intersection of Heritage Trace Parkway and Tehama Ridge Parkway necessitated by traffic capacity limitations at the existing intersection. The project was advertised on January 28, 2016 and February 4, 2015 M the Fort Worth Star-Telegram using the low bind plus incentives method. Reyes Group, Ltd., submitted the lowest bid. Proposal Opening: 212512016 Bid Results Contractor Base Bid Alt. 1 Bid Total Bid Reyes Grow Ltd_ $11'98M4430 $ 89,929.00 $2,076,653-30 The Fain Group $2,383,022.00 $ 88,600.00 $2,451,622.00 JLB Construction $2,077,566.80 5148,623.60 $2,1186,189.80 Jackson Construction $2,16 4fl1.00 $56x261Q00 $2729,011.0[} The project bid consists of a base bid and two alternates, The Base Bid includes all elements necessary to construct the project except for street lights. Bid Alternate 1 requested bid pricing for fast setting concrete (I-iigh early strength concrete) in order to complete project faster and minirnize overall construction time. Bid.Alternate 2 sought bid pricing for installation of street fights within the project area. The City currently has a separate unit price contract for street light installation, which allows for comparison of pricing to complete this portion of the project. Staff recommends awarding the contract to Reyes Croup, Ltd., with the contract amount consisting of the Base Bid and Bid Alternate 1. The street light elements (Bid.Alternate 2) will be completed by the City's existing unit price contract with Bean Electric, Inc. There are potential incentives of$3,000.00 per dayL not to exceed $105,000,00. built into the construction contract if the contractor delivers the project prior to the specified substantial completion date. Failure to deliver the project by the specified substantial completion date will subject the ooritractor to liquidated damages of$3.000.00 per day until substantial completion is achieved. The budget for the reconstruction of Heritage Trac: Parkway at Tehama Ridge Roundabout will consist of the following: Project Budget Consultant Desi n and Ccnstruciion Semis M&C Review Construction Contract Base Bid and Bid Alternate 1 $2,076,653.30 Right-of-Way and Easements $ 352,965.00 Maximum Potential Construction Incentives $ 105,000.00 City Project Management, Inspection, Quality $ 276,538.00 Control/Assurance and Coordination Project Contingencies 10percent) $ 218,738.90 *Illumination Construction $ 82,943.80 Total Project Costs $3,491,699.00 *Illumination will be constructed under the Bean Electrical Contract due to the lower construction costs. This project is being funded through a combination of 2014 Bond Funds and Tax Increment Reinvestment Zone No. 7 (TIF 7) Funds. On February 10, 2016, the Board of Directors of TIF 7 approved reimbursement of$2,500,000.00 for this project. The TIF funds are anticipated to be available in July 2016 and a supplemental Agreement is forthcoming. In anticipation of approval of the TIF Funding Agreement, Staff recommends moving this project forward and utilizing 2014 Bond funds until receipt of the TIF funds. Project funding will be as follows: Description Amount 2014 Bond Program r $ 991,699.00 Tax Increment Reinvestment Zone No. 7 IF 7 $2,500,000.00 Total $3,491,699.00 Upon completion of this capital project, the anticipated annual operating impacts are increased electricity costs approximately $1,600.00 and increased mowing approximately $3,875.00 to the City of Fort Worth's budget. Construction is anticipated to commence in April and be substantially complete in 140 calendar days. This project is included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund, in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014). M/WBE OFFICE: Reyes Group, Ltd., is in compliance with the City's BIDE Ordinance by committing to 17 percent MBE participation on the base bid. The City's MBE goal on this project is 16 percent. Additionally, Reyes Group Ltd., is a certified M/WBE firm. This project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of the 2014 Bond Program Fund. A subsequent Mayor and Council Communication will appropriate the TIF funds upon approval of that Agreement. FUNDS APPROPRIATIONS PENDING EXPENDITURES/ REMAINING To Date ENCUMBRANCES BUDGET 2014 Bond Pro ram $3,100,000.00 $2,589,601.38 $510,398.62 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2) FROM M&C Review Fund aepartmerwt Account Project Program Activity Budget Referenced Amount ID I ID Year (Chartfield 2 34014 0200431 5740510 002529 2016 14010204 $2,0715,653 31 Submitted for City Manager's Office by: Jay Chea (5804) Originating Department Plead: DouglasWiersicg (7801) Additional Information Contact: Todd Estes (5440) ATTACHMENTS HERITAGE TRACE_TEHAMA_RIDGE_Rndbt 02529.pdf Reyes Gaup Form 1295.pdf TIE 7 Resolutions 2016-01 .pdf CERTIFICATE OF INTERESTED PARTIES 4?7� FORM 2SI 1 of 3 Camp ule hos. 1-d and fi it there are Interested parties. OFFICE USE ONLY ComPlale Nos.1,2,3,5,anti 6 If mere are ne Into rested parties. C11155RTIRCATION OF FILJNG 1 Name of business entity filing farm,mdthe city,staia and country of the bis[Hess entity's place0drtiflr to Numtrur: of business. 2016.27377 Keyes Group Grand Prairie. TX United States bete Fuel: 2 blame of governmental entity or stair agency that rs a party tot the contras[for which the form Isb3(17(2416 being!lied. City 4f Fcrt Wvrlh Vale�rr iedged: 3 Provide the identificerWn numbor used by the governmental encty or state agency to twk or identify the conlreat,and provide a description of the goods or services to be provided under the aantract, ##252 This supersedes certificate 2W S-24707 Uanelnucticn of a new concrete roundabout intersection. 4 Nature of interest{check applicabW-) Name of trrterested party city,Stater,country(peace of 6uslness) Conirnlllnlg Intermediary Heirfler,Jeffrey Grartd Prairie,TX United States x Volkov, Born Markham, IL United Stab-s X Reyes, Marcos Matkham,IL United Slaw x S Check only If there is NO Interrst€d Party, ❑ 4 AFFOAViT Isavaat,OF affirm,under pernaltyof perjury,that the shave disclosurelsirtle arra correct, ,4�YMItr+r MARICELA REYFS NOIARY PU19HO-STWE OF TLXAO Comm, EXP. 06.09-2019 NiJTARY it]121364411a r Sr/c,"mid agent of conirscting btrslness entity AFFfX NOTARY STAMP l'Si=RL ABOVE Sviarn to attd substrjbed bitfore tne.by ifa-m sold . E ( I _.this The R day cr 2Q ILF ,to certify whM,wilness my hand and sealQf uflice, I JW9— JJ/ 10,fi-OCEL,4r � k4lbfttary of oviiosr r ml _ r ft cath Printed name of officer adni[oislering oath Tltlr of rAirer ad rrdnistadn V oath FD ms provided by Texas Ethics Corn rnlesion vWAV-eihfes.state.tx.us Veeslon V1.0.312 Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Addendum No. I CITY OF FORT WORTH TRANSPORTATION&PUBLIC WORKS INFRASTRUCTURE DESIGN AND CONSTRUCTION GROUP ADDENDUM No. 1 TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR HERITAGE TRACE PAY AND TEHAMA RIDGE PARKWAY ROUNDABOUT CITY PROJECT NO. 02529 Advertise Date: Thursday January 28,2016 Addendum No 1 Issued: Monday, February 22,2016 The contract and documents for the subject project are hereby revised or amended as the following: https://proicctyoint.buzzsaw.com/fortivorthL-ov/Infrastructure%20Projects/02529%20- %20Heritaae%20Trace%20Parkivay/Bid%20Documents%20PackaLe/Addenda/Addenduin%20- %201? ublic Project Manual: Section 00 00 00 Table of Contents shall be replaced with this addendum. The following revisions have been made: Division 34-Transportation 34 4130 Aluminum Signs specification has not been modified. The original City specification will be used for this project. Section 00 42 43 Proposal Form The Proposal Form shall be replaced with the Proposal From in the addendum. The following items have been changed or added. ® Unit I: Paving and Drainage o Revised Quantity I-12—0241.3023 Remove 48" Storm Line—Changed from 80 LF to 10 LF o Added Item I-74—3341.0409 48"RCP Class III—20 LF o Added Item I-75—3305.0104 Manhole Adjustment, Minor— 1 EA ® Unit II: Utilities o Added Item II-14—3305.0102 Cathodic Protection Test Station Adjustment— 1 EA o Added Item II-15—3305.0103 Exploratory Excavation of Existing Utilities— 1 EA ® Bid Alternate 1 o Added Item IIII-2 -3213.0106 10.5"Conc Pvmt-8860 SY Section 00 73 00 Supplementary Conditions Pg 1 Heritage Trace Parkway and Tehama Ridge Parkway Roundabout Addendum No. 1 The Proposal Form shall be replaced with the Proposal From in the addendum. The following items have been changed or added. ® SC-11.03 "Unit III Lump Sum Items" o 9999.0025 Drip Irrigation System—Central Island o 9999.0026 Landscape—Central Island o 9999.027 Landscape—Parkway Plans Replace the following sheets with the revised sheets included in the addendum: ® Cover Sheet ® Sheet C2.01 —Revised Callout for DAT on the approach ® Sheet C2.02—Revised Callout for DAT on the approach ® Sheet C2.05—Revised Callout on Detail D508 ® Sheet C7.05—Added callout to adjust existing manhole to grade. Clarification: The removal of 48"RCP has been revised to 10 LF. It was intended to be used for any removal of existing pipe that was required for the removal of the existing inlet. Bid Item 1I-7 Miscellaneous Structure Adjustment @ STA 13+72 will require the replacement of the structure top per the City specification. Information to Bidders: This Addendum No. 1, forms part of the Specifications and Contract Documents for the subject project and modifies the original Specifications and Contract Documents of the same. Acknowledge your receipt of this addendum No. 1 by completing the requested information at the following locations: 1. In the space provided in Section 00 4100 Bid Form of the Bid Proposal. 2. Execute acknowledgement below and submit signed copy with your proposal at the time of the bid submittal. RECEIPT ACKNOWLEDGES: Douglas W. Wiersig, P.E. Director BY: Department f Tnsportation/Pu is Wo ks Title: By: Wilma Smith Project Manager Pg 2 61)11 13=6 INVITATION TO 1311]DERS Page I ore I SECTION 0111113 2 TNVITATION TO BIDDERS 3 RE Cl OF RIDS 4 Sealed bids for the construction of Heritage Trace Parimay at Tichama Midge Parkway 5 Rnurtd$6nut, City Project`+Tufmber. 02529 will be received bythe City of Fort Worth 6 Purc-has.bl g office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000`1`hrockmorton St1-eet I I Foil Worth, Texas 76102. 12 until dr-1b PAW CST,'Thursdoy, February 25,2016,and Fitts will be opened publicly and read 1.3 aloud at 2:00 PM CST in the Coualcil Chambers. 14 15 GENERAL DESCRIPTION OF WORK. 16 Reconstruct the into,se ction of Heritage Ti7ice Park-way and Teha is Ridge Parkway to a 17 siatgle/dual lane hybrid roundabout. The major work will consist of the following items: 18 Concrete Paving, Landscape,Irrigation, Storm Drain Adjustments,, Wator and Salutary Sewer 19 Adjustments; Street Lighting, Pavement Markings and Sipage. 24 21 PREQUALiFICATION 22 '11e iinprovett:ents inck ided in this project must:be perfbrmcd by a contractor who is pre- 23 quaiif cd by the City at the time c hid ripening. The procedures for qualification and pre- 24 qualification are outlined in the Section 00 21 13—INSTRUCTfONS TO BIDDERS. 25 26 LOW 811)WITH INC1!NTWES 27 Refer to the InstructiDas to Bidders for information regarding the project irccntivc. 28 29 DOCUMENT EXAMINATION AND PROCUREMENTS 30 The Bidding and Contract Documents may be examined or obtained on-line by vIgiting the; City 31 of Foil Wotth.'s Purchasing Division website athtip:r'I�vti��► farzr�ortl��o� a:ur urehasin�r and 32 clickirlg on the Ni7zsew lisle tc the advertised project folders on the City's Duzasaw site. The 33 Contract Documents may be downloaded_ viewed, and printed by interested contractors and/or 34 supptiers_ The contractor is required to fill out and notarize the Certificate of Interested 35 Parties Form 1295 and the form rrtt><st be submitted to the Project N%nager before the 36 contract"ill be presented to the City Council. The form can be obtained at 37 htt .)I%v iiv.ethics.state.tx.usltecll295-Inro.lilm 38 39 Copies of the Bidding and Contract Docurnmts ma; be purchased Froin Kimley-Born and 40 Associates, Inc., 801. Cherry Street, Unit 911, Suite 950,Fort Wurth, TX,76102,817-335- 41 6511 vn January 29,2016. Call a minimum oft 4 brq in, advance to schcdule pickup: 42 43 The cost of Bidding and Contract Documents is: 44 Set of Bidding and Contract Documents with Tull size drawings; 3150 45 Set of Bidding and Contract DoeumerLt with half size drawings: $1 N 46 47 48 CITY OF FORT WORTH }ferilage Trace vut my st-rehumn ridge Rowwlabniji STANDARD CQN5TR1UC-T0N SPECIMCATION DOCUMENTS traject N11mt>T-112544 fl:evised December 23.2015 001J i3-i rNVITATION TO BIDDERS P€ge 2 of 2 1 PREBID CONFERENCE 2 ,A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 3 BIDDERS at the following location, date, and time- 4 DATE: )February 17,2016 5 TIME: 10 AM 6 PLACE: PP40 Conlerenee Room 7 LOCATION: City Hall 9 9 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 10 City reserves the right to waive irregularities and to accept or reject bids. 11 12 INQUIRIES 13 All inquiries relative to this prozuremeut shou Id be addressed to the following: 14 Attn, Wilma Snaith, City of Fort V4rt ilh 15 Email: Wilma.Smith@fortworthtexas.gov t6 Phone: (817)392-8M S 5 17 AND/OR 1$ Attn: 5atr Delmotte, Manley-Horn aiid Associates, he 19 E1nai1: Sans.I7elmottet jmley-horny cGorn 20 Phone. (817)335-6511 21 22 A1]VE11TTS1;Tl P-NT DATES 23 Thursday Jaauaiy 28,2016 24 25 XNO UY SECTION CITY OF FORT WORTH Her 4w ge T raca Mkway at TLIl o rn 9 Ridge Ramdahwa s,P-AN DAaD cowrw�CTION 9PPC1PfCA110N DOCLIMWTS Projnet plumber-02529 Rev[Sed December 23,2015 0021 J3-1 Iiw15YJ�L'1"Cli]1V TOSFODERg Page I ar 10 1 SECTION OBD 2113 2 INSTRTJCTICINS TO BIDDERS 3 1. Defined Terms 4 5 1.1.7`erms used in these INSTRUCTIONS TO BIDDERS,whieh are defined in Section 00 72 G 00 -GENERAL C NIDI'I'J NS, 7 9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 9 Lneanings indicated below which are applimbte to bath the singular and plural thereof. to I t 1.2..1. Bidder: Any person, firm, partnership, company, association, or aorpGratiorj acting 12 directly through a duly authorizer] representative, submitting a bid for performing 13 the work contemplated under the Contract Documeats. 14 15 1.2.2. Nonresident Bidder: Any person, firm, partnership, Gampany,association, or 16 corporation seting dirv(,-tly N'ough a duly authorized representative, submitting a 17 bid for perform tag the*work contemplated under the Contract Documents whose 18 principal place of business is not in the Stag of Texas. I? 20 1.2.3. Succemful Bidder. The lowest responsible and.responsive Bidder to whom City 21 (on the basis of City's evaluation as hereinafter provided) makes an award. 22 23 2. Copies of Bidding Documents 24 25 2.1.Neither City nor Engineer small assume any responsibility for errors or raisinterpretatiolls 26 resulting front they Bidders use of incomplete sets of Bidding DOG17I7 CWS, 27 28 2.2.City and Engineer in making copio5 of'Bidding Documents availabla do so only for the 79 purpose of obtaining Bids for the Work and do not authorize or confer a license yr ga•ant 30 for• any other use. 31 32 3. Prequalif cation of Bidders (Prime Contractors and Suheontractom) 33 34 3.T-Ali Bidders and their subconTractors am reqUired to be pmqualirted fur the work types 35 requiring prequalification at the time of bidding. Bids received from contractors who are 35 not prequalified(even if inadvertently opened)shall not be considered. Paqualification 37 regDIrement work types and documentation are as hollows, 3S 39 3.t.1. paving—Rrquiremonts dvcutneat located at, 40 lits ihprai ect oini,ho?;N,aye contlfonxDrti ov!Resourees{02%20- 4.L "°,620 Const rucIiolt%20Doc Lmen tsJContracloif/420Preaualifcatiortn'PW%20Pavittg 42 °�a2 QCcantractoJ•g�o20Prequalit�cat iean°1o?gFrot rani SPR,EQUA I IF1CA.Tl ON"/a2C1RE0 43 LlfRE?N`F-NTS%ZOFORVo20PAVll+GII/n2OCONTRACTORS.ADF? ublic 44 45 3-1,2. Roadway and Pedestrian Lighting—Requirements document located at; 46https:Plllroeevtpoirtt.buzzsat .colrllfort�rortl� olficsourcesfU"°�20- 47 5/a2DCcrlsiruction° 2ODocurncnt_s.+'Contractor°/d2t}i'retlual6ttc_ation,'TPW%20Paving 48 °/'a20Contractcar°I®2OP uallFication%2OPi-a an-UPPP UAI-IFICCATIN%20R.E 499 LJIREM ENTS%20FC1RYat0PAVIN '%2000NTRACTORS.['DF?aublic CITY OF FORT WORTH Heritage Trace Park+,wAy at Teharm Ridge Roundabme STANDARD LONI TKUCTJVN 5F)rCJFLCAT1QN DOCUMENTS Wojed Numh r-02529 Revised January 27,2016 1021 t3-2 FNSTRUCT74N5TO BFDDERS Page!of 10 1 2 3.1.3. Water and Sanitary Sewer Roquireme.nts d-orument located at; 3 https:,'lprojectpoint.buzzsaw.con-dfort,�yofthgov/Rcsoti cesl022fat0 4 °?C?Ccrtistructi o� �a t 1�o earn entslContract or�rc' P recl.t i i Fi a r`rnry 4ater°�`o {Iartid°/off S OSanitar�°• =�Sey� °°,�o?[�Cr���traCl�r°�'��I�Prcgej{�l ir`s�z��is�rp°�RZOPr�grarnll�VSS�/42�pre G qual%'?Rreg0iremertts,d1-? Lib1i 7 S 9 3.2.Each Bidder sinless currently prequalified, inust be prepared to submit to City witl-in 10 seven(7) calendar days prior to Bid-opening, the documentation identified in Section 00 1 t 45 11,RIDDERS PREQUALIFICAfiIONS. 12 13 3.11. Subnnission of and/ur questions related to prequalifncation should be addressed to 14 the City contact as provided in Paragraph 6.1. 15 16 17 3.3.,rhae City reserves the right to require any pre-qualified eontractvr who is the apparent low 18 bidder(s) for a project to submit such additional information as the City, in its sole 19 d7$Creta4n nay require, including but not Hmited to inaapowr-r and equipment records, 20 information about key personnel to be assigned tD the praiect, and construction schedule, 21 to assist thu City in evaluating and assessing,the ability of the apparent 10w bidder(s)to 27 deliver a quality product and successfully complete projects for the amount bid within 23 the stipulated tinne frame. Based upon the City's assessment of the submitted 24 informatic ii, a recomm endation regarding the award of a contract wil l be made to the, 25 City Council. Fai ure to submit t)e additional information, if requested, may be grounds 26 for rejecting the apparent low bidder as non-responsive. Affected contractors will be 27 notified in writing sof a recornmendatiorn to the City Council, 28 29 3.4.In addition to prequalification,additional requirements for qualification may be required 30 witlin Various sections of the Contract Documents. 31 32 4. Examination of Bidding nud Contract Documents, Other Related Data, and Site 33 34 4.1.Beforc subtrlitting a Bid, each Bidder shall: 35 36 4.1.1. Examine and carefully stady the Contract Documents and other related data 37 identified in the Bidding Documents(including"technical data" refenTd to in 38 Paragraph 4.2, be1Dw). No information given by City or any represenfative of the 39 City other than that contained in the Contract Documents and officially 40 promulgated addenda thereto, shall be binding upon the City. 41 47 4.1.2. Visit the site to became familiar with and satisfy Bidder as to the general, local and 43 site conditions that may affect cDst,progress, performance or furnishing ofthe 44 Work. 45 46 4.1.3. Consider federal, state and local Laws and Regulations that irray affect cost, 47 progress, performance or furnishing of the Work 48 c iT Y n F FORT WORTH H erilaige T'aace Mway y at Telma Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fro.1w Nil n1ber-025 29 Kevl3ed January 27,2d 16 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 1 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site(except Underground Facilities)that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 8 9 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 10 the information which the City will furnish. All additional information and data 11 which the City will supply after promulgation of the formal Contract Documents 12 shall be issued in the form of written addenda and shall become part of the Contract 13 Documents just as though such addenda were actually written into the original 14 Contract Documents.No information given by the City other than that contained in 15 the Contract Documents and officially promulgated addenda thereto, shall be 16 binding upon the City. 17 18 4.1.6. Perform independent research, investigations,tests, borings, and such other means 19 as may be necessary to gain a complete knowledge of the conditions which will be 20 encountered during the construction of the project. On request, City may provide 21 each Bidder access to the site to conduct such examinations, investigations, 22 explorations,tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fill all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations,tests and studies. 25 26 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 27 cost of doing the Work, time required for its completion, and obtain all information 28 required to make a proposal. Bidders shall rely exclusively and solely upon their 29 own estimates, investigation,research, tests, explorations, and other data which are 30 necessary for full and complete information upon which the proposal is to be based. 31 It is understood that the submission of a proposal is prima-facie evidence that the 32 Bidder has made the investigation, examinations and tests herein required. Claims 33 for additional compensation due to variations between conditions actually 34 encountered in construction and as indicated in the Contract Documents will not be 35 allowed. 36 37 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 38 between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted to make such corrections or interpretations as may 41 be deemed necessary for fulfillment of the intent of the Contract Documents. 42 43 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of. 44 45 4.2.1. Those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised January 27,2016 DID 21 13-4 INS'rRUC1IONS TO BIDDERS Page of 10 1 4.2.2. 'Those drawings ofphysical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities)which are at or contiguous to 3 the site that have been utilized by City in preparation of the Contract Doc'ume'nts- 4 5 4,2,3, Copies of such reports and drawings will be made available by City to any Bidder 6 on request. Those reports and dra%ings may nest be part ef'the Contract 7 Daaurnlents, but the"technical data" contained therein upon-which Bidder is entitled 8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 9 and established in Paragraph SG 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawls from any "technical data" or 1 I any ether data, interpretations,opinions or information. 12 13 4.3.The submisslan of a Bid will constiMe on incontrovertible reprewritation by Bidder(i) 14 that Bidder has complied with every requirement of°this Parag��aph 4, (ii) that without 15 exception the Bid is premised upon perfortning and furnishing the Work required by the 16 Contract Documents and applying the specific rneatas,methods, techniques, sequences or 17 procedures of construction(Many)that may be shown or indicated or expressly required Is by the Contract Documents, (iii)that Bidder has given City written notice of all 19 conflicts, errors, atttbiguities and discrepancies in the Contract norutnents and the 20 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 21 etc., have not been resolved tivouglt the.interpretatians by City as described in 22 Paragraph 6., and (iv) that the Contract Documents are generally sufficierA to indicate 23 and convey understanding of all terms and conditions for performing and furnishing the 24 Work. 25 26 4.4.T he provisions of this Paragraph 4,inclusive, do not apply to Asbestos, Poiynhlprinated 27 biphenyls(PC13s), Petroleum, Hazardous Waste or Radioactive Material covered by 28 Paragt-aph 4.06.of the"General Conditions, unless specifically identified in the Contraa 29 a ocurnerlts. 3U 31 5. Availability of Lands for Work,Etc. 32 33 5,1.The lands upon which the Work is to be performed, rights-riff-way and easements fm 34 access thereto and other lands designated for use by Coatraetar in perforinin,g rho Work 35 are identified in the Contract Documents. All additional lands and access thereto 36 required for temporary construction facilities, construction equipment or storage of 37 mated a]s and equipment to be incorporated in the Work are to be obtained and paid for 38 by Ccntr4ctor. basements for permanent s,truedurn or pet inanent changes in existing 39 facilities are to be obtained and paid for by City unless otherwise provided [n the 40 Contract Drocurnents. 41 142 5.2.Outstanding right-or-way,easements,and/or permits to be acquired by the City are listed 143 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 44 of-way, easements, and/or permits are not obtained, the City reserves the right to cancel 45 the award of contract at any time before the Bidder begins auy construction work on the 46 project. 47 CITY OF FORT WOR ria Horitage Trace Parkwny al Tehama Ridge(roundabout STANUARD CQNSTRU4'TIUTi$PWiCATION COCUMILIMS PrGiXt NuMbcr-02524 Revised January 27,2016 0021 I3=5 INSTRUCTIONS TO BIDDIM I'Me 5 of In 1 5.1 The Bidder shall be prepared to commence construction without all executed right-of- 2 way, easennents, and/or permits, and shall submit a schedule to the City of liDw 3 cunstructian wilt proceed in the oilier areas of the project that do not.require permits 4 and/or easements. 5 6 6. )lnterpretafion:6 and Addenda 7 8 6.1.All questions abort the meaning or intent of the Bidding Documents are to be directed to 9 City in writing an or before 2 p.ra., the Monday prior to the Bid opening. Questions 10 received alter tNs day inav not be responded to. Tntetpretatiom or clarifications i 1 considered necemary by City ill response to such questions will be issued by Addenda 12 del iverad to ail parties recorded by City as having received the Bidding Documents. 13 Only questions answered by formal written Addenda will be binding, Dial and ether 14 interpretations or clarifications will be Nvithvut legal effect. 1.5 1.6 Address questions to: 17 18 City of Fort forth 19 1000 Thfoclt.morton Street 20 Tort Worth, TX 76102 21 Alm Wilma Smith, City of Port Forth Transportation and Public Works 22 Fax: (8 17)3 U-6543 23 Email: 'Wilma.Smith@fort+worthtexas.gQv 24 Phone: (8 17)392-8795 25 26 27 6.2.Addenda may also be issued to modify tate Bidding Dncunients as deemed advisable hyr 28 City. 29 30 6.3.Addenda or clarifications may be posted via Buzzsaw at 31 hit ps:l/rrp',ectyoint_b uzz-saw.cemifortwrerdiFovfintrasirue ture%2UPro iCets/025291/1620- 32 °Io?OFierltae°a20Trace° 20ParicvavlTtd°.r,2bsneu�r3��lts}®?ttt�acepulic 33 -- 34 6.4..A prebid conference may be held at the time and place indicated in the Advertisement or 3S INVITATION TO 13]DDF-RS. representative}of City will be present to discuss the 36 Project. Bidders are encouraged to attend and participate in the cflnference. City Will 37 transmit to all ptospective Bidders ofrecoM such.Addenda as City considers nemsaryr 38 in response to g4cst[ons aris ing at the Conference. Oral statements may not be relied 39 upon and will not be hiriding ar legally effective. 40 41 7, Bid Security 42. 43 7.1.Each Bid must be ucwmpuniW by Bid Bond made payable to City in an amount sof five 44 (5) lxrcent of L3iddet's maximum Bid price on form atta6cd, issued by a surety meeting 45 the requirements of Paragraphs 5,aI of the General Conditions. 46 CITY OF FORT WORTH Hcriugc Trace Purktiway at'Teharrja kldgeRour�ahaut STANDAFW CONSI'RL'CTION s?M ICATION 1]MWAENT5 Project Number-025,24 Revised Jeri u a ry 27,2016 0021 13-6 INSTRUCTIONS TO BIDDERS page 6 o f In 1 7.2.The Bid B n n d of all Bidders will be retained until tate conditions of the Notice of Award 2 haGvo been satisfied. if the Successful Bidder fails to execute and deliver the complete 3 Agreement within, 10 days after the Notice of Award,City may consider Bidder to be in 4 default, rescind the"Notice of Award, and the Bid Rand of that 'Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if bidder defaults. The Bid Bund of all b other Bidders whom City believes to have a.reasonable chance of receiving the award 7 wi11 be retained by City antiI Boal contract executioil. 8 9 S. Contract Times 1D I 1 8.1.'Substaiitial Completion—The litimber of days within which, or the dates by which, 12 Milestones are to be achieved in accordance with the General Requirements and the 13 'Work is to be completed and ready for Substantial Completion is set forth in the 14 Agreement or incorporated therein by reference to the attuolred Bid Form. Is 8.2.Final Acceptance—The designated additional time to achieve Final Acceptance as stated 16 in the Agreenteat. 17 18 9, Incentives 19 Provisions for Incentives are defined in the Supplementary Conditions and set forth in the 2D Agreement. 2.1 22 W. Liquidated Damages 23 Provisions fbY liquidated damages are set forllt in the Agreement. 'A 25 1[1. Subq itute 2nd "Or—Squat" Items 26 The Contract, if awarded, will be on the basis of materials and equiprn mt described in the 27 Bidding Dacurnents withuvt consideration of possible substitute or"or-equal" items. 28 Whenever it is.indicated or specified in the Bidding Documents Oat a"substitute" or "or- 29 equaP item.of rnatei-i a] or equipment may be furnished or used by Contract or if aceeptabl_to 3n City, application for such acceptance will not be considered by Cit} until after the Effective 31 Date oftl3e Agreement The proceduryfcr aubmission Many such application by Contractor -32 and consideration by City is set forth hi Paragraphs 6.05A., 6.058. and 6.D5C. of the General 33 Conditions and is supplemented m Section 01 25 00 of the General Requirements. 34 35 1.2. Subcontractors, Suppliers and Others 36 37 12.1. In accordance with the City's I3tisiness Diversity Enterprise Ordinance No. 20020- 38 12-2011 (as amended),the City has goals for the participation of minority buainem 39 and/or small business enterprises in City contracts. A copy of the Ordinance can be 4D obtained from the Office of the City Secretary.The Bidder shat l submit the MBI;and 41 SBE Utilization Form, Subcontract&Supplier lhilization Form, Prime Contractor 42 Waiver Form and/or Goad Faith Effort Form with documentation and/or Joint 43 Venture Form as appropriate. The Forms including documentation must be received 44 by the City no later than 2:00 P.M.CST, on the second business days after the/rid 45 opening date. The Bidder shall obtain a receipt from the City as evidence the 46 documentation was received.Failure to comply shall render the bid as nota- 47 respomive. 48 49 112. No Contractor shall be required to ern ploy any Subcontractor,Supp1 ier, other person 50 or organization against whole Ccritractor has reasonable abjection. 51 CITY OF FORT WORTH I{arirejZc Tmue Barkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS r'aaieu NLiinbu-02529 Roylsed January 27,2016 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 1 2 3 13. Bid Form 4 5 13.1. The Bid Form is included with the Bidding Documents; additional copies may be 6 obtained from the City. 7 8 13.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 9 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 10 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 11 price item listed therein. In the case of optional alternatives,the words "No Bid," 12 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 13 written in ink in both words and numerals, for which the Bidder proposes to do the 14 work contemplated or furnish materials required. All prices shall be written legibly. 15 In case of discrepancy between price in written words and the price in written 16 numerals,the price in written words shall govern. 17 18 13.3. Bids by corporations shall be executed in the corporate name by the president or a 19 vice-president or other corporate officer accompanied by evidence of authority to 20 sign. The corporate seal shall be affixed. The corporate address and state of 21 incorporation shall be shown below the signature. 22 23 13.4. Bids by partnerships shall be executed in the partnership name and signed by a 24 partner, whose title must appear under the signature accompanied by evidence of 25 authority to sign. The official address of the partnership shall be shown below the 26 signature. 27 28 13.5. Bids by limited liability companies shall be executed in the name of the firm by a 29 member and accompanied by evidence of authority to sign. The state of formation of 30 the firm and the official address of the firm shall be shown. 31 32 13.6. Bids by individuals shall show the Bidder's name and official address. 33 34 13.7. Bids by joint ventures shall be executed by each joint venturer in the manner 35 indicated on the Bid Form. The official address of the joint venture shall be shown. 36 37 13.8. All names shall be typed or printed in ink below the signature. 38 39 13.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of 40 which shall be filled in on the Bid Form. 41 42 13.10. Postal and e-mail addresses and telephone number for communications regarding the 43 Bid shall be shown. 44 45 13.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 46 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 47 to State Law Non Resident Bidder. 48 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised January 27,2016 0021 i3•8 iNSTRUCIMONS TO BIDDERS t>ape$or i u l 14. SUbMissian of Bids 2 Bids shall ba submitted on the prescribed Bid Form, provided with the Bidding Documents, 3 at the time and place Indicated in the Advertisement or INVITATION'TO 1'IDDERS, 4 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 5 envelope, marked-with the City project Number, Project title, the name and address of 6 Ridder, and accompanied by the Bidd security and other required documents. If the Bid is sent 7 through the snail or other delivery system,the sealed envelope shall be enclosed in a.separate 8 envelope with the notation °BLE) ENCLOSED" can the face of it. 9 10 15. 1'4"Iodiiicatian and Withdrawal of Bids 11 12 15.1 13ids addressed to the Purcl-osing Manager and filed with the Purclaa5i11g Office 13 cannot be withdrawn 'prior to the time set for bid opening. A request for withdrawal 14 must be made in uniting by an appropriate document duly executed in the manner 15 that a Bid inust be executed and delivered to the place where Bids are to be submitted 16 at any time prier to the opening of Bias. After all Bids not requested for withdrawal 1.7 are opened artd publicly read aloud, the Bids for which a withdrawal request has been is prop tri y filed may, at the option of the C ity, be returned unopened. 19 24 15.2. Bidders may modify their Bid by electronic communication at any nitre prior to the 21 time set for the closing ofBid receipt. 22 23 16. Opening of Bids 24 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 25 abstract of the amounts of the base Bids and major alternates(if any)will be =de available 26 to Bidders after the open ing of Bids. 27 28 17. Bids to Regain Subject to Acceptance 29 All Bids will remain subject to acceptance for the time period specified for Notice of Awt3rd 30 and execution and delivery of a complete Agreement by Successful Bidder. City may,at 31 City's sole discretion, n-1 ease any Bid and nullify the Bid security prior to that date. 32 33 18. Evaluation of Bids and Award of Contract 34 35 11 ,1. City reserves the right to reject any or all Bids, i-rcluding without limitation the rights 36 to reject any or all noncoLtforming, nonresponsive., unbalanced or conditional Bids 37 and to reject the Bid of any Bidder if City believes that it would not be in the best 38 interest ofthe Project to tztake an award to that Blddet,whether bemuse the Bid is 39 not responsive or the Bidder is unqualified or of doubtful finaneial ability or fails tr1 40 meet any other pertinent dandard or criteria.established by City. City also reserves 41 the right to waive informalities not involving price,caittrucat time or changes in the 42 Work with the Successful Bidder. Discrepancica betwocii the multiplication Of=Its 43 of Work and unit princes will be reschred in War of the unit prim. Discrepancies 44 between the indicated sum of any column of figures and the correct sum thereof will 45 be m3olved in favor of the currect sure. Discrepancies between words and li gures 46 will be resolved in favor of the girds. 47 CITY OF FORT WORTH ierilagc Truc4 Eorkymy at rc7mma Ricigo rsoundebout STA.I+AJAR0 CUNSTRUCTIQN SFECIVICATIOTti DOCL'MF—NTS Pric amMimbnr-02%2q Fitwised]anuary 27,2Q16 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 10 1 18.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 2 among the Bidders, Bidder is an interested party to any litigation against City, 3 City or Bidder may have a claim against the other or be engaged in litigation, 4 Bidder is in arrears on any existing contract or has defaulted on a previous 5 contract,Bidder has performed a prior contract in an unsatisfactory manner, or 6 Bidder has uncompleted work which in the judgment of the City will prevent or 7 hinder the prompt completion of additional work if awarded. 8 9 18.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and 10 other persons and organizations proposed for those portions of the Work as to which 11 the identity of Subcontractors, Suppliers, and other persons and organizations must 12 be submitted as provided in the Contract Documents or upon the request of the City. 13 City also may consider the operating costs,maintenance requirements, performance 14 data and guarantees of major items of materials and equipment proposed for 15 incorporation in the Work when such data is required to be submitted prior to the 16 Notice of Award. 17 18 18.3. City may conduct such investigations as City deems necessary to assist in the 19 evaluation of any Bid and to establish the responsibility, qualifications, and financial 20 ability of Bidders, proposed Subcontractors, Suppliers and other persons and 21 organizations to perform and furnish the Work in accordance with the Contract 22 Documents to City's satisfaction within the prescribed time. 23 24 18.4. Contractor shall perform with his own organization, work of a value not less than 25 35% of the value embraced on the Contract,unless otherwise approved by the City. 26 27 18.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 28 responsive Bidder whose evaluation by City indicates that the award will be in the 29 best interests of the City. 30 31 18.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 32 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 33 the lowest bid submitted by a responsible Texas Bidder by the salve amount that a 34 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 35 comparable contract in the state in which the nonresident's principal place of 36 business is located. 37 38 18.7. A contract is not awarded until formal City Council authorization. If the Contract is 39 to be awarded, City will award the Contract within 90 days after the day of the Bid 40 opening unless extended in writing. No other act of City or others will constitute 41 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 42 the City. 43 44 18.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 45 46 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised January 27,2016 0021 l3=10 INSTRUCTIONSTO BIDI)ERS P09C 1C of 10 t 19. Signing of Agreement 2 When City issues a Notice of Award to the Stiocessful Bidder} it Evill be accompanied by the 3 required number of unsigned counterparts or the Agreement. Within 14 days thereafter 4 Contractor shall sign and deliver the required number of counterparts of the Agreement to. 5 City Willi the required Bonds,Cartifieates of Insurance, and all other required documentation. 6 City slial l thereafter deliver one fully signed counterpart to Cnzitractor. 7 8 9 to END OF SECTION CITY OF FORT WORTH Hurfinge Trnoe Parkway at Tehama Midge Roundahout STANDARD CONSTRUC710N SPECURCATION DOCU1v FLATS Project lumber-02529 Revised January-27.2016 003513 BID FORM Page 1 of 1 SECTION OC 3513 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent(hereinafter also referred to as"you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict sof Interest Questionnaire (the attached C 1 Form) and Local Government Office r Conflicts Disclosure Statement(the attached CIS Form) below pursuant to state lave. Th is affidavit will certify that t h a Didder has on fife with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also he downloaded from the website links provident below. Mtn:flwvvw.ethlics.state.U.Wforrnsfc IQ_Pdf htfP-,1 krWW ethics state 1x,uslfnrmS10JS.Pdf CIQ Farm is on file with City Secretary CIO Form is being provided to the City Secretary CI CIS Form is an File with City Secretary GIS Form is being provided to the City Secretary 13IDDER: Reyes Group Ltd. 1520 Parker Road By: Marcos G, eyes Grand Prairie,TX 75050 '�r Signature: A/A�Iz' Title- Presldent END OF SECTICIN CITY OF FORT WORTH STANDARD CONSTRUCTION 5PFC[FICATION nocuIVIFNTS Her!lage TrzGe Parkway 8t Tehama Rk2pe Psrkway Roundabout Farm Revised 2f2212015 Project Xumber•02529 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o:The Purchasing Division 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: Heritage Trace Parkway at Tehama Ridge Parkway Roundabout City Project No.: 02529 Units/Sections: Unit I: Paving and Drainage Unit II: Utilities Unit III: Landscape and Irrigation Bid Alternate 1 -HES Concrete Bid Alternate 2-Illumination 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association,organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering,giving,receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial,non-competitive levels. d. "coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised 1/28/2016 Qd 41 C•0 BID FORM Pap 2 or 9 3_ Prequalification The Bidder acknowledges that the following work types must be perfurmed only by prequalified contractors, and sub:entractars: a. Asphalt Paving CwnstrurbinnMeconstructlon 11-ESS THAN 15,000 squere yards) b. Concrete Paving OonstruclioniRecanstructinri(LESS THAN 15,©00 equate yards) c. Roadway and Pedestrian Lighting d. Water Distribution, Urban and RegeNal, 12-inch diameter and smaller 4. Time of Completion 4,1. The Work will be complete for Suhslantial Completion within 140 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Ccriditic ns, 4.2.. Bidder accepis :he provisions of tha Agree rrient as to incenVives and I[quidaled damages in the event of failure to complete the Work and obtain Substanllal Completion within the times specified in the ABreemenL 4.3. The Dally Value Is S3,00D per day. S. Attached to this old The following docannents are attached to and made a part of this Bid: a, This Old Form,Ser tlan 00 41 00 b. Required Bid Bond, Sactlon 40 43 13 Issued by a surety meetIng the requirements of Paragraph 5.01 of the Gecmral Conditions. c_ Proposal Form,Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder.Sectlori 00 43 37 in- MVVBE Forms(apfianaI at time c bid) f. Prequa I dicahon Statement, SecliDin 00 4512 g. Cunflict of Interest Atf cawit,SecUo i UU 35 13 'If necessary, CIO or CIS forms are to he provided directly to City Secretary h. Any adcdtti4naI d©cumenis that may ha required by Section 12 of the Instruckicns to Bidders 6. Total Bfd Amount 6 1. 4ldder will complete the Worrc In accordance with the Contract Documants for the fol ming bid amount_ In the apace prov[ded below, please enter the tolel bid amount for this project.Only I.hls figura will be read pubtidy by the City at the bid opening, 6.2. It is understood and agreed by the Bidder in signing this proposal [hat the total bid amount entered below is subject to verification andror Imadiftcatlon by multiplying the unit bid prlces for each pay itern by the respective estimated quantities shawn In tails preposall and then totaling all of the Wenried amounts. 0MOFFORTW ORTIi PtNlago grata Pa rkaay a 70amn Rdge Pakwso Rawdaba i STANDARD CONSTRUCTION sIRMFIUATION ooCUMENTS ergcd%mter-02629 Rbymd 1rd@P2U le 00 111 00 813 FORi61 Page a®r3 6.3. Evaluation of Wd Items Total Base Bid Unit I 31,760,600,75 Total Sass Bid Unit.II $34,562.30 Total Base Bid Unit III $191,4$1.25 Total Base Bid $1,986,644,31? Old Alternate 1 $89,929.00 Bid Alternate 2 $0.00 Total 1310 (Oase Bid+E3id Alternate 1) $2,076,573.30 7. Rld Submittal ThIs Old Is submitted on 2125=16 by the entity roamed below, Respectfull Receipt is acknowledged of the Initial followingAddenda: ay: MAddendum No, 1 (S' shire Addendum Me.2: Addandurn Na.3: Marcos G.Reve jAdderidurn No.4: (Printed Narne) Miller President Company: Reyes Group Ltd. Address: 1520 Parker Road Grand Prairie,7X 75050 Stale of Incorporation: Illinois Ernall: r�rar n= {Ire r s rnu;i c�,nf Phone: 214-260-3535 END OF SECTION CITY U PORT wvRTH Hefdoija Trace Parkway aj Tuhame Ridge Parkwray Roundahoul STANOARD CON$TRU CTIQN SKUI HPATI ON 00 CUN�ENTS Prole€I Nurobw-02 529 ROMIsed40 f2016 00 42 43 BID PROPOSAL Paget of 3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantit Unit I:Paving and Drainage 1-1 9999.0001 Construction Staking 0171 23 LS 1 21,011.75 $21,011.75 1-2 9999.0002 Construction Survey 0171 23 LS 1 10,506.00 $10,506.00 1-3 0241.0100 Remove Sidewalk 0241 13 SF 5610 1.75 $9,817.50 1-4 0241.0300 Remove ADA Ramp 0241 13 EA 4 253.75 $1,015.00 1-5 0241.0401 Remove Concrete Drive 0241 13 SF 1250 2.25 $2,812.50 1-6 0241.0500 Remove Fence 0241 13 LF 110 2.00 $220.00 1-7 0241.1000 Remove Conc Pvmt 0241 15 SY 7450 8.75 $65,187.50 1-8 0241.1100 Remove Asphalt Pvmt 0241 15 SY 450 8.00 $3,600.00 1-9 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 540 5.75 $3,105.00 1-10 0241.0550 Remove Guardrail 0241 13 LF 210 6.00 $1,260.00 1-11 0241.3015 Remove 24"Storm Line 0241 14 LF 150 23.75 $3,562.50 1-12 0241.3023 Remove 48"Storm Line 02 41 14 LF 10 52.50 $525.00 1-13 0241.3104 24"Storm Abandonment Plug 0241 14 EA 4 726.75 $2,907.00 1-14 0241.4101 Remove 10'Recessed inlet 0241 14 EA 3 540.75 $1,622.25 1-15 0241.4103 Remove 20'Recessed Inlet 0241 14 EA 2 730.50 $1,461.00 1-16 0241.4203 Remove 6'Drop Inlet(Apron Only) 0241 14 EA 1 204.50 $204.50 1-17 3110.0102 6"-12"Tree Removal 31 10 00 EA 13 350.25 $4,553.25 1-18 3110.0101 Site Clearing 31 1000 LS 1 50,000.00 $50,000.00 1-19 3123.0101 Unclassified Excavation by Plan 31 2316 CY 750 16.50 $12,375.00 1-20 3124.0101 Embankment by Plan 31 24 00 CY 750 9.50 $7,125.00 1-21 3123.0103 Borrow by Plan 31 2323 CY 1050 37.00 $38,850.00 1-22 3125.0101 SWPPP >_1 acre 312500 LS 1 11,439.75 $11,439.75 1-23 3211.0113 8"Flexible Base,Type A,GR-1 3211 23 SY 7930 13.50 $107,055.00 1-24 3213.0106 10.5"Conc Pvmt 32 13 13 SY 8860 71.50 $633,490.00 1-25 3213.0301 4"Conc Sidewalk 32 13 20 SF 9900 4.25 $42,075.00 1-26 3213.0401 6"Concrete Driveway 32 13 20 SF 1000 8.00 $8,000.00 1-27 3213.0503 Barrier Free Ramp,Type M-1 32 13 20 EA 6 1,824.75 $10,948.50 1-28 3213.0504 Barrier Free Ramp,Type M-2 32 13 20 EA 2 1,825.50 $3,651.00 1-29 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 2 1,825.501 $3,651.00 1-30 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA 6 1,880.251 $11,281.50 1-31 9999.0003 17"Concrete Retaining Wall Truck Apron) 32 16 13 LF 250 41.75 $10,437.50 32 13 13, 1-32 9999.0004 Integral Colored 10.5"Concrete Truck Apron Tech SY 540 03 35 13 132.00 $71,280.00 9999.0005 Integral Colored 10.5"Concrete Median 32 13 13, 1-33 Splitter Island) Tech SY 60 03 35 13 132.00 $7,920.00 9999.0006 Integral Colored/Textured 4"Concrete Median 32 13 20, 1-34 Splitter Island) Tech SY 860 03 35 13 79.50 $68,370.00 9999.0007 Integral Colored/Textured Concrete Pedestrian 32 13 20, 1-35 Buffer Tech SY 330 03 35 13 159.00 $52,470.00 1-36 9999.0008 Monolithic Noses,Splitter Island 32 13 13 EA 12 1,963.25 $23,559.00 1-37 9999.0009 MTL W-BEAM GD FEN TIM POST TXDOT LF 270 29.25 $7,897.50 1-38 9999.0010 Terminal Anchor Section TXDOT EA 2 2,918.25 $5,836.50 139 9999.0011 Rail Anchorage Curb and Type T631 Traffic TXDOT LF 70 Rail 116.75 $8,172.50 1-40 13216.0101 6"Conc Curb and Gutter 32 16 13 LF 660 24.50 $16,170.00 I-41 13217.0001 4"SLD Pvmt Markin HAS W 32 17 23 LF 505 1.25 $631.25 I-42 13217.0002 4"SLD Pvmt Markin HAS Y 32 17 23 LF 2645 1.25 $3,306.25 1-43 13217.0003 4"BRK Pvmt Markin HAS W 32 17 23 LF 1 70 1.50 $105.00 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised 2/25/2016 00 42 43 BID PROPOSAL Page 2 of 3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity 1-44 3217.0203 8"SLD Pvmt Markin HAE W 32 17 23 LF 500 2.25 $1,125.00 1-45 9999.0012 8"DOT Contrast Pvmt Markin HAE W 32 17 23 LF 102 3.00 $306.00 1-46 3217.0202 8"SLD Pvmt Markin HAS Y 32 17 23 LF 300 2.25 $675.00 1-47 9999.0013 24"SLD Contrast Pvmt Markin HAE W 32 17 23 LF 380 8.25 $3,135.00 1-48 9999.0014 18"DOT Contrast Pvmt Markin HAE W 32 17 23 LF 80 7.00 $560.00 1-49 9999.0015 Lane Legend Contrast Arrow 32 17 23 EA 1 175.00 $175.00 1-50 9999.0016 Lane Legend Contrast DBL Arrow 32 17 23 EA 4 303.50 $1,214.00 1-51 9999.0017 Lane Legend Contrast TRIPLE Arrow 32 17 23 EA 2 478.50 $957.00 1-52 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 8 4.75 $38.00 1-53 3217.2103 REFL Raised Marker TY II-A-A 32 17 23 EA 35 4.75 $166.25 1-54 9999.0018 2'Diameter SLD White Contrast Circle Pvmt 32 17 23 EA 6 Marking 140.00 $840.00 1-55 9999.0019 Lane Legend Contrast Word 32 17 23 EA 6 1,225.75 $7,354.50 1-56 3217.4307 Remove Raised Marker 32 17 23 EA 209 3.50 $731.50 1-57 3231.0211 Barbed Wire Fence, Metal Posts 3231 26 LF 100 7.50 $750.00 1-58 3341.0205 24"RCP,Class III 3341 10 LF 1 420 140.50 $59,010.00 1-59 3349.5001 10'Curb Inlet 33 49 20 EA 2 4,669.25 $9,338.50 1-60 3349.6001 10'Recessed Inlet 33 49 20 EA 2 4,902.75 $9,805.50 1-61 3349.6002 15'Recessed Inlet 33 49 20 EA 2 7,004.00 $14,008.00 1-62 3349.6003 20'Recessed Inlet 33 49 20 EA 3 10,272.50 $30,817.50 1-63 3349.8001 10'Type 2 Inlet 33 49 20 EA 1 10,972.75 $10,972.75 1-64 9999.0020 5'Drop Inlet(Apron Only) 33 49 20 EA 1 1 1,167.25 $1,167.25 1-65 9999.0021 IN SMD RD SN SUP 8r AM TYS80(1)SA(T) TXDOT EA 4 652.50 $2,610.00 1-66 3441.4003 Furnish/Install Alum Sign Ground Mount City 3441 30 EA 78 Std. 437.00 $34,086.00 I-67 3441.4108 Remove Sign Panel and Post 34 41 30 EA 10 48.00 $480.00 1-68 3441.4109 Remove Sign Panel 34 41 30 EA 1 24.00 $24.00 I-69 3471.0001 Traffic Control 3471 13 1 MO 7 3,562.75 $24,939.25 1-70 9999.0022 Detour Route 3471 13 EA 2 385.25 $770.50 1-71 3471.0002 Portable Message Sin 3471 13 WK 52 350.25 $18,213.00 172 9999.0023 Temporary Asphalt Pavement(4"TY B on 6" 32 12 16 SY 2260 Compacted Sub rade) 31.50 $71,190.00 1-73 9999.0096 Paving Construction Allowance 00 73 00 EA 100000 1.00 $100,000.00 1-74 13341.0409 48"RCP,Class 111 3341 10 LF 20 269.75 $5,395.00 1-75 13305.0104 Manhole Adjustment,Minor 330514] EA 1 1 278.251 $278.25 Unit I:Paving and Drainage Subtotal 1 $1,760,600.75 Unit It:Utilities II-1 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 6 278.25 $1,669.50 II-2 3312.2003 1"Water Service 33 12 10 EA 1 2,892.75 $2,892.75 11-3 3305.0108 Miscellaneous Structure Adjustment Heritage 3305 14 EA 1 Trace STA 58+05 1,993.75 $1,993.75 II-4 3305.0108 Miscellaneous Structure Adjustment Heritage 3305 14 EA 1 Trace STA 58+22 2,052.00 $2,052.00 II-5 3305.0108 Miscellaneous Structure Adjustment Heritage 33 05 14 EA 1 Trace STA 59+81 3,637.25 $3,637.25 II-6 3305.0108 Miscellaneous Structure Adjustment Heritage 33 05 14 EA 1 Trace STA 60+40 2,052.00 $2,052.00 II-7 3305.0108 Miscellaneous Structure Adjustment Tehema 33 05 14 EA 1 STA 13+72 6,166.50 $6,166.50 II-8 9999.0024 Water Meter Box Re lacement33 12 10 1 EA 1 753.50 $753.50 II-9 3305.0109 Trench Safety 33 05 10 LF 5 175.00 $875.00 II-10 3305.0111 Valve Box Adjustment 33 05 14 EA 2 1 338.00 $676.00 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised 2/25/2016 145 a.a; HID r11-71nli,ar. SECTION OD 42 43 PROPOSAL FORM UNIT PRICE BIC Bidder's Application Project liem information 'Bidder's PrCposal Bldlist I 8peeltl tion Unit of Bid Item No. Description 8ee110n No, Measure QuantityLin It Prim Bid Value 11.11 3311.0141 6"Water Pipe 33 11 10, LF 5 331112 209,50 $1047.50 11-12 3312.4106 12"x ti Tapping Sleeve 8 Valve 33 05 14 EA. 1 5992.75 $5,992.75 11-13 3311.0001 0uctIle Iran Water Fitting a wl ReMraInt 3311 11 TON 0,1 14,i23.00 $1.432.20 It-14 3305.4102 Carthodlc Protection Test stallion 33 05 14 EA 1 Adjustment 1,199.25 31,199.29 11.15 3305.0103 Exploralory Excavation of Existing Utilities 33 05 30 EA 1 2,122.25 $2,122.25 Unit li:111111ties Subleta' $34,562.30 ''.r Unit ill!Laridscapa and Irrigation III-1 3291.0100 To soil-4" - 3291 19 CY 730 51-5c $37.595.00 1-2 3292.0109 Block sod Place Mew - 3292 13 Sof 6520 4.011 $26.1380.00 111-3 3293.4103 Plant 3"Tree [Live Oak 32 93 43 EA 5 6174.75 $3,023,75 II i-4 5999.0025 MR Irrigation System�Central Island' ' 3290 10 L8 1 9,222.00 9,222.00 II1-5 9999.0026 Landsc.a a-Central Island 32 93 43 L$ 1 610 915.75 $60916.75 W-6 9499 0027 Landscape-Parkwey 329343 LS 1 7,644,75 $7.644.75 111-7 9999.0028 Allowance-Ini align ResloratIon-Pa32 90 10 EA 12000 1.00 $12,000-00 111.8 9999,0029 Allowance-2V lufanurnent 329343 EA 20000 1.003 T20,1501100 Ilii 9999.60-0 AIimwnce-Lan dsca pe Calumn 32 93 43 EA 15UD0 1,00 $15,00.00 Unit 111'Landscape and Irri atlan Su blot at 191 454 .25 -- Bid Alternate 1 -HES Concrete 1111-1 11213.0106 10-5"Ccno Pyrnt HES 321 a 13 81350 51 9.00 I111-2 13213.0106 10,V Mane Pmt 32 13 13 5Y -8680 71.50 4111393,490.00 Eld Alternate 1 -HES Cuncmlel 58G.529.50 Bid Alto mate 2•Ilium last]*" V-1 1,2605.3015 2"CONDT PV+C BCH 83 26 05:33 LF 490 Mo 54 655.01) V-2 12605-3016 Z GONDT PVC SGH 80 13 210 05 43 LF 950 14.25 $13,537.50 V-3 210015.3026 Y CC NOT PITC SCH 80 B 260633 LF 3310 18,00 5 94 0.a s V-1 3447-1502 Ground EuxTypo E3 w1A n 34 41 10 FA 10 598.75 $S.987-50 99'd9.0031 Powder Coated Black(RAL 8417)Rdwy Ilium V-5 Assembly TY 18,18A, 19,and D-40 (With T81-17 STD 34 41 11 EA 9 TuDC)T Birs"a Bata 4.518.51) $35,14bXD V-6 3441.3241 LED Vghting fixture 34 41 2p EA 12 957J61 111,493-01) V-7 3441.3301 Rdwy Illurll Foundal6on TY 1 2.and 4 34 41 20 EA 1 1,017,751 $1, 017.75 V-8 3441.33172 Rdwy Mum l oundationTY 3,51,6,and 9 3441 20 FA 9 1,376,75 $12r390.75 V_9 3441,34D4 2-2-2-4 Quad lex Alum Elec Conductor 34 41 20 LF 1840 3.25 $5 960. D4 V-10 3441.3502 Relueate Street L' ht Pole 34 41 20 EA 2 718.25 ;1, 43 6.50 V-11 9999.0032 Contact Enclosure Pad Replacement&MaurrE 3+441 233 EA 1 770.25 778.25 � V-12 3305.0103 EKproralorV Excavation of EAGIIng Udlities 1 33 06 30 EA 1 38 1 299.25 1: 371 -50 Bid Alternate 2-illunrinaban Subtotal $110,';35-75 Bid Summ;kry Unit I:Pavia and D rain aq a Subtotal $1,760,60CI 75 Unit It.,UtlIItie s Subtotal $34,562,30 Unit III.Landscape and Irrl atlnn Subtotal' S1.91, 481 .25 Total Base Bid $1,983,620.55r+�P- _ Bid AlternaWl -HES Concrete $89.929.0 Old Alternate 2-111urninatlan $110, 735.7_5 Total Bid(Bass+Alternate) s2.1s7.349.o5 E:ND OE SEGTiON CITY OF YORT WORTH Haimp7w,Parkway w Tdimm Pideb Partwr,p PwundiA4id STAN1},�1.IM)CONSTRUC97p74 4PFk:kF1('A:JWA DCKU:�aENT!; PrsljactlV,I�bcr-nE',�4 CC 40 Z7 VENDOR COMKIANCE TO SWE LAW Page 10r 1 SECTION 04 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Cade Chapter 2252 was adopted for the avrard of contracts to nonresident bidder$. This law provides that, in order to be awarded a crintract as low bidder, nonresident bidders (aut-of-state contractors whose corporate offices or principal pla= of business are outside the Stste of Texas) bid projects for"nstmction, improvements. supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract In the State which the nonresident's principal place Of business is looated- The appropriate blanks in Section A must be tilled out by all nonresident bidders in order for your bid to meet specifications, The failure of nonresident bidders to Isla so Will autornatically disqualify that bidder. Resident kidders must aleck the box in Section B, A, Nonresident bidders in the State of our;prirlcipal piece of busi-less, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders In the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company cr our parent company or rnajonty owner is in the State of Taxes. a BIDDER: Reyes (Group Ltd- By: Marcos G. Reyes 1 524 Parker Rood Grand Prairie, TX 75060 ig uTe) Title: President Date: END Ur SECTION CITY OF FORT WQRTW STANDARD 00N3TRVrTkDN SPECIFICATION DOCUMENTS Herimpe'tmco Pukw;;y of Tawns Ridge Parkway Roundubmit Form Revised 212=010 Projad Nklinber•IU529 444313 BID S€ND Page 1 of t SECTION 00 43 13 130 BONE) KNClW ALL BY THESE PRESENTS: That we, (Bidder Name) Reyes Group, Ltd hareinatter called the Principal, and (Surety Name) Travelers Casualty and Surety Company of America a corporation or firm duly authorized #o transact surety buslnesa In the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City of Fort Worth, Texas, hereinafter called the Obligee, in the sum of Five Percent of the Amount of[aid and MOM 00 Dollars t$ 5% }, the payment of which sure will be well and truly made and the said Principal and the said Surety, bind ourselves,our heirs, executors, administrators, successors and assigns,jointly and severally, firm by these presents, WHEREAS, the Principal has submitted a proposal to perform work for the following project of the ObliSee, Identified as Heritage Trace .Barkway at Tehams Ridge Parkway Roundabout. City Pro ect No 02529 NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with (I)e Obllgee in accordance with the terms of such proposal, thea this Fond shall be null and void. If the Principal fails to execute such, Contract in accordance with the terms of suer proposal or fails to satisfy all requirements and conditions required for :he execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this band shall bsoome the property of the Obligee, without recourse of the Principal andlar Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bld Arrotrnt and the next selected Bidder's Total Bid Amount. SIGMED this 25th day of `February 2t 1 By: Hey 0 �.td. f j/fi E (Signature and Title of Principal) "Sy: Travelers Gasualty and Surety Company of America Q,,T\ "Qf --- reel A. Dou h 7grnature of Attorney-of-Fact} 'Attach Power of Attorney (Surety)for Attorney-in-Fact Impressed Surety Seal Only END OF SECTION CITY OF FORT WOR711 STANDARD CONSTRUCTION SPECIHCATION DOCUMENTS Heril"e TrF9e Parkway Qt TAharn&Ridon Parkway FZO-undab out Rauised 2J221Z016 Pro vo NumDer-02529 Surety Company Acknowledgement STATE OF ILLINOIS COUNTY OF COOK SS: On this 25th day of February,2016, before me personally appeared Carol A. Dougherty ,to me known,who, being by me duly sworn, did depose and say: that(s)he resides at Schaumburg,Illinois,that(s)he is the Attorney in Fact of Travelers Casualty and Surety Company Of America,the corporation described in and which executed the annexed instrument; that(s)he knows the corporate seal of said corporation;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said corporation; that(s)he signed his/her name thereto by like order; and that the liabilities of said corporation do not exceed its assets as ascertained in the manner provided by law. --�z&&z Z&/�& I Notary Public in and for the above County and State My Commission Expires: 03/29/18 `j,7} SHE ;A WAFINJNea THIS PCWEF]OF ATTORNEY IS INVALID WITHOUTTHE RED BORDER « POWER OF ATTORNEY TRAVELERS] Ise{rwinglan Cawally Cunalrany 5t.Paul Merrur�V Insurance COM puny Fidelity acrd Guae'anty Ins-urnnce CunipailY Trawlers i(.nmialty and Surely CnmPnny Tiderlily Hord Guaranty Insurance Iluderwriters,Inc. Travelers Casually and Surety Compatry nrAmorica St.Paul F4v am]Mwine Insurance Company United States Fidclily and Gunrunly Cmipuny St.Paul Gua rdWin Imurance Cnmpaiq Aft- ricy-In Fact No. 22 tt247 l;ci tillraw No_ 006413404 KNOW ALI, rv'IFN 13Y THESE PRESENTS- 71hat I+RiTaIngion Casualty Company,St- Panl tyit'c and MKI11e litSllranCe Carnlfauy, SI. Paul Gtrardiart Insur'anCc Cornprny,St. Paul Mercury Insuranw Compinny.Truvelers Casually Pad Sufety CDMI)Mny,"Crawlers Gustlnlly nuel Surety Cumpany ur Arturioa,and United 5latas ]ideiiiky aril Guaranty Company are CMpol-aliolis duty urgnnized cotter lir laws of the Slate Lir Cunneclit:ul, thal Pidcl ty and Cluaranty Insurarn;u 'Company ih a cnrporalion duly coganir.ed under the Isws of l&i Male nF lawn,and that l+trlc,ity azul Gitisranly Insurance Undarwritors,Iter.,is a eniparalion duly c ganized under the laws of tae Stale ol'Wiseonsin(herein colleclisely called the"Companies-'),and that the Compnnieu do hereby make,constitute and appaini R- 13_ StrhUlt.J. S. RIK 11num L. Sulkowski,C'mol A� Dougherty, Rtrhori E_ Knppus, Shw-vne L. litnrilcr.Mun!d1th A. Irllelk"Miku Pohl.Robvrl Miclk4',anal John Adams of the City of .9ch;1Llmburt -'shale of Iii inoi-9 _ ,dwir lrun and lawfnt Arlomey(s)-ifl-I"aci. Bench in heir separnte Capacity it more than Linc is named abay.t,to sigai,exert le, I and neknowredge any and all bonds,re gnizznces.ccmdirional underlakiW and utlxr vriitinp obligatory in the nature lhmwl on bchairof LIM 0311-Lpanit:s ir.their business of guaranteeing rhe ritielil}'of PVTS 11a,gual•AWPCe ng Ilk IAMTOrlUalUC Of conifacls and executing or;guaranteeing boil&acid undertakLags required or pennitted in any actions Dr praeeediugs allowed by law" Eq wrrNT,SS%TME0F,[lie Coinpai m have causer this iu:inMenl to be rigried and their corporaw wkto lac lwvcto ttt7ixed,this "lt' day off Augua. I5 , Far mingle n Cnamialry Contpnay Int,Paul h'tcrcury Innoiratice Umnpimy Fidehly and Guaranty Insrtrance Company Wayclq'8 Cmwalty and S-ar'ety Comp-any FidclRy and Guatrltrity.Insurance Lhrdel't rifer,.Inc. Davelli`S C.9NIJUIIY kind SlUeIy{ M1PaIQV Of AnrIeriCn St.Puut TSir and MaJ im Insurance Caltepany United Slates leIALKiy and Gunranlp Cmapuny Sr.Psnll l..Ilardlan Iniumnee f�ml)ant V 4k°G0.#�'��f� �� +e4� .g 4'` �Fxen4� ��'nayP T�.•tr,,xu� �a9�A Y.'� 1!8 3 0-1-100054, a�'le°"" yeas 9vL1t MK la..4i1� i��.• _A -Ff F Y �lith T' it StuitafCmnectieut By: _ Citw of Ihiril'otd S&. ^l;t beri L Raney. tli.Vette Prixjdcnt On this the n day of AJlgast 2015 iIreare rip, ersnriall] a prenfcd t;.ohel9 I..fr`[4tiCy,w11e}tukncAwlt^dgc[1 1'1tif5@lf t4 bcthe SrwiQr Vicc Vmr iderit aff r'wrmingtnn Casually Compally, Fidelity and(luttraiily arld{;tierftaty Insaraluc Underwrilcrs,Inc..St,Paul Fire and Marine]nsuralxo—CDxrlpany,St.Paul Quard:ian fnswKince Compmy,SI.Pwil Nlenctiry Insorawe Corupny.TriwtIcrs C4sualty shut Surely Company.Trawclera Casually Linc[Surety C:ampany of America,and United Srates Fidelity and U'.Iarmaly Company,and that he,as tech,buing huthnri;ood No In de.ex*c,utcd the rorgn ng iiisr vniew far the putpics tlimin contahwd by signing On behalf I3I'thc corp[x"atitstiz by himwif as 8 duly atilhorixer]rtffJ:!ea'. ,,Er In Witticss VPbwwf.I herrounto set my hand buil rWC:wl said. � TAR My commission expircs tht loth day of lune.�c 16; * Ai",18LO Marle C.TeIreault,Nolay Public 58AA0.8-12 Prin'ed it U.S.A. WARNING:THIS PCMER OF ATTORNEY IS WAVAL p WffHOJTTHE ICD 180PIDER WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St. Paul Fire and Marine Insurance Company,St. Paul Guardian Insurance Company,St. Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Suety Company,Travelers Casualty and Suety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 25th day of February 20 Kevin E.Hughes,Assistant Sec tary GASU,� F\RE 4 .Qlo,:A-•-..MS.~.:q' ., AtTD �lY'>HO '� 1 9 8 2 0 '� 1977 ORPofwrEu � ?�,�r^, � �! .,, •m l .�:oo_._Tf;^`; a 3 �' �" 1irto F f .n s ' HARTFORD, t i(/N4_R�T,F,OF�, 2 �9 � 3 1951 t SG NL "S '�i.So '� CONN. \ S u+ 1896 BSL%3- ? o Vrnl�cb� �1,a�f �v..(•.., ae To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the above-named individuals and the details of the bond to which the power is attached. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 0045 11-1 BIDDERS PREQUALIFICATIONS Pagel of3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary.All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12,Prequalification 6 Statement for the work type(s)listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s)listed must submit Section 00 45 13,Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven(7)days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter,Articles 23 of Incorporation,Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun&Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised July 1,2011 0045 11-2 BIIJDERS PREQUALIFICAMONS Pago 2 of 3 1 (2) To be satisfactory,the financial statements must be audited or rcvicw€d 2 by an independent, certified public accounting firm registered and in 3 good standing in any nate. Currei t Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly Iicerssed or registered wi tis the Texas State 5 Board of Public Accountancy. 7 (3) The accounting.firm should state in the audit report or review whether 8 thecontractor is an individual, corporation, ar limited liability company. 9 (4) Financial Statements rnust be presented in U.S. dollars at the currant rate 10 ofexchange of the Balance Sheet date. 11 (5) The City will not recogrt ze any certified public accountane as 12 independent Who is not in fact, independent. 13 (6) The accountant's opilvun ars the frrtanaial statements of the contracting 14 company should state that the audit or review has been conducted in Is accordance with auditing standards generally accepted in the United 16 States of America.. This mast be stated in[lie accounting firtrr°s opinion. 17 It should: (1) express an unqualified opinion, or(2)express a qualified 18 opinion on the statements taken as a whole. 19 (7) Tl-w City reserves the right to requixr,a new statement at any time. 20 (S) The financial statement gust be prepared as of the last day of any imonth, 21 nen more than one year old and must to on file with the.City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital =r current assets—current 26 liabilities)by a fautur of 10, Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalilication purposes. 2.9 (10) In the case that a bidding date fails within the time a new financial 30 stateLnent is being prepared,the previous statement shall be updated with 31 proper verification. 32 b. Mdder Prequahficatron Applicarion. A Bidder Praqual"sficat[on Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligib leto bid on all classes of construction and maintenance projects. Incomplete 35 App Iicatittms will be rejected. 36 (1) In those schedules where there is nothing to report,the notation of 37 "None"or'IN/A"should be insetted. 38 (2) A minimum of five(5)references of related work ttlust be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Ccntactor is seeking prequalification. The schedule must 42 include the rnansifactureir, model and general cornt-non description of 43 each piece of equipment, Abbreviatrom or means of describing 4.4 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a_ Tfic City shall be the sole judge as to a contractor's prequaliflcatiom 48 b, The City may rcejcct, suspend, or modify any prequalilication for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY nF FORT WORTH Heritage Trace Farkway at Teh a inn Riege Roundabout STANDARD coNsTRucTioN SPECIFICATION DOCUMENTS Frolecr NiAmber-02539 Rtvijed fvly 1,2011 0045 11-3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid 2 the prequalified work types until the expiration date stated in the letter. 3 4 5 6 7 8 END OF SECTION 9 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised July I,2011 00-4512 E3fr)FdFW Page 1 cr 7 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to ccnnpiete he information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Preq�rall�cation Major Work Type GontractorlSubcontractor Company Marne Expiration Date Asphalt Paving XF�Y n61415 J Sf f't[fr a CJ' Construt;tionfRaconstruction ' (I-ESS THAN 155,000 square � �G� f �,�,rd f Muir#t l 60 (0/,5 {'�]t� yards) f le$5 IT 7C �0 0 301 I Concrete ,Paving X04 I � C-1�CYy-'� 1. A, Construct onJReconstruction, 113 7 0 poly Y--(Y 9--a• 1 � (LESS THAN 15,000 square i�_ yards) vAn ID{A IF r,i (e 1 K -7S65� Roadway and Pedestrian F3 e (A E— 1?-i<�Y 1��t �Yt C Llghtin�g �� �' � ` TV( uUvr iI -7 VILf0 Water Distribution, Urban and - ICts+ P L--('6� Renewal, 12-inch diameter and AL0 PQY1Le V fid• 'd J 3¢/Zol 0 smaller C-V(t Y-1Ot 4 C-LIT 1'+- JY IS5 The undersigned hereby certifes that the contractcrs and1or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Reyes Group Ltd. amps G. Reye 1520,Parker Roast Grand Prairie,TX 750550 ( gnat e Title: President Date: Z lzfll�- END OF SECTCON C TY OF FORT WORTH STANDARD CONSTRUCTION SPKIFICATIM 00rVNFNTA Haritaga'rara Plark ay at Tahama Mdon Parkway Rauridaboui Revised 2QZ12016 Proiaal NuMber-ID252@ FORTWORTH SECTION UO 45 13 I3IDDER PREQUAIAFICATION APPLICATION Date of Balance Shect r. Mark only one: Individual Limited Partnership Mame under which you wish t4 quaI16 General Partnership Corporation Limned Liability Cwopany Past Office Boy City State Zip Cade Street Address (required) City State Zip Cade Teluphono Fax Eirrail Texas Taxpayer Identilication No. Federal Employers Identification No. DUNS No~ (ifapplieable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1-000THROCKMOI fUN STREET FORT WORTH, 'lTP AS 76102-631 l AND . RJC 714E ENVELOPE: "8lDt)FR PREQUALIFICATION APPLICATION" 0D4511-2 BIDDER PRLKQUALIFICATION APPLICATION Psgs2 of BUSINESS CLASSIFICATION The following,should be completed in order that we may properly classify your firm: (Check the block(s)wbic:h are applicable- Block 3 is to be left blank if-Slock 1 and/or Block 2 is the-eked) leas fewer than 100 employees. and/or Has less than 56,000,000.00 in annual gloss receipts OR Docs not inect the criteria for being designated a small business as provided in Section 2006.001 of the Texas Gove nrner]t Cade. The classification of yollr firin as a small ❑r large btis iuess is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur boring-24-inch.dlameter casing and less Atigur boring-Greater than 24-inch diameter casing,and greater Tinineling-36-hiches-60--inches, and 350 LF or less Tunneling- 36-Inches 60-inches, ar_,d greater than 350 LF Tunneling-66"and greater, 350 LF and greater TrartneIing 66"and greater, 350 LF or Less Cathodic Protection Water Distribution. Development, 8-inch diameter and srnalJor Water Distribution,Urban and Renewal, 8-inch diameter and smaller Water Distribution,Development, 12-itch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diaineter and sinader Ulm-Transmission, Develupment,24-inches and smaller Water Transmission, Urban/Renewal,24-inches and smaller Water Transmission, Development,42-inches and smaller Water Trnnsmhsion, UrbanfRenewval, 42-inches and smaller Water Transmission, Development,All Sizes WaterTransmission, UrbanfRenewral,All Sizes Sewea-Bypass Pumping, 18-inches and smaller Sewer Bypass Furnping, 18-hiches-36-inches Sewer Bypass [lumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and similler CCTV, l 9-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller C17Y OF FORT WORTH Heritage Trace Parkway ui Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICADON DOCUMENTS Projoct Narnbtr-C2n9 PtAscd Dercmbm 2A,20 t 2 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement,All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning,All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction(LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction(15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance(UNDER$1,000,000) Asphalt Paving Heavy Maintenance($1,000,000 and OVER) Concrete Paving Construction/Reconstruction(LESS THAN 15,000 square yards) Concrete Paving Construction/Reconstruction(15,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised December 20,2012 oo 4s 13-4 BIDDZR PREQUAMFICATION APPLICATION Pap,4 of R 1. List equipment you deo not awn but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OAR 2. How man} years liar,your organization been in business as a general contl-actor under your present n am r? List previous business names. 3. How many ym-9 of experience in Construction work has year organization had: (a) As a general Contractor: (b)Asa Sub-Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AK�D DETA)[,E ] CONTRACT OF DATE. CITY-COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COhVLETEID STATE WHOM YOU REFER *If req ual1fying only show work performed since last stater ent. 5.Have you ever fa Bed to complete any work awarded to you? if so, where and why? 6.Has any officer or owner of your organization ever Iaeen an officer of another orgarAzatinn that failed to wnlplete a contract? If so, state the name of the individual, ether organization and reason, 7.Has ally offices or owner of your organization even failed to colnpletc a contract oxceuted in his/her I]AID0 If so, state the name of the individual,name of owner and reason- CITY OF FORT WORTH Heritage Trace Farhwdy ar Tchamu Ridge Parkway Roundabout STANDARD CONSTRUCTION SFECIFICATIO DOCLJM&NTS Pro-.vet N Jmbsr-02529 Revised December X0.2012 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household With a City employee,please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the salve household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised December 20,2012 0045 13,6 RIDIDRR PREQUALIFICATION APPECATION Fuge 5 off CORPORAIIOhI BLOOD PARTNERSHIP BLOCK If corporation: If partnership: Date of Incorporation State of Organo-ation Charter/PRe No, Tate of organization President Is partnership getieral, limited, or registered limited liability paltnershipr4 Vice Presidents File No. (if Limited Partnership) General Partners/Officers Secretary Litnited Partners(if applicable) Treasurer LIi1'iUl D LIA.BILiTY COMPANY BLOCK If a corporation: State.of Incorporation Date of organization File No. Indiuidualg auth-orized to sign for Partnership Officers or Managers(with titles, if any) tycept for limited partners, the individuals listed in the h1ncks above etre presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authar'1ty for additional individuals, please attach a certified copy of the corporate resolutiDn, corporate minutes, partnership agreement, power of attorney or uthcr legal documentation which grants this authority. r1Tv OF volur WOWVH Heritage Tree Parkural nt l'eharna Ridge Parkway Apundab4or STAADARD CONS"PItl.IC1'€ON 9PECIFFICATTOX DOCUMENT& PrajeLl Number-02529 Revised Detem a 20,2012 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 14. Equipment $ TOTAL BALANCESHEET ITEM QUANTITY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various- TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include,the manufacturer, model, and general common description of each. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised December 20,2012 4UA513-g I lrl):7F,Il PREQUALIF]CATION APPLICATION ?0EL 8 of a BIDDER PRXQUALI<FIC-ATlClN AFFIDAVIT STATE OF COUNTY OC The undersigned llcreby declares that the Foregoing is a true statement of the financial condition of the entity herein fist earned, as of the date herein Arst given; that this statement is for the express purpose of inducing tho party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the l)al$Itce sheet accornponying this re�,ort as wvll as any depository, vendor irr airy other agency herein named is Hereby authorized to supply party with any information, while this statement is in force, Necessary to verify said statemant. } being duly sworn, deposes and says that he/she is the _ of , the entity described in and which executed the foregoing statement that he she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the boobs of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application am correct and true as of the date of this affidavit. Finn blame: Signature; Sworn to before me this day of , Notary Public Notary Public must not he an officer, director,or stockholder or relative thereA M V DF F'€1T WOWI'H [JesilageTrKe Pukmyat Tehama Ridge Pnrkway Roundab" SCAN DARN CONSTRUCT]ON$PECIF'ICA'C ESN DDCL MEWT3 Prnj=Nnmh®r-02.529 Rovised Ddeember 20,2012 004 26-1 CONTRACTOR C0M L1ANCRW11-11WORKC -5C0MPFN5ATFONLAW Page t or I I SECTION OQ 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPI :MATION LAW 3 Pursuant to Texas Labor Code Sact[on 406.096(a),as amended, Contractor certifies that it 4 provides worker's cumperisation insurance coverage for all of its employees employed an City 5 Project No. 02.529- Contractor further ceftifies tliat, pursuatit to Teras Labor Cede,Secti.an 6 406.096(b), as amended, it will provide to City its subeoniractor's cm-6ftcates of complia.nae with 7 worker's compensation coveragc, 8 9 CONTRACTOR.- 1.0 f 12 Company P'Tint) I3 14 '-'z 1112I f2: r_ 15 Address 16 17 w�) 22ellallf 5&'75,9 Title: ��s}PFA)t- 1S City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 C01-1NTY OF TARRANT § 24 25F0'B NVr ,the.underi ned authority, an this day personal ly appeared 26 +[ S . known to the to be the lacmon whose rums is 27 subscribed to the foregoing instrumc�aclsnowledged to me that he/she executed the salve as 2S the act and deed of 1' r the purpom arta 29 consideration therein expressed and in the capacity therein,stated. 30 31 GI YEN UNDER MY HAND ANIS SEAL OF OFFICE this day of 32 � 20 33 34 35 36 ic in anU theSt�a cfTe as 37 38 ENJB OF SECTION a DENY W s s�ar�r:ar�n _ "_ NolaryPvblic.Vole of l'ews ��� ' My Cc rl ni ssiun Empires ��,'�#j .1uy 16. 2019 CITY OF POKT WORTH [Jerirage irate Parkaruyat'rehama Ridge Reundabew.x STAa1DA.RD CON 5TRUCTLON SPEC]FiCA'flOW DOCUMENTS Prooct:°Number-07529 Revised July 1,2011 004540-1 Minority Business Enterprise Specifications Pagel of 2 1 SECTION 00 45 40 2 Minority Business Enterprise Specifications 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is 5 applicable. 6 7 POLICY STATEMENT 8 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 9 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 10 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 11 12 MBE PROJECT GOALS 13 The City's MBE goal on this project is 16% of the total bid value of the contract (Base bid applies to 14 Parks and Community Services). 15 16 Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror 17 must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to 21 comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 22 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 23 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 24 3. Good Faith Effort documentation, or; 25 4. Prime Waiver documentation. 26 27 SUBMITTAL OF REQUIRED DOCUMENTATION 28 The applicable documents must be received by the Purchasing Division, within the following times 29 allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall' 30 deliver the MBE documentation in person to the appropriate employee of the;purchasing division and 31 obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the, 32 time allocated. A faxed and/or emailed copy will not be accepted., 33 1. Subcontractor Utilization Form, if received no later than 2:00 p.m., on the second City business goal is met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if day after the bid opening date, exclusive of the bid opening participation is less than stated goal: date. 3. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if no day after the bid opening date, exclusive of the bid opening MBE participation: date. 4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business if you will perform all day after the bid opening date, exclusive of the bid opening contracting/supplier work: date. 34 CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised June 9,2015 004544-2 Minnrily Busines Enirrprise Spmiriralions Paget oft 5. Jobst Venture Farm, if goal is met received no later than 2:00 p.m,, on the second City business or exceeded. day after the bid opening date, exclusive of the bid opening bate. 2 FAILURE TO COtWPLY WITIt THE CITY''S BUSINESS DIVERSITY ENTERPRISE ORDINANCE 3 WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSWE TO SPECIFICATIONS. 4 FAILL-RE TO SUBMIT THE REQUIRED MME DOCUMENTATION WILL RESULT IN THE BED BEING CONSIDERED NON-RESPONSIVE.A SECOND FAILURE WILL RESULT IN TIIE OFFEROR 5 BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A[FIVE YEAR PERJOD WILL RE,SULT IN Ar DISQ UALIFICAITON PC,RIOD OF TUREF YEARS. G 7 Any Questions,Please Contact The 1VI}WBE Office at(837)212-2674. 8 END OF SECTION 9 in a� CITY OF tORT WORTH Nlerimp Trace Fak+vay at Tehama Ridge Roundabout STANDARD CONSTRUCT SON SPECIFI CATION DOCUMENTS Project Number-02529 Rev i sed June 9,2415 005243-1 Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on March 29,2016 is made by and between the City of Forth 4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 5 ("City"), and Reyes Group, Ltd., authorized to do business in Texas, acting by and through its 6 duly authorized representative, ("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Heritage Trace Parkway at Tehama Ridge Parkway Roundabout 16 City Proiect Number-02529 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, Substantial Completion and Final Acceptance as 20 stated in the Contract Documents are of the essence to this Contract. 21 3.2 Substantial Completion. 22 The Work will be complete for Substantial Completion within 140 days the date when the 23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 24 3.3 Final Acceptance. 25 The Work will be complete for Final Acceptance within 40 days of Substantial Completion 26 3.4. Incentive 27 Incentive for timely completion of the Work shall be the Daily Value of$3,000 per day. 28 The Contractor will earn the Incentive for each Day that the Work is Complete prior to 29 the Substantial Completion Time of 140 Calendar Days taking into account any 30 additional time extensions as documented in an approved Change Order. The 31 Substantial Completion Date will be the date determined by the City and as stated on 32 the Letter of Substantial Completion issued by the City. The maximum number of 33 Days for which the incentive may be paid is 35 Days.Any extension granted in a 34 Change Order does not increase the potential Incentive. Any Incentive payment earned 35 by the Contractor shall be made at Final Payment. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised April 4,20I6 005243-2 Agreement Page 2 of 4 36 37 3.5 Liquidated damages 38 Contractor recognizes that time is of the essence of this Agreement and that City will 39 suffer financial loss if the Work is not completed within the times specified in Paragraph 40 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 41 General Conditions. The Contractor also recognizes the delays, expense and difficulties 42 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 43 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 44 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 45 City One Thousand Two Hundred Fifty Dollars ($1,250.00) for each day that expires 46 after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the 47 Final Letter of Acceptance. 48 Article 4. CONTRACT PRICE 49 City agrees to pay Contractor for performance of the Work in accordance with the Contract 50 Documents an amount in current funds of Two Million Seventy-Six Thousand,Six Hundred 51 Fifty-Three and 301100 Dollars($2,076,653.30). 52 Article 5. CONTRACT DOCUMENTS 53 5.1 CONTENTS: 54 A. The Contract Documents which comprise the entire agreement between City and 55 Contractor concerning the Work consist of the following: 56 1. This Agreement. 57 2. Attachments to this Agreement: 58 a. Bid Form 59 1) Proposal Form 60 2) Vendor Compliance to State Law Non-Resident Bidder 61 3) Prequalification Statement 62 4) State and Federal documents (project speck) 63 b. Current Prevailing Wage Rate Table 64 c. Insurance ACORD Form(s) 65 d. Payment Bond 66 e. Performance Bond 67 f. Maintenance Bond 68 g. Power of Attorney for the Bonds 69 h. Worker's Compensation Affidavit 70 i. MBE and/or SBE Commitment Form 71 3. General Conditions. 72 4. Supplementary Conditions. 73 5. Specifications specifically made a part of the Contract Documents by attachment 74 or, if not attached, as incorporated by reference and described in the Table of 75 Contents of the Project's Contract Documents. 76 6. Drawings. 77 7. Addenda. 78 8. Documentation submitted by Contractor prior to Notice of Award. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised April 4,2016 005243-3 Agreement Page 3 of 4 79 9. The following which may be delivered or issued after the Effective Date of the 80 Agreement and, if issued, become an incorporated part of the Contract Documents: 81 a. Notice to Proceed. 82 b. Field Orders. 83 c. Change Orders. 84 d. Letter of Final Acceptance. 85 86 Article 6.INDEAIWICATION 87 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 88 expense, the city, its officers, servants and employees, from and against any and all 89 claims arising out of, or alleged to arise out of,the work and services to-be performed 90 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 91 under this contract.This indemnification provision is specifically intended to operate 92 and be effective even if it is alleged or proven that all or some of the damages being 93 sought were caused,in whole or in part, by any act, omission or negligence of the city. 94 This indemnity provision is intended to include, without limitation, indemnity for 95 costs,'expenses and legal fees incurred by the city in defending against such claims and 96 causes of actions. 97 98 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 99 the city,its officers,servants and employees,from and against any and all loss,damage 100 or destruction of property of the city, arising out of,or alleged to arise out of,the work 101 and services to be performed by the contractor, its officers, agents, employees, 102 subcontractors, licensees or invitees under this contract. This indemnification J 103 provision is specifically intended to operate and be effective even if it is alleged or 104 proven that all or some of the damages being sought were caused, in whole or in part, 105 by any act,omission or negligence of the city. 106 107 Article 7.MISCELLANEOUS 108 7.1 Terms. 109 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 110 have the meanings indicated in the General Conditions. 111 7.2 Assignment of Contract. 112 This Agreement, including all of the Contract Documents may not be assigned by the 113 Contractor without the advanced express written consent of the City. 114 7.3 Successors and Assigns. 115 City and Contractor each binds itself, its partners, successors, assigns and .legal 116 representatives to the other party hereto, in respect to all covenants, agreements and 117 obligations contained in the Contract Documents. 118 7.4 Severability. 119 Any provision or part of the Contract Documents held to be unconstitutional, void or 120 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 121 remaining provisions shall continue to be valid and binding upon CITY and 122 CONTRACTOR. CITY OF FORT WORTH Heritage Trace Parkway at Tehama Ridge Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number-02529 Revised April 4,2016 00$243-4 Agreement Pagr 4 of 4 123 7.5 Governing Lawn and'venue. 124 This Agreement, including all of the Contract DQc:uments is performable in the State of 125 TcAas. Venue shalt be Tarrant County, Texas, or the United Raw District Courr for the 126 Northern District of Texas, Fort Worth Division. 127 7.6 Other Provisions. 128 The Contractor agrees to pay at least minimurn wage per hour for all iabor as the same is 124 classified, promulgated and set out by the City, a copy of which is attached hereto and 130 made a part hereof the same as if it were copied verbatun hereiu. 131 7.7 Authority to sip. 132 Contractor shall attach evidence of authority to sign Agreenjaiit if other than duly 133 autharized signatory of the Contractor, 134 135 IN WITNESS VR-M-REOF, City and Cortractor have executed this Agreement in TnUltiple 136 counterparts. 137 13$ This Agreement is effective as of the last date signed by the Parties C`Sffective Date")- 134 1 Contractor: City of Fort Worth Ely, { Jesus J.Chapa Assistaiat City Manager L�il f~ ', ds Dato V`'d Attest: IF (PriatudName) city secret r F . (Seal Tittle: 6W � . 0 Address: 4 .1'1+1&C ` 7-144VA' 6,0ANP fAffl—Alf-q 7X Date.. 3 4t-0 AS C4)5tat/,�elZip: i ' proved as to Form and Legality: fJ' J +G r Date cug as . Blac1� Assistant City Attorney 144 141 142 APPROVAL MCCUAffiNDED: 143 144 OFFICIAL R§Cla� CITz (�, 14� Y SECRL 146 Douglas . Wiersig,PE 147 T.11MI R K DIRECT{ Transportation acrd bfic Works CITY OF FORT WORTH Hediflga Trace Parkway at Tehama Ridge Roundabout STANDARD iCONSTRUCMN SPPX-'IFMATTOIN DO MMS NTS F'roj=t3 umber-M529 R vised April R,2016 t 0061 13-1 PERFORM"CE BOND Page 1 of 2 1 SECTION 00 6113 2 PERFORMANCE BOND Bond #106494805 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,Reyes Group,Ltd, known as"Principal"herein and 8 Travelers Casualty and Surety Company of America ,a corporate Surety(suretles, if more than 9 one) duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 10 or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 11 pursuant to the laws of Texas, known as "City"herein, in the penal sum of, TWO MILLION 12 SEVENTY-SIX THOUSAND SIX HUNDRED FIFTY-THREEAND 30/100 Dollars 13 ($2,076,653.30), lawfill money of the United States, to be paid in Fort Worth,Tarrant County, 14 Texas for the payment of which sum well and truly to be made, we bind ourselves,our heirs, 15 executors, administrators, successors and assigns,jointly and severally, firmly by these presents. 16 WHEREAS,the Principal has entered into a certain written contract with the City 17 awarded the 29th day of March,2016,which Contract is hereby referred to and made a part _ 18 hereof for all purposes as if fully set forth herein,to furnish all materials, equipment labor and 19 other accessories defined by law,in the prosecution of the Work, including any Change Orders, 20 as provided for in said Contract designated as Heritage Trace Parkway ai Tehama Ride 21 Parkway Roundabout 22 City Project Number 02529 23 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perforin the Work, including Change Orders,under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City,then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 30 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 31 Worth Division. 32 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 33 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 34 accordance with the provisions of said statue. 35 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 36 this instrument by duly authorized agents and officers an this 29tH day of March,2016. CITY OF FORT WORTH Heritage Trace.Parkway at Tehama Ridge Parlovay Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 02529 Revised July 1,2011 t PERFORMANCE 2014D 1 MNCIPAL: 2 Reyes Croup, Ltd._ _ Y— - 3 4 5 BY: Vwo lz4w� 6 ign atUN 7 AI T S CA Ir f Q 10 (1' ipnl)5 r t� Name and fide ll 12 AddrtSS; 152D Parker Road 13 Grand Prairie, —_X 75QbD 14 16 Vu"i��ness as to Pry eigal 17 SURETY: 1$ Travelarn Casualty and Surety Company 19 of America 20 21 BY: I 22 Signatures I 23 24 Carol A. Dougaierty, At ey zD Faot 25 Warne and Titin 26 27 Address; one Tower Square 29 Hartford, CT 0G183 J 29 34 t Y 31 Uness as to.Surety Q Telephone Number: 1,947}485-2416 32 33 34 35 *Nme: if signed by an officer of the Surety Company, thrre must be on file a uerlified extract 9 36 from the by-laws showing that this person has authority to sign aurh obligation. H 37 Sur+ely's physical address is different fi-cm its mailing address, both must be provided. 39 The date of the bond shall not bo prior to the dale thr,Cotdract is awarded, 39 I I CCry Or,FORT WORTH Pleeirage fracn Parbi-ay M 70jenja Rifle Prrrrt roy Rajmdaboirr STANDARD C ONS'TRUCTMN 5PEC1FfCATION DOCUiv MOTS 04Y Prcliecl IiJnmber.WJ29 Rey isod July I,2013 0061 14-1 PAYMENTBOND Page I of 2 1 SECTION 00 6114 2 PAYMENT BOND Bona #106494805 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Reyes Group, Ltd., known as "Principal" herein, and 8 Travelers Casualty and Surety Company of America a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of TWO MILLION SEVENTY-SIX THOUSAND SIX HUNDRED FIFTY-THREE 13 AND 301100 Dollars ($2,076,653.30), lawful money of the United States, to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents: 17 WHEREAS,Principal has entered into a certain written Contract with City, awarded the 18 29th day of March,2016,which Contract is hereby referred to and made a part hereof for all 19 purposes as if fully set forth herein,to furnish all maferials, equipment,labor and other 20 accessories as defined by law, in the prosecution of the Work as provided for in said Contract and 21 designated as Heritage Trace Parkway at Tehama Ride Parkway Roundabout, City Proiect 22 No. 02529 23 24 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 25 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 26 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 27 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 28 force and effect. 29 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 30 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 31 accordance with the provisions of said statute. 32 CITY OF PORT WORT H FFeiWage Dace Pai 6hwy at 7eliama Ridge NA-way Roxndaboul STA1vTDARD CONSTRUCTION SPECIFICATION DOCUMENTS Cily Project Number 02529 Revised July 1,2011 DQ 61 J4-2 PAYNIF NT EOND Pagc2af2 1 IN WITNESS WHEREOF,the Pritleipal and Surety have mcb SIGNED and SEALED 2 this instrument by duly authorized Agents and officers an this the 29th day ofN argh,201f,. 3 PRINCIPAL: Rages Group, Ltd. ATTEST: 13Y: s- S tare �- L14el-t-t- teal) S eta Warne end Tine Address: _152o p&rker Raad Grand Prairie, TX 75050 t { Witness as to Prim' pal SURETY: Tarave2ers Caarxalty and Surety Company �__AmeriG� f1 ATTEST: signame Carel A. Dougherty, Attorney Fa.;L (Surety) Secretary Nam--and Title a Address: One Tower Square Witness as to Surety TelepboneNumbeP; I84714£35-2115 4 5 :Note; If signed by an cif!icor of the Surcty, there must be on file a certified exti-act from the 6 bylaws showing that this person has av�io>rity to si&n such, obligation. If ,surety's physical 7 add ss is diffment from its Mailing address,both must br provided. E 9 The date of tlwe bond shall not be prior to Rhe elate the Contract is awarded. 10 END OF 'SEC'i' ON 11 CITY OF FORT WORTH i1village 7imv Parkmwy al Teloviija Ride Parkway Rnirrrdabard `I STANDARD WNMUCTION SPMF[CATEIN DDC UM7NTS City Pr4ea Amvbrr 02529 Rovised fuly 1,2011 Surety Company Acknowledgement STATE OF ILLINOIS COUNTY OF COOK SS: On this 29th day of March,2016, before me personally appeared Carol A.Dougherty , _. to me known, who, being by me duly sworn, did depose and say: that(s)he resides at Schaumburg,Illinois, that(s)he is the Attorney in Fact of Travelers Casualty and Surety Company Of America,the corporation described in and which executed the annexed instrument; that(s)he knows the corporate seal of said corporation;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said corporation; - that(s)he signed his/her name thereto by like order; and that the liabilities of said corporation do not exceed its assets as ascertained in the manner provided by law. -a Notary Public in and for tle—atiove County and State My Commission Expires: 05/23/18 MEREDITH H MIELKE OFFICIAL SEAL Notary Public,state of Illinois My Commission Expires May 23,2018 _ P WAFININO'TMIE POWER 5F ATTORNEY IS INVALID VVITHOLJTTHE RM BOMEF. POWER OFA'�TiyRNEY TRAVELERS ] Farnihnaten Casualty[agnpany 81.Paul klercw-y Insurance Company Fidelity and Guaranty hisnrunce Car[rpnay Travelers Casualty and Surety Company Ad011y 81lU Guaranty Insul ince Undorivriters,Inc. Travtlers Casualty and Surlily C omipany ufAmerica St.Paul Fire find Mal'ine Insurance Compuny limited Slates 1''ldOilly and Guaranty Company SC PHul Guardian Insurance Cunrpany 1 Allor myelo I'nct'4o. 229217 Certitirate No. 0 0 6 4 13`t 14 l{lN0101 ALL MEN BY THESE PRESENTS; Mat Forminglun Casualty Ckmipany, St. Paul Fire and Marine Insurance Company. 5I- Patil Gunidlint Insurance Crmipatii)_Sl. PauI MercuTT Insuranm Comp nny>Tvnve[ees C-Naualty and Surety Compilny,Trauclers Casually cavil Surely Company of A Tle]-ICA.Uttd I;rrited Stales Fidelity and. Guaranty Company are corpaoralions duly orgnuized tinder Ilts laws OF the State or C❑nnecticul, that Fidelity and Gaaniinty lnsurance Conlpearu is al curpotalion duly ot'gatnired under the latus of[tie Slate of Iowa,Rud Vaal FidcbLq and GaLL=ty lnsuranee Undenvrilers,lac-,is a carl)nralion duly or'ganiu_d under the lmvs or the State of Wisconsin(herein volleclively caller[the"Cornpenics'j rind tltat the CornpunieR do 1w rby wakr7,consdrue:and uppoirl: R. B. SCAN..J.S. Ntslil.Janit;s I_ S11141W%ki,Cam:I A. DUL[FhUTI.y,Rahurl E. K:rllplls, Shert;�l�l.. [ILrJtll j%MCred[[ll 11. hrlielk<, Mike Podii, Rarlrt!ij MicIke,Lind J 0111 A11,1laN of Ilse City of Schauniburr. State ol, IIIIIrtrtS their [late and la-whil rlt1Urney(s)-in-F4v-1, cltch in their separate capacity if m®rte drat:pile is named r,have,in sign,execute,seal and acknowledge any and RI I horlds,recognirtettces,ct nclitic aardl undertakings arad ath,"'.dogs obligatory lit rhe matte ihoreof on behalf of ild Compatnics in their business of puarantceing 1l,c fidelity of ptrson4,g,um unlceing Ilic pciformance of colu=ts and extculing or guard ecing bonds and unclt:rlttkittgs 1leyuiied or permitted in any actions orprocecdings allowed by lain. IN WITNESS August �NiI OF.the C�ompaniu I have caused this instrument to he signed arwi their coidlornte seals Io be hereto Itffixud,this 3ax1 dot}'rsF IlWinir[klon C'asltalty C:rrmpanr St.Pttnl MCMII,Y rltstlrance VAimpa►ny IndrIlly uitd Cuamni;v Insuraance Cunipdjny Tkltveters C 11mail,y and Stird1 Cumparly Fidelity and Guaranty Insw-ance Underwriters,Inc. 1y,aveters C:at,Sualty and Su net}Coin puny DIAniericn St.Pau!Fire and M4411-9 Inxi'Pi ice Company 'Tailed States Fidelity and GUF raitly Company St.Patti Guut'diau Insurance Company �),,) U i M �.�hwGw ��.i� fig,.,..... ij k� � At• . State of Connecllcut By. Cil}Of II;lrlford sac, kc6rri L.KULCy, enior Vicc rrciident On this:he 3fd day sof August I before me personally appeared Kalea L.Rainey,who acknmvledgcd himself to he the Seniinr Vive President of Fm-mington Cnsunity Cpmpany, Fidelity and Ouaranly tnsv"noc Compuny.FSdchly end Guaranty lnsurai:cc Underwriters,Inc.,St.Nul Fire and Martine Ij)strrance C)mpaiiy,St,Paul Guat'didu IltrsTIM11CC Collar any,Si.PnUl Mercury lnsurtanue C::ompamy,Travelers Casually and Surely Carl Tr n'elet's I Caytuilty and Surely Company of Arwlc a,and 1.lniled Slates FidclitY Arid Clua,rardy C:umpany,and That he,as such,being anthnriaed sal tri de,executed the Frn'egoing in Itaameid Fut the puipost!s fit!tair ucnlatined by signing un behair it Lhe corporations by Itimr.Llf ap o duly;;vItwd7gd gf leor, or �,7tT In bvitnrss MiLrenf,I hereunio ser rely Iiand and offcial 8col � �� � -� � o � My f'omntissinn rxPires The 3bth day or June,2oi 6, # '4�11� a4 hSuio C.It tresult„Itat®ey Public a9d4[I,g-12 Prinled In k1.5.Fi. IAFARNING:THI5 PIAVItR OF ATY09NI Y 13 INVALID WITli0LITTHE RED DDRDEF. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St. Paul Fire and Marine Insurance Company,St. Paul Guardian Insurance Company,St. Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kevin E.Hughes,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 29th day of Manch 2016. Kevin E.Hughes,Assistant Secr Lary O�su,� pyn�•y 'etas a ��a ip .•��°.,,,4 err Apo "'�*5uq tY ill �' . O\:........G •Pt F9 JP s 1Ye I1n 4v u(0 O�p��AfJ A C7�'�rto 4.. �Py ti Sb!1 �4 ��QQTfO Z �fZOFPo.A,�TC•,m �WQ.'�oPPORATf,P" �i I �+ -_ i :a t -._ w HaRTFOR� t H4RTfOH0. k atm Z " ; 'a 1951 l tet•SEAL,,io� '�' `� CONN. R+ r ,a~n 1896 o.'1....�•;�L� '�v,.,5,......rdd� To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the above-named individuals and the details of the bond to which the power is attached. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 0061 19-1 MAINTENANCE BOND Page I of 3 I SECTION 00 6119 2 MAINTENANCE BOND Bond #106494805 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Reyes Group,Ltd, known as"Principal"herein and 9 Travelers Casualty and Surety Company of America , a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas,known as "Surety"herein (whether one 1 I or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of the State of Texas,knovcm as"City"herein, in the sum of TWO MILLION 13 SEVENTY-SIX THOUSAND SIX HUNDRED FIFTY THREEAND 30/100 Dollars 14 ($2,076,653.30) lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas,for payment of which sum well and truly be made unto the City and its successors, we 16 bind ourselves, our heirs, executors, administrators,successors and assigns,jointly and severally, 17 firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded the 20 29th day of March,2016,which Contract is hereby referred to and a made part hereof for all 21 purposes as if fully set forth herein,to fin-nish all materials,equipment labor and other accessories 22 as defined by law, in the prosecution of the Work, including any Work resulting from a duly 23 authorized Change Order(collectively herein,the"Work")as provided for in said contract and 24 designated as Heritage Trace Parkway at Tehama Ridge Roundabout 25 City Proiect Number 02529;and 26 27 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period"); and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. 35 CITY OF FORT WORTH Heritage!race Pta•kway tit Tehama Ridge Park-wQV Roundabout STANDAR I CONSTRUCTION SPECIFICATION DOCUMENTS Ch),Project Manber 02.529 Revised July 1,2011 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 NOW THEREFORE,the condition of this obligation is such that if Principal shall 2 remedy any defective Work, for which timely notice was provided by City,to a completion 3 satisfactory to the City,then this obligation shall become null and void; otherwise to remain in 4 full force and effect. r 5 6 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 8 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 9 the Surety under this Maintenance bond;and 10 11 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 12 Tarrant County,Texas or the United States District Court for the Northern District of Texas, Fort 13 Worth Division; and 14 15 PROVIDED FURTHER,that this obligation shall be continuous in nature and 16 successive recoveries may be had hereon for successive breaches. 17 18 19 CITY OF FORT WORTH heritage Trace Parkway al Tehama Ridge Parkway Roundabout STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number 02529 Revised July 1,2011 i ivGiINT&NANCE BOND Page3pf3 1 IN WITNESS WHFR]COF,the Principal alid (tic Surety have each SIGNED wid SEALED this 2 instrument by duly rtuthuri=.d agants acid officers ou this the 29th day oflM,arch,201G. 3 A P7tINMAt_: Reyes Group, Ltd. y 6 I $ l P,,tIatllTe t F1 ATT itAj 33 { 1pal) Sec any NRme and`Fide 14 I4 Addre55: 1520 earkgr Road i( Grand Prairie, TX 75054 17 r� _ 1s 19 WtE s as 1C pri ipat 20 S METY 21 Travelers Casualty and Surety C any 22 of America 23 - 24 BY: ' 25 16 PireL 26 27 Carol A. Dougherty, in Faet gi ll iVITI fi'u^u: Nmwe and Tit Ie - - i 29 i 30 At1CtfCSS; QnC Bowes Squs.re it �Sut ty)$ecratary _Ziartford. CT 061�3 32 33 _�wLd •1 34 Wimcss as to Surety Tefephoae Nuanber (1347)485-2416 35 M 36 *Note: If signed by an officer of flia Surety,Company, there must he on file a certified oxtiact ,. 37 froze the by-laws showing that this person Inas aiithority to sign stbch obligation. If 38 Surety's physio] address is different from its mailing address, buth Enust be provided. i 39 The date of the bon€I shall not be prior to (lie date the ICantraot is awarded. i 4U r r CUY OF TORT WORTH 11"IMC?barer Parka uar 7'rLnrrrcr Ridge p6rkri ate•Rnplok hard SrANDARD CYINSTRUC ION 51-IT--C1FICA'I'1UN DOC UMENI'S CrCv A ofecl Ali rmbuo F11i29 Reviged hiLy I,2011 I I