HomeMy WebLinkAboutOrdinance 9022.. _ ~, , ORDINANCE NO. 9Q,2.o2 AN ORDINANCE AMENDING ORDINANCE NO. 8770 TO ADJUST THE AMOUNT OF ASSESSMENTS FOR PART OF THE COST OF IMPROVING A PORTION OF BRIDGE STREET AND BRIDGEWOOD DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS, SAID ASSESSMENTS BEING HERETO- FORE LEVIED BY SAID ORDINANCE NO. 8770; PROVIDING THAT ALL OTHER PROVISIONS OF SAID ORDINANCE NO. 8770 NOT SO AMENDED SHALL REMAIN IN FULL FORCE AND EFFECT; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on March 29, 1983, the City Council of Fort Worth passed Ordinance No. 8770, closing the benefit hearing and levying assessments for part of the costs of improving a portion of Bridge Street, Bridgewood Drive and sundry other streets, avenues and public places in the City of Fort Worth, Texas, said assessments being levied in strict compliance with and under and by virtue of Article 1105b of the Revised Civil Statutes of Texas; and WHEREAS, all the proceedings with reference to the making of the improvements have been regularly had in compliance with law and all prerequisites to the levy of said assessments required by law have been performed; and WHEREAS, the improvements for which the assessments were levied are to be accomplished under two contracts, the first contract to provide for excavation and installation of drainage facilities and the second contract for paving; and WHEREAS, at the time of the levy of the assessments by Ordinance No. 8770, the first contract (excavation and drainage) had been awarded and the second contract (paving) had not; and WHEREAS, the assessments were levied in regard to the paving portion of the improvements after consideration, adoption, and approval of an engineer's estimate of cost for said portion of the improvements, as provided by law, said assessments, however, having been made and levied by the City Council as it deemed just and equitable, having in view the ,special benefits in enhanced value to be received by such parcels of property and the owners thereof, and apportioned so as to produce a substantial equality of benefits received and burdens imposed; and WHEREAS; subsequent to the levy of said assessments by Ordinance No. 8770, competitive bids for the construction of the ' , ti paving portion of the improvements have been received after adver- tisement as required by law; and WHEREAS, the low bid for said contract is in an amount which is less than the engineer's estimate of the costs of said portion of the improvements referenced above; and a WHEREAS, the City Council now desires to adjust the amount of the assessments heretofore levied by reducing the amount of the assessment for each parcel and owner in proportion to the amount by which the aforesaid bid is less than said engineer's estimate; and WHEREAS, the City Council desires to amend said Ordinance No. 8770 to reflect said adjustment; NOW, THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF FORT WORTH, TEXAS: SECTION 1. That Ordinance No. 8770, passed by the City Council on March 29, 1983, and on file in the office of the City Secretary of Fort Worth, Texas, be and the same is hereby amended by substituting the following in place of Section III of said ordinance, so that Section III of said ordinance shall hereafter read as follows: "III. "There shall be, and is hereby, levied and assessed against the parcels of property herein below mentioned, and against the real and true owners thereof (whether such owners be correctly named herein or not) the sums of money itemized below opposite the description of the respective parcels of property and the several amounts assessed against the same, and the owners thereof, as far as such owners are known, being as follows: SECTION 2. That all other provisions of the aforesaid Ordinance No. 8770 shall remain in full force and effect. SECTION 3. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. SECTION 4. This ordinance shall take effect and be in full force and effect from and after the date of its passage, and it is so or- dained. PASSED AND APPROVED this ~~~day of v.Jl~l~ 19~. APPROVED AS TO FORM AND LEGALITY: ~PROJE'(;'r,•N0. U29-036-533, UNIT I,. BRIDGE STREET F~ZOM WEST•YKOPERTY LINE OF LOT 1, BLOCK A, BOAZ TURNPIKE ADDITION TO OAKLAND HILLS DRIVE, to be improved with seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a six-inch thick lime stabilised subgrade, so that the finished roadway will be forty-four feet wide. Seven-inch thick concrete driveway approaches and turn lanes will be constructed where specified. BLOCK OWNER LOT ZONING NORTH SIDE Natl.Farm Life Ins.Co. 1 A Attn. J.U. Davis, Jr. G P.O. Box 14$6 Fort Worth, TX 76101 FRONTAGE RATE AMOUNT ASSESSr4.NT BOAZ TURNPIKE ADDITION 1285.0' Adjusted to: (Grade Differential) 526.0' Pavement 52.32 27,520.32 526.0' Curb 1.54 810.04 28,330.36 Woodhaven Joint Venture 7-A 5 c/o Carmel Devel., Inc. D-Apt. 5327 N. Central Expwy. Suite 3l4 Dallas, TX 75205 WOODHAVEN COUNTRY CLUB ESTATES 804.44' Pavement 804.44' Curb 52.32 42,088.30 1.54 1,238.84 43,327.14 SOUTH SIDE State Department of IH-30 Highways and Public Transportation 2105.0' (No Benefit) 0.00 UNIT I: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) $71,657.50 -1- ~. PROJF:GT N0. 029-036533, UNIT I A, BRIDGE STREET ~FROI~ 0.9KI,AND HILLS DRIVE. TO BRIDGEWOOD DRIVE, t:o be improved with seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a six-inch thick lime stabilized subgrade, so that the finished roadway will be sixty feet wide. Seven-inch thick concrete drlyeway approaches and turn lanes will be constructed where specified. OWNER NORTH SIDE Alden E. Wagner, Jr. 8333 Douglas Suite 1370 Dallas, TX 75225 LOT TR.1 AMOUNT 61.63 34,705.74 1.54 992.1b 20.04 12,910.97 1.09 702.24 4.08 2,628.58 5.11 3,292.17 ASSESSMENT 60,231.86 TESCO R.O.W. TR1-A 200.0' No Benefit 0.00 BRIDGEWOOD VILLAGE ADDITION San Antonio Savings Asn c/o Talmadge Tinsley Co 17000 Preston Read Suite 400 Dallas, TX 75248 1 BLOCK ZONING FRONTAGE RATE P . E . ~ SURVEY , ABSTRAGI`-'372 644.26' Pavement E-Com. 644.26' Curb 644.26' Storm Drain 644.2b' ROW Prep. 644.26' Top Soil & Seeding 644.26' St.Lights & Traf. Markers 1 185.26' No Benefit G (Grade Differential) 0.00 SUBTOTAL THIS PAGE $60,231.86 -2- PROJECT N0. 029-036533, UNIT I-A, BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, continued OWNER City of Fort Worth Water Department BLOCK LOT ZONING FRONTAGE RATE AMOUNT ASSESSiMENT BRIDGEWOOD VILLAGE ADDITION 76.70' Entrance to Water Tank 0.00 San Antonio Savings Asn c/o 'Talmadge Tinsley Co 17000 Preston Road Suite 400 Dallas, TX 75248 City of Fort Worth Water Department 3 511.25' G 60.0' 60.0' 60.0' 60.0' 60.0' 60.0' Adjusted to: Pavement Curb Storm Drain ROW Prep. Top Soil & Seeding St. Lights & Traf. Markers 25.34' Water Tank (Grade Differential) 61.63 3,697.80 1.54 9'L.40 20.04 1,202.40 1.09 65.40 4.08 244.80 5.11 306.60 5,609.40 CL00 SUBTOTAL THIS PAGE X5,609.40 -3- s ~ PROJECT N0. 029-036533, UNIT I A, .BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, contj:nued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BRIDGEWOOD VILLAGE ADDITION San Antonio Savings Asn 4 ~/o Talmadge Tinsley Co 17000 Preston Road Suite 400 Dallas, TX 75248 San Antonio Savings Asn 3 ~/o Talmadge Tinsley Co 17000 Preston Road Suite 400 Dallas, TX 75248 1 G 1 G 330.0' Adjust to: 80.0' Pavement 80.0' Curb 80.0' Storm Drain 80.0' ROW Prep. 80.0' Top Soil & Seeding 80.0' St. Lights & Traf. Markers 463.22' No Benefit (Grade Differential) (Grade Differential) 61.63 4,930.40 1.54 123.20 20.04 1,603.20 1.09 87.20 4.08 326.40 5.11 408.80 7,4,'9.20 -0.00 SOUTH SIDE San Antonio Savings Asn ~/o Talmadge Tinsley Co 17000 Preston Road Suite 400 Dallas, TX 75248 4 G SUBTOTAL THIS PAGE BRIDGEWOOD DRIVE INTERSECTS 1580.29' Adjusted to: 150.0' Pavement 150.0' Curb 150.0' Storm Drain 150.0' ROW Prep. 150.0' Top Soil & Seeding 150.0' St. Lights & Traf. Markers (Grade Differential) 61.63 9,244.50 1.54 231.00 20.04 3,006.00 1.09 163.50 4.08 612.00 5.11 766.50 14, 02:!.50 .21,502.70 ,4- PROJECT N0. 029-036533, UNIT i-A, BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT P.E. COLEMAN SURVEY, ABSTRACT 372 TESCO R.O.W. TR1 6 0.00 Harold H. Ginsburg 2610 Fairmount St. Dallas, TX 75201 TR.1 E IH-30 282.0' Adjusted to: 159.4' Pavement 159.4' Curb 159.4' Storm Drain 159.4' ROW Prep. 159.4' Top Soil & Seeding 159.4' St. Lights & Traf. Markers (Depth Factor) 61.63 9,823.82 1.54 245.48 20.04 3,194.38 1.09 173.75 4.08 650.35 State Department of Highways and Public Transportation 200.0' No Benefit (Grade Differential) 395.0' (No Benefit) 14,902.31 0.00 SUBTOTAL THLS PAGE 5.11 814.53 UNIT I-A: TOTAL OOST TO PROPERTY OWNERS (ASSESSMENTS) $14,90x:.31 $102.,246.27 -5- _PRO,TF.ET, N0. 629-036533, UNIT I-B, BRIDGE STREET FRAM ,BRIDGEWOOD DRIVE TO WEST SERVICE ROAD-1820,, to ~_ improved with seven-inch thick concrete pavement with seven-inch high superimposed concrete curib on p six-inch thick lime stabilized subgrade, so that the finished roadway will consist of two thirty-si'cx feet wide traffic lanes with a twenty-eight feet wide median. Seven-inch thick cancrete turn lanes w~i.ll be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE BRIDGEWOOD VILLAGE ADDITION AMOUNT ASSESSMENT San Antonio Savings Asn 2 c/o Talmadge Tinsley Co G 17000 Preston Road Suite 400 Dallas, TX 75248 181.78' No Benefit (Grade Differential) 0.00 Fort Worth 820 Corp. TR.4 V.6606 200 Love Field Bank Bld P.203 Lemmon & Mockingbird C & E Dallas, TX 75209 SOUTH SIDE Fort Worth 820 Corp. TR.4 V.6b06 200 Love Field Bank Bld P.203 Lemmon & Mockingbird G Dallas, TX 75209 WILLIAM MANN SURVEY. ABSTRACT 1353 1038.77' Adjusted to: 170.0' Pavement 170.0' Curb 170.0' Storm Drain 170.0' ROW Prep. 170.0' Top Soil & Seeding 170.0' St. Lights & Traf . Markers (Grade Differential) 61.63 10,477.10 1.54 261.80 20.04 3,406.80 1.09 185.30 4.08 693.60 5.11 868.70 I-820 INTERSECTS 930.77' No Benefit (Grade Differential) 15,89.3.30 0.00 SUBTOTAL. THIS PAGE $15,893.30 -fi- PROJECT N0. 029--036533,_UNIT I-8, BRIDGE STREET FROM BRIDGEWOOD DRIVE TO WEST SERVICE ROAD-1820, cont. OWNER BLACK LOT ZONING FRONTAGE RATE AMOUNT WILLIAM MANN SURVEY. ABSTRACT 1353 San Antonio Savings Asn TR3 A V.7466 c/o Talmadge Tinsley Co P.818 17000 Preston Road G Suite 400 Dallas, TX 75248 SUBTOTAL THIS PAGE ASSESSMENT 30,384.25 325.0' Pavement 325.0' Curb 325.0' Storm Drain 325.0' ROW Prep. 325.0' Top Soil & Seeding 325.0' St. Lights & Traf. Markers 61.63 20,029.75 1.54 500.54 20.04 6,513.00 1.09 354.25 4.08 1,326.00 5.11 1,660.75 UNIT I-B: TOTAL COST ~ PROPERTY OWNERS (ASSESSMENTS) $30,384.25 $45,277.55 -7- J PRO.F~EZ;NO. 029-036533, UNIT II, BRIDGEWOOD DRIVE FROM,BRIDGE STREET SOUTH 1085 FEET, to be improved wic~ "seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a six-inch. thick lime stabilized subgrade, so that the finished roadway will be sixty feet wide. Seven inch thick concrete turn lanes will. be constructed where specified. OWNER BLACK IAT ZONING FRONTAGE RATE AIrYJUNT WILLIAM MANN SURVEY, ABSTRACT 1353 San Antonio Savings Asn TR3 A V.7466 cio Talmadge Tinsley Co P.818 17000 Preston Road G Suite 400 Dallas, TX 75248 1061.0' No Benefit (Grade Differential) ASSESSMENT 0.00 State Department of Highways and Public Transportation Property Intersects WESTSIDE San Antonio Savings Asn c/o Talmadge Tinsley Co 17000 Preston Road Suite 400 Dallas, TX 75248 BRIDGEWOOD VILLAGE ADDITION 4 943.12' Adjusted to: G 30.0' Pavement 30.0' Curb 30.0' Storm Drain 30.0' ROW Prep. 30.0' Top Soil 6 Seeding 30.0' St. Lights & Traf. Markers (Grade Differential) 61.63 1,848.90 1.54 46.20 20.04 601.20 1.09 32..70 4.08 122.40 5.11 153.30 a,so4.~o UNIT II: TOTAL COST TO PROPERTX OWNERS (ASSESSMENTS) TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) TOTAL COST TO CITY OF FORT WORTH ESTIMATED TOTAL CONSTRUCTION OOST $2,804.70 $222,986.02 $1,307,811.84 .$1,530,797.$6 -8~ r sreR r1~E >. ~~ - ~.., CI'iY iviANAUER 1 !~ 5.1 ~~~ ~ ~ ~it~- ~n~' 1F~~°t ~'~~°th, ~C~~a~ ACCOU'N71NG•2 ~//// ~° /f~ ~~p/~// ~ fJ ///7// ~']-~ ~ // ~) /f~/f~ .//)~ 7RANSPQRTA?10N~PU6L{C~~ // ® U '~.W~1LtV ~~ LL/lV~~~IV ~®~0 // W IVIV~ IV~L/'lAf/1L~®~ MATER AO -~ :• DATE REFERENCE SUBJECT Award of Contract - Bridge Str bet/ PAGE NUMBER John T. White Road Connection 4 1/24/84 C-8184 ~ Hof Contract II Pavin an Stree Li s ,~ City Council action is requested on Project Nos. 021-036-533-00 (Engineering) and 02.9-036-533-00 (Construction), as described below Roadway R.O.W. Unit Street Limits Width - Feet Width - Feet I. Bridge W.P/L of Lot 1 44 to 60 64 to 80 Street Block A, Boaz Turnpike,Addn. ,_ to Oakland Hills Drive I-A. Bridge Oakland Hills Dr. 60 80 Street to Bridgewood Dr. I-B. Bridge Bridgewood Dr. 2-36' Lanes 120 Street to W. Service Rd. W/28' Median I-820 II. Bridgewood Bridge St. 60 80 Drive to So 1085' Origin of Project On Apr-il 5, 1980, the citizens of Fort Worth approved a $47,813,000 bond program for street and storm drainage improvements and on May 20, 1980 (M&C G-4548), the City Council allotted the funds into specific categories. One of the categories was Major Thoroughfares and Collectors, which included Bridge Street-John T. White Road Connection, at an estimated construction cost of $3,506,000. Improvements Bridge Street will be improved with major thoroughfare grade concrete pavement with concrete curb, complete with turn lanes, street lights and required drainage facilities. The improvements are being accomplished in two contracts to allow for major utility relocations. Contract I (M&C C-6780), was awarded on March 1, 1983 and provided for the excavation and shaping of the new roadway and the installation of required drainage facilities save storm drain inlets which are included in Contract II. Contract I and utility adjustments have now been completed and Contract II was advertised for bids. Receipt of Bids ~ ' Contract II, Paving and Street Lighting, was advertised for bids on December $ and 15, 1983, and the following bids were received on January 5, 1984,, with 100 working days allotted to complete the project. (~ Y DATE REFERENCE SUBJECT: ~ PA~("i~ NUMBER Award of Contract - Br'id`ge Street/ 1/24/84 C-8184 John T. White Road Connection, _2ar ~ Bidder Amount J. L. Bertram Construction $1,035,292.66 and Engineering, Inc. S.R.O. Asphalt, Inc. 1,079,294.62 Texas Bitulithic Co. 1,111,444.60 L. H. Lacy Company 1,189,905.75 Southwestern Contracting Co. 1,248,936.00 Uvalde Construction Co. 1,253,917..54 Engineer's estimated $1,300,000.00 (December, 1983) Adjustment of Assessments On March 29,-1983 (M&C G-5574), the benefit hearing for this project was conducted by the City Council. The benefit hearing was closed and assessments levied based on the actual unit prices on Contract I and the Engineer's Estimate for Contract Il,,with stipulation that such assessments would be adjusted, based on actual unit prices, at such time as Contract II was awarded. The engineers' estimate for Contract II at the time the assessments were calculated was $1,17$,259.48. The current low bid, as indicated above, is $1,035,292.66 which will reduce the total assessments, on the entire project from $243,040.69 to $222,986.02 as indicated below Property Owner National Farm Life Ins. Co. Woodhaven Joint Venture *(Daon-Texas) Alden E. Wagner, Jr. *(Daon-Texas) San Antonio Savings Assn. *(Herman J Smith) Harold H. Ginsburg *(Daon-Texas) Assessments Based on Estimate Based on Actual Cost ~~ $30,602.68 $28,330.36 47,707.60 65,916.50 65,409.45 16,164.76 43,327.14 60,231.86 Fort Worth 820 Corp. 17,239.70 Total $243,040.69 *Indicates owner on March 29, 1983 60,301.05 14,902.31 15,893.30 $222,986.02 ,• 4" r DATEr~~ ~ NUMBER CE SUBJECTAWard of Contract - Bridge Street/ PAGE 1/24/84 C-8184 I John T. White Road Connection, ~ 3 of 4 It is recommended that Ordinance No. 8770, adopted on March 29, 1983, levying the assessments based on Contract I and the Engineers' Estimate, be amended by adjusting the assessments based on actual unit prices in Contract I and Contract II (this contract), as outlined above. All of the adjacent property owners were notified of this recommendation by certified mail on January 10, 1984. ~-m.. Project Cost and Financing Contract I was financed entirely by the City from Account No. 029-023-176-00 and 021-095-901-00. Based on standard City Policy in effect on March 29, 1983, cost to adjacent property owners on Contract I and II is $222,986.02, which will be provided for by a bond fund transfer from the "Revolving Fund Unspecified." Cost to the City for construction in Contract II is approximately $778,254.64, and $72,470.48 for Engineering plus $57,330.00 for street lighting. Bond fund transfers are required for all City costs in Contract II. Recommendations It is recommended that: 1. A construction contract be awarded to J. L. Bertram Construction Engineering, Inc . in the amount of $1, 035, 292.66 based on their low for paving and street light improvements, 2. An Ordinance be adopted amending Ordinance No. 8770, adjusting th assessments as indicated above, and, 3. The following bond fund transfers be approved., From To Amount Reason 094-009-905-00 094-036-533-00 $222,986.02 To provide funds for 4Revolving Fund Bridge Street/ the property owners Unspecified John T. White share of construction Connection cost. 029-023-176-00 Bridge Street/ John T. White Connection 021-095-901-00 Engineering Unspecified 029-036-533-00 Bridge Street/ John T. White Connection 030-032-901-00 Misc. Street Light- ing Unspecified 021-036-533-00 Bridge Street/ John T. White Connection 030-U32-067-00 Bridge Street/ John T. White Connection $778,254.64 $72,470.48 $34,052.00 To provide funds for the City's street construction cost. To provide for the City's engineering cost. To provide funds for City's street light cost in contract. ~ ~ ~ I s may. DATE REFERENCE NUMBER SURJECTAward Of Contract - Bridge Street/ PACE 1/24/84 C-8184 John T. White Road Connection, 4of 4 030-032-901-00 030-032-077-00 $23,278.OU To provide funds for Misc. Street Light- Bridge Street/ Street light materials Unspecified John T. White from City Warehouse. Connection DAI dw -, ,. APPR~V~D BY CITY COUNCIL JAN 24 1984 Cary Seczetaxy n; xhq Ciry of Fort Wp~~ ,~,~ SUBMITTED FOR THE ~I/// CITY MANAGER'S ~ ~ DISPOSITION BY COUNCIL. PROCESSED BY OFFICE BY L.C (1 APPROVED ORIGINATING Gar L. DEPARTMENT HEAD: y Santerre I.I OTHER (DESCRIBE) CITY SECRETARY FOR ADDITIONAL IN FORMlLi19eN~1 S CONTACT UQ chmidt xt. ~ tiAjdCE N0. 9~~~ DATE 1 +, N