ORDINANCE NO. 9Q,2.o2
AN ORDINANCE AMENDING ORDINANCE NO. 8770 TO ADJUST THE
AMOUNT OF ASSESSMENTS FOR PART OF THE COST OF IMPROVING A
PORTION OF BRIDGE STREET AND BRIDGEWOOD DRIVE AND PORTIONS
OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS, SAID ASSESSMENTS BEING HERETO-
FORE LEVIED BY SAID ORDINANCE NO. 8770; PROVIDING THAT ALL
OTHER PROVISIONS OF SAID ORDINANCE NO. 8770 NOT SO AMENDED
SHALL REMAIN IN FULL FORCE AND EFFECT; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF
FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE
RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, on March 29, 1983, the City Council of Fort Worth
passed Ordinance No. 8770, closing the benefit hearing and levying
assessments for part of the costs of improving a portion of Bridge
Street, Bridgewood Drive and sundry other streets, avenues and
public places in the City of Fort Worth, Texas, said assessments
being levied in strict compliance with and under and by virtue of
Article 1105b of the Revised Civil Statutes of Texas; and
WHEREAS, all the proceedings with reference to the making of
the improvements have been regularly had in compliance with law and
all prerequisites to the levy of said assessments required by law
have been performed; and
WHEREAS, the improvements for which the assessments were levied
are to be accomplished under two contracts, the first contract to
provide for excavation and installation of drainage facilities and
the second contract for paving; and
WHEREAS, at the time of the levy of the assessments by
Ordinance No. 8770, the first contract (excavation and drainage) had
been awarded and the second contract (paving) had not; and
WHEREAS, the assessments were levied in regard to the paving
portion of the improvements after consideration, adoption, and
approval of an engineer's estimate of cost for said portion of the
improvements, as provided by law, said assessments, however, having
been made and levied by the City Council as it deemed just and
equitable, having in view the ,special benefits in enhanced value to
be received by such parcels of property and the owners thereof, and
apportioned so as to produce a substantial equality of benefits
received and burdens imposed; and
WHEREAS; subsequent to the levy of said assessments by
Ordinance No. 8770, competitive bids for the construction of the
' , ti
paving portion of the improvements have been received after adver-
tisement as required by law; and
WHEREAS, the low bid for said contract is in an amount which is
less than the engineer's estimate of the costs of said portion of
the improvements referenced above; and
a
WHEREAS, the City Council now desires to adjust the amount of
the assessments heretofore levied by reducing the amount of the
assessment for each parcel and owner in proportion to the amount by
which the aforesaid bid is less than said engineer's estimate; and
WHEREAS, the City Council desires to amend said Ordinance
No. 8770 to reflect said adjustment;
NOW, THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF FORT WORTH, TEXAS:
SECTION 1.
That Ordinance No. 8770, passed by the City Council on
March 29, 1983, and on file in the office of the City Secretary of
Fort Worth, Texas, be and the same is hereby amended by substituting
the following in place of Section III of said ordinance, so that
Section III of said ordinance shall hereafter read as follows:
"III.
"There shall be, and is hereby, levied and assessed
against the parcels of property herein below mentioned,
and against the real and true owners thereof (whether such
owners be correctly named herein or not) the sums of money
itemized below opposite the description of the respective
parcels of property and the several amounts assessed
against the same, and the owners thereof, as far as such
owners are known, being as follows:
SECTION 2.
That all other provisions of the aforesaid Ordinance No. 8770
shall remain in full force and effect.
SECTION 3.
The City Secretary is hereby directed to engross and enroll
this ordinance by copying the caption of same in the Minute Book of
the City Council of Fort Worth, Texas, and by filing the complete
ordinance in the appropriate Ordinance Records of said City.
SECTION 4.
This ordinance shall take effect and be in full force and
effect from and after the date of its passage, and it is so or-
dained.
PASSED AND APPROVED this ~~~day of v.Jl~l~ 19~.
APPROVED AS TO FORM AND LEGALITY:
~PROJE'(;'r,•N0. U29-036-533, UNIT I,. BRIDGE STREET F~ZOM WEST•YKOPERTY LINE OF LOT 1, BLOCK A, BOAZ TURNPIKE
ADDITION TO OAKLAND HILLS DRIVE, to be improved with seven-inch thick concrete pavement with seven-inch
high superimposed concrete curb on a six-inch thick lime stabilised subgrade, so that the finished
roadway will be forty-four feet wide. Seven-inch thick concrete driveway approaches and turn lanes will
be constructed where specified.
BLOCK
OWNER LOT ZONING
NORTH SIDE
Natl.Farm Life Ins.Co. 1 A
Attn. J.U. Davis, Jr. G
P.O. Box 14$6
Fort Worth, TX 76101
FRONTAGE RATE AMOUNT ASSESSr4.NT
BOAZ TURNPIKE ADDITION
1285.0' Adjusted to: (Grade Differential)
526.0' Pavement 52.32 27,520.32
526.0' Curb 1.54 810.04
28,330.36
Woodhaven Joint Venture 7-A 5
c/o Carmel Devel., Inc. D-Apt.
5327 N. Central Expwy.
Suite 3l4
Dallas, TX 75205
WOODHAVEN COUNTRY CLUB ESTATES
804.44' Pavement
804.44' Curb
52.32 42,088.30
1.54 1,238.84
43,327.14
SOUTH SIDE
State Department of IH-30
Highways and Public
Transportation
2105.0' (No Benefit)
0.00
UNIT I: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)
$71,657.50
-1-
~.
PROJF:GT N0. 029-036533, UNIT I A, BRIDGE STREET ~FROI~ 0.9KI,AND HILLS DRIVE. TO BRIDGEWOOD DRIVE, t:o be
improved with seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a
six-inch thick lime stabilized subgrade, so that the finished roadway will be sixty feet wide. Seven-inch
thick concrete drlyeway approaches and turn lanes will be constructed where specified.
OWNER
NORTH SIDE
Alden E. Wagner, Jr.
8333 Douglas
Suite 1370
Dallas, TX 75225
LOT
TR.1
AMOUNT
61.63 34,705.74
1.54 992.1b
20.04 12,910.97
1.09 702.24
4.08 2,628.58
5.11 3,292.17
ASSESSMENT
60,231.86
TESCO R.O.W.
TR1-A
200.0' No Benefit
0.00
BRIDGEWOOD VILLAGE ADDITION
San Antonio Savings Asn
c/o Talmadge Tinsley Co
17000 Preston Read
Suite 400
Dallas, TX 75248
1
BLOCK
ZONING FRONTAGE RATE
P . E . ~ SURVEY , ABSTRAGI`-'372
644.26' Pavement
E-Com. 644.26' Curb
644.26' Storm Drain
644.2b' ROW Prep.
644.26' Top Soil &
Seeding
644.26' St.Lights &
Traf. Markers
1 185.26' No Benefit
G (Grade Differential)
0.00
SUBTOTAL THIS PAGE
$60,231.86
-2-
PROJECT N0. 029-036533, UNIT I-A, BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, continued
OWNER
City of Fort Worth
Water Department
BLOCK
LOT ZONING FRONTAGE RATE AMOUNT ASSESSiMENT
BRIDGEWOOD VILLAGE ADDITION
76.70' Entrance to
Water Tank
0.00
San Antonio Savings Asn
c/o 'Talmadge Tinsley Co
17000 Preston Road
Suite 400
Dallas, TX 75248
City of Fort Worth
Water Department
3 511.25'
G 60.0'
60.0'
60.0'
60.0'
60.0'
60.0'
Adjusted to:
Pavement
Curb
Storm Drain
ROW Prep.
Top Soil &
Seeding
St. Lights &
Traf. Markers
25.34' Water Tank
(Grade Differential)
61.63 3,697.80
1.54 9'L.40
20.04 1,202.40
1.09 65.40
4.08 244.80
5.11 306.60
5,609.40
CL00
SUBTOTAL THIS PAGE
X5,609.40
-3-
s ~
PROJECT N0. 029-036533, UNIT I A, .BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, contj:nued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BRIDGEWOOD VILLAGE ADDITION
San Antonio Savings Asn 4
~/o Talmadge Tinsley Co
17000 Preston Road
Suite 400
Dallas, TX 75248
San Antonio Savings Asn 3
~/o Talmadge Tinsley Co
17000 Preston Road
Suite 400
Dallas, TX 75248
1
G
1
G
330.0' Adjust to:
80.0' Pavement
80.0' Curb
80.0' Storm Drain
80.0' ROW Prep.
80.0' Top Soil &
Seeding
80.0' St. Lights &
Traf. Markers
463.22' No Benefit
(Grade Differential)
(Grade Differential)
61.63 4,930.40
1.54 123.20
20.04 1,603.20
1.09 87.20
4.08 326.40
5.11 408.80
7,4,'9.20
-0.00
SOUTH SIDE
San Antonio Savings Asn
~/o Talmadge Tinsley Co
17000 Preston Road
Suite 400
Dallas, TX 75248
4
G
SUBTOTAL THIS PAGE
BRIDGEWOOD DRIVE INTERSECTS
1580.29' Adjusted to:
150.0' Pavement
150.0' Curb
150.0' Storm Drain
150.0' ROW Prep.
150.0' Top Soil &
Seeding
150.0' St. Lights &
Traf. Markers
(Grade Differential)
61.63 9,244.50
1.54 231.00
20.04 3,006.00
1.09 163.50
4.08 612.00
5.11 766.50
14, 02:!.50
.21,502.70
,4-
PROJECT N0. 029-036533, UNIT i-A, BRIDGE STREET FROM OAKLAND HILLS DRIVE TO BRIDGEWOOD DRIVE, continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
P.E. COLEMAN SURVEY, ABSTRACT 372
TESCO R.O.W.
TR1 6
0.00
Harold H. Ginsburg
2610 Fairmount St.
Dallas, TX 75201
TR.1
E
IH-30
282.0' Adjusted to:
159.4' Pavement
159.4' Curb
159.4' Storm Drain
159.4' ROW Prep.
159.4' Top Soil &
Seeding
159.4' St. Lights &
Traf. Markers
(Depth Factor)
61.63 9,823.82
1.54 245.48
20.04 3,194.38
1.09 173.75
4.08 650.35
State Department of
Highways and Public
Transportation
200.0' No Benefit
(Grade Differential)
395.0' (No Benefit)
14,902.31
0.00
SUBTOTAL THLS PAGE
5.11 814.53
UNIT I-A: TOTAL OOST TO PROPERTY OWNERS (ASSESSMENTS)
$14,90x:.31
$102.,246.27
-5-
_PRO,TF.ET, N0. 629-036533, UNIT I-B, BRIDGE STREET FRAM ,BRIDGEWOOD DRIVE TO WEST SERVICE ROAD-1820,, to ~_
improved with seven-inch thick concrete pavement with seven-inch high superimposed concrete curib on p
six-inch thick lime stabilized subgrade, so that the finished roadway will consist of two thirty-si'cx feet
wide traffic lanes with a twenty-eight feet wide median. Seven-inch thick cancrete turn lanes w~i.ll be
constructed where specified.
BLOCK
OWNER LOT ZONING
FRONTAGE RATE
BRIDGEWOOD VILLAGE ADDITION
AMOUNT
ASSESSMENT
San Antonio Savings Asn 2
c/o Talmadge Tinsley Co G
17000 Preston Road
Suite 400
Dallas, TX 75248
181.78' No Benefit
(Grade Differential)
0.00
Fort Worth 820 Corp. TR.4 V.6606
200 Love Field Bank Bld P.203
Lemmon & Mockingbird C & E
Dallas, TX 75209
SOUTH SIDE
Fort Worth 820 Corp. TR.4 V.6b06
200 Love Field Bank Bld P.203
Lemmon & Mockingbird G
Dallas, TX 75209
WILLIAM MANN SURVEY. ABSTRACT 1353
1038.77' Adjusted to:
170.0' Pavement
170.0' Curb
170.0' Storm Drain
170.0' ROW Prep.
170.0' Top Soil &
Seeding
170.0' St. Lights &
Traf . Markers
(Grade Differential)
61.63 10,477.10
1.54 261.80
20.04 3,406.80
1.09 185.30
4.08 693.60
5.11 868.70
I-820 INTERSECTS
930.77' No Benefit
(Grade Differential)
15,89.3.30
0.00
SUBTOTAL. THIS PAGE
$15,893.30
-fi-
PROJECT N0. 029--036533,_UNIT I-8, BRIDGE STREET FROM BRIDGEWOOD DRIVE TO WEST SERVICE ROAD-1820, cont.
OWNER
BLACK
LOT ZONING FRONTAGE RATE AMOUNT
WILLIAM MANN SURVEY. ABSTRACT 1353
San Antonio Savings Asn TR3 A V.7466
c/o Talmadge Tinsley Co P.818
17000 Preston Road G
Suite 400
Dallas, TX 75248
SUBTOTAL THIS PAGE
ASSESSMENT
30,384.25
325.0' Pavement
325.0' Curb
325.0' Storm Drain
325.0' ROW Prep.
325.0' Top Soil &
Seeding
325.0' St. Lights &
Traf. Markers
61.63 20,029.75
1.54 500.54
20.04 6,513.00
1.09 354.25
4.08 1,326.00
5.11 1,660.75
UNIT I-B: TOTAL COST ~ PROPERTY OWNERS (ASSESSMENTS)
$30,384.25
$45,277.55
-7-
J PRO.F~EZ;NO. 029-036533, UNIT II, BRIDGEWOOD DRIVE FROM,BRIDGE STREET SOUTH 1085 FEET, to be improved wic~
"seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a six-inch. thick
lime stabilized subgrade, so that the finished roadway will be sixty feet wide. Seven inch thick concrete
turn lanes will. be constructed where specified.
OWNER
BLACK
IAT ZONING
FRONTAGE RATE AIrYJUNT
WILLIAM MANN SURVEY, ABSTRACT 1353
San Antonio Savings Asn TR3 A V.7466
cio Talmadge Tinsley Co P.818
17000 Preston Road G
Suite 400
Dallas, TX 75248
1061.0' No Benefit
(Grade Differential)
ASSESSMENT
0.00
State Department of
Highways and Public
Transportation
Property Intersects
WESTSIDE
San Antonio Savings Asn
c/o Talmadge Tinsley Co
17000 Preston Road
Suite 400
Dallas, TX 75248
BRIDGEWOOD VILLAGE ADDITION
4 943.12' Adjusted to:
G 30.0' Pavement
30.0' Curb
30.0' Storm Drain
30.0' ROW Prep.
30.0' Top Soil 6
Seeding
30.0' St. Lights &
Traf. Markers
(Grade Differential)
61.63 1,848.90
1.54 46.20
20.04 601.20
1.09 32..70
4.08 122.40
5.11 153.30
a,so4.~o
UNIT II: TOTAL COST TO PROPERTX OWNERS (ASSESSMENTS)
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)
TOTAL COST TO CITY OF FORT WORTH
ESTIMATED TOTAL CONSTRUCTION OOST
$2,804.70
$222,986.02
$1,307,811.84
.$1,530,797.$6
-8~
r
sreR r1~E >. ~~ - ~..,
CI'iY iviANAUER 1 !~ 5.1
~~~ ~ ~ ~it~- ~n~' 1F~~°t ~'~~°th, ~C~~a~
ACCOU'N71NG•2 ~//// ~° /f~ ~~p/~// ~ fJ ///7// ~']-~ ~ // ~) /f~/f~ .//)~
7RANSPQRTA?10N~PU6L{C~~ // ® U '~.W~1LtV ~~ LL/lV~~~IV ~®~0 // W IVIV~ IV~L/'lAf/1L~®~
MATER AO
-~
:•
DATE REFERENCE SUBJECT Award of Contract - Bridge Str bet/ PAGE
NUMBER John T. White Road Connection 4
1/24/84 C-8184 ~ Hof
Contract II Pavin an Stree Li s
,~
City Council action is requested on Project Nos. 021-036-533-00 (Engineering)
and 02.9-036-533-00 (Construction), as described below
Roadway R.O.W.
Unit Street Limits Width - Feet Width - Feet
I. Bridge W.P/L of Lot 1 44 to 60 64 to 80
Street Block A, Boaz
Turnpike,Addn. ,_
to Oakland Hills
Drive
I-A. Bridge Oakland Hills Dr. 60 80
Street to Bridgewood Dr.
I-B. Bridge Bridgewood Dr. 2-36' Lanes 120
Street to W. Service Rd. W/28' Median
I-820
II. Bridgewood Bridge St. 60 80
Drive to So 1085'
Origin of Project
On Apr-il 5, 1980, the citizens of Fort Worth approved a $47,813,000 bond program
for street and storm drainage improvements and on May 20, 1980 (M&C G-4548), the
City Council allotted the funds into specific categories. One of the categories
was Major Thoroughfares and Collectors, which included Bridge Street-John T.
White Road Connection, at an estimated construction cost of $3,506,000.
Improvements
Bridge Street will be improved with major thoroughfare grade concrete pavement
with concrete curb, complete with turn lanes, street lights and required
drainage facilities. The improvements are being accomplished in two contracts to
allow for major utility relocations. Contract I (M&C C-6780), was awarded on
March 1, 1983 and provided for the excavation and shaping of the new roadway and
the installation of required drainage facilities save storm drain inlets which
are included in Contract II. Contract I and utility adjustments have now been
completed and Contract II was advertised for bids.
Receipt of Bids ~ '
Contract II, Paving and Street Lighting, was advertised for bids on December $
and 15, 1983, and the following bids were received on January 5, 1984,, with 100
working days allotted to complete the project.
(~
Y
DATE REFERENCE SUBJECT: ~ PA~("i~
NUMBER Award of Contract - Br'id`ge Street/
1/24/84 C-8184 John T. White Road Connection, _2ar ~
Bidder Amount
J. L. Bertram Construction $1,035,292.66
and Engineering, Inc.
S.R.O. Asphalt, Inc. 1,079,294.62
Texas Bitulithic Co. 1,111,444.60
L. H. Lacy Company 1,189,905.75
Southwestern Contracting Co. 1,248,936.00
Uvalde Construction Co. 1,253,917..54
Engineer's estimated $1,300,000.00 (December, 1983)
Adjustment of Assessments
On March 29,-1983 (M&C G-5574), the benefit hearing for this project was
conducted by the City Council. The benefit hearing was closed and assessments
levied based on the actual unit prices on Contract I and the Engineer's Estimate
for Contract Il,,with stipulation that such assessments would be adjusted, based
on actual unit prices, at such time as Contract II was awarded.
The engineers' estimate for Contract II at the time the assessments were
calculated was $1,17$,259.48. The current low bid, as indicated above, is
$1,035,292.66 which will reduce the total assessments, on the entire project
from $243,040.69 to $222,986.02 as indicated below
Property Owner
National Farm Life Ins. Co.
Woodhaven Joint Venture
*(Daon-Texas)
Alden E. Wagner, Jr.
*(Daon-Texas)
San Antonio Savings Assn.
*(Herman J Smith)
Harold H. Ginsburg
*(Daon-Texas)
Assessments
Based on Estimate Based on Actual Cost ~~
$30,602.68 $28,330.36
47,707.60
65,916.50
65,409.45
16,164.76
43,327.14
60,231.86
Fort Worth 820 Corp. 17,239.70
Total $243,040.69
*Indicates owner on March 29, 1983
60,301.05
14,902.31
15,893.30
$222,986.02
,•
4" r
DATEr~~ ~ NUMBER CE SUBJECTAWard of Contract - Bridge Street/ PAGE
1/24/84 C-8184 I John T. White Road Connection, ~ 3 of 4
It is recommended that Ordinance No. 8770, adopted on March 29, 1983, levying
the assessments based on Contract I and the Engineers' Estimate, be amended by
adjusting the assessments based on actual unit prices in Contract I and Contract
II (this contract), as outlined above. All of the adjacent property owners were
notified of this recommendation by certified mail on January 10, 1984.
~-m..
Project Cost and Financing
Contract I was financed entirely by the City from Account No. 029-023-176-00 and
021-095-901-00. Based on standard City Policy in effect on March 29, 1983, cost
to adjacent property owners on Contract I and II is $222,986.02, which will be
provided for by a bond fund transfer from the "Revolving Fund Unspecified." Cost
to the City for construction in Contract II is approximately $778,254.64, and
$72,470.48 for Engineering plus $57,330.00 for street lighting. Bond fund
transfers are required for all City costs in Contract II.
Recommendations
It is recommended that:
1. A construction contract be awarded to J. L. Bertram Construction
Engineering, Inc . in the amount of $1, 035, 292.66 based on their low
for paving and street light improvements,
2. An Ordinance be adopted amending Ordinance No. 8770, adjusting th
assessments as indicated above, and,
3. The following bond fund transfers be approved.,
From To Amount Reason
094-009-905-00 094-036-533-00 $222,986.02 To provide funds for
4Revolving Fund Bridge Street/ the property owners
Unspecified John T. White share of construction
Connection cost.
029-023-176-00
Bridge Street/
John T. White
Connection
021-095-901-00
Engineering
Unspecified
029-036-533-00
Bridge Street/
John T. White
Connection
030-032-901-00
Misc. Street Light-
ing Unspecified
021-036-533-00
Bridge Street/
John T. White
Connection
030-U32-067-00
Bridge Street/
John T. White
Connection
$778,254.64
$72,470.48
$34,052.00
To provide funds for
the City's street
construction cost.
To provide for the
City's engineering
cost.
To provide funds for
City's street light
cost in contract.
~ ~ ~ I
s
may.
DATE REFERENCE
NUMBER SURJECTAward Of Contract - Bridge Street/ PACE
1/24/84 C-8184 John T. White Road Connection, 4of 4
030-032-901-00 030-032-077-00 $23,278.OU To provide funds for
Misc. Street Light- Bridge Street/ Street light materials
Unspecified John T. White from City Warehouse.
Connection
DAI dw
-, ,.
APPR~V~D BY
CITY COUNCIL
JAN 24 1984
Cary Seczetaxy n; xhq
Ciry of Fort Wp~~ ,~,~
SUBMITTED FOR THE ~I///
CITY MANAGER'S ~
~
DISPOSITION BY COUNCIL.
PROCESSED BY
OFFICE BY