Developer and Project Information Cover Sheet:
Developer Company Name: Matador Commercial Partner, LTD
Address, State,Zip Code: 6617 Precinct Line Rd Ste 200,North Richland Hills, TX 76182
Phone& Email: 817-223-3015, mhowe@howewood.com
Authorized Signatory, Title: Mark Howe, Vice President
Project Name and Brief Matador Addition Phase IIB
Description:
Project Location: 9000 Crowley Rd , Fort Worth, TX
Plat Case Number: Plat Name: FP-15-066
Mapsco: 104-P Council District: 8 City Project Number: 02747
CFA Number: 2016-029 DOE Number: None
To be completed b aff.-
lk
Received by: Date: 7�
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015 FT.WORTH,TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Matador Commercial Partner, LTD, ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Matador Addition Phase IIB ("Project") within the
City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights &
Signs (C) ®.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section I1, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 1I, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Matador Addition Phase IIB
CFA No.: 2016-029 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1 Water Construction $ 181,770.90
2.Sewer Construction $ 99,996.50
Water and Sewer Construction Total $ 281,767.40
B. TPW Construction
1.Street $ 270,835.00
2.Storrs Drain $ 47,675.00
3.Street Lights Installed by Developer $ 36,990.00
4. Signals
TPW Construction Cost Total $ 355,500.00
Total Construction Cost(excluding the fees): $ 637,267.40
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 5,635.35
D. Water/Sewer Material Testing Fee(2%) $ 5,635.35
Sub-Total for Water Construction Fees $ 11,270.70
E. TPW Inspection Fee(4%) $ 12,740.40
F. TPW Material Testing(2%) $ 6,370.20
G. Street Light lnspsection Cost $ 1,479.60
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ 980.00
Sub-Total for TPW Construction Fees $ 21,570.20
Total Construction Fees: $ 32,840.90
Choice
Financial Guarantee Options,choose one Amount Mark one
Completion Agreement=100%/Holds Plat/on site $ 597,646.40 x
Cash Escrow Water/Sanitary Sewer-125%off-site $ 49,526.25 x
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Matador Commercial Partner,LTD
A L- G is fi+r
Jesus J. Chapa _
Assistant City Manager am : Mark Howe
Title: Vice President
Date:
Date:
Recommended by:
ATTEST: (Only if required by Developer)
Wendy Chi-B ulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name:
W,
Dougla . Wiersig, P.E.
Rr
Director ®� 300
Transportation& Public Works Department y °%0
F— °70
Approved as to Form &Legality: ATTEST: Vag
Richard A. McCracken y J.
Assistant City Attorney City Sec ary
M&C No. _ Ph4
Date: A IIy
rot. 121 S V44-
OFFICIAL RECORD
CITY SECRETARY
City of Fort worth,Texas
Standard Community Facilities Agreement FT.WORTH, TX
CFA Official Release Date: 10.07.2015
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvments
® Water Cost Estimate
® Exhibit A-l: Sewer Improvements
® Sewer Cost Estimate
I� Exhibit B: Paving Improvements
® Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of'Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: I0.07.20I5
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02747
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
° ° __. .Shane-Are=
° Green WHIONN 01.
B+errybrOnk.Dr
--Pacing Dr
Richards Ranch Rd Ashley Dr-
Reunion Ranch Rcl:, Kings-
Graham Ranch,-Rd--,----
Hunting Gr'
cc
Matador Ranch Rd tA
oc 4
°C Cattle_Creek Rd
Dorchester St--
Joyner
t---- -Joyner Ranch Rd
SITE
_...._ . Yorkshire'St-._---
K L 1.p
CMDLERIDGE- Woodhail-Way.
. .............. unningharn St Southworth Dr
A
r
Etter Ct Southview Dr
I
Old Glory-.Trail
SITE VICINITY MAP
LOTS 10-40, BLOCK 1; LOTS 1-16, BLOCK 2
MATADOR ADDITION PHASE IIB
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
\CFA\Vicinity Map.dgn 4/21/20169:58:50A
I
- l-------�
�( $ JO,tEO AnKM e0.0------------------------__—__—
•♦ B x P.n.r.,
—1----1 ---1--- --1� --T— ---�
iAO.�a-fM1SM Ap0EF ipl - d I ' MIAGOt-W.Apps ,*
32 CAB.a. SLIF i
! 73 1 e. I,I R % 13 III I JLI
y
I P,OF�.BJIF
r
I
VOL�
L
CONNECT TO = — — i-- -
a t ` — EX . 8 " DIA . h _. FURNISH AND INxSTALL
-gip WATER LINE 942 LF 8 '° DIA . PVC
WATERLINE
-
__—'• I I I I I ,
1__ FURNISH AND INSTALL . T` -- i
ia.tt ,�t
453 LF 8 " DIA . PVC
WATERL INEs YELLIM TEO PaE\
V(X.%V.P0. 21.6 G R '..T.ir
f
.fB.tl iaY
I__�' ....WPOr t.rt•t—.�tY•.rY6. •IL�:�1f�1re,-Y
.
—__—__—__—_ __—__—__—__—__—__
LOT t.BLOCK 1 Rw_
LOY 1.
Bi �®ONSHM SCRES sw'. p
DDC. O. rOIT{ON02034 0335
OOC.Y0.
■(i.i! '
CIM-It�i-w-1 LPK.CMSELLUEO•/•le..'f
FURN I SH AND INSTALL ut.,..�L
OOC.NO.01-OZMM
1467 LF 10 " DIA . PVC
i
WATERLINE
SCALE 1" - 200'
0 100 200
GILD&fOL.7(n9W MATADOR ADDITION PHASE II B
LEt7) COMMUNITY FACILITIES AGREEMENT
mgjg� y' PC FORT WORTH, TEXAS
C O N S V L T 1 N Q
" B'mWL��"� WATER PLAN — EXHIBIT A
C1.1L B..w..1 B.w.B•R .r-•eesw.eilwl�E
s2At 11w-areas aro. •"mffleft o mus. tam rs1a2
hOE 10170 0+10.0800 FM 19171 2M•l100
\CFA\193-018 CFA WATERAgn 4/21/2016 9:54:13 AM
V t 1 7
o � ` I MATADOR ADDITION LEONARD RANCH ROAD
�Or CONNECT TOa '
i i
EX . SS MH m is 19 ze zz za z,
Z - I 13 I I
0 . ,19.9 FURNISH AND INSTALL zP
INF0I,z- r•---------• ke ,a S T D . 4 ' SS MH ---- I -----..i '
., 67 I •-- .mom I i
GAP
/ era.z ou
wT£ S.S. d W.E.
-----
R:
I I I i Im
R, T. FURNISH AND INSTALL
894 LF 8 " DIA . „z
r
Ty TItiNAR EASEME�s° i3 Fc
,R,-7 T. T PVC SS
SIT.
-
6q N
_ W70
�
m FURNISH AND INSTALL
71 1 72 70
STD . 4 ' SS MHkD
ii I ---- ----- N
2 -----=-•�------ -�-- FURNISH AND I N S T ALL ------
STD .
-----STD . 4 ' SS MH ; - -----------
7187i 64 FURNISH AND INSTALL f '
430 LF 8 " D I A . - �
PVC SS 4
C�A7N LIN:
FURNISH AND INSTALL
STD . 4 ' SS MH I z
r co I ! r
i I F
BLOCK I
1.47'00 E �— --- -- -
--- -- ------------- -----1------L------�---- 1---- -J- -1 ----�
75.73' ' f
PRO
• ' PH_.._.i. �::—..`—..—..— — —__—__ &SPH rr ar+'r sr rr ar rr .- — rr rr
—:s—
r�--—_-—--—--—--—--—- —.'�.._'a�." �kSm^.TV'...13�'"�---7F/a�"L�'.66a�•,.__,.--.�,.'w _._�._..._...... .. .._....... _..._..__,�—'..�--___'."�.�--- __..N':"n'
------------- -----
DOC. NO. DU4 5601 D.R.T.C.T. CUNNINGHAM ROAD �RavEL - �G
----- F------------------------------------- ---- --- - --=`-- --- —
(VAR/Asu WIDTH R.�Y.) --�" ------
LOT 1. BLOCK I I
GRESHAM ACRES LOT 1. BLOCK 8
DOC. NO. I SOUTH FORK
0203458338 ADDITION
D.R.T.C.T. I DOC. NO.
D204055601
i D.R.T.C.T.
I
SCALE 1" - 100'
0 50 100 I
QafOZ MATADOR ADDITION PHASE II B
COMMUNITY FACILITIES AGREEMENT
MUFFY, PCS FORT WORTH, TEXAS
C O N S U L T 1 N O
"'"`P"'"° P°"� WASTEWATER PLAN — EXHIBIT Al
6A.....,..,..n. -�....•a,Aa.R,,...,v.
amino-cm as ronv nouA,o vias ,ws u,st
wo,E 1217, Z-04 a FU 1917,124"U
...\CFA\193-018 CFA SEWER.dgn 4/21/2016 9:50:35 AM
Li LLJ
o ' /I\f I MATADOR ADDITION LEONARD RANCH ROAD
¢� _....._ - - � _ —tea - - - - - - - - - -
--I I—( _ __._..__.____..._.._...�........._.._..
l —r v�
Qff0 9 I I — J ` — a3•Ja1 � - - � — y2L�L=�- -
Qoa j —I
L
c.�r� ----------
CD 9 I �• m I8 19 20 21 22 23 N
eb C() '•^3 s
sUTM 6LOCt 2
0~ I S 81194928•EI IS I -I I I ! my#ma Awillo• I I Is 2s ! 27 ! 20
p�lrz• -•T :� I S 89 54_28•I I I I 1/�' I I
E 387 50' FT sP«.• ca;
�' 67 ,� - -..r.. . —r. _. .1- •-----f--------imp I i
c,w.a II --TEWCO-Y S.S. 4 Y.E. I i 6�xY 2 j i •�LD '
---------'—
A'PH. 00C. NO- -----1-----
0. mIN N 84-55'56--&
R.r c.r. !cn
�------------- )7 r Is I 15 I 14 I 13 I I
# 68 I �_ I •.-
TEMP�IRY-TtF)Y1R EAS£11E�� I I I rr� •SPR7• CAP INf
a17
Nu
' --I D..R.L .T_ --i�lP1.� T � 0 R A P Y 9
__—-_—69—- �_ ' {moiC. N0. __________I
I �
a Cn aY
\ 6LLJ
!
79
m
F U R N I SH AND INSTALL ! >s ! ! 78
5 , 050 SY 6 " THICK
E Z CONC . PAVEMENT --- rt-'- -rt ---- --"--
f,
W/ 7 CURB -
CHAIN€L'NK
ZE NCE ,� + i
e7 . _ IK 93 ! ez I 111 ! ee ! 79 I S
•' I � m
as
j I I 3
I
CH 3N 1.iN: �• '
FENCE � '�•� � � + _�__—__—__--_
64FURNISH AND INSTALL I`- _�-----------
I I
TYPE R-1 BARRIER
JE FREE RAMPS1.47'00 -------=-----------L-----1------------75.73' — GRavEL
I RfSFI'1 s
'T 9+a.1 ASPH asRH _..
-------------------------- — _ _ 763;-S&f._....._.._.. __---_.__-__- =rnz-
.. • . .. Jiiltil lr ilii it lr if It it RatfR i.Ri.�r r.
36,
- H FORS< ADDITION � '
mac. nq. �20aaF�v�t O.R.T.C.' CUNNINGHAM ROA GRavEL DO
----------------------------- ------- ---------------------------------------
fVAR/ABf.E vlOTH R.O.Y.
FURNISH AND INSTALL FURNISH AND INSTALL `
600 LF CONC . CURB TYPE R-1 BARRIER
AND GUTTER FREE RAMPS
j
SCALE T' - 100'
0 50 100
I
MA&fgg M MATADOR ADDITION PHASE 1113
LTb
COMMUNITY FACILITIES AGREEMENT
muovI7p GCS FORT WORTH, TEXAS
C O N SU L T 1 NQ
19"PIM
lam.)O...f>r PAVING PLAN - EXHIBIT B
cMIL•sw11111Yp.K— •R.�nO{•a�Yll[If"-N�
w11110•cllln2616 SON"PIMA*MILLS. Me iotaPHOW 16171 266.646 FAX 1617)2N-6
...\CFA\193-018 CFA PAVING.dgn 4/21/2016 9:49:36 AM
23 i 24
I :--k
I I I \ 12 ' 8�
I
I 1_ 26 27 28
50"
I IiY2' IRF I I I i
50 �'� 'SPRYCAP, i i 29 3
----------------t- —.._.._-------•—I��
I
I
FURNISH AND INSTALL
I 1 8 7 LF 4211 RCP
I 1/2'. IRFi----------------------
W/ 'SPRY" CAP I j I RF
I
i FURNISH AND INSTALL i I ,
- - - - - -rte 64 LF 36 " RCP
_ . U - -----------
D.
---------D.R. T. C. T.
FURNISH AND INSTALJT I 5 ' JUNCTION BOX
- - ---- 1L 7
VOL. 9892. PG. 2
i FURNISH AND INSTALL o.R.T.C.T.
9 LF 36 " RCP
io 15 ' CURB INLET
I o
FURNISH AND INSTALL 7
77 42 LF 21 RCP
2 — 10 ' CURB INLETS
SCALE 1" - 50'
0 25 50
G�'zIQG��L��l,�M MATADOR ADDITION PHASE 11 13
COMMUNITY FACILITIES AGREEMENT
d ®qjIrrrry, PCS FORT WORTH, TEXAS
C O N S U L T I N C1
[I.R.F�UIMtalli"'ar':w It.'O'.'r•Irl.--�. DRAINAGE PLAN - EXHIBIT B1
ac"Illo•clrin as •.oln1•IQan9 M1)Lf. Rsrt x)9:
FIDE 1917)269•MM FM 1917)2M-9M9
...\CFA\193-018 CFA STORM.dgn 4/21/2016 9:52:11 AM
MATADOR ADDITION LEONARD RANCH ROAD
z I —
�a' ri
v7a® -------L�—OD
' 20 ' 21 ' ' 23 ' 24.6i1�. 1 I I I I I I=S 84.54'28• EI p , , ou%ft Pl9C%2 , , , 26 , 27 26
•
119.92'
I alas,»
is INF I I
. r•- - --�• 1 ;0 "�s�Y_cavr•----�.. 5.89�54.28'•�E •387150;—•--.f—..—..— i In - cw i
1 R7
W/ 67 ,
CAP1 I r BLOCK z OD ,
EMPARY S.S. 4 V.E. I I I I
.� 1I�I i* imni 1 56'4 —
C.R,T'c.T, r
-- — — — — I ,. 13 47 J,yX
68 PROP S T R E E T :1/2- SAF ' 'rl Fw
T PROP . STREET "' '` `� `�`
L IGHT LIGHT 4 I ;�
y ORPRY v.
wc. No -----------
D.R.T.C.T----
ex
_ _ -1
\—0.R.T.C..T.
-..............._ m� — 6K
�` 6 i
w
79
PROP . STREET
71 L IGHT 75 i 76 i 77 i 76 I 7 �D
------r-----T-----T-----rt-----rt-------r-----�-----gym
PROP . STREET
—�;RE & P R O P . STREETOCK
Ct Al14 LIN 65
NCE L IGHT B7 i 8 i 111 79 LIGHT
lb PROP . ST R E E T -------- - m
i � .4. I— T LIGHT 4 h
CHIN LINK-
FENCE -----------
i PROP . STREET
r PROP . STREET ce 43 PROP . STREET LIGHT
' LIGHT I I LIGHT `
I I BLOCK
1.47'00 E I /
75.73' ----- ------- ------L---- 1 -----� ---- ---�------L-----J--- -J J ----
GRAVEL,
!R�'1 �"`, 53 TE 6+e•t —__—__—__ �sr a.r:�nara-ra.ra-r ar4-ra.ra-ra.ra-r.r.-r a.r a-r rra-r rrrr.v.:rrrirrrr�� .-:y..P.:-- �� �..
Tao{. N FORK RL76?T i 0!; ,,i ,. 4� •
coc. No. ozea Ksas o.R.r.c.?. CUNNlNGHAM ROAD -'' oRAvEL;- tx1C.
f VNRIABLE vlDTH R./�,v.)
LOT 1. BLOCK I I
ORESHAM ACRES LOT 1, BLOCK 8
DOC. NO. I SOUTH FORK
D203458338 ADDITION
D.R.T.C.T. I DOC. NO.
D204055601
j D.R.T.C.T.
I
SCALE 1" - 100' i
0 50 100
M MATADOR ADDITION PHASE II B
COMMUNITY FACILITIES AGREEMENT
7,b) �����a ISG FORT WORTH, TEXAS
C O N S U L T I N CS
1LL/■1M N6.N0.6•{lr
"'""" M1, STREET LIGHT PLAN — EXHIBIT C
RMI NN•tllllf RSO. MORN NN?aMq NIN.f. RNIt filft
mm It171 IY•tNt FIL11 It17/ 2M•tMt
—\193-018 CFA STREET LIGHTS.dgn 4/21/2016 9:52:51 AM
"" /q�/l ( MATADOR ADDITION LEONARD RANCH ROAD
- -
m
-1 .....__
�Z_ I - - - - - - - - - - - - - - - - - - -,- -
�Za i I I I I I I I I I
_lJm i i i i i i i i i
0� �__—___9—__ I y„py 0I i@ ' i9 ' 2p ' 21 ' 22 • 27 ' 2< ' ' '
-z CD
1n funk luxe f I I z@ I 27 I ze
p'" S 89.54 '28' EI r ' € ' ' ' �,T.orn AW111 0. ' ' , '
Ir �• 119.92_ ,19F
Elar
our w v .Y_`r..—..�.. S•89�54�28'•�E •387150;—••--t--------+m sir cai i
ASPN, STREET NAME i Cm EL«R 2 i i �mN II i
—__— In N 8A-55'56'1-C-
-
- -==- - S I G N
i/2• E16 .1 AF
Be I TEMPO URNAR UNI? EASEM I I I V/ sRm CAR
DOC < --------
0-
D .T` RARY E ms—
L__—_--__--_ C. NO. __ _=_ _=__I '
—I_- \—O.R..T.C.3.
6q I CK
' STREET NAME I FE
77 7t
' I 7
S I G N -------
j7--
BLOCK E
Fj ---i-----------
as
NAIENQE i �' i S I G N
NCE 97 ,`�� 8, TP i B7 0 7q I S
/%�� STREET NAME
�-- - T - S I GN -
i ----------
Be
ps i
I I I 7
CNOtN i..:N.
FENCE 1 .a
-
89
43 ql STOP S I GN q7
i I
i iSTREET NAME I F
SIGN I 1
1•47'7e E ------- -=-----------L-----1---- —L------L— ----------------------J J ------
�.+7+5�7_3.,�� oRAVE I
ASPH
Ifs �L.Y`:�. w:T �•€ _.__—__—__ y rs a r:�— ---------------rr..r.:..rr...r--r...rr
2'
TaQI1��H 01�16.D AD�OJT • ,=Y
OOC. - -- 5-- O.R,T.C.T. :/ --
CUNNINGHAM ROAD _��;
t VARIABLE vIDTH R.rv.)
LOT 1. BLOCK I I
GRESHAM ACRES LOT I. BLOCK 8
DOC. NO. I SOUTH FORK
D203458338 ADDITION
D.R.T.C.T. I DOC. NO.
D204055601
D.R.T.C.T.
I
SCALE 1" - 100' i
0 50 100
LIQ VGOL���� MATADOR ADDITION PHASE II B
COMMUNITY FACILITIES AGREEMENT
d FORT WORTH, TEXAS
C O N 9 U I- T 1 N O
a" IBM
M0.n0.F-01111"""""""""" '""` °" '"""" STREET NAME SIGN PLAN - EXHIBIT C1
SMI N -civin KIM •MOM NICROM■IW. Iti1a$IY
R" 1x171 2641•Nr FAR Itl7>2M•NM
...\193-01B CFA STREET SIGNS.dgn 4/21/2016 9:53:27 AM
MATADOR ADDITION PHASE IIB 3/15/2016
COST ESTIMATE
Water:
1 10" PVC Water Pipe 1467 LF @ $44.25 $64,914.75
2 8" PVC Water Pipe 1395 LF @ $33.25 $46,383.75
3 10"Gate Valve 2 EA @ $1,800.00 $3,600.00
4 8" Gate Valve 3 EA @ $1,175.00 $3,525.00
5 12"x 10"Tapping Sleeve&Valve 1 EA @ $4,950.00 $4,950.00
6 Fire Hydrant 5 EA @ $3,750.00 $18,750.00
7 Ductile Iron Water Fittings w/Restraint 0.5 TON @ $8,000.00 $4,000.00
8 1"Water Service 47 EA $725.00 $34,075.00
9 Connection to Existing 4"-12"Water Main 1 EA $1,000.00 $1,000.00
10 Trench Safety 2862 LF $0.20 $572.40
Total Water: $181 770.90
Sanitary Sewer:
8 8" Sewer Pie 1324 LF @ $36.00 $47,664.00
9 4' Manhole 7 EA @ $2,950.00 $20,650.00
10 4' Extra Depth Manhole 7.5 VF @ $135.00 $1,012.50
11 4" Sewer Service 47 EA 9 11 $595.00 $27,965.00
12 Manhole Vacuum Testing 7 EA @ $150.00 $1,050.00
13 Post-CCTV Inspection 1324 LF @ $1.001 $1,324.00
14 Trench Safety 1324 LF @ $0.251 $331.00
Total Sanitary Sewer: $99 996.50
Storm Draina e:
16 42" RCP, Class III 187 LF @ $125.00 $23,375.00
17 36" RCP, Class III 9 LF @ $100.00 $900.00
18 24"RCP, Class III 64 LF @ $67.00 $4,288.00
19 21" RCP, Class III 42 EA @ $61.00 $2,562.00
20 5' Storm Junction Box 1 EA $4,900.00 $4,900.00
21 15'Curb Inlet 1 EA @ $4,950.00 $4,950.00
22 10' Curb Inlet 2 EA $3,350.00 $6,700.00
Total Storm Drainage: 7 675.00
Paving: - -
25 6" Lime Treatment 5,732 SY @ $2.75 $15,763.00
26 Hydrated Lime 104 TON @ $145.00 $15,080.00
27 6" Concrete Pavement 5,050 SY $39.80 $200,990.00
28 4" Concrete Sidewalk 2508 SF @ $6.50 $16,302.00
29 7"Concrete Curb and Gutter 600 LF @ $22.00 $13,200.00
30 Barrier Free Ramp, Type R-1 4 EA @ $1,500.00 $6,000.00
31 Seeding, Broadcast 3500 SY @ $1.00 $3,500.00
Total Paving: 270 835.00
Street Lip htin :
33 2"Conduit PVC Schedule 80 (T) 430 T—LF @ 15.00 $6,450.00
34 Number 6 Insulated Electric Conductor 1290 LF @ $1.00 $1,290.00
35 Transformer 9 EA @ $250.00 $2,250.00
36 Roadway Ilium.Assembly TY 1, 4, and6 9 EA @ $3,000.00L $27,000.00
Total Street Lighting: 136,990.00
Total Construction Estimate: $637,267.40
MATADOR ADDITION PHASE IIB-On-Site Improvements 3/15/2016
COST ESTIMATE
Water:
1 10" PVC Water Pipe 687 LF @ $44.25 $30,399.75
2 8" PVC Water Pipe 1395 LF @ $33.25 $46,383.75
3 10"Gate Valve 2 EA @ $1,800.00 $3,600.00
4 8"Gate Valve 3 EA @ $1,175.00 $3,525.00
5 12"x 10"Tapping Sleeve&Valve 0 EA Q $4,950.00 $0.00
6 Fire Hydrant 5 EA @ 1 $3,750.00 $18,750.00
7 Ductile Iron Water Fittings w/Restraint 0.5 TON $8,000.00 $4,000.00
8 1"Water Service 47 EA @ $725.00 $34,075.00
9 Connection to Existing 4"-12"Water Main 1 EA @ $1,000.00 $1,000.00
10 Trench Safety 2082 LF @ 1 $0.20 $416.40
Total Water: 142149.90
Sanita Sewer:
8 8"Sewer Pipe 1324 LF @ $36.00 $47,664.00
9 4'Manhole 7 EA a $2,950.00 $20,650.00
10 4' Extra Depth Manhole 7.5 I VF @ 1 $135.00 $1,012.50
11 4" Sewer Service 47 EA $595.00 $27,965.00
12 Manhole Vacuum Testing 7 EA Q $150.00 $1,050.00
13 Post-CCTV Inspection 1324 LF @ $1.00 $1,324.00
14 Trench Safety 1324 LF @ $0.25 $331.00
Total Sanitary Sewer: 99 996.50
Storm Draina e:
16 42" RCP, Class III 187 LF $125.00 $23,375.00
17 36" RCP, Class 111 9 LF @ $100.00 $900.00
18 24" RCP, Class III 64 LF @ $67.00 $4,288.00
19 21" RCP, Class III 42 EA @ $61.00 $2,562.00
20 5'Storm Junction Box 1 EA $4,900.00 $4,900.00
21 15' Curb Inlet 1 EA @ $4,950.00 $4,950.00
22 10'Curb Inlet 2 EA @ $3,350.00 $6,700.00
Total Storm Drainage: $47,675.00
Paving:
25 6" Lime Treatment 5,732 SY $2.75 $15,763.00
26 Hydrated Lime 104 TON @ $145.00 $15,080.00
27 6" Concrete Pavement 5,050 SY @ $39.80 $200,990.00
28 4"Concrete Sidewalk 2508 SF @ $6.50 $16,302.00
29 7"Concrete Curb and Gutter 600 LF @ $22.00 $13,200.00
30 Barrier Free Ramp, Type R-1 4 EA @ $1,500.00 $6,000.00
31 Seeding, Broadcast 3500 SY @ $1.001 $3,500.00
Total Paving: 270 835.00
Street Lighting:
33 2"Conduit PVC Schedule 80(T) 430 LF $15.00 $6,450.00
34 Number 6 Insulated Electric Conductor 1290 LF @ $1.00 $1,290.00
35 Transformer 9 EA @ $250.00 $2,250.00
36 Roadway Illum.Assembly TY 1,4, and 6 9 EA @ $3,000.00 $27,000.00
Total Street Lighting: $36,990.00
Total Construction Estimate: $59T 646.40
MATADOR ADDITION PHASE IIB-Off-Site Improvements 3/15/2016
COST ESTIMATE
Water:
1 10"PVC Water Pipe 780 LF 7i $44.25 $34,515.00
2 8" PVC Water Pie 0 LF $33.25 $0.00
3 10"Gate Valve 0 EA $1,800.00 $0.00
4 8"Gate Valve 0 EA @ $1,175.00 $0.00
5 12"x 10"Tapping SleeValve 1 EA @ $4,950.00 $4,950.00
6 Fire Hydrant 0 EA $3,750.00 $0.00
7 Ductile Iron Water Fittings w/Restraint 0 TON @ $8,000.00 $0.00
8 1"Water Service 0 EA @ $725.001 $0.00
9 Connection to Existing 4"-12"Water Main 0 EA @ $1,000-001 $0.00
10 Trench Safety 780 LF $0.201 $156.00
Total Water: $39,621.00
Sanita Sewer:
8 8" Sewer Pipe 0 LF @ $36.00 $0.00
9 4'Manhole 0 EA @ $2,950.00 $0.00
10 4' Extra Depth Manhole 0 1 VF @ $135.00 $0.00
11 4" Sewer Service 0 EA @ $595.00 $0.00
12 Manhole Vacuum Testing 0 EA $150.00 $0.00
13 Post-CCN Inspection 0 LF @ $1.00 $0.00
14 Trench Safety 0 LF @ $0.251 $0.00
Total Sanita $0.00
Storm Draina e:
16 42" RCP, Class III 0 LF @ $125.001 $0.00
17 36" RCP, Class III 0 LF @ $100.001 $0.00
18 24" RCP, Class 111 0 LF @ 1 $67.00 $0.00
19 21"RCP, Class III 0 EA @ $61.00 $0.00
20 5' Storm Junction Box 0 EA @ $4,900.00 $0.00
21 15' Curb Inlet 0 EA @ $4,950.00 $0.00
22 10'Curb Inlet 0 EA @ $3,350.00 $0.00
Total Storm Drainage: $0.00
Paving:
25 6"Lime Treatment 0 SY $2.75 $0.00
26 Hydrated Lime 0 TON $145.00 $0.00
27 6"Concrete Pavement 0 SY @ $39.80 $0.00
28 4"Concrete Sidewalk 0 SF @ $6.50 $0.00
29 7"Concrete Curb and Gutter 0 LF @ $22.00 $0.00
30 Barrier Free Ramp, Type R-1 0 EA @ $1,500.00 $0.00
31 Seeding, Broadcast 0 SY @ $1.00 $0.00
Total Paving: $0.00,
Street Lig htin :
33 2" Conduit PVC Schedule 80 (T) 0 LF @ $15.00 $0.00
34 Number 6 Insulated Electric Conductor 0 LF a $1.00 $0.00
35 Transformer 0 EA @ $250.00 $0.00
36 Roadway Ilium.Assembly TY 1,4, and 6 0 EA @ $ '000.001 $0.00
Total Street Lighting: $0.00
Total Construction Estimate: $39,621.00