Loading...
HomeMy WebLinkAboutContract 47744 CITY sEcRETAW/ ����/ CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: MMCAD, LLC Address, State,Zip Code: 1800 Valley View Lane Suite 300,Farmers Branch TX 75234 Phone& Email: 469-892-7200,rome@centurionamerican.com Authorized Signatory, Title: Mehrdad Moayedi, Owner Project Name and Brief Primrose Crossing-W. Risinger Rd Description: Project Location: W.Risinger Road and Sweet Flag Flane Plat Case Number: FP-15-065 Plat Name: Primrose Crossing Mapsco: NA Council District: 6 City Project Number: 02683 CFA Number: 2015-128 DOE Number: 7541 To be completed by�taff� SIP Received by. Date: �� 2 3 4 S /f e9 � N City of Fort Worth,Texas OFFICIAL RE 'U @, @ F�RrJ�QR Standard Community Facilities Agreement S�CiR�TAR U; �ARp� CFA Official Release Date:07.30.2015 CITY ` 3, Page 1 of 11 FT.VVORTR:. 9 9 b g -Z STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, MMCAD, LLC, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Primrose Crossing- W.Risinger Rd ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) Z. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent(100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 7of11 Cost Summary Sheet Project Name: Primrose Crossing-W.Risinger Rd CFA No.: 2015-128 DOE No.: 7541 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 293,760.54 2.Sewer Construction $ 81,851.00 Water and Sewer Construction Total $ 375,611.54 B. TPW Construction I.Street $ 902,249.51 2.Storm Drain $ 276,989.85 3.Street Lights Installed by Developer $ 117,876.50 4. Signals $ - TPW Construction Cost Total $ 1,297,115.86 Total Construction Cost(excluding the fees): $ 1,672,727.40 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 7,512.23 D. Water/Sewer Material Testing Fee(2%) $ 7,512.23 Sub-Total for Water Construction Fees $ 15,024.46 E. TPW Inspection Fee(4%) $ 47,169.57 F. TPW Material Testing(2%) $ 23,584.79 G. Street Light Inspsection Cost $ 4,715.06 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ 1,470.00 Sub-Total for TPW Construction Fees $ 76,939.42 Total Construction Fees: $ 91,963.88 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,672,727.40 Completion A reement=100%/Holds Plat $ 1,672,727.40 490 Cash Escrow Water/Sanitary Sewer=125% $ 469,514.43 Cash Escrow Paving/Storm Drain=125% $ 1,621,394.83 Letter of Credit=125%w/2yr expiration period $ 2,090,909.25 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER MMCAD,LLC Jes s J. Chapa Assistant City Manager Name: Mehrdad Moayedi �� Date: Title: Owner 2 ^.Z Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Ukbulal, EMBA, P.E. Development Engineering Manager Signator Water Department Name: DZA J- 0 Dougla6kV. Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form &Legality: ATTEST: M c6r",IGc.% ?dary J. Ka ser Assistant City Attorney M&C No. N/it $® V n7® Date: 5�y It y rV411 ILSs 44C4K S�tc�Jk+w� : MSA. 00000c,0011 �C S City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement CITY SECRETARY CFA Official Release Date:07.30.2015 FT.WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement 7Location Map 7Exhibit A: Water Improvments ® Water Cost Estimate Fx Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate zX Exhibit B: Paving Improvements © Paving Cost Estimate © Exhibit B-1: Storm Drain Improvements © Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02683 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 11 of 11 00 42 43 DAP-BID PROPOSAL Page 1 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Bid Quantity Unit Price Bid Value Measure Section No. UNIT 1:WATER IMPROVEMENTS 3305.0109 Trench Safety for Water LF 33 05 10 4797 $0.30 $1,439.10 3311.0001 Ductile Iron Water Fittings w/Restraint TN 3311 11 3.622 $10,654.00 $38,588.79 3311.0261 8"PVC Water Pipe LF 3311 12 681 $22.90 $15,594.90 3311.0461 12"PVC Water Pipe LF 3311 12 4101 $38.00 $155,838.00 3311.0462 12"PVC Water Pipe,CSS Backfill LF 3311 12 15 $53.85 $807.75 3305.0116 Concrete Encasement for Utility Pipes CY 33 05 10 6.8 $165.00 $1,122.00 3312.0001 Fire Hydrant(inc 6"Gate Valve) EA 33 12 40 7 $4,126.00 $28,882.00 3312.0117 Connection to Existing 4"-12"Water Main EA 33 12 25 1 $645.00 $645.00 3312.3003 8"Gate Valve EA 33 12 20 11 $1,325.00 $14,575.00 3312.3005 12"Gate Valve EA 33 12 20 12 $2,643.00 $31,716.00 3312.4109 12"x 12"Tapping Sleeve&Valve EA 33 12 25 1 $4,552.00 $4,552.00 TOTAL UNIT I:WATER IMPROVEMENTS11 $293,760.54 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECT'S Form Version April 2,2014 00 42 43—Bid Proposal_DAP 00 42 43 DAP-BID PROPOSAL Page 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No. Description Unit of Specification Bid Quantity Unit Price Bid Value Measure Section No. UNIT II:SANITARY SEWER IMPROVEMENTS 3301.0002 Post-CCN Inspection LF 3301 31 1263 $1.25 $1,578.75 3301.0101 Manhole Vacuum Testing EA 3301 30 8 $167.00 $1,336.00 3305.0109 Trench Safety LF 33 05 10 1263 $0.30 $378.90 3311 10, 3331.4115 8"Sewer Pipe(SDR-26) EA 3331 12, 1079 3331 20 $30.45 $32,855.55 3311 10, 3331.4116 8"Sewer Pipe,CSS Backfill LF 3331 12, 110 3331 20 $46.40 $5,104.00 3311 10, 3331.4215 15"Sewer Pipe LF 3331 12, 52 3331 20 $44.65 $2,321.80 3311 10, 3331.4216 15"Sewer Pipe,CSS Backfill LF 3331 12, 22 3331 20 $63.50 $1,397.00 0330.0001 Concrete Encase Sewer Pipe CY 03 30 00 4.8 $155.00 $744.00 3339.1001 4'Manhole EA 33 39 10, 8 33 39 20 $3,466.25 $27,730.00 3339.1003 4'Extra Depth Manhole VF 33 39 10, 41 33 39 20 $205.00 $8,405.00 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $81,851.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43 Bid Propmal_DAP 00 42 43 DAP-BID PROPOSAL Page 3 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Bid Quantity Unit Price FBid Value Measure Section No. UNIT III: DRAINAGE IMPROVEMENTS 0241.4401 Remove Headwall/SET EA 0241 14 1 $450.00 $450.00 3137.0104 Medium Stone Riprap,dry SY 31 3700 99 $85.00 $8,415.00 3305.0109 Trench Safety LF 33 05 10 1862 $0.30 $558.60 3349.0001 4'Storm Junction Box EA 33 49 10 5 $3,579.00 $17,895.00 3349.0002 5'Storm Junction Box EA 33 49 10 3 $4,426.00 $13,278.00 3341.0201 21"RCP,Class III LF 3341 10 235 $51.05 $11,996.75 3341.0205 24"RCP,Class III LF 3341 10 411 $59.15 $24,310.65 3341.0302 30"RCP,Class III LF 3341 10 540 $74.65 $40,311.00 3341.0309 36"RCP,Class III LF 3341 10 168 $99.60 $16,732.80 3341.0402 42"RCP,Class III LF 3341 10 287 $130.75 $37,525.25 3341.0409 48"RCP,Class III LF 3341 10 221 $159.80 $35,315.80 3349.3003 24"Straight Headwall, 1 pipe EA 33 49 40 3 $1,569.00 $4,707.00 3349.3005 30"Straight Headwall, 1 pipe EA 33 49 40 1 $1,837.00 $1,837.00 3349.3007 36"Straight Headwall, 1 pipe EA 33 49 40 2 $2,834.00 $5,668.00 3349.3009 42"Straight Headwall, 1 pipe EA 33 49 40 1 $3,460.00 $3,460.00 3349.3011 48"Straight Headwall, 1 pipe EA 34 49 40 1 $3,220.00 $3,220.00 3349.5001 10'Curb Inlet EA 33 49 20 10 $3,818.00 $38,180.00 3349.5002 15'Curb Inlet EA 33 49 20 1 $4,993.00 $4,993.00 3349.7002 5'Drop Inlet EA 33 49 20 2 $4,068.00 $8,136.00 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $276,989.85 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_Bid Proposal_DAP 00 42 43 DAP-BID PROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Bid Quantity Unit Price Bid Value Measure Section No. UNIT IV:PAVING IMPROVEMENTS 0241.1300 Remove Concrete Curb&Gutter LF 0241 15 9 $10.00 $90.00 3211.0400 Hydrated Lime TN 3211 29 427.392 $155.00 $66,245.76 3211.0502 8"Lime Treatment SY 3211 29 17808 $3.00 $53,424.00 3212.0303 3"Asphalt Pvmt Type D SY 32 12 16 198 $35.00 $6,930.00 3212.0502 5.5"Asphalt Base Type B SY 32 12 16 198 $45.00 $8,910.00 3213.0102 7"Conc Pvmt SY 32 13 13 16442 $36.00 $591,912.00 3213.0105 10"Conc Pvmt SY 32 13 13 294 $53.00 $15,582.00 3213.0301 4"Conc Sidewalk SF 32 13 20 31,031 $4.00 $124,124.00 3213.0506 Barrier Free Ramp,Type P-1 EA 32 13 20 6 $1,200.00 $7,200.00 3217.2001 Raised Marker TY W-4 EA 32 17 23 78 $3.25 $253.50 3217.2002 Raised Marker TY Y-4 EA 32 17 23 1562 $3.25 $5,076.50 3217.2103 REFL Raised Marker TY II-AA-4 EA 32 17 23 391 $3.25 $1,270.75 3217.2104 REFL Raised Marker TY 11-CR-4 EA 32 17 23 20 $3.25 $65.00 3441.4006 Install Alum Sign Ground Mount EA 00 00 00 5 $400.00 $2,000.00 9999.0001 Remove Existing Barricade EA 00 00 00 1 $125.00 $125.00 9999.0002 Install Standard Barricade EA 00 00 00 2 $1,600.00 $3,200.00 9999.0003 Pavement Header LF 00 00 00 60 $20.00 $1,200.00 9999.0004 Lane Reduction Sign TMUTCD W4-2 EA 00 00 00 1 $400.00 $400.00 9999.0005 Lane Assignment Sign EA 00 00 00 1 $400.00 $400.00 9999.0006 Stop Sign EA 00 00 00 4 $400.00 $1,600.00 9999.0007 Street Name Blades EA 00 00 00 6 $375.00 $2,250.00 9999.0009 Delineator Posts(FLX SRF) EA 00 00 00 14 $200.00 $2,800.00 9999.0010 Yield Sign EA 0 00 00 1 $450.00 $450.00 9999.0011 Right Turn Sign EA 0 00 00 1 $450.00 $450.00 9999.0012 Do Not Enter Sign EA 0 00 00 1 $450.00 $450.00 9999.0013 No Right Turn Sign EA 0 00 00 1 $450.00 $450.00 3217.0002 4"Solid Yellow Striping LF 32 17 23 308 $2.25 $693.00 9999.0014 24"Solid Yellow Crosshatch Marking LF 32 17 23 286 $15.75 $4,504.50 9999.0015 Remove 4"Solid White Striping&Replace LF 32 17 23 86 $2.25 $193.50 with Broken White Striping TOTAL UNIT IV: PAVING IMPROVEMENTS1 $902,249.51 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Fofm Version April 2,2014 00 42 43_Bid Pmposal_DAP <tr<4=43 DAP BID PROPOSAL Page`of6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of I Specification Bid Quantity Unit Price Bid Value Measure Section No. UNIT V:STREET LIGHTING IMPROVEMENTS 2605.3015 2"CONDT PVC SCH 80 LF 26 05 33 3690 $7.69 $28,376.10 3441.1502 Ground Box Type B,w/Apron EA 3441 10 4 $737.00 $2,948.00 3441.3201 LED Lighting Fixture(138W) EA 34 41 20 21 $764.00 $16,044.00 3441.3301 Rdwy Ilium Foundation TY 2 EA 3541 20 21 $1,073.00 $22,533.00 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor LF 3441 20 3690 $3.00 $11,070.00 3441.3002 Rdwy Ilium Assmbly TY 8 EA 34 41 20 21 $1,383.00 $29,043.00 9999.0008 4"CONDT PVC SCH 80 LF 00 00 00 480 $16.38 $7,862.40 TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $117,876.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_Bid Proposal DAP 00 42 43 DAP a BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of I specification Bid Quantity Unit Price Bid Value Measure I Section No. Bid Summary UNIT 1:WATER IMPROVEMENTS $293,760.54 UNIT II:SANITARY SEWER IMPROVEMENTS $81,851.00 UNIT III: DRAINAGE IMPROVEMENTS $276,989.85 UNIT IV:PAVING IMPROVEMENTS $902,249.51 UNIT V:STREET LIGHTING IMPROVEMENTS $117,876.50 Total Construction Bid $1,672,727.40 Contractor agrees to complete WORK for FINAL ACCEPTANCE within calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_Bid Proposal DAP vu C.A. rav �R v �r +v twr+eer rrw ALTA rte, VWyeea' roes" an uer � � .on """ °^ uer nuecs 'srr � arr d peer r r Ln N ,eee.Y a Q SCALE:1" = 4000' o BEEOK LAK rn AKE \ I R 0 V E C r LOCATION v � U rsrt / eara N � tGR U em rs¢ts vu� v o 0 w � a L K W n 0 VICINITY MAP o PRIMROSE CROSSING 0 W. RISINGER ROAD Y � �0 BTM o0 X LOCATION MAP 777 MAIN STREET 3 FORT WORTH, TX 76102 / >> > PHONE 817-735-6000 1 =4000 e::j FUTURE�LLJ PRIMROSE CROSSING PHASE 2 FUTURE PRIMROSE Qprp CROSSING CONNECT TO EXISTING 8" SS FUTURE PRIMROSE CROSSING PHASE 38 XT U N 8" SS—B d a SCALE:1" = 400' � s" SS uo E P UG 10 FUTURE o PRIMROSE EXISTING CROSSING PRIMROSE ` CROSSING ?�P 8" SS—D FUTURE �t 3 PRIMROSE 2° CROSSING 3' U H L x W Q W U U O N O, C N � La LEGEND WASTEWATER EXHIBIT Al N PROPOSED SANITARY SEWER PROPOSED MANHOLE 0 EXISTING SANITARY SEWER PRIMROSE CROSSING rl EW. RISINGER ROAD EXISTING MANHOLE U 0 LIMITS OF PROJECT I' ���o �TM 3 0 PROPOSED SEWER LINES ARE 8 Y UNLESS OTHERWISE INDICATED 777 MAIN STREET 3 FORT WORTH, TX 76102 o PHONE 817-735-6000 J N 8" WL-7 LJ� FUTURE W� PRIMROSE CROSSING PHASE 2 FUTU R E PRIMROSE CROSSING Rod • ONNECT TO 8" WL( WL!1 EXISTING FUTURE WL-12 PRIMROSE CROSSING PHASE 38 OON (u 3,v �1 8" W -11T7 1 1 8" WL-8 8" W - a SCALE:1" = 400' 00 66 FUTURE o PRIMROSE EXISTING CROSSING PRIMROSE CROSSING FUTURE PRIMROSE 2° d CROSSING 2 8" W -4 U N W � �ry U 0 8' W -1 0 d O 8" WL-5 a LEGEND WATER x x EXHIBIT 'A' 00PROPOSED WATER LINE n / o �J PROPOSED GATE VALVE o PROPOSED FIRE HYDRANT PRIMROSE CROSSING EXISTING WATER LINE W. RISINGER ROAD EXISTING GATE VALVE TM o EXISTING FIRE HYDRANT JAC05% Ln0 y LIMITS OF PROJECT CONNECT TO •777 MAIN STREET EXISTING FORT WORTH, TX 76102 o PHONE 817-735-6000 e::jl� FUTURE� PRIMROSE CROSSING PHASE 2 FUTURE PRIMROSECONSTRUCT 15' INLET CROSSING R RAW ON ECT TO EXISTING F' STOR IN VI FUTURE 6 s PRIMROSE CROSSING PHASE 3B N a SCALE:1" = 400' O �o tn m FUTURE 0 3, PRIMROSE EXISTING s CROSSING PRIMROSE CROSSING rn �� FUTURE �e PRIMROSE �U a CROSSING Q j 3 , N V iE w Js U 'o 0 O K N T C .N O.' n STORM L w LEGEND EXHIBIT 'B1 ' I 00 N . PROPOSED STORM DRAIN LINE a PROPOSED INLET T PRIMROSE CROSSING PROPOSED MANHOLE W. RISINGER ROAD Y EXISTING STORM DRAIN LINE p �» x JACO LIMITS OF PROJECT 0 - �� N REPLACE EXISTING Y STORM LINE WITH 42" PIPE 777 MAIN STREET x WITH 3 FORT WORTH, TX 76102 o PHONE 817-735-6000 J (n V FUTURE PRIMROSE CROSSING PHASE 2 UTURE PRFIMROSE CROSSING FUTURE PRIMROSE CROSSING o PHASE 38 �nOON `w a SCALE:1" = 400' m FUTURE C-4 PRIMROSE EXISTING n CROSSING PRIMROSE CROSSING m FUTURE PRIMROSE CROSSING U N x w LEGEND v PROPOSED 37'B—Bckf j / ROADWAY/60'ROW y PAVING r PROPOSED 10" - W THICK CONCRETE `;` EjCHIBIT 'B' PAVEMENT / 0 0 L) PROPOSED ASPHALT PRIMROSE CROSSING W. RISINGER ROAD 10PROPOSED SIDEWALK X (BY DEVELOPER) o PROPOSED ADA RAMPS BS X (BY DEVELOPER) 777 MAIN STREET FORT WORTH, TX 76102 LIMITS OF PROJECT PHONE 817-735-6000 FUTURE � PRIMROSE CROSSING PHASE 2 FUTURE PRIMROSE �o�p CROSSING •M FUTURE PRIMROSE CROSSING PHASE 38 oT cn 1� d a SCALE:1" = 400' 0 m FUTURE o PRIMROSE EXISTING v CROSSING PRIMROSE CROSSING N FUTURE 4e 3 PRIMROSE v CROSSING h a � U L X W Q -----------L W ITU O O Q' Ol O • C .N STREET SIGNS LEGEND EXHIBIT 'C1' 00 g PROPOSED STREET SIGN p EXISTING STREET SIGN PRIMROSE CROSSING W. RISINGER ROAD Ln LIMITS OF PROJECT 0, JACOBS 0 Y 777 MAIN STREET 3 FORT WORTH, TX 76102 o PHONE 817-735-6000 J N FUTURE PRIMROSE CROSSING PHASE 2 FUTURE PRIMROSE R0 CROSSING FUTURE PRIMROSE CROSSING PHASE 36 ((N)) a SCALE:1" = 400' m 2 FUTURE o PRIMROSE EXISTING CROSSING PRIMROSE CROSSING m FUTURE ° PRIMROSE h CROSSING 3' U N i L X W U O O d D• C .N STREET LIGHTS LEGEND EXHIBIT 'C' 00 04 aPROPOSED SINGLE STREET LIGHT . +�I PRIMROSE CROSSING EXISTING SINGLE STREET LIGHT W. RISINGER ROAD 0 LIMITS OF PROJECT a 0 BS 0 x 777 MAIN STREET FORT WORTH, TX 76102 o PHONE 817-735-6000 J