HomeMy WebLinkAboutContract 47767 CITY SF.CItETAW CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: LRIC Champions Center,LP Address, State,Zip Code: 4311 Oak Lawn, Suite 370,Dallas TX 75219 Phone& Email: 214-307-1000; steve.lipscomb@LRICRE.com Authorized Signatory,Title: Steve Lipscomb Project Name and Brief Champions Center Retail Description: Project Location: SW Comer of III 35W and SH 114 Plat Case Number: FP-15-080 Plat Name: Champions Circle Addition Mapsco: Council District: City Project Number: 100010 CFA Number: 2016-011 DOE Number: <N/A> To be completed by yy: Received by: Date: 3 RECEIVED MAY 11 2W City of Fort Worth,Texas OFFICIAL RECORD C[TYOFFORT WORTH Standard Community Facilities Agreement CITY SECRETARY CUSMETARY CFA Official Release Date: 10.07.2015 Page 1 of 11 FT.WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, LRIC Champions Center, LP, ("Developer'), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Champions Center Retail ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ❑, Storm Drain (B-1) 0, Street Lights & Signs (C) a. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth;Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Champions Center Retail CFA No.: 2016-011 DOE No.: N/A An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction $ 212,229.00 2.Sewer Construction $ 77,459.00 Water and Sewer Construction Total $ 289,688.00 B. TPW Construction 1_Street 2.Storm Drain 3.Street Lights Installed by Developer 4. Signals $ TPW Construction Cost Total $ - Total Construction Cost(excluding the fees): $ 289,688.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,793.76 D. Water/Sewer Material Testing Fee(2%) $ 5,793.76 Sub-Total for Water Construction Fees $ 11,587.52 E. TPW Inspection Fee(4%) $ - F. TPW Material Testing(2%) $ - G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ - Total Construction Fees: $ 11,587.52 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 289 688.00 Completion Agreement=100%/Holds Plat $ 289,688.00 Cash Escrow Water/Sanitary Sewer-125% $ 362,110.00 Cash Escrow Paving/Storm Drain=125% $ - Letter of Credit=125%w/2yr expiration period $ 362,110.00 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER LRIC Champions Center,LP Jesus J. Chapa Assistant City Manager Name: Steve Lipscomb '�� Title: Founder and Principal Date: !► Date: 7 Recommended by: ATTEST: (Only if required by Developer) Wendy Chi- abulal, EMBA,P.E. Development Engineering Manager Signature Water Department Name: FO Douglas W. Wiersig, P.E. '' �t Director 0 Transportation&Public Works Department $ y a� ` Approved as to Form &Legality: ATTEST: � Q11"Okm UT'T11-Gk Mary J. K Assistant City Attorney City Secretary M&C No. Nii4 Date: Si to t i k Fid mi 5 �ci ?ts. �w► : a�/}" OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 FT.WORTH,TX Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map © Exhibit A: Water Improvments ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100010 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 2/16/2016 COMMUNITY FACILITIES AGREEMENT BURY#: Rou27i8-30001 COST ESTIMATE CITY#:02589 FOR CHAMPIONS CENTER BID ITEM DESCRIPTION UNIT APPROX, UNIT TOTAL NO. QUANTITY PRICE AMOUNT A. WATER DISTRIBUTION SYSTEM 33u.000l DUCTILE IRON WTR FITTINGS WJ RESTRAINTS TON 13.6o $2,000.00 $27,200.00 3312.2203 2"WATER SERVICE EA 8 $950.00 $7,600.00 33u.o161 6"P.V.C.WATERLINE LF 205 $30.00 $6,15o.00 3311.o261 8"P.V.C.WATERLINE LF 45 $40.00 $1,800.00 33u.o461 t2"P.V.C.WATERLINE LF 2,234 $50.00 $114700.00 3312.3002 6"GATE VALVE&BOX EA u $1,000.00 $11,000.00 33M3003 8"GATE VALVE&BOX EA 2 $1,500.00 $3,000.00 33m3oo5 12"GATE VALVE&BOX EA 6 $2,000.00 $12,000,00 3311.o442 12"WATER PIPE,CSS BACKFILL LF 16o $40.00 $6,400.00 3305.1103 2o"ENCASEMENT BY OPEN CUT LF 8o $145.00 $11,600.o0 3312.0117 CONNECT TO EX.12"WATER LINE EA 2 $2,000.00 $4,000.00 3312.0001 FIRE HYDRANT ASSEMBLY EA 3 $2,500.00 $7,500.00 33os.olog TRENCH SAFETY LF 2,279 $1.00 $2,379.00 SUN - TOTAL WATER DISTRIBUTION SYSTEM $212,229.00 B SANITARY SEWER SYSTEM 3331.4nS 6"P.V.0 PIPE LF 16o $17.00 $2,720.00 3331.4208 8"P.V.0 PIPE LF 1,647 $20.00 $32.940.00 3339.1oo3 EXTRA DEPTH MH(>8') VF 13 $250.00 $3,250.00 3339.1oo1 4'MANHOLE EA 5 $4,250.00 $21,250.00 3339•0003 WASTEWATER ACCESS CHAMBER EA 8 $350.00 $2,800.00 9999.0002 CONNET TO EXIST.S.S.MH EA 1 $3,710.00 $3,710.00 3331.4u6 8"P.V.C.SEWER PIPE,CSS BACKFILL LF 16o $40.00 $6,400.00 33o5.01o9 TRENCH SAFETY LF 1,807 $1.00 $1,807.00 33o1.o1o1 MANHOLE VACUUM TESTING EA 5 $155.00 $775.00 3301.0002 POST-CCTV INSPECTION LF 1,807 $1.00 $1,807.00 SUR - TOTAL SANITARY SEWER SYSTEM $77.459.00 S U M M A R Y A.WATER DISTRIBUTION SYSTEM $212,229.00 B.SANITARY SEWER SYSTEM $77.459.00 TOTAL ESTIMATED CONSTRUCTION COST $289,688•oo NOTES: This estimate was prepared without the benefit of City meetings. Private Improvements not included in this estimate. This estimate does not include required fees. This estimate does not include environmental reports or wetlands determinations. BURY1 2016-02-i6 Champions Center CFA Cost Estimate l-i >r CL CA Flory Cir 4��1 0 lill. 1t4 �1 m f a , PROJECT LOCATION o _ ZO BUCEES BLVD. IL d 0 J . i CtWvv*k Apar rth . "e< It. 00 / Io 0 1000 2000 1 "=1000' BURY CHAMPIONS CIRCLE RETAIL DEVELOPMENT T"'Wrlh,T-7102 FT. WORTH, TEXAS VICINITY MAP Furl Worth,Teeee 73102 T«.(817)887-4104 Fn(317)881-4001 TSwrim&m 013 7BR33F•10107l02 CapyridRO 73 WATER LINE IMPROVEMENTS A DATE: 11-2312015 1 SCALE: 1-=1000' DRAWN BY: AAI I FILE:F:\0109284\30003\EXHIBITS\MC.. PROJECT No. R0109284-30003 STATE HIGHWAY 114 X. 12" WATER MAIN -- -t--- .__. y-- ----i------- ----i I I � I I I M u I l l I ><.s ucowmw a I iFrApow I N. I a I to u iKIt7M1a v EXISTING 5 it FM - I i WADI LME C9 FIRE HYDRANT I I I I EX, 12" I Y. 11 �"rf LATERAL I I �• D. I _ - MLA 4-t LATERALS M LATERALS u J Gj XISTING LOT 1, BLOC II / a I 1 1 / / I 12" STUB OUT, 4" IRRI AT10,1 t*� IIZI I • WATER LME f al 4-!u l/1 1 STUB W/ METER LOCA IPN t O 1!'WATER /1 G.I WATER LME If If XISTING LOT 1, BLOCK 5 II 6" DOMESTIC STUB , r I • TO I f / W/ METER LOCATION VI I LATERAL WATER LINE 1 k. 12 WATER MAIN / / EXISTING 1 FIRE HYDRANTS/ / X. 12" WATER / --.___— - ------ - ----.._. - ---- MAIN r c Ewsnac LATERAL I I ''� FIRE HYDRANT I kX. 12" LATERAL C- // I / 400 800 I I 1 , '�.` /�/ ��' \� / 1 M j I II XISTING 12 E%. B I I DOMESTIC 1 1 EX. 12" LATERAL y \ LATERAL I 1 1 FIRE HYDRANT ExIST 12° \ATER I I j 1 11 � — I \ J_II 11 / LEGEND / Exlsrw ` 12--\ J FIRE HYDRANT �,EXI TING 12" I c l 1 1 DOME I I xlsrlNc 1z' I 1 / -w 24'°- EXISTING WATER LINE OUTLET BLVD. __ DOMESTIC -tea! // EXISTING FIRE HYDRANT -W 12`- PROPOSED WATER LINE 01-12 _,- _-� -- 11 // PROPOSED FIRE HYDRANT BURY URY CHAMPIONS CIRCLE RETAIL DEVELOPMENT Tn Wo Tom.781 eozamwa Fon ou" FT. WORTH TEXAS EXHIBIT W Woo, Tn7e+ . T.I.(e17)ee7dt04Fu(e17)ee14W1 WATER EXHIBIT TBPEFF-10.e TBPLeeF-101o7eos coPynpn o xo+e WATER LINE IMPROVEMENTS DAZE: 11-23-2DI8 I SCALE 1--4W DRANK Ert, AN Fm F.\010IMe4\30003\E%4m1S\w_..r PR"CT No. 80100204-300Q3 STATE HIGHWAY 114 _ _ I _ -Ex15TIN — — — — - -) WASTEWATER-- Y -- - - — — — & MANHOLE ✓7 — _—y --- .—'�----..— f-- -' ---b--- tt•— — E.. . ._-- spa. —as ai— »at••_�aar I i I I II I II I I YYASTRYIIA I WAS'1lWATSR I it I, +T I I I ` ( i J I I yrA1TEW m ;I 1 I / am OUTS 1 j $TUN IT WW O WWW 'r' EXISTING S' ASTEWA WASTEWATER WASTEWA I I I 1 _ Lm MANHOLE l I I 11-1:3 MANHOLE k ( I I �•uTj WASTEWA 11 WA�EWA 1 8' STI18O1T I If STUS OUTS WASTlMIA �,Aa sf r 1 MAIMIDLIT i MANN / 01 E a 11 �'u►TERALe J J EXISTING !'a•LATERALS STUB OUTS 1 1 SOUS OUTS J J WASTEWATER EXISTING STUSOUTS I I 1/ MANHOLE —I / EXISTING WASTEWATER MANHOLE EXISTING I I /// ,O WASTEWATER WASTEWATER \ 8' STUBOUT II f// �� MANHOLE Q" /�// •7 tic EXISTIN WASTEWATER L . MANHOLE I EDCMVD._ 11 �.gip ilj J 0 400 800 800 1 { r 4W# EXISTIN I WASTEWATER I II l l ! 8' STUBOUT EXISTING 8" I�Gt II WASTEWATER �• 1 / MANHOLE It % ml I al I III I ExlsnNc i/ � I I WASTEWATER EXISTING 8" EXISTING EXISTING 8" MANHOLE WASTEWATER I i LEGEND / J WASTEWATER WASTEWATER „ MANHOLE I I -55 24'— EXISTING WASTEWATER LINE k MANHOLE otmET BLVD. MANHOLE ® ® EXISTING WASTEWATER MH PROPOSED WASTEWATER LINE HIIf " /� / � O PROPOSED WASTEWATER MH BURY CHAMPIONS CIRCLE RETAIL DEVELOPMENT FoltWOO,"..7010Suft °° FT. WORTH, TEXAS EXHIBIT 'B' Fon Wath,T•u•7l1C! T•L WASTEWATER EXHIBIT TBPEoFTBPLBIF•tOtOT�OI c•tanOna20ta WASTEWATER LINE IMPROVEMENTS zo DATE: 11-23-2018 SCALE 1--W DRAIMI B11 M FILE F'\010N"\0WW\PQ11"\W—. PWZCT No. R0 IMI%-30003