HomeMy WebLinkAboutOrdinance 18021-03-2008ORDINANCE NO. 18021-03-2008
AN ORDINANCE BY THE CITY COUNCIL OF THE CITY OF FORT
WORTH, APPROVING RESOLUTION NO. 2007-10-269 OF THE
DALLAS-FORT WORTH INTERNATIONAL AIRPORT BOARD WFIICH
AIVIENDS THE DALLAS-FORT WORTH INTERNATIONAL AIRPORT
BOARD'S CONSTRUCTION AND FIRE PREVENTION STANDARDS
RESOLUTION (ADOPTED BY RESOLUTION NO. 88-147, AS
AMENDED); PROVIDING FOR A FINE NOT TO EXCEED TWO
THOUSAND DOLLARS 02,000) PER DAY FOR ANY VIOLATION
THEREOF; PROVH)ING A SAVINGS CLAUSE; PROVIDING A
SEVERABILITY CLAUSE; PROVIDING FOR PUBLICATION IN THE
OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE
WI~REAS, Section 8.F of the Contract and Agreement, as amended, between the City
of Fort Worth, and the City of Dallas, Texas, provides that the Dallas-Fort Worth International
Airport Board shall have the power, by a duly adopted order, to adopt and enforce rules and
regulations for the orderly, safe, efficient and sanitary operation of the Airport; and
WHEREAS, Sections 22.082 of the Texas Transportation Code, Chapter 22, Subchapter
D and Section 8.F of the 1968 Contract and Agreement, as amended, provide that such orders by
the Dallas-Fort Worth International Airport Board shall become effective only upon approval of
the governing bodies of the Cities of Fort Worth and Dallas and proper publication; and
WHEREAS, pursuant to the foregoing, the Dallas-Fort Worth International Airport
Board adopted the Construction and Fire Prevention Standards Resolution No. 88-147, as
amended by Resolutions No. 2006-03-068 and 2006-06-207, which establishes standards for
construction and fire prevention to protect the health, safety and welfare of the public; and
WHEREAS, in accordance with Section 3 of Chapter 9 of the Code of Rules and
Regulations of the Dallas-Fort Worth International Airport Board, as amended, the Airport Board
has requested that the City Councils of the Cities of Fort Worth and Dallas approve its said
Resolution No. 2007-10-269 in order that it may become effective;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH TEXAS:
SECTION 1.
That all of the declarations and findings contained in the preamble of this ordinance are
made a part hereof and shall be fully effective as part of the ordained subject matter of this
ordinance.
SECTION 2.
That Resolution No. 2007-10-269 of the Dallas-Fort Worth International Airport Board, a
duly certified copy of which is attached hereto as Exhibit "A" and is made a part of this
ordinance by reference, is hereby approved.
SECTION 3.
That after publication of a substantive statement relating to the contents of Resolution
No. 2007-10-269 of the Dallas-Fort Worth International Airport Board in a newspaper of general
circulation in each of the counties of Tarrant and Dallas, stating that a breach of any provision of
Resolution No. 2007-10-269 will subject the violator to a penalty, and stating that the full text of
Resolution No. 2007-10-269 and any attachments to it are on file in the principal office of the
Airport Board to be read by any interested party. Resolution No. 2007-10-269 shall thereafter
have the same force and effect within the boundaries of the Dallas-Fort Worth International
Airport as an ordinance by the City Council of the City of Fort Worth would have in the City of
2
Fort Worth, and the penalty shall be enforced in the same manner in which penalties prescribed
by other ordinances of the City of Fort Worth are enforced.
SECTION 4.
That the sections, paragraphs, sentences, clauses and phrases of this ordinance and
Resolution No. 2007-10-269 are severable, and if any phrase, clause, sentence, paragraph or
section shall be declared unconstitutional or invalid by the valid judgment or decree of any court
of competent jurisdiction, the unconstitutionality or invalidity shall not affect any of the
remaining phrases, clauses, sentences, paragraphs, and sections of this ordinance or Resolution
No. 2007-10-269, since the same would have been enacted without the incorporation of any
unconstitutional phrase, clause, sentence, paragraph, or section.
SECTION 5.
Any person, firm or corporation who violates, disobeys, omits, neglects or refuses to
comply with or who resists the enforcement of any of the provisions of this ordinance or
Resolution No. 2007-10-269 shall be fined not more than Five Hundred Dollars ($500.00) or
more than Two Thousand Dollars ($2000.00) for each offense relating to fire safety, public
health and sanitation, or the dumping of refuse. Each day that a violation is permitted to exist
shall constitute a separate offense.
SECTION 6.
All rights and remedies of the City of Fort Worth, Texas, are expressly saved as to any
and all violations of the provisions of any other ordinances affecting the Code of Rules and
Regulations of the Dallas-Fort Worth International Airport Board which have accrued at the time
of the effective date of this ordinance; and, as to such accrued violations and all pending
3
litigation, both civil and criminal, whether pending in court or not, under such ordinances, same
shall not be affected by this ordinance but may be prosecuted until final disposition by the courts.
SECTION 7.
That the City Secretary of the City of Fort Worth, Texas is hereby directed to publish the
caption, penalty clause and effective date of this ordinance for two days in the official newspaper
of the City of Fort Worth, Texas, as authorized by Texas Local Government Code, Section
52.013.
SECTION 8.
That this ordinance shall take effect immediately from and after its passage and
publication as required by law, in accordance with the provisions of the Charter of the City of
Fort Worth, and it is accordingly so ordained.
APPRO~D AS TO EO LEGALITY:
By:
Assistant City Attorney
Date: ~ ~o~, ~~
Adopted: March 25 2008
Effective: l~'n t',l'~.. ;J~ D~
4
Cif ®f F®~f ~/®h, 7"exas
Mayor and Council Communication
COUNCIL ACTION: Approved on 3/25/2008 -Ord. No. # 18021-03-2008
DATE: Tuesday, March 25, 2008
LOG NAME: 12DFWCONS&F108 REFERENCE NO.: **G-16083
SUBJECT:
Adopt Ordinance Approving Dallas/Fort Worth International Airport Board Resolution 2007-10-269,
Amending the Construction and Fire Prevention Standards by Amending Part Nine -Oil and Gas
Exploration and Production and Adopting Certain 2006 International Code Council Model Codes and
the 2005 National Electrical Code
RECOMMENDATION:
It is recommended that the City Council adopt the attached ordinance approving Dallas/Fort Worth
International Airport Board (Airport Board) Resolution 2007-10-269, which amends Airport Board Resolution
88-147, Construction and Fire Prevention Standards (Standards).
DISCUSSION:
At its meeting on October 4, 2007, the Airport Board approved amendments to the Construction and Fire
Prevention Standards to adopt the following model codes, with local amendments:
2006 International Building Code
2006 International Fire Code
2005 National Electrical Code
2006 ICC Electrical Code Administrative Provisions
2006 International Mechanical Code
2006 International Plumbing Code
2006 International Fuel Gas Code
2006 International Energy Conservation Code.
In addition, Part Nine -Oil and Gas Exploration and production is amended to include various technical
clarifications. The most significant change clarifies the appropriate setbacks for tank batteries, separators
and their associated flares from buildings not associated with drilling operations and buildings containing
flammable materials. Buildings with occupant loads of three or fewer are not subject to the setback
requirements to allow guard shacks and similar uses adjacent to these sites. This change should reduce the
number of applications for variance requests to the Variance Resolution Committee since they have
consistently been approved.
Both state law and the 1968 Contract and Agreement between the cities of Fort Worth and Dallas require
that amendments to the Airport Board's resolutions must be approved by the Councils of both cities. The
City of Dallas approved these amendments on February 13, 2008 at a regularly scheduled meeting.
The Airport Board first adopted Construction and Fire Prevention Standards Resolution No. 880147 on June
7, 1988, in order to establish standards for construction and fire prevention to protect the health, safety, and
welfare of the public. Standards for oil and gas exploration were not included in the original adoption. Part
Nine-Oil and Gas Exploration and Production was adopted by the Airport Board in Resolution No. 2006-
Logname: 12DFWCONSFI08 Page 1 of 2
03-068 on March 6, 2003.
The resolution approved by the Airport Board is in furtherance of the Strategic Imperative of the Airport
Board to create a safe environment for the airport's employees, tenants, and guests.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that this action will have no material effect on City funds.
TO Fund/AccountlCenters
FROM Fund/Account/Centers
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
Tom Higgins (Acting) (6192)
David Yett (7623)
Charlene Sanders (7611)
Logname: 12DFWCONSFI08 Page 2 of 2
EXHIBIT A
DALLAS-FORT WORTH INTERNATIONAL AIRPORT
CONSTRUCTION AND FIRE PREVENTION STANDARDS RESOLUTION
AND
AMENDMENTS TO THE CODES
October 2007
TABLE OF COiVTENTS
PART ONE --CONSTRUCTION AND FIRE PREVENTION STANDARDS RESOLUTION ...........................................1
SECTION 1 TITLE .........................................................................................................................................................1
SECTION 2 PURPOSE ................................................................................................................................................ .1
SECTION 3 CREATION OF BOARD OF APPEALS (BOA) ........................................................................................... .2
SECTION 4 COMPOSITION OF BOA .......................................................................................................................... .2
SECTION 5 EX-OFFICIO MEMBERS ........................................................................................................................... .4
SECTION 6 MEETINGS: QUORUM ............................................................................................................................. .4
SECTION 7 BYLAWS AND RECORDS ........................................................................................................................ .5
SECTION 8 AUTHORITY AND POWER ...................................................................................................................... .5
SECTION 9 RIGHT OF APPEAL .................................................................................................................................. .6
SECTION 10 AGENDAAND RECORDS ...................................................................................................................... .6
SECTION 11 HEARING ................................................................................................................................................ .6
SECTION 12 STAY OF PROCEEDINGS ...................................................................................................................... .6
SECTION 13 2006 INTERNATIONAL BUILDING CODE ADOPTED ............................................................................ .7
SECTION 14 2006 INTERNATIONAL FIRE CODE ADOPTED ................................................................................... ..7
SECTION 15 2005 NATIONAL ELECTRICAL CODE ADOPTED ................................................................................ ..7
SECTION 16 2006 INTERNATIONAL MECHANICAL CODE ADOPTED .................................................................... ..7
SECTION 17 2006 INTERNATIONAL PLUMBING CODE ADOPTED ......................................................................... ..7
SECTION 18 2006 INTERNATIONAL FUEL GAS CODE ADOPTED .......................................................................... ..8
SECTION 19 2006 INTERNATIONAL ENERGY CONSERVATION CODE ADOPTED ............................................... ..8
SECTION 20 REQUIRED PERMITS ........................................................................................................................... ..8
SECTION 21 REQUIRED FEES .................................................................................................................................. ..9
SECTION 22 LICENSES REQUIRED .....................:................................................................................................... ..9
SECTION 23 ENFORCEMENT ................................................................................................................................... ..9
SECTION 24 SPECIAL ENACTMENT ......................................................................................................................... 10
SECTION 25 CONFLICTING PROVISIONS ................................................................................................................ 10
SECTION 26 SEVERABILITY CLAUSE ...................................................................................................................... 10
SECTION 27 PENAL CLAUSE .................................................................................................................................... 10
SECTION 28 SAVINGS CLAUSE ................................................................................................................................ 11
SECTION 29 PUBLICATION ....................................................................................................................................... 11
SECTION 30 EFFECTIVE DATE ................................................................................................................................. 11
PART TWO -BUILDING CODE AMENDMENTS .........................................................................................................1
SECTION 101.1 TITLE .................................................................................................................................................. 1
SECTION 101.4 REFERENCED CODES ...................................................................................................................... 1
SECTION 102.6 EXISTING STRUCTURES .................................................................................................................. 1
SECTION 103 DEPARTMENT OF BUILDING SAFETY ................................................................................................ 2
SECTION 105 PERMITS ............................................................................................................................................... 2
SECTION 105.2 WORK EXEMPT FROM PERMIT ........................................................................................................ 2
SECTION 106.1 SUBMITTAL DOCUMENTS ................................................................................................................ 4
SECTION 106.3.1 APPROVAL OF CONSTRUCTION DOCUMENTS ........................................................................... 4
SECTION 108 FEES ..................................................................................................................................................... 4
SECTION 110.2 CERTIFICATE ISSUED ...................................................................................................................... 6
SECTION 112 BOARD OF APPEALS ........................................................................................................................... 6
SECTION 113.4 VIOLATION PENALTIES .................................................................................................................... 6
SECTION 202 DEFINITIONS ........................................................................................................................................ 7
SECTION 403.1 APPLICABILITY FOR HIGH-RISE BUILDINGS .................................................................................. 7
SECTION 412.6 FUELING RAMP DRAINAGE AND AIRCRAFT LOADING WALKWAYS ............................................ 8
SECTION 412.7 FIXED GUIDEWAY TRANSIT SYSTEMS ........................................................................................... 8
SECTION 903.2 AUTOMATIC SPRINKLER SYSTEMS -WHERE REQUIRED ............................................................ 9
SECTION 903.2.7.1 AUTOMATIC SPRINKLER SYSTEMS -GROUP R OCCUPANCIES ............................................. 9
SECTION 903.2.10.3 BUILDINGS 55 FEET OR MORE IN HEIGHT .............................................................................. 9
TOC
SECTION 903.2.10.4 HIGH-PILED COMBUSTIBLE STORAGE ...................................................................................9
SECTION 903.2.10.5 SPRAY BOOTHS AND ROOMS ............................................................................................... 10
SECTION 903.2.10.6 BUILDING AREAS EXCEEDING 6,000 SQUARE FEET ........................................................... 10
SECTION 903.2.10.7 SELF-SERVICE STORAGE FACILITY ..................................................................................... 10
SECTION 907.2 FIRE ALARM AND DETECTION SYSTEMS -WHERE REQUIRED ................................................. 10
SECTION 907.2.1.1 FIRE ALARM ACTIVATION - GROUP A OCCUPANCIES .......................................................... 11
SECTION 907.2.12 HIGH-RISE BUILDINGS -FIRE ALARM SYSTEM ...................................................................... 11
SECTION 907.3 MANUAL FIRE ALARM BOXES ........................................................................................................ 12
SECTION 907.3.1 MANUAL FIRE ALARM BOXES -LOCATION ............................................................................... 12
SECTION 907.8.2 HIGH-RISE BUILDINGS -FIRE ALARM ZONES .......................................................................... 12
SECTION 1003.5 ELEVATION CHANGE .................................................................................................................... 12
SECTION 1004.3 POSTING OF OCCUPANT LOAD ................................................................................................... 13
SECTION 1020.1.7 SMOKEPROOF ENCLOSURES .................................................................................................. 13
CHAPTER 11 ACCESSIBILITY ................................................................................................................................... 13
CHAPTER 29 PLUMBING SYSTEMS ......................................................................................................................... 14
SECTION 3002.4 ELEVATOR CAR TO ACCOMMODATE AMBULANCE STRETCHER ............................................. 14
CHAPTER 35 REFERENCED STANDARDS .............................................................................................................. 14
ADOPTION OF APPENDIX CHAPTER H SIGNS ......................................................................................................... 15
SECTION H -101.2 SIGNS EXEMPT FROM PERMITS ............................................................................................... 15
SECTION H105.2 PERMITS, DRAWINGS AND SPECIFICATIONS FOR SIGNS ....................................................... 15
PART THREE -FIRE CODE AMENDMENTS ................................................................................................................1
SECTION 101.1 TITLE .................................................................................................................................................1
SECTION 102.6 REFERENCED CODES AND STANDARDS ...................................................................................... .1
SECTION 103.1 DEPARTMENT OF FIRE PREVENTION ............................................................................................ .1
SECTION 105.4.1 CONSTRUCTION DOCUMENTS-SUBMITTALS .......................................................................... .1
SECTION 105.6.7 COMBUSTIBLE DUST-PRODUCING OPERATIONS ..................................................................... .2
SECTION 105.6.18 FRUITAND CROP RIPENING ...................................................................................................... .2
SECTION 105.6.30 OPEN BURNING .......................................................................................................................... .2
SECTION 105.6.33 ORGANIC COATINGS .................................................................................................................. .2
SECTION 105.6.37 PYROXYLIN PLASTICS ............................................................................................................... .2
SECTION 107.2.2 REINSPECTION AND TESTING .................................................................................................... .3
SECTION 108 BOARD OF APPEALS ........................................................................................................................... . 3
SECTION 109.3 VIOLATION PENALTIES ................................................................................................................... .3
SECTION 202 DEFINITIONS ....................................................................................................................................... .3
SECTION 307.4.1 BONFIRES ..................................................................................................................................... .4
SECTION 503.1.1 FIRE APPARATUS ACCESS ROADS-BUILDINGSAND FACILITIES ......................................... .4
SECTION 503.2.1 FIRE APPARATUS ACCESS ROADS -DIMENSIONS .................................................................. .4
SECTION 508.5.1 FIRE HYDRANT SYSTEMS -WHERE REQUIRED ....................................................................... .5
SECTION 704.1 FLOOR OPENINGS AND SHAFTS .................................................................................................... .5
SECTION 903.2 AUTOMATIC SPRINKLER SYSTEMS -WHERE REQUIRED .......................................................... .5
SECTION 903.2.7.1 GROUP R ..................................................................................................................................... .5
SECTION 903.2.10.3 BUILDINGS 55 FEET OR MORE IN HEIGHT ............................................................................. .5
SECTION 903.2.10.4 HIGH-PILED COMBUSTIBLE STORAGE .................................................................................. .6
SECTION 903.2.10.5 SPRAY BOOTHS AND ROOMS ................................................................................................ .6
SECTION 903.2.10.6 BUILDINGS WITH A FLOOR AREA EXCEEDING 6,000 SQUARE FEET .................................. .6
SECTION 903.2.14 SELF-SERVICE STORAGE FACILITY ........................................................................................ ..7
SECTION 905.2 STANDPIPE SYSTEMS -INSTALLATION STANDARD ................................................................... ..7
SECTION 907.2 FIRE ALARM AND DETECTION SYSTEMS-WHERE REQUIRED ................................................. ..7
SECTION 907.2.1.1 FIRE ALARM ACTIVATION - GROUP A OCCUPANCIES .......................................................... ..8
SECTION 907.2.12 HIGH-RISE BUILDINGS .............................................................................................................. ..8
SECTION 907.4 MANUAL FIRE ALARM BOXES ........................................................................................................ ..8
SECTION 907.4.1 MANUAL FIRE ALARM BOXES -LOCATION ............................................................................... ..9
SECTION 907.9.2 FIRE ALARM ZONES-HIGH-RISE BUILDINGS .......................................................................... ..9
SECTION 1003.5 ELEVATION CHANGE .................................................................................................................... ..9
SECTION 1004.3 POSTING OF OCCUPANT LOAD ................................................................................................... 10
SECTION 1020.1.7 SMOKEPROOF ENCLOSURES .................................................................................................. 10
SECTION 2705.1.8 HAZARDOUS MATERIALS- FIRE EXTINGUISHING SYSTEMS ............................................... 10
SECTION 3301 EXPLOSIVES AND FIREWORKS -GENERAL ................................................................................. 10
SECTION 3301.2.4 FINANCIAL RESPONSIBILITY ..................................................................................................... 11
SECTION 3406.3.1.3.3 NATURAL GAS PIPELINE SETBAGK FROM BUILDINGS .................................................... 11
TOC
2
SECTION 3703.2.5 OUTDOOR STORAGE AND WEATHER PROTECTION .............................................................11
CHAPTER 45 REFERENCED STANDARDS ..............................................................................................................11
ADOPTION OF APPENDIX CHAPTERS ......................................................................................................................11
PART FOUR -ELECTRICAL CODE AMENDMENTS ...................................................................................................1
SECTION 101.1 TITLE ..................................................................................................................................................1
SECTION 301.1 CREATION OF ENFORCEMENT AGENCY ........................................................................................1
SECTION 404.2 SCHEDULE OF PERMIT FEES ..........................................................................................................1
SECTION 501.1 SUBMITTAL DOCUMENTS ................................................................................................................1
SECTION 1003.1 PENALTIES .................................:.....................................................................................................2
CHAPTER 11 MEANS OF APPEAL ..............................................................................................................................2
NEC SECTION 230.71(A) MAXIMUM NUMBER OF DISCONNECTS -GENERAL ......................................................2
NEC SECTION 300.11(A) SECURED IN PLACE ..........................................................................................................2
PART FIVE -MECHANICAL CODE AMENDMENTS ....................................................................................................1
SECTION 101.1 TITLE ..................................................................................................................................................1
SECTION 103.1 DEPARTMENT OF MECHANICAL INSPECTION -GENERAL ..........................................................1
SECTION 106.3.1 CONSTRUCTION DOCUMENTS ....................................................................................................1
SECTION 106.5.2 FEE SCHEDULE .............................................................................................................................1
SECTION 106.5.3 FEE REFUNDS ................................................................................................................................2
SECTION 108.4 VIOLATION PENALTIES ....................................................................................................................2
SECTION 109 MEANS OF APPEAL ..............................................................................................................................2
PART SIX -PLUMBING CODE AMENDMENTS ...........................................................................................................1
SECTION 101.1 TITLE ..................................................................................................................................................1
SECTION 103.1 DEPARTMENT OF PLUMBING INSPECTION -GENERAL ...............................................................1
SECTION 106.3.1 CONSTRUCTION DOCUMENTS ....................................................................................................1
SECTION 106.6.2 FEE SCHEDULE .............................................................................................................................1
SECTION 106.6.3 FEE REFUNDS ................................................................................................................................2
SECTION 108.4 VIOLATION PENALTIES ....................................................................................................................2
SECTION 109 MEANS OF APPEAL ...............................................................................................................................2
SECTION 312.9 INSPECTION AND TESTING OF BACKFLOW PREVENTION ASSEMBLIES ...................................2
TABLE 403.1 MINIMUM NUMBER OF PLUMBING FACILITIES ...................................................................................2
SECTION 404 ACCESSIBLE PLUMBING FACILITIES .................................................................................................3
SECTION 1106.1 CONDUCTORS, LEADERS AND STORM DRAINS ..........................................................................3
SECTION 1108 COMBINED SANITARYAND STORM SYSTEM ..................................................................................3
PART SEVEN -FUEL GAS CODE AMENDMENTS ......................................................................................................1
SECTION 101.1 TITLE ..................................................................................................................................................1
SECTION 103.1 DEPARTMENT OFINSPECTION -GENERAL ..................................................................................1
SECTION 106.3.1 CONSTRUCTION DOCUMENTS ....................................................................................................1
SECTION 106.5.2 FEE SCHEDULE .............................................................................................................................1
SECTION 106.5.3 FEE REFUNDS ................................................................................................................................2
SECTION 108.4 VIOLATION PENALTIES ....................................................................................................................2
SECTION 109 MEANS OF APPEAL ..............................................................................................................................2
PART EIGHT -ENERGY CODE AMENDMENTS ..........................................................................................................1
SECTION 101.1 TITLE ...................................................................................................................................................1
TOC
3
SECTION 101.1.1 DEPARTMENT OFINSPECTION -GENERAL ............................................................................... 1
SECTION 101.2 SCOPE ............................................................................................................................................... 1
SECTION 101.4.5 MIXED OCCUPANCY ................:..................................................................................................... 1
SECTION 101.5 COMPLIANCE .................................................................................................................................... 1
SECTION 104.1 CONSTRUCTION DOCUMENTS -GENERAL .................................................................................... 2
SECTION 108 FEE SCHEDULE ................................................................................................................................... 2
SECTION 109 FEE REFUNDS ...................................................................................................................................... 2
SECTION 110 VIOLATION PENALTIES ...................................................................................................................... 2
SECTION 111 MEANS OF APPEAL .............................................................................................................................. 2
CHAPTER2 DEFINITIONS ........................................................................................................................................... 3
CHAPTER 4 RESIDENTIAL ENERGY EFFICIENCY .................................................................................................... 3
SECTION 501.3 COMPLIANCE SOFTWARE TOOLS .................................................................................................. 3
SECTION 505.2.1 INTERIOR LIGHTING CONTROLS .................................................................................................. 3
PART NINE -OIL AND GAS EXPLORATION AND PRODUCTION .............................................................................1
SECTION 1 GENERAL INFORMATION ........................................................................................................................1
SECTION2 DEFINITIONS .......................................................................................................................................... ..1
SECTION3 AIRPORTOVERSIGHT ........................................................................................................................... ..4
SECTION 4 OPERATOR'S AGENT ............................................................................................................................ ..5
SECTION 5 SEISMIC SURVEY PERMIT REQUIREMENTS ....................................................................................... ..5
SECTION 6 GAS WELL AND DISPOSAL WELL PERMIT REQUIREMENTS ............................................................. ..5
SECTION 7 PERMIT APPLICATION ........................................................................................................................... ..7
SECTION 8 PERMITTING PROCEDURE ................................................................................................................... ..9
SECTION 9 AMENDED GAS WELL PERMITS ........................................................................................................... 10
SECTION 10 SUSPENSION OR REVOCATION OF WELL PERMITS ........................................................................ 11
SECTION 11 PERIODIC REPORTS ........................................................................................................................... 12
SECTION 12 BOND, LETTERS OF CREDIT, INDEMNITY INSURANCE .................................................................... 12
SECTION 13 SETBACK REQUIREMENTS ................................................................................................................. 15
SECTION 14 ON SITE AND TECHNICAL REGULATIONS ......................................................................................... 16
SECTION 15 SCREENING ......................................................................................................................................... 27
SECTION 16 CLEANUPAND MAINTENANCE ........................................................................................................... 29
SECTION 17 PLUGGED AND ABANDONED WELLS ................................................................................................ 29
SECTION 18 TECHNICAL ADVISOR .......................................................................................................................... 31
SECTION 19 MEANS OF APPEAL .............................................................................................................................. 31
SECTION 20 VARIANCE RESOLUTION COMMITTEE ............................................................................................... 31
SECTION 21 SEVERABILITY CLAUSE ............................................................................................:......................... 33
TOC
4
PART ONE -- CONSTRUCTION AND FIRE PREVENTION STANDARDS
RESOLUTION
A Board Resolution creating the Board of Appeals (BOA) of the Dallas-Fort Worth
International Airport (the Airport); providing for the selection and term of office of
members; providing for public hearings, meetings and procedures therefore; prescribing
the authority and powers of the Board of Appeals; providing for appeal from decisions
of the Building Official and Fire Chief; providing for a stay of proceedings upon appeal;
providing for the adoption of the Building Code; providing for the adoption of the Fire
Code; providing for the adoption of the Electrical Code; providing for the adoption of the
Mechanical Code; providing for the adoption of the Plumbing Code; providing for the
adoption of the Fuel Gas Code; providing for the adoption of the Energy Code;
providing for the regulation of oil and gas exploration and production; making it unlawful
to perform construction work or oil and gas exploration and production without a permit;
making it unlawful to undertake the contracted installation of fire protection, mechanical,
plumbing, irrigation or electrical equipment without a proper license to do such work;
providing for the termination of the Board of Airport Building Code of Appeals; providing
that this resolution shall be cumulative; providing a severability clause; providing a
penal clause; providing a savings clause; providing for publication in pamphlet form;
providing for publication in a newspaper; and providing an effective date.
SECTION 1
TITLE
This resolution shall be known as the Dallas-Fort Worth International Airport
Construction and Fire Prevention Standards Resolution, and referred to herein as (this
Resolution).
SECTION 2
PURPOSE
It is the specific intent of the Dallas-Fort Worth International Airport Board (the Airport
Board) that standards for construction and fire prevention be used for the health, safety
and welfare of all persons at the Airport. The Airport Board finds that construction and
fire prevention standards change from time to time and that these standards should
stay current with modern practices of construction and fire safety. In carrying out these
purposes, it is the intent of the Airport Board that such construction and fire prevention
standards be adopted as outlined herein and that a Board of Appeals (BOA) be given
limited authority over matters pertaining thereto. The scope of the BOA is as set forth
below.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 1
It is the intent of the Airport Board that compliance with the construction and fire
prevention standards contained herein is the responsibility of those persons and
businesses to which they apply; and that neither the BOA nor the Airport Board, its
members, agents and employees, shall be Liable or responsible for any errors or
omissions arising out of the enforcement or failure to enforce these standards.
SECTION 3
CREATION OF BOARD OF APPEALS (BOA)
The Airport Board hereby establishes a Board of Appeals (BOA) for the purpose of
determining the acceptability and adequacy of materials, equipment and methods of
construction and for interpretation of these standards. The Airport Board shall adopt
construction and fire prevention standards, which will be applicable throughout the
Airport. The Construction and Fire Prevention Standards shall include but not be limited
to the Building Code, Fire Code, Electrical Code, Mechanical Code, Plumbing Code,
Fuel Gas Code and Energy Code and Part Nine of this Resolution for Oil and Gas
Exploration and Production as adopted by the Airport Board and amended from time to
time.
SECTION 4
COMPOSITION OF BOA
The BOA shall consist of seven voting members who shall serve without compensation
and shall be selected in the following manner:
Place 1: An architect, registered to practice as an architect in the State of Texas -
The selection of the architect shall be made alternatively by the Dallas
and Fort Worth Chapters of the American Institute of Architects and shall
be confirmed by the Airport Board. The initial term will be filled by a
selection of the Dallas Chapter and will extend from the Airport Board's
confirmation of the selection through December 31, 1990. Thereafter,
terms will be for two years extending from January 1 of odd-numbered
years through December 31 of even-numbered years.
Place 2: An electrical engineer, registered to practice as a professional engineer in
the State of Texas whose practice is or has been the design of electrical
systems for buildings -The selection of the electrical engineer shall be
made. alternatively by the Dallas and Fort Worth Chapters of the Texas
Society of Professional Engineers and shall be confirmed by the Airport
Board. The initial term will be filled by a selection of the Fort Worth
Chapter and will extend from the Airport Board's confirmation of the
selection through December 31, 1990. Thereafter, terms will be for two
years extending from January 1 of odd-numbered years through
December 31 of even-numbered years.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 2
Place 3: A mechanical engineer, registered to practice as a professional engineer
in the State of Texas whose practice is or has been the design of
mechanical systems for buildings -The selection of the mechanical
engineer shall be made alternatively by the Dallas and Fort Worth
Chapters of the Texas Society of Professional Engineers and shall be
confirmed by the Airport Board. The initial term will be filled by a selection
of the Fort Worth Chapter and will extend from the Airport Board's
confirmation of the selection through December 31, 1991. Thereafter,
terms will be for two years extending from January 1 of even-numbered
years through December 31 of odd-numbered years.
Place 4: A structural engineer, registered to practice as a professional engineer in
the State of Texas whose practice is or has been the design of structural
systems for buildings -The selection of the structural engineer shall be
made alternatively by the Dallas and Fort Worth Chapters of the Texas
Society of Professional Engineers and shall be confirmed by the Airport
Board. The initial term will be filled by a selection of the Fort Worth
Chapter and will extend from the Airport Board's confirmation of the
selection through December 31, 1991. Thereafter, terms will be for two
years extending from January 1 of even-numbered years through
December 31 of odd-numbered years.
Place 5: Afire protection specialist -The selection of the fire protection specialist
shall be made by the Dallas/Fort Worth Chapter of the Society of Fire
Protection Engineers and shall be confirmed by the Airport Board. The
initial term will extend from the Airport Board's confirmation of the
selection through December 31, 1991. Thereafter, terms will be for two
years extending from January 1 of even-numbered years through
December 31 of odd-numbered years.
Place 6: A design professional, registered to practice as an architect or as a
professional engineer in the State of Texas, and whose profession relates
to the design of facilities, structures or systems that are constructed -The
selection of the design professional for Place 6 shall be made by the
Dallas Metroplex Alumni Extension Chapter of the National Society of
Black Engineers and shall be confirmed by the Airport Board. The initial
term shall extend from the Airport Board's confirmation of the selection
through December 31, 2005. Thereafter, terms will be for two years
extending from January 1 of even-numbered years through December 31
of odd-numbered years.
Place 7: A design professional registered to practice as an architect or as a
professional engineer in the State of Texas, and whose profession relates
to the design of facilities, structures or systems that are constructed -The
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 3
selection of the design professional for Place 7 shall be made by the
Dallas-Fort Worth Chapter of the Society of Hispanic Professional
Engineers and shall be confirmed by the Airport Board. The initial term
will extend from the Airport Board's confirmation of the selection through
December 31, 2004.* Thereafter, terms will be for two years extending
from January 1 of odd-numbered years through December 31 of even-
numbered years.
There is no limit on the number of terms an individual may serve on the BOA; however,
only in Places 5, 6 and 7 may an individual serve in consecutive terms. Any term
scheduled to end on December 31, shall be automatically extended until a successor
for that place is selected, confirmed, and sworn in.
In the event that any professional organization, designated to select a candidate to fill a
term on the BOA, is unable to make such a selection, and the professional organization
notifies the Building Official that a selection cannot be made, then the Building Official
shall designate the unfilled seat as officially vacant, and it shall remain vacant until the
next scheduled term for that seat.
SECTION 5
EX-OFFICIO MEMBERS
The Building Official and the Fire Chief or their designated representatives shall be ex-
officio non-voting members of the BOA. The BOA may make recommendations
through the Building Official or Fire Chief to the Airport Board for amendments to the
standards accordingly.
The Building Official of the Dallas/Fort Worth International Airport Board is the official in
charge of the Code Compliance Section of the Airport Development and Engineering
Department.
The Director of the Department of Public Safety of the Dallas/Fort Worth International
Airport Board or his designee is hereby designated as the Fire Chief.
SECTION 6
MEETINGS: QUORUM
All meetings of the BOA shall be open to the public except as permitted by law and as
is in the interest of the Airport. Three (3) members of the BOA shall constitute a
quorum to transact business. Every matter before the BOA for vote shall require for
final passage the affirmative vote of a majority of the members present and voting. The
first meeting of the BOA following its appointment shall be at such time and place as
called by the Building Official. Thereafter the BOA shall hold meetings at such time and
place as called by the Chairman or one lawfully acting in that capacity.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 4
SECTION 7
BYLAWS AND RECORDS
At its first meeting the BOA shall elect one of its members as Chairman, and he shall
keep a record of the proceedings and decisions, and a copy of same shall be filed in
the office of the Building Official. Each year thereafter, following the Airport Board's
confirmation of the composition of the BOA, the BOA shall hold an organizational
meeting, at which time it shall elect a Chairman before proceeding to other matters of
business. The BOA shall establish its own rules of procedure and shall amend them
from time to time as it deems necessary. The Building Official shall serve as Secretary
to the BOA.
SECTION 8
AUTHORITY AND POWER
The BOA shall have the authority and power to:
1. Hear appeals on interpretations by the Building Official of the Building Code,
Electrical Code, Mechanical Code, Plumbing Code, Fuel Gas Code and Energy Cade.
The BOA may modify in whole or in part or may affirm the interpretation of the Building
Official. The Building Official shall render a written interpretation within thirty (30) days
of a request by a person who has been aggrieved by a decision of the Building Official.
No interpretations shall be heard by the BOA until the Building Official has rendered a
written interpretation.
2. Hear appeals on interpretations by the Fire Chief of the Fire Code. The BOA
may modify in whole or in part or may affirm the interpretation of the Fire Chief. The
Fire Chief shall render a written interpretation within thirty (30) days of a request by a
person who has been aggrieved by a decision of the Fire Chief. No interpretations shall
be heard by the BOA until the Fire Chief has rendered a written interpretation.
3. Approve alternate methods of construction and fire prevention where it is
impractical to meet the adopted construction and fire prevention standards, provided
that the BOA finds the same degree of suitability, strength, effectiveness, fire
resistance, durability, sanitation and safety exists in the alternate method as intended
by the standards.
4. Approve new methods of construction and fire prevention not covered by the
construction and fire prevention standards, provided that the BOA finds the same
degree of suitability, strength, effectiveness, fire resistance, durability, sanitation and
safety exists in the new method as intended by the standards.
The BOA shall have no power to otherwise limit, modify or change these construction
and fire prevention standards.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 5
SECTION 9
RIGHT OF APPEAL
Any person, firm, company or corporation aggrieved by any decision or order of the
Building Official or Fire Chief may appeal such decision or order to the BOA. Every
appeal must be in writing and must be filed in triplicate with the Building Official within
thirty (30) days from the date of the decision or order appealed from. The BOA shall
not consider any appeal that is filed after the thirty (30) day period. Such appeal shall
contain appropriate reference to the decision or order appealed from, as well as the
grounds for the appeal.
SECTION 10
AGENDA AND RECORDS
The agenda for the BOA shall be prepared by the Building Official and shall be posted
as required by law. All records and evidence pertinent to any appeal shall be
transmitted to the BOA and to the aggrieved party prior to the hearing. Records of all
appeals shall be kept in the office of the Building Official. The Building Official shall
transmit copies of appeal records to the Fire Chief.
SECTION 11
HEARING
The BOA shall fix a reasonable time for the hearing of an appeal and shall give notice
of the hearing in writing to the parties in interest. Parties may appear before the BOA in
person, by agent or by attorney. The BOA shall establish rules for the fair and efficient
conduct of the hearing and the just resolution to an appeal. The BOA shall notify the
appellant of its decision.
SECTION 12
STAY OF PROCEEDINGS
An appeal shall stay all proceedings in connection with the decision or order appealed
from, unless and until the Building Official or Fire Chief shall have certified to the BOA
after notice of appeal has been filed that a stay would cause an unreasonable risk of
harm to life or damage to property. Any work done contrary to the order of the Building
Official or Fire Chief after filing an appeal hereunder, pending the determination of such
appeal, shall be subject to removal or repair should the order be affirmed. The cost of
removal or repair of the work done shall be borne solely by the person, firm, company
or corporation who was responsible for the work without consideration of mitigating or
extenuating circumstances.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 6
SECTION 13
2006 INTERNATIONAL BUILDING CODE ADOPTED
The Building Code of the Dallas-Fort Worth International Airport Board is hereby
revised and amended to conform to the 2006 International Building Code of the
International Code Council, Inc. except as amended by separate exhibit attached
hereto and is hereby adopted as the Building Code and forms a part of the Construction
and Fire Prevention Standards from the effective date hereof.
SECTION 14
2006 INTERNATIONAL FIRE CODE ADOPTED
The Fire Code of the Dallas-Fort Worth International Airport Board is hereby revised
and amended to conform to the 2006 International Fire Code of the International Code
Council, Inc. except as further amended by separate exhibit attached hereto and is
hereby adopted as the Fire Code and forms a part of the Construction and Fire
Prevention Standards from the effective date hereof.
SECTION 15
2005 NATIONAL ELECTRICAL CODE ADOPTED
The Electrical Code of the Dallas-Fort Worth International Airport Board is hereby
revised and amended to conform to the 2005 National Electrical Code of the National
Fire Protection Association and the 2006 ICC Electrical Code Administrative Provisions
of the International Code Council, Inc. except as amended by separate exhibit attached
hereto and together are hereby adopted as the Electrical Code and form a part of the
Construction and Fire Prevention Standards from the effective date hereof.
SECTION 16
2006 INTERNATIONAL MECHANICAL CODE ADOPTED
The Mechanical Code of the Dallas-Fort Worth International Airport Board is hereby
revised and amended to conform to the 2006 International Mechanical Code of the
International Code Council, Inc. except as amended by separate exhibit attached
hereto and is hereby adopted as the Mechanical Code and forms a part of the
Construction and Fire Prevention Standards from the effective date hereof.
SECTION 17
2006 INTERNATIONAL PLUMBING CODE ADOPTED
The Plumbing Code of the Dallas-Fort Worth International Airport Board is hereby
revised and amended to conform to the 2006 International Plumbing Code of the
International Code Council, Inc. except as amended by separate exhibit attached
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 7
hereto and is hereby adopted as the Plumbing Code and forms a part of the
Construction and Fire Prevention Standards from the effective date hereof.
SECTION 18
2006 INTERNATIONAL FUEL GAS CODE ADOPTED
The Fuel Gas Code of the Dallas-Fort Worth International Airport Board is hereby
revised and amended to conform to the 2006 International Fuel Gas Code of the
International Code Council, Inc. except as amended by separate exhibit attached
hereto and is hereby adopted as the Fuel Gas Code and forms a part of the
Construction and Fire Prevention Standards from the effective date hereof.
SECTION 19
2006 INTERNATIONAL ENERGY CONSERVATION CODE ADOPTED
The Energy Code of the Dallas-Fort Worth International Airport Board is hereby revised
and amended to conform to the 2006 International Energy Conservation Code of the
International Code Council, Inc. except as amended by separate exhibit attached
hereto and is hereby adopted as the Energy Code and forms a part of the Construction
and Fire Prevention Standards from the effective date hereof.
SECTION 20
REQUIRED PERMITS
The following activities shall not be performed within the boundaries of the Dallas-Fort
Worth International Airport unless a permit for such work has first been obtained from
the building official.
1. Construction
2. Oil and Gas Exploration and Production
3. Erection or Alteration of Signs
A permit shall not be required for Airport Board maintenance-related construction work
for replacement in like kind under either of the following conditions:
All of the work is performed by Airport Board personnel, and the cost of the work
does not exceed $50,000.
All or part of the work is contracted by the Airport Board, and the cost of the work
does not exceed $5,000.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 8
SECTION 21
REQUIRED FEES
All construction projects for which construction permits are required are subject to a
construction permit fee and a plan review fee except where otherwise prohibited by law.
Permit and plan review fees shall not be imposed for Airport Board construction
projects funded from operating and maintenance funds or seized funds.
SECTION 22
LICENSES REQUIRED
Contractors providing the following work within the boundaries of Dallas-Fort Worth
International Airport shall be licensed respectively for the category of work performed as
regulated by the following:
28 TEX. ADMIN. CODE, Part 1, Subchapter E, Fire Extinguisher Rules § 34.511, Fire
Extinguisher Licenses
28 TEX. ADMIN. CODE, Part 1, Subchapter F, Fire Alarm Rules § 34.611, Licenses
28 TEX. ADMIN. CODE, Part 1, Subchapter G, Fire Sprinkler Rules § 34.710, Certificates
of Registration
The Air Conditioning and Refrigeration Contractor License Law, Title 8, Occupations
Code, Chapter 1302
The Plumbing License Law, Occupations Code, Chapter 1301
Irrigators. Occupations Code, Chapter 1903
Electricians, Title 8, Occupations Code, Chapter 1305
SECTION 23
ENFORCEMENT
The Building Official and Fire Chief shall enforce and execute all decisions and orders
of the BOA for which they are respectively responsible. Upon adoption by the Airport
Board and the City Councils of the Cities of Dallas and Fort Worth, this resolution shall
become effective and shall be enforceable in the municipal courts of a municipality
within whose boundaries a violation occurs.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 9
SECTION 24
SPECIAL ENACTMENT
The provisions of this Resolution and the Codes which are a part hereof constitute a
special enactment in effect only within the boundaries of the Dallas-Fort Worth
International Airport, and are adopted in recognition of the unique and special
requirements connected with the planning, building, improvement, maintenance,
operation, regulation, protection and policing of the Dallas-Fort Worth International
Airport. Neither the Resolution nor the Codes shall be construed to waive or set aside
any provisions contained in any law of the Stafie of Texas.
SECTION 25
CONFLICTING PROVISIONS
This resolution shall be cumulative of all provisions of previous actions of the Airport
Board except where the provisions of this resolution are in direct conflict with the
provisions of previous Board Actions, in which event conflicting provisions of such
previous Board Actions are hereby repealed.
SECTION 26
SEVERABILITY CLAUSE
It is hereby declared to be the intention of the Airport Board that the sections,
paragraphs, sentences, clauses and phrases of this resolution are severable, and if any
phrase, clause, sentence, paragraph or section of this resolution shall be declared
unconstitutional by the valid judgment or decree of any court of competent jurisdiction
such unconstitutionality shall not affect any of the remaining phrases, clauses,
sentences, paragraphs and sections of this resolution, since the same would have been
enacted by the Airport Board without the incorporation in this resolution of any such
unconstitutional phrase, clause, sentence, paragraph or section.
SECTION 27
PENAL CLAUSE
Section B.F. of the 1968 Contract and Agreement, as amended, between the City of
Dallas, Texas and the City of Fort Worth, Texas, provides that the Dallas-Fort Worth
International Airport Board shall have the power, by a duly adopted order, to adopt and
enforce rules and regulations for the orderly, safe efficient and sanitary operation of the
airport and to prescribe penalties for the breach of any rule or regulation not to exceed
the maximum fines authorized by state law. State law currently authorizes fines of up to
$500 for all violations of the airport's rules and regulations, except for those violations
relating to fire safety, public health and sanitation, or the dumping of refuse, for which
the maximum fine is $2,000, and except when another fine is fixed by state law. Each
day that a violation is permitted to exist shall constitute a separate offense.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 10
SECTION 28
SAVINGS CLAUSE
All rights and remedies of the Airport Board are expressly saved as to any and all
violations of the provisions of the Building Code, the Fire Code or any other codes
affecting construction or fire prevention which have accrued at the time of the effective
date of this resolution and, as to such accrued violations and all pending litigation, both
civil and criminal, whether pending in court or not, under such codes, same shall not be
affected by this resolution but may be prosecuted until final disposition by the courts.
SECTION 29
PUBLICATION
The Building Official is hereby authorized to publish this resolution in pamphlet form for
general distribution among the public, and the operative provisions of this resolution as
so published shall be admissible in evidence in all courts without further proof than the
production thereof. The Building Official is hereby directed to publish a caption of this
Resolution which summarizes the purposes thereof for two (2) days in major
newspapers of the Cities of Dallas and Fort Worth Texas, as authorized by V.T.C.A.,
focal Government Code '52.013.
SECTION 30
EFFECTIVE DATE
This resolution shall be in full force and effect from and after its passage and
publication as required by law and it is so ordained.
Part One -Construction and Fire Prevention Standards Resolution
Part One - Pg. 11
PART T1~/O -BUILDING CODE AI~IENDIVIENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Building Code as amended herein is the Building
Code of Dallas-Fort Worth International Airport. References to the International
Building Code shall be construed to reference the Building Code as adopted herein with
its local amendments.
SECTION 101.4
REFERENCED CODES
Amend Section 101.4 to read as follows:
101.4 Referenced codes. The other codes listed in Sections 101.4.1 through 101.4.7
(except 101.4.5) and referenced elsewhere in this code, when specifically adopted,
shall be considered part of the requirements of this code to the prescribed extern of
each such reference. Whenever amendments have been adopted to the referenced
codes and standards, each reference to said code and standard shall be considered to
reference the amendments as well. Any reference to iVFPA 70 or the ICC Electrical
Code shall mean the Electrical Code as adopted. Delete all references to the
International Property Maintenance Code.
SECTION 102.6
EXISTING STRUCTURES
Amend Section 102.6 to read as follows:
102.6 Existing structures. The legal occupancy of any structure existing on the date
of adoption of this code shall be permitted to continue without change, except as
specifically covered in this code, t#e-h~t~ ~^^~°~-"v °~;~*°~~~~ or the
Fire Code, or as is deemed necessary. by the building official for the general safety and
welfare of the occupants and the public.
Part Two -Building Code Amendments
Part Two - Pg. 1
SECTION 103
DEPARTMENT OF BUILDING SAFETY
Amend Section 103.1 as follows:
103.1 Creation of enforcement agency. The department of building safety is hereby
created, and the official in charge thereof shall be known as the building official.
References to the Department of Building Safety shall mean the Code Compliance
Section of the Airport Development and Engineering Department.
SECTION 105
PERMITS
Amend Section 105.1 as follows:
105.1 Required. Refer to Part One, Section 20 for general permit requirements. Any
owner or authorized agent who intends to construct, enlarge, alter, repair, move
demolish or change the occupancy of a building or structure, or to erect, install, enlarge,
alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing
system, the installation of which is regulated by this code, or to cause any such work to
be done, shall first make application to the building official and obtain the required
permit.
Delete Sections 105.1.1, Annual permit and Section 105.1.2, Annual permit records.
SECTION 105.2
WOR~C EXEMPT FROM PERMIT
Amend Section 105.2 as follows:
105.2 Work exempt from permit. Exemptions from permit requirements of this code
shall not be deemed to grant authorization for any work to be done in any manner
in violation of the provisions of this code or any other laws or ordinances of this
jurisdiction. Permits shall not be required for the following:
Building:
r~n~ ovnoorl 'I `J (1 c•rn ~ ~ro foo+ /1 1 m21 _
rrvn~
Part Two -Building Code Amendments
Part Two - Pg. 2
4-Reta~nng vv ~r"at-aT~ ~-rtvr-v Q /~ foo~~L') Q mm\~hoi~hf
a7TJ v{~.r~P--f~i -i q'-mrrr r ~Gr ric
7
I t ~+t ll^~1^~/l ~ /'1.__~! ~THi rt~lryJ.'l~'7-i'f~fl_ _ '"' "_"' "~J-~~7L~JrJ' ~ ~ ~ !1Y' ~ ( 0
aaa`
1
~r ~niirl+h rJnoc nn4 ovnoorJ '1•'1
e
7. Painting, papering, tiling, carpeting, cabinets, counter tops and
similar finish work if installation of such is a replacement in like kind
and when not associated with other construction work.
8. Temporary motion picture, television and theater stage sets and
scenery.
9. Prefabricated swimming pools accessory to a Group R-3
occupancy, as applicable in Section 101.2, which are less than 24
inches (610 mm) deep, do not exceed 5,000 gallons (18,925 ~) and
are installed entirely above ground.
10. Shade cloth structures constructed for nursery or agricultural
purposes, not including service systems.
11. Swings or other playground equipment accessory to one- and two-
family dwellings.
12. Window awnings supported by an exterior wall that do not project
more than 54 inches (1372 mm) from the exterior wall and do not
require additional support of Group R-3 and U occupancies.
13. Nonfixed and movable fixtures, cases, racks, counters and
partitions not over 5 feet 9 inches (1753 mm) in height, except in
Airport terminal buildings.
Electrical:
Repairs and maintenance: Minor repair work, including the replacement of
lamps or the connection of approved portable electrical equipment to approved
permanently installed receptacles.
4 .diR~~P,a~yp.9 1 _ __" _ _ T4.e ..4 iM'.. .....I., X4...11
Part Two -Building Code Amendments
Part Two - Pg. 3
The remainder of Section 105.2 shall be unchanged.
SECTION 106.1
SUBMITTAL DOCUMENTS
Amend the first paragraph under Section 106.1 to read as follows:
106.1 Submittal documents. Unless approved otherwise by the building official,
construction documents, statement of special inspections and other data shall be
submitted in eight sets with each permit application. For building
construction projects, provide on the drawings information required under Section
110.2 of this Code for Items 1, 2, 3, 7, 8, 9, 10 and 11. Vehicular parking count
and building areas listed by floor level and occupancy group shall also be
included. For all projects, include a north arrow and graphic scale where
applicable. The construction documents shall be prepared by a registered
design professional where required by the statutes of the jurisdiction in which the
project is to be constructed. Where special conditions exist, the building official
is authorized to require additional construction documents to be prepared by a
registered design professional.
SECTION 106.3.1
APPROVAL OF CONSTRUCTION ®OCUMENTS
Add the following sentence at the beginning Section 106.3.1:
106.3.1 Approval of construction documents. Where construction documents are
required to be prepared by a registered design professional, a construction permit
cannot be issued before the building official receives two sets of final construction
documents sealed by the registered design professional.
SECTION 108
FEES
Following Section 108.6, add Table 1A -Construction Permit and Plan Review Fees.
CONSTRUCTION PERMIT AN® PLAN REVIEW FEES
All construction projects for which construction permits are required are subject to a
construction permit fee and a plan review fee except where otherwise prohibited by law.
Refer to Part One, Section 21 for exceptions. The construction permit fee is based
upon the value of all construction work for which the permit is issued, as well as all
Part Two -Building Code Amendments
Part Two - Pg. 4
finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators,
fire extinguishing systems and any other permanent equipment. Where proposed
maintenance work is limited to replacement in like kind, and in the opinion of the
Building Official a construction permit fee or plan review fee is not justified, the Building
Official may waive such fees. The plan review fee is an additional fee equal to 65% of
the construction permit fee. The following table shall be used to determine the
construction permit fee. The plan review fee shall be added thereto. These fees shall
be paid prior to the issuance of a construction permit unless otherwise approved.
VALUE OF COi~STRUCTION COi~STRUCTIOIV PERMIT FEE
WORK (Add to it6~ese amounts 65% for t'lan Revfiew Fee)
$1.00 to $500.00 $23.50
$501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional
$100.00, or fraction thereof, to and includin $2,000.00
$2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each
additional $1,000.00, or fraction thereof, to and including
$25,000.00
$25,001.00 to $50,000.00 $391.75 for the first $25,000.00 plus $10.10 for each
additional $1,000.00, or fraction thereof, to and including
$50,000.00
$50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each
additional $1,000.00, or fraction thereof, to and including
$100, 000.00
$100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each
additional $1,000.00, or fraction thereof, to and including
$500,000.00
$500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each
additional $1,000.00, or fraction thereof, to and including
$1, 000, 000.00
$1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each
additional $1,000.00, or fraction thereof
Part Two -Building Code Amendments
Part Two - Pg. 5
--
Other Inspecti®u~s ar~d Fees:
(These fees are payable upon services rendered and receipt of invoice.)
1. Inspections outside of normal business hours ........................$47.00 per hour"
(minimum charge -two hours)
2. Reinspection fees ............................................................ $47.00 per hour"
3. Inspections for which no fee is specifically indicated ............... $47.00 per hour"
(minimum charge -one-half hour)
4. Additional plan review for changes, additions
or revisions to plans .........................................................$47.00 per hour"
(minimum charge -one-half hour)
5. For use of outside consultants for plan checking,
inspections or both.. Actual costs2
"Or the total hourly cost to the Airport Board, whichever is the greatest. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of the
employees involved.
AActual costs include administrative and overhead costs.
SECTION 110.2
CERTIFICATE ISSUED
Delete from list at the bottom of Section 110.2 Items 7 through 11.
SECTION 112
BOARD OF APPEALS
Amend Section 112 to read as follows:
Sectl®ra 112 -Board ®f Appeals Refer to Part One, Construction and Fire Prevention
Standards Resolution for Board of Appeals.
SECTION 113.4
VIOLATION PENALTIES
Add the following sentence at the bottom of Section 113.4:
Refer to Part One, Construction and Fire Prevention Standards Resolution, Section 27,
Penal Clause.
Part Two -Building Code Amendments
Part Two - Pg. 6
SECTION 202
DEFINITIONS
Following the definition of ADDITION, add the following definition:
ADDRESSABLE FIRE DETECTION SYSTEM. Any fire alarm system capable of
providing identification of each individual alarm-initiating device. The identification shall
be in clear English and shall identify the type and location of the device in alarm. The
system shall have the ability of alarm verification.
Following the definition of AGRICULTURE BUILDING, add the following definition:
AIRPORT. Airport is the area within the boundaries of the Dallas-Fort Worth
International Airport. Following the definition of ADDITION, add the following definition:
Following the definition of ALTERNATING TREAD DEVICE, add the following
definition:
ANALOG INTELLIGENT ADDRESSABLE FIRE DETECTION SYSTEM. Any system
capable of calculating a change in value by directly measurable quantities (voltage,
resistance, etc.) at the sensing point. The physical analog may be conducted at the
sensing point or at the main control panel. The system shall be capable of
compensating for long-term changes in sensor response while maintaining a constant
sensitivity. The compensation shall have a preset point at which a detector
maintenance signal shall be transmitted to the control panel. The sensor shall remain
capable of detecting and transmitting an alarm while in maintenance alert.
Following the definition of HIGHLY TOXIC, add the following definition:
HIGH-RISE BUILDINGS. Buildings with a floor used for human occupancy located
more than 55 feet (16 764 mm) above the lowest level of fire department vehicle
access.
Amend the definition of SELF-SERVICE STORAGE FACILITY to read as follows:
SELF-SERVICE STORAGE FACILITY. Real property designed and used for the
purpose of renting or leasing individual storage spaces to customers for the purpose of
storing and removing personal property on aself-service basis.
SECTION 403.1
APPLICABILITY FOR HIGH-RISE BUILDINGS
Amend Section 403.1 as follows: (Exceptions 1 through 5 to remain and add Exception
6.)
Part Two -Building Code Amendments
Part Two - Pg. 7
403.1 Applicability. The provisions of this
occupied floors located more than 7a 55 fee
lowest level of fire department vehicle access.
Exceptions:
section shall apply to buildings having
t i~~ sz~n mm~ (16 764 mm) above the
6. Train platforms for fixed guideway transit systems in accordance with
Section 412.7.
SECTION 412.6
FUELING RAMP DRAINAGE AND AIRCRAFT LOADING Vl/A~KWAYS
Add new section as follows:
412.6 Aircraft fueling ramp drainage and aircraft loading walkways. Except for
references to airport terminal buildings, comply with NFPA 415, 2008 Edition for aircraft
fueling ramp drainage and aircraft loading walkways.
Exceptions:
Attached or adjacent fixed loading walkways, gate houses and similar
structures accessory to airport terminal buildings may be constructed
of Type II-A Construction, provided the floor area of individual
structures does not exceed 500 square feet. An approved automatic
sprinkler system in accordance with Section 903.3.1.1 shall be allowed
to be substituted for 1-hour fire-resistance-rated construction. If the
automatic sprinkler system substitution is provided, exterior walls of
such structures shall not be required to be of 1-hour fire-resistance-
rated construction and openings in such walls shall not be required to
be protected.
2. Canopies aver baggage conveyors attached to or adjacent to airport
terminal buildings may be of Type II-B Construction.
SECTION 412.7
FIXED GUIDEWAY TRANSIT SYSTEMS
Add new section as follows:
412.7 Fixed guideway transit systems. Fixed guideway transit systems shall comply
with RIFPA 130, 2000 Edition.
Part Two -Building Code Amendments
Part Two - Pg. 8
SECTION 903.2
AUTOMATIC SPRINKLER SYSTEMS -WHERE REQUIRED
Delete exception in Section 903.2 for spaces and areas in telecommunications
buildings.
SECTION 903.2.7.1
AUTOMATIC SPRINKLER SYSTEMS - GROUP R OCCUPANCIES
Add Section 903.2.7 as follows:
[F] 903.2.7.1 Fire sprinklers. An approved automatic sprinkler system shall be
installed in new one and two-family dwellings and town homes constructed in
accordance with Section 903.3.1.3.
SECTION 903.2.10.3
BUILDINGS 55 FEET OR MORE IN HEIGHT
Amend Section 903.2.10.3 to read as follows and delete two exceptions:
[F] 903.2.10.3 Buildings more than 55 feet in height. An automatic sprinkler system
shall be installed throughout buildings with a floor level, other than penthouses in
compliance with Section 1509 that is located 55
feet (16 764 mm) or more above the lowest level of fire department vehicle access.
Exception:
2. Open parking structures.
SECTION 903.2.10.4
HIGH-PILED COMBUSTIBLE STORAGE
Add Section 903.2.10.4 as follows:
[F] 903.2.10.4 High-piled combustible storage. For any building with a clear height
exceeding 12 feet (4572 mm), see Chapter 23 to determine if those provisions apply.
Part Two -Building Code Amendments
Part Two - Pg. 9
SECTION 903.2.10.5
SPRAY BOOTHS AND ROOMS
Add Section 903.2.10.5 as follows:
[F] 903.2.10.5 Sp~°ay b®®ths aa~d ~®®ms. Spray booths and rooms shall be protected
by an approved automatic fire-extinguishing system.
SECTION 903.2.10.6
BUILDING AREAS EXCEEDING 6,000 SQUARE FEET
Add Section 903.2.10.6 as follows:
[F] 903.2.10.6 Baslldings with fl®®~ areas exceeding 6,000 sga~are feet. An
automatic sprinkler system shall be installed throughout all buildings with a building
area exceeding 6,000 square feet. For purposes of this provision, fire walls shall not
define separate buildings.
Except)®nse
1. Open parking garages
2. Group A-5 Occupancies
SECTION 903.2.10.7
SELF-SER!lICE STORAGE FACILITY
Add Section 903.2.10.7 as follows:
[F] 903.2.10.7 Self-se~°vice st®~°a~e facilities. An approved automatic sprinkler
system shall be installed throughout all self-storage facilities.
Excepti®n:
Open parking garages
SECTION 907.2
FIRE ALARM AND DETECTION SYSTEMS -WHERE REQUIRED
Add the following two paragraphs after the second paragraph under Section 907.2:
All buildings or occupancies, occupied, operated, maintained or monitored by the
Dallas-Fort Worth International Airport Board shall have a complete operational manual
and automatic fire alarm system in accordance with this code. The system shall be
Part Two -Building Code Amendments
Part Two - Pg. 10
designed and installed in accordance with the DFW Airport Design Criteria Manual and
applicable standards.
All buildings or occupancies, other than those described in the preceding paragraph,
hereafter constructed or moved on to the airport and having a total floor area of 1,000
square feet or more, regardless of height or occupant load shall have a complete
operational manual and automatic .fire alarm system in accordance with the
requirements of this code.
Exceptions:
1. Open parking garages may use other approved means for fire
department notification.
2. Temporary structures or buildings erected for less than 365 days when
approved by the fire chief.
SECTION 907.2.1.1
FIRE ALARM ACTIVATION - GROUP A OCCUPANCIES
Amend Section 907.2.1.1 to read as follows:
[F] 907.2.1.1 System initiation in Group A occupancies with an occupant load of
1,000 or snore. Activation of the fire alarm in Group A occupancies with an occupant
load of 1,000 or more shall initiate a signal using an emergency voice/alarm
communications system in accordance. with NFPA 72.
Exceptions:
1. Where approved, the prerecorded announcement is allowed to be manually
deactivated for a period of time, not to exceed 3 minutes, for the sole
purpose of allowing a live voice announcement from an approved, constantly
attended location.
2. Where approved by the code official in airport terminal buildings, and where
the fire alarm is monitored directly by the Dallas/Fort Worth International
Airport Board Department of Public Safety, the activation of the fire alarm
notification signal shall be manually initiated by emergency responders.
SECTION 907.2.12
HIGH-RISE BUIL®INGS -FIRE ALARM SYSTEM
Amend Section 907.2.12 as follows with the exceptions unchanged:
Part Two -Building Code Amendments
Part Two - Pg. 11
[F] 907.2.12 High-rise buildings. Buildings having floors used for human occupancy
located more than ~ 55 feet ~'''' ~~~ mm` (16 764 mm) above the lowest level of fire
department vehicle access shall be provided with an automatic fire alarm system and
an emergency voice/alarm communications system in accordance with Section
907.2.12.2.
SECTION 907.3
MANUAL FIRE ALARM BOXES
Amend Section 907.3 to read as follows:
[F] 907.3 Manual fire alarm boxes. Manual fire alarm boxes shall be installed in
accordance with Sections 907.3.1 through 907.3.5. Manual alarm actuating devices
shall be an approved double action type.
SECTION 907.3.1
MANUAL FIRE ALARM BOXES -LOCATION
Amend Section 907.3.1 to read as follows:
[F] 907.3.1 Location. Manual fire alarm boxes shall be located not more than 5 feet
(1524 mm) from the entrance to each exit.
SECTION 907.x.2
HIGH-RISE BUIL®INGS -FIRE ALARM ZONES
Amend Section 907.8.2 as follows:
907.8.2 High-rise buildings. In buildings used for human occupancy that have floors
located more than 7T5 55 feet ~,.~ (16 764 mm) above the lowest level of
fire department vehicle access, a separate zone by floor shall be provided all of
the following types of alarm initiating devices where provided.
1. Smoke detectors.
2. Sprinkler water-flow devices.
3. Manual fire alarm boxes.
4. Other approved types of automatic fire detection devices or
suppression systems.
SECTION 1003.5
ELEVATION CHANGE
Amend Exception 1 under Section 1003.5 to read as follows:
Part Two -Building Code Amendments
Part Two - Pg. 12
1. A single step with a maximum height of 7 inches (178 mm) is permitted for
buildings with occupancies in Groups F, H, R-2 and R-3 and Groups S and U
at exterior doors not required to be accessible by Chapter 11, and at
entrances to mechanical penthouses from roofed areas, the door .sill
elevation may be up to 8 inches (203 mm) above the elevation of the landing
on either or both sides of the door.
SECTION 1004.3
POSTING OF OCCUPANT LOAD
Amend Section 1004.3 to read as follows:
1004.3 Posting of occupant load. Every room or space that is an assembly
occupancy shall have the occupant load of the room or space posted in a conspicuous
place, near the main exit or exit access doorway from the room or space. Posted signs
shall be of an approved legible permanent design and shall be maintained by the owner
or authorized agent. Assembly occupancies within airport terminal buildings are not
required to have the occupant load posted unless required by the Building Official.
SECTION 1020.1.7
SMOI~CEPROOF ENCLOSURES
Amend Section 1020.1.7 as follows:
10.20.1.7 Srnokeproof enclosures. In buildings required to comply with Section 403
or 405, each of the exits of a building that serves stories where the floor surface is
located more than 7a 55 feet {~-2--8~0--rte} (16 764 mm) above the lowest level of fire
department vehicle access or more than 30 feet (9144 mm) below the level of exit
discharge serving such floor levels shall be a smokeproof enclosure or pressurized
stairway in accordance with Section 909.20.
Exception:
Fixed guideway train stations.
CH~4PTER 11
~4CCESSIBI~ITY
Replace Chapter 11 as follows:
Spaces and elements of buildings and facilities shall be designed and constructed to
standards consistent with the Texas Accessibility Standards as administered by the
Texas Department of Licensing and Regulation, except for the following:
Part Two -Building Code Amendments
Part Two - Pg. 13
Unisex t®Ilet r®®ms. Assembly areas shall be provided with one unisex toilet room for
each instance where the total fixture count (water closets and urinals) in a set of men
and women's toilet rooms exceeds 20 fixtures. In assembly areas of airport terminal
buildings, one .unisex toilet room shall be provided in each instance where the total
fixture count (water closets and urinals) in a set of men and women's toilet rooms
exceeds 6 fixtures. The unisex toilet room shall be located adjacent to the men and
women's toilet rooms, which are used to determine that the unisex toilet room is
required
CHAPTER 29
PLUMBING SYSTEMS
Replace Chapter 29 as follows:
Plumbing systems and the minimum number of plumbing fixtures shall comply with the
Plumbing Code.
SECTION 3002.4
ELEVATOR CAR TO ACCOMMODATE AMBULANCE STRETCHER
Amend Section 3002.4 to read as follows:
3002.4 Elevator car to accommodate ambulance stretcher. Where elevators are
provided in buildings four or more stories above grade plane or four or more stories
below grade plane, at least one elevator shall be provided for fire department
emergency access to all floors. The elevator car shall be of such size and arrangement
to accommodate a 24- 31- by ~4- 90-inch (788 mm by 2068
mm) ambulance stretcher in the horizontal open position and shall be identified by the
international symbol for emergency medical services (star of life). The symbol shall not
be less than 3 inches (76 mm) high and shall be placed inside on both sides of the
hoistway door frame.
CHAPTER 35
REFERENCED STANDARDS
Amend the NFPA standard reference number for National Fire Alarm Code as follows:
NFPA
Standard Reference Number 7~-8~ 72-07 National Fire Alarm Code
Part Two -Building Code Amendments
Part Two - Pg. 14
ADOPTION OF APPENDIX CHAPTER H
SIGNS
Appendix Chapter H -Signs is specifically adopted as part of the Building Code.
SECTION H-101.2
SIGNS EXEMPT FROM PERMITS
Amend Section H101.2 as follows:
H- 101.2 Signs exempt from permits. The following signs are exempt from the
requirements to obtain a permit before erection:
3. Signs erected by transportation authorities.
Drnian n o r+o nn~ rlir~ 7 c+rr~~~ro food /(1 '~ 2
41T~•vTitFl~-7. '~7TJT v ~TG~J~'FDIPv 1''G'4T~.
5. The changing of movable parts of an approved sign that is designed for such
changes, or the repainting or repositioning of display matter shall not be
deemed an alteration.
SECTION H105.2
PERMITS, DRAWINGS AND SPECIFICATIONS FOR SIGNS
Amend Section H 105.2 as follows:
H105.2 Permits, drawings and specifications. Where a permit is required, as
provided in ~~~„~- Part One, Section 20, construction documents shall be required.
These documents shall show the dimensions, material and required details of
construction, including loads, stresses and anchors.
Part Two -Building Code Amendments
Part Two - Pg. 15
PART THREE -FIRE CODE AMENDMENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Fire Code as amended herein is the Fire Code of
Dallas-Fort Worth International Airport. References to International Fire Code
shall be construed to reference the Fire Code as adopted herein with its local
amendments.
SECTION 102.6
REFERENCED CODES AND STANDARDS
Amend Section 102.6 to read as follows:
102.6 Referenced codes and standards. The codes and standards referenced in this
code shall be those that are listed in Chapter 45, and such codes, when specifically
adopted, and standards shall be considered part of the requirements of this code to the
prescribed extent of each such reference. Where differences occur between the
provisions of this code and the referenced standards, the provisions of this code shall
apply. Whenever amendments have been adopted to the referenced codes and
standards, each reference to said code and standard shall be considered to reference
the amendments as well. Any reference to IVFPA 70 or the ICC Electrical Code shall
mean the Electrical Code as adopted.
SECTION 103.1
DEPARTMENT OF FIRE PREVENTION
Amend Section 103.1 as follows:
103.1 General. The department of fire prevention is established within the jurisdiction
under the direction of the code official. The function of the department shall be the
implementation, administration and enforcement of the provisions of this code.
References to the department of fire prevention shall mean the Department of Public
Safety, Fire Prevention Office.
SECTION 105.4.1
CONSTRUCTION DOCUMENTS -SUBMITTALS
Amend Section 105.4.1 to read as follows:
Part Three -Fire Code Amendments
Part Three - Pg. 1
105.4.1 Submittals. Construction documents required by the Fire Code shall be
submitted in two sets to the Fire Prevention Office. The construction documents shall
be legible and scalable and shall be prepared by a design professional as required by
Texas law.
SECTION 105.6.7
COMBUSTIBLE DUST-PRODUCING OPERATIONS
Amend Section 105.6.7 to read as follows:
105.6.7 Combustible dust-producing operations. Combustible dust-producing
operations, as defined in this code, shall be prohibited within the airport.
SECTION 105.6.18
FRUIT AND CROP RIPENING
Amend Section 105.6.18 to read as follows:
105.6.18 Fruit and crop ripening. Fruit and crop ripening operations using ethylene
or other flammable gases shall be prohibited within the airport.
SECTION 105.6.30
OPEN BURNING
Delete exception for Recreational fires.
SECTION 105.6.33
ORGANIC COATINGS
Amend Section 105.6.33 to read as follows:
105.6.33Organic coatings. The manufacturing or application of organic coatings, as
defined in this code, shall be prohibited within the airport.
SECTION 105.6.37
PYROXYLIN PLASTICS
Amend Section 105.6.37 as follows:
105.6.37 Pyroxylin plastics. An operational permit is required for storage or handling
of any amount of cellulose nitrate (pyroxylin)
plastics and for the assembly or manufacture of articles involving pyroxylin
plastics.
Part Three -Fire Code Amendments
Part Three - Pg. 2
SECTION 107.2.2
REINSPECTION AND TESTING
Add a second paragraph under Section 107.2.2 to read as follows:
Fees for reinspections or for inspections outside of normal business hours shall be
reimbursed as required by the fire chief in accordance with the Building Code, Section
108 -Fees.
SECTION 108
BOARD OF APPEALS
Amend Section 108 to read as follows:
108 Board of appeals. Refer to Part One, Construction and Fire Prevention
Standards Resolution for Board of Appeals.
SECTION 109.3
VIOLATION PENALTIES
Amend Section 109.3 to read as follows:
109.3 Violation penalties. Refer to Part One, Construction and Fire Prevention
Standards Resolution, Section 27, Penal Clause.
SECTION 202
DEFINITIONS
Following the definition of ACCESSIBLE MEANS OF EGRESS, add the following
definition:
ADDRESSABLE FIRE DETECTION SYSTEM. Any fire alarm system capable of
providing identification of each individual alarm-initiating device. The identification shall
be in clear English and shall identify the type and location of the device in alarm. The
system shall have the ability of alarm verification.
Following the definition of AMMONIUM NITRATE, add the following definition:
ANALOG INTELLIGENT ADDRESSABLE FIRE DETECTION SYSTEM. Any system
capable of calculating a change in value by directly measurable quantities (voltage,
resistance, etc.) at the sensing point. The physical analog may be conducted at the
sensing point or at the main control panel. The system shall be capable of
compensating for long-term changes in sensor response while maintaining a constant
sensitivity. The compensation shall have a preset point at which a detector
Part Three -Fire Code Amendments
Part Three - Pg. 3
maintenance signal shall be transmitted to the control panel. The sensor shall remain
capable of detecting and transmitting an alarm while in maintenance alert.
Following the definition of HIGH PILED STORAGE AREA, add the following definition:
HIGH-RISE BUILDINGS. Buildings with a floor used for human occupancy located
more than 55 feet (16 764 mm) above the lowest level of fire department vehicle
access.
Following the definition of SELF-SERVICE MOTOR FUEL-DISPENSING FACILITY add
the following definition:
SELF-SERVICE STO GE FACILITY. Real property designed and used for the
purpose of renting or leasing individual storage spaces to customers for the purpose of
storing and removing personal property on aself-service basis
SECTION 307.4.1
BONFIRES
Amend Section 307.4.1 to read as follows:
307.4.1 Bonfires. Bonfires shall be prohibited within the airport.
SECTION 503.1.1
FIRE APPARATUS ACCESS ROADS -BUILDINGS AND FACILITIES
Amend Section 503.1.1 as follows: (Exceptions remain in effect.)
503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be
provided for every facility, building or portion of a building hereinafter
constructed or moved into or within the jurisdiction. The fire apparatus access
road shall comply with the requirements of this section and shall extend to
within 150 feet (45 720 mm) of all portions of the facility.
SECTION 503.2.1
FIRE APPARATUS ACCESS ROADS -DIMENSIONS
Amend Section 503.2.1 to read as follows:
503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of
not less than ~ 22 feet ¢CO~~g--r~a~ (6706 mm), except for approved security gates in
accordance with Section 503.6, and an unobstructed vertical clearance of not less than
7 ~ foo+ a innhoa 14 feet {4~-~~ (4267 mm).
Part Three -Fire Code Amendments
Part Three - Pg. 4
SECTION 508.5.1
FIRE HYDRANT SYSTEMS -WHERE REQUIRED
Delete Section 508.5.1 including exceptions and substitute the following:
508.5.1 Where requA~°ed. The location, number and type of fire hydrants connected to
a water supply capable of delivering the required fire flow shall be provided on the
public street or on the site to be protected or both as required by the fire chief. Fire
hydrants shall be installed at intervals not to exceed 250 feet (76 200 mm) along new
roadways, and at such locations that no part of a building exterior wall is in excess of a
hose lay, 300 feet (91 440 mm) in length from the hydrant as measured along an
approved route around the exterior of the building.
SECTION 704.1
FLOOR OPENINGS AND SHAFTS
Section 704.1; amend section to read as follows:
704.1 Enclosure. Interior vertical shafts, including but not limited to stairways, elevator
hoistways, service and utility shafts, that connect two or more stories of a building
shall be enclosed or protected in accordance with the codes in effect at the time of
construction but, regardless of when constructed, not less than as specified in Table
704.1.
SECTION 903.2
AUTOMATIC SPRINKLER SYSTEMS -WHERE REQUIRED
Delete the exception under Section 903.2.
SECTION 903.2.7.1
GROUP R
Add Section 903.2.7.1 as follows:
903.2.7.1 Fire Sprinklers. An approved automatic fire sprinkler system shall be installed
in new one- and two-family dwellings and townhomes constructed under the
International Residential Code in accordance with Section 903.3.1.3.
SECTION 903.2.10.3
BUILDINGS 55 FEET OR MORE IN HEIGHT
Amend Section 903.2.10.3 to read as follows:
Part Three -Fire Code Amendments
Part Three - Pg. 5
903.2.10.3 Buildings more than 55 feet in height. An automatic sprinkler system
shall be installed throughout buildings with a floor level, other than penthouses in
compliance with Section 1509 of the Building Code, located more than 55 feet (16 764
mm) above the lowest level of fire department vehicle access.
Exceptions:
2. Open parking structures.
SECTION 903.2.10.4
HIGH-PILED COMBUSTIBLE STORAGE
Add Section 903.2.10.4 as follows:
903.2.10.4 D~igh-piled combustible storage. For any building with a clear height
exceeding 12 feet (4572 mm), see Chapter 23 to determine if those provisions apply.
SECTION 903.2.10.5
SPRAY BOOTHS AND ROOMS
Add Section 903.2.10.5 as follows:
903.2.10.5 Spray booths and rooms. Spray booths and rooms shall be protected by
an approved automatic fire-extinguishing system.
SECTION 903.2.10.6
BUILDINGS INITFI A FLOOR AREA EXCEEDING 6,000 SQUARE FEET
Add Section 903.2.10.6 as follows:
903.2.10.6 Buildings with a fl®or area exceeding 6,000 square feet. An automatic
sprinkler system shall be installed throughout all buildings with a building area
exceeding 6,000 square feet. For the purpose of this provision, fire walls shall not
define separate buildings.
Exceptions:
1. Open parking garages.
2. Group A-5 Occupancies.
Part Three -Fire Code Amendments
Part Three - Pg. 6
SECTION 903.2.14
SELF-SERVICE STORAGE FACILITY
Add to Section 903.2.14
903.2.14 Self-service storage facilities. An approved automatic sprinkler system
shall be installed throughout all self-storage facilities.
SECTION 905.2
STANDPIPE SYSTEMS -INSTALLATION STANDARD
Amend Section 905.2 to read as follows:
905.2 Installation standard. Standpipe systems shall be installed in accordance with
this section and NFPA 14. New manual dry standpipe systems shall be supervised with
a minimum of 10 psig and a maximum of 40 psig air pressure and shall be equipped
with ahigh/low alarm.
SECTION 907.2
FIRE ALARM AND DETECTION SYSTEMS -WHERE REQUIRED
Add the following two paragraphs after.the second paragraph under Section 907.2.
All buildings or occupancies, occupied, operated, maintained or monitored by the
Dallas-Fort Worth International Airport Board shall have a complete operational manual
and automatic fire alarm system in accordance with this code. The system shall be
designed and installed in accordance with the DFW Airport Design Criteria Manual and
applicable standards.
All buildings, other than those described in the preceding paragraph, hereafter
constructed or moved on to the airport and having a total floor area of 1,000 square feet
or more, regardless of height or occupant load, shall have a complete operational
manual and automatic fire alarm system in accordance with the occupancy
requirements of this code.
Eacceptions:
1. Open parking garages may use other approved means for fire
department notification.
2. Temporary structures or buildings erected for less than 365 days
when approved by the fire chief.
Part Three -Fire Code Amendments
Part Three - Pg. 7
SECTION 907.2.1.1
FIRE ALARM ACTIVATION - GROUP A OCCUPANCIES
Add Exception 2 under Section 907.2.1.1 to read as follows:
907.2.1.1 System initiation in Group A occupancies with an occupant load of
1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant
load of 1,000 or more shall initiate a signal using an emergency voice/alarm
communications system in accordance with NFPA 72.
Exceptions:
1. Where approved, the prerecorded announcement is allowed to be
manually deactivated for a period of time, not to exceed 3 minutes, for
the sole purpose of. allowing a live voice announcement from an
approved, constantly attended location.
2. Where approved by the code official in airport terminal buildings, and
where the fire alarm is monitored directly by the Dallas/Fort Worth
International Airport Board Department of Public Safety, the activation
of the fire alarm notification signal shall be manually initiated by
emergency responders.
SECTION 907.2.12
HIGH~RISE BUIL®INGS
With exceptions unchanged, amend Section 907.2.12 to read as follows:
907.2.12 High-rise buildings. Buildings having floors used for human occupancy
located more than ~ 55 feet {~-~} (16 764 mm) above the lowest level of fire
department vehicle access shall be provided with an automatic fire alarm system and
an emergency voice/alarm communication system in accordance with Section
907.2.12.2.
SECTION 907.4
MANUAL FIRE ALARM BOXES
Amend Section 907.4 to read as follows:
907.4 Manual fire alarm boxes. Manual fire alarm boxes shall be installed in
accordance with Sections 907.4.1 through 907.4.5. Manual alarm actuating devices
shall be of an approved double action type.
Part Three -Fire Code Amendments
Part Three - Pg. 8
SECTION 907.4.1
MANUAL FIRE ALARM BOXES -LOCATION
Amend Section 907.4.1 to read as follows:
907.4.1 Location. Manual fire alarm boxes shall be located not more than 5 feet (1524
mm) from the entrance to each exit.
#~=~-(-~9--968-~r~-
SECTION 907.9.2
FIRE ALARM ZONES -HIGH-RISE BUILDINGS
Amend Section 907.9.2 to read as follows:
907.9.2 High-rise buildings. In buildings with a floor used for human occupancy that
is located more than ~ 55 feet ~~`' szan rr,rv,~ (16 764 mm) above the lowest level of fire
department vehicle access, a separate zone by floor shall be provided for all of the
following types of alarm-initiating devices where provided:
1. Smoke detectors.
2. Sprinkler water-flow devices.
3. Manual fire alarm boxes.
4. Other approved types of automatic fire detection devices or suppression
systems.
SECTION 1003.5
ELEVATION CHANGE
Amend Exception 1 under Section 1003.5 to read as follows:
1. A single step with a maximum height of 7 inches (178 mm) is permitted for
buildings with occupancies in Groups F, H, R-2 and R-3 and Groups S arid U
at exterior doors not required to be accessible by Chapter 11, and at
entrances to mechanical penthouses from roofed areas, the door sill
elevation may be up to 8 inches (203 mm) above the elevation of the landing
on either or both sides of the door.
Part Three -Fire Code Amendments
Part Three - Pg. 9
SECTION 1004.3
POSTING OF OCCUPANT LOAD
Amend Section 1004.3 to read as follows:
[B, 1004.3 Posting of occupant load. Every room or space that is an assembly
occupancy shall have the occupant load of the room or space posted in a conspicuous
place, near the main exit or exit access doorway from the room or space. Posted signs
shall be of an approved legible permanent design and shall be maintained by the owner
or authorized agent. Assembly occupancies within airport terminal buildings are not
required to have the occupant load posted unless required by the Building Official
SECTION 1020.1.7
SMOI~CEPROOF ENCLOSURES
Amend Section 1020.1.7 as follows:
10.20.1.7 Smokeproof enclosures. In buildings required to comply with Section 403
or 405, each of the exits of a building that serves stories where the floor surface is
located more than 7a 55 feet {~2-~6(~~a} (16 764 mm) above the lowest level of fire
department vehicle access or more than 30 feet (9144 mm) below the level of exit
discharge serving such floor levels shall be a smokeproof enclosure or pressurized
stairway in accordance with Section 909.20.
Exception:
Fixed guideway train stations.
SECTION 2705.1.8
HAZARDOUS MATERIALS -FIRE EXTINGUISHING SYSTEMS
Add a second paragraph under Section 2705.1.8 to read as follows:
Gas cabinets, exhaust enclosures and exhaust ducts with a cross sectional dimension
of 10 inches (255 mm) or greater shall be internally sprinklered.
SECTION 3301
EXPLOSIVES AND FIREWORKS -GENERAL
Add Section 3301- General as follows:
3301 General. The manufacture and sale of explosive material shall be prohibited
within the airport.
Part Three -Fire Code Amendments
Part Three - Pg. 10
SECTION 330'1.2.4
FINANCIAL RESPONSIBILITY
Amend Section 3301.2.4 to read as follows:
3301.2.4 Financial responsibility. Before a permit is issued, as required by Section
3301.2, the applicant shall file with the jurisdiction a corporate surety bond in the
principal sum of $-a-88;89 $1,000,000 or a public liability insurance policy for the same
amount, for the purpose of the payment of all damages to persons or property which
arise from, or are caused by, the conduct of any act authorized by the permit upon
which any judicial judgment results. The code official is authorized to specify a greater
or lesser amount when, in his or her opinion, conditions at the location of use indicate a
greater or lesser amount is required. Government entities shall be exempt from this
bond requirement.
SECTION 3406.3.1.3.3
NATURAL GAS PIPELINE SETBACK FROI~l11 BUILDINGS
Add Section 3406.1.3.3 to read as follows:
3406.3.x.3.3 Nata~a°a8 gas pipeline setback f~°orn baaildings. No building hereinafter
erected shall be located within 50 feet (15 240 mm) of a natural gas gathering or
transmission pipeline.
SECTION 3703.2.5
OUTDOOR STORAGE AND WEATHER PROTECTION
Add an exception under Section 3703.2.5 to read as follows:
Es~ception:
Sprinklers are not required for certain water reactive materials when
sprinklers would not be effective in controlling the fire.
CHAPTER 45
REFERENCED STANDARDS
Amend the NFPA standard reference number for National Fire Alarm Code as follows:
NFPA
Standard Reference Number ~2-8~ 72-07 National Fire Alarm Code
ADOPTION OF APPENDIX CHAPTERS
The following appendix chapters are specifically adopted as part of the Fire Code.
Part Three -Fire Code Amendments
Part Three - Pg. 11
Appendix B Fire Flow Requirements for Buildings
Appendix C Fire Hydrant Locations and Distribution (Except hydrant spacing as
required by Section 508.5.1.)
Appendix D Fire Apparatus Access Roads (except that minimum width of fire
apparatus access roads shall be in accordance with Section 503.2.1 of
the Fire Code)
Appendix G Cryogenic Fluids -Weight and Volume Equivalents
Part Three -Fire Code Amendments
Part Three - Pg. 12
PART FOUR -ELECTRICAL CODE AMENDMENTS
Local Amendments to the
2006 International Code Council Electrical Code
Administrative Provisions
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2005 ~lational Electrical Code with the 2006 ICC Electrical Code
Administrative Provisions as amended herein is the Electrical Code of Dallas-Fort
Worth International Airport. References to the ICC Electrical Code shall be construed
to reference fihe Electrical Code as adopted herein with its local amendments.
SECTION 301.1
CREATION OF ENFORCEMENT AGENCY
Amend Section 301.1 to read as follows:
301.1 Creation of enforcement agency. The department of electrical inspection is
hereby created and the official in charge thereof shall be known as the cede building
official. The function of the department shall be to assist the eede building official in the
administration and enforcement of the provisions of this code. References to the
department of electrical inspection shall mean the Code Compliance Section of the
Airport Development and Engineering Department.
SECTION 404.2
SCHEDULE OF PERMIT FEES
Amend Section 404.2 to read as follows:
404.2 Schedule of permit fees. Refer to Part Two, Building Code Amendments,
Section 108 for fees.
SECTION 501.1
SUBMITTAL DOCUMENTS
Add the following sentence below Section 501.1:
Part Four -Electrical Code Amendments
Part Four - Pg. 1
Refer to Part Two, Building Code Amendments, Section 106.1 for additional
requirements related to submittal of construction documents.
SECTION 1003.1
PENALTIES
Add the following sentence below Section 1003.1:
Refer to Part One, Construction and Fire Prevention Standards Resolution, Section 27,
Penal Clause.
CHAPTER 11
MEANS OF APPEAL
Replace Chapter 11 with the following reference.
Refer to Part One, Construction and Fire Prevention Standards Resolution for Board of
Appeals.
Local Amendments to NFPA 70
2005 National. Electrical Code
NEC SECTION 230.71(A)
MAXIMUM NUMBER OF ®ISCONNECTS -GENERAL
Add the following exception below Section 230.71(A) to read as follows:
Exception: In multi-occupant buildings, individual service disconnecting means is
limited to six for each occupant. In this context, the number of individual disconnects at
one location may exceed six.
NEC SECTION 300.11(A)
SECURED IN PLACE
Add the following exception below Section 300.11(A) to read as follows:
Exception: Ceiling grid support wires may be used for structural supports when the
associated wiring is located in that area. No more than two raceways or cables maybe
supported per support wire, with a maximum nominal metric designation 76 (trade size
%').
Part Four -Electrical Code Amendments
Part Four - Pg. 2
PART FIVE -MECHANICAL CODE AMENDMENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Mechanical Code as amended herein is the
Mechanical Code of Dallas-Fort Worth International Airport. References to the
International Mechanical Code shall be construed to reference the Mechanical Code as
adopted herein with its local amendments.
SECTION 103.1
DEPARTMENT OF MECHANICAL INSPECTION -GENERAL
Amend Section 103.1 as follows:
103.1 General. The department of mechanical inspection is hereby created and the
executive official in charge thereof shall be known as the ~e building official.
References to the department of mechanical inspection shall mean the Code
Compliance Section of the Airport Development and Engineering Department.
SECTION 106.3.1
CONSTRUCTION DOCUMENTS
Add the following sentence below Section 106.3.1:
Refer to Part Two, Building Code Amendments, Section 106.1 for additional
requirements related to submittal of construction documents.
SECTION 106.5.2
FEE SCHEDULE
Amend Section 106.5.2 to read as follows:
106.5.2 Fee schedule. Refer to Part Two, Building Code Amendments, Section 108 for
fees.
Part Five -Mechanical Code Amendments
Part Five - Pg. 1
SECTION 106.5.3
FEE REFUNDS
Amend Section 106.5.3 to read as follows:
106.5.3 Fee refunds. The building official is authorized to establish a refund policy.
SECTION 108.4
VIOLATION PENALTIES
Amend Section 108.4 to read as follows:
108.4 Violation penalties. Refer to Part One, Construction and Fire Prevention
Standards Resolution, Section 27, Penal Clause.
SECTION 109
MEANS OF APPEAL
Replace Section 109 with the following reference:
Refer to Part One, Construction and Fire Prevention Standards Resolution for Board of
Appeals.
Part Five -Mechanical Code Amendments
Part Five - Pg. 2
PART SIX -PLUMBING CODE AMENDMENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Plumbing Code as amended herein is the Plumbing
Code of Dallas-Fort Worth International Airport. References to the International
Plumbing Code shall be construed to reference the Plumbing Code as adopted herein
with its local amendments.
SECTION 103.1
DEPARTMENT OF PLUMBING INSPECTION -GENERAL
Amend Section 103.1 as follows:
103.1 General. The department of Plumbing inspection is hereby created and the
executive official in charge thereof shall be known as the c-e~e building official.
References to the department of plumbing inspection shall mean the Code Compliance
Section of the Airport Development and Engineering Department.
SECTION 106.3.1
CONSTRUCTION DOCUMENTS
Add the following sentence below Section 106.3.1:
Refer to Part Two, Building Code Amendments, Section 106.1 for additional
requirements related to submittal of construction documents.
SECTION 106.6.2
FEE SChIEDULE
Amend Section 106.6.2 to read as follows:
106.6.2 Fee schedule. Refer to Part Two, Building Code Amendments, Section 108 for
fees.
Part Six -Plumbing Code Amendments
Part Six - Pg. 1
SECTION 106.6.3
FEE REFUNDS
Amend Section 106.6.3 to read as follows:
106.6.3 Fee refunds. The building official is authorized to establish a refund policy.
SECTION 108.4
VIOLATION PENALTIES
Amend Section 108.4 to read as follows:
108.4 Violation penalties. Refer to Part One, Construction and Fire Prevention
Standards Resolution, Section 27, Penal Clause.
SECTION 109
MEANS OF APPEAL
Replace Section 109 with the following. reference:
Refer to Part One, Construction and Fire Prevention Standards Resolution for Board of
Appeals.
SECTION 312.9
INSPECTION AND TESTING OF BACKFLOW PREVENTION ASSEMBLIES
Replace Section 312.9 with the following reference:
312.9 Inspection and testing of backflow prevention assemblies. Backflow
prevention assemblies shall be inspected and tested as required by Texas
Administrative Code, Title 30, Part 1, Chapter 290 Public Drinking Water.
TABLE 403.1
MINIMUM NUMBER OF PLUMBING FACILITIES
Amend public assembly areas of passenger terminals in Table 403.1 as follows:
Part Six -Plumbing Code Amendments
Part Six - Pg. 2
WATER CLOSETS
(Urinals see
Section 419.2
BATHTUBS/ DRINKING
FOUNTAINS
(See Section
OCCUPANCY Male Female LAVATORIES SHOWERS 410.1 OTHERS
Public assembly
areas of
passenger 1 per --- 1 per 1,000 1 service
terminals and 1 per 100 100 1 per 200 sink
transportation
facilities
SECTION 404
ACCESSIBLE PLUMBING FACILITIES
Replace Section 404 as follows:
Refer to Part One, Building Code Amendments, Chapter 11 for accessibility standards.
SECTION 1106.1
CONDUCTORS, LEADERS AND STORM DRAINS
Amend to read as follows:
1106.'1 General. The size of the vertical conductors and leaders, building storm drains,
building storm sewers and any horizontal branches of such drains or sewers shall be
based on 5 inches per hour rainfall rate.
SECTION 1108
COMBINED SANITARY AND STORM SYSTEM
Delete Section 1108. Combined sanitary and storm sewer systems shall be prohibited
within the airport.
Part Six -Plumbing Code Amendments
Part Six - Pg. 3
PART SEVEN -FUEL GAS CODE AMENDMENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Fuel Gas Code as amended herein is the Fuel Gas
Code of Dallas-Fort Worth International Airport. References to the International Fuel
Gas Code shall be construed to reference the Fuel Gas Code as adopted herein with its
local amendments.
SECTION 103.1
DEPARTMENT OF INSPECTION -GENERAL
Amend Section 103.1 to read as follows:
103.1 General. The Department of Inspection is hereby created and the executive
official in charge thereof shall be known as the esde building official. References to the
department of inspection shall mean the Code Compliance Section of the Airport
Development and Engineering Department.
SECTION 106.3.1
CONSTRUCTION DOCUMENTS
Add the following sentence under Section 106.3.1:
Refer to Part Two, Building Code Amendments, Section 106.1 for additional
requirements related to submittal of construction documents.
SECTION 106.5.2
FEE SCHEDULE
Amend Section 106.5.2 to read as follows:
106.5.2 Fee schedule. Refer to Part Two, Building Code Amendments, Section 108 for
fees.
Part Seven -Fuel Gas Code Amendments
Part Seven - Pg. 1
SECTION 106.5.3
FEE REFUNDS
Amend Section 106.5.3 to read as follows:
106.5.3 Fee refunds. The building official is authorized to establish a refund policy.
SECTION 108.4
VIOLATION PENALTIES
Amend Section 108.4 to read as follows:
108.4 Violation penalties. Refer to Part One, Construction and Fire Prevention
Standards Resolution, Section 27, Penal Clause.
SECTION 109
MEANS OF APPEAL
Replace Section 109 with the following reference:
Refer to Part One, Construction and Fire Prevention Standards Resolution for Board of
Appeals.
-.
Part Seven -Fuel Gas Code Amendments
Part Seven - Pg. 2
PART EIGHT -ENERGY CODE AMENDMENTS
SECTION 101.1
TITLE
Amend Section 101.1 to read as follows:
101.1 Title. The 2006 International Energy Conservation Code as amended herein is
the Energy Code of Dallas-Fort Worth International Airport. References to the
International Energy Conservation Code shall be construed to reference the Energy
Code as adopted herein with its local amendments.
SECTION 101.1.1
DEPARTMENT OF INSPECTION -GENERAL
Add Section 101.1.1 as follows:
101.1.1 Gene~°al. The Department of Inspection is hereby created and the .executive
official in charge thereof shall be known as the building official. References to the
department of inspection shall mean the Code Compliance Section of the Airport
Development and Engineering Department.
SECTION 101.2
SCOPE
Amend Section 101.2 to read as follows:
101.2 Scope. This code applies to r°c~~al-anycommercial buildings.
SECTION 101.4.5
MIXED OCCUPANCY
Amend Section 101.4.5 to read as follows:
101.4.5 Mixed occupancy. Where a building includes both residential and commercial
occupancies, each occupancy shall be separately considered. ~^~ .,.,°°+ +~° ~r~r~rnot,~°
SECTION 101.5
COMPLIANCE
Amend Section 101.5 to read as follows:
Part Eight -Energy Code Amendments
Part Eight - Pg. 1
101.5 Compliance. Residential buildings shall meet the provisions of G"~~-,~t°~4 Texas
Building Energy Performance Standards. Commercial buildings shall meet the
provisions of Chapter 5.
SECTION 104.1
CONSTRUCTION DOCUMENTS -GENERAL
Add the following sentence after the first paragraph under Section 104.1:
Refer to Part Two, Building Code Amendments, Section 106.1 for additional
requirements related to submittal of construction documents.
SECTION 108
FEE SCIiEDULE
Add Section 108 to read as follows:
108 Fee schedule. Refer to Part Two, Building Code Amendments, Section 108 for
fees.
SECTION 109
FEE REFUNDS
Add Section 109 to read as follows:
109 Fee refunds. The building official is authorized to establish a refund policy.
SECTION 110
VIOLATION PENALTIES
Add Section 110 as follows:
110 !/iolation penalties. Refer to Part One, Construction and Fire Prevention
Standards Resolution, Section 27, Penal Clause.
SECTION 111
MEANS OF APPEAL
Add Section 111 as follows:
111 Meaa~s of Appeal. Refer to Part One, Construction and Fire Prevention Standards
Resolution for Board of Appeals.
Part Eight -Energy Code Amendments
Part Eight - Pg. 2
CHAPTER 2
DEFINITIONS
Amend definition of code official as follows:
CODE OFFICIAL. The building official is charged with the administration and
enforcement of this code.
CHAPTER 4
RESIDENTIAL- ENERGY EFFICIENCY
Delete Chapter 4 in its entirety. For residential energy efficiency requirements, refer to
Texas Building Energy PerFormance Standards.
SECTION 501.3
COMP<_IANCE SOFTWARE TOOLS
Add Section 501.3 as follows:
501.3 Compliance software tools. Software tools used to demonstrate compliance
with the Energy Code will be deemed acceptable to the building official if they utilize
either this code or the 2004 Edition of ASHRAE 90.1 -Energy Standard for Buildings
Except Low Rise Residential Buildings.
SECTION 505.2.1
INTERIOR LIGHTING CONTROLS
Amend Section 505.2.1 to read as follows with the exceptions to remain unchanged:
505.2.1 Interior lighting controls. Each area enclosed by walls or floor-to-ceiling
partitions shall have at least one manual control for the lighting serving that area. The
required controls shall be located within the area served by the controls or be a remote
switch that identifies the lights served and their status. Each control device shall control
a maximum of 2,500 square feet (232.26 square meters) of floor area for a space
10,000 square feet (929.03 square meters) or less and a maximum of 10,000 square
feet (929.03 square meters) for a space greater than 10,000 square feet (929.03
square meters).
Part Eight -Energy Code Amendments
Part Eight - Pg. 3
PART NINE -OIL AND GAS EXPLORATION AND PRODUCTION
SECTION 1
GENERAL INFORMATION
The Exploration, development and Production of Gas on the Airport property are
activities which make necessary regulations to establish uniform limitations, safeguards
and requirements for operations related to the Exploration, Drilling, developing,
producing, transporting and storing of Gas and other substances produced in
association with Gas within the Airport to protect the health, safety and general welfare
of the public, minimize the potential impact to property, protect the quality of the
environment and encourage the orderly production of available mineral, and gas
resources.
SECTION 2
DEFINITIONS
The following words, terms and phrases, when used in this Part, shall have the
meanings ascribed to them in this section:
Abandonment: means "abandonment" as defined by the Commission and includes the
plugging of a Well and the restoration of the area used during the Production of a Well
as required by this Part.
All-Weather Hard Surface: means a permanent surface that as a minimum is a base
course constructed such that it meets the requirements of the Fire Code, is at least
twenty two feet (22') wide, has an overhead clearance of fourteen feet (14'), drains
appropriately, remains water resistant, is free of litter, debris, weeds, grass or other
objectionable materials or objects and is visibly dust free.
API: means the American Petroleum Institute.
Berm: means a mound of soil, either natural or man made, used to obstruct a view.
The side slope shall not exceed athree-foot (3') horizontal and aone-foot (1') vertical
slope.
Blowout Preventer. means a mechanical, hydraulic, pneumatic or other device or
combination of such devices, including valves, fittings and control mechanisms
connected therewith, which can be closed around the drill pipe, or other tubular goods
which completely close the top of the casing and are designed for preventing blowouts.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 1
Brackish Water. means flow back water used in the fracturing and re-fracturing process
and other waste liquids produced in association with the production, treatment,
processing or transportation of hydrocarbons.
Building: means any structure used or intended for supporting or sheltering any use or
occupancy. Buildings with an occupant load of 3 or fewer in accordance with Table
1004.1.1 of the Building Code are not subject to the setback requirements of this Part.
Building Code: as defined in Part Two.
Building Official: as defined in Section 5, Part 1.
Closed Loop System: means a system utilized while Drilling so that reserve pits are not
used and instead steel bins are used to collect all drilling waste.
Commission: means the Texas Railroad Commission and all state rules.
Completion: means the earlier of the date the work is completed for the Drilling, re-
drilling or reworking of a Well and the crew involved in such activities is released or the
date the rig is released.
Derrick: means any portable framework, tower, mast and/or structure, which is required
or used in connection with Drilling or re-working a Well for the production of Gas.
Disposal Well: means a well drilled for the purpose of disposing of Brackish Water.
Drilling: means digging or boring a new Well for the purpose of exploring for,
developing or producing Gas or for the purpose of injecting Gas, water or any other fluid
or substance into the earth.
Drill Site: means the immediate area used during the Drilling, re-drilling or re-working of
a Well.
Electrical Code: as defined in Part Four.
Emergency Response Plan: means a plan put in place to deal with emergency
situations that may occur at the Drill Site and/or the Operation Site.
Energy Code: as defined in Part Eight.
Exploration: means geologic or geophysical activities, including seismic surveys,
related to the search for Gas or other subsurface hydrocarbons.
FEMA: means the Federal Emergency Management Agency.
FIRM: means the Flood Insurance Rate Map.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 2
Fire Chief: as defined in Section 5, Part 1
Fire Code: as defined in Part Three.
Fire Department: means the Fire Department of the Airport.
Frac Tank: means an enclosed steel tank used to hold Brackish Water.
Fracturing: means the injecting of a substance into a Well or formation so as to cause
underground channels in hydro-carbon-bearing formations to open.
Fresh Water Fracing Pit: means a pond, open to the atmosphere, used to hold fresh
water for Fracturing.
Fuel Gas Code: as defined in Part Seven.
Gas: means any fluid, either combustible or noncombustible, which is produced in a
natural state from the earth and which maintains a gaseous or rarefied state at standard
temperature and pressure conditions and/or the gaseous components or vapors
occurring in or derived from petroleum or Gas.
Gas Well: means any Well drilled, to be drilled, or used for the intended or actual
production of natural gas.
Mechanical Code: as defined in Part Five.
Oil: means crude petroleum oil and other hydrocarbons regardless of gravity which are
produced at the wellhead in liquid form and the liquid hydrocarbons known as distillate
or condensate recovered or extracted from Gas, other than gas produced in association
with oil and commonly known as casinghead gas.
Oil Well: means any Well drilled, to be drilled, or used for the intended or actual
production of Oil.
Operation Site: means the area used for development and production and all
operational activities associated with Gas after Drilling activities are complete.
Operator. means, for each Well, the person listed on the Commission's Form W-1 or
Form P-4 for a Gas Well or Oil Well that is, or will be actually in charge and in control of
Drilling, maintaining, operating, pumping or controlling any Well, including, without
limitation, a unit operator.
Permit: means any written license granted by the Airport authorizing the Operator to
undertake activity on the Airport.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 3
Plumbing Code: as defined in Part Six.
Production: means the period between Completion of Drilling and the Abandonment of
the Well.
Re-Drill: means the Drilling of a new Well located in essentially the same place as an
earlier Well or the re-completion of an existing Well by deepening or sidetrack
operations extending more than one hundred fifty feet (150') from the existing Well
bore.
Re-working: means re-completion or re-entry of an existing Well within the existing
bore hole or by deepening or sidetrack operations which do not extend more than one
hundred fifty feet (150') from the existing well bore, or replacement of well liners or
casings.
Street: means any street, highway, sidewalk, alley, or avenue that is open to public use
or is in support of Airport operations.
SWPPP: means stormwater pollution prevention plan.
TCEQ: means the Texas Commission on Environmental Quality.
USEPA: means the United States Environmental Protection Agency.
Well: means any single hole or bore to any horizon, formation, or strata, for the
purpose of producing Gas and/or Oil from the Airport.
SECTION 3
AIRPORT OVERSIGHT
The Building Official is charged with the administration and enforcement of this part.
The Building Official and the Fire Chief shall have the authority to enter and inspect any
Drill Site or Operation Site to determine compliance with this Resolution and all
applicable laws, rules, regulations, standards or directives adopted by the Airport Board
or State. Failure of any person to permit access to the Building Official or Fire Chief
shall constitute a violation of this Resolution. Additionally, the Building Official or Fire
Chief and other Airport officials shall have the authority to issue any orders or directives
required to implement the intent and purpose of this Resolution and its provisions. The
Building Official or Fire Chief shall have the authority to request and receive any
records, including any records sent to the Commission, logs, reports and the like,
relating to the status or condition of any Well necessary to establish and determine
compliance with a Permit. Failure of any person to provide any such requested material
shall be deemed a violation of this Resolution.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 4
SECTION 4
OPERATOR'S AGENT
Every Operator shall designate an agent, who is a resident of the State of Texas, upon
whom all orders and notices provided in this Resolution may be served in person or by
registered or certified mail. Every Operator designating such agent shall within ten (10)
days notify the Building Official in writing of any change in such agent or such mailing
address unless operations within the Airport are discontinued. Failure to do so shall be
deemed a violation of this Resolution.
SECTION 5
SEISMIC SURVEY PERMIT REQUIREMENTS
A Permit shall be required for all geophysical tests, including but not limited to seismic
surveys. All applications for a Permit to conduct geophysical tests, including but not
limited to seismic surveys, shall be submitted to the Building Official for approval. No
geophysical tests shall begin prior to the issuance of a Permit from the Airport Board. A
Permit application shall include, but is not limited to, the following information:
(a) Operator/applicant name, phone number, fax number, physical address, and e-
mail address.
(b) Detailed mapping of location and extent of the proposed geophysical test.
(c) Detailed explanation of the survey or testing method to be used.
(d) Frequency and strength of all radio frequency (RF) signals.
(e) Under no circumstances may explosive charges, including, but not limited to, the
use of dynamite, be used in any way related to the preparation for andlor
conducting of a geophysical test.
SECTION 6
GAS WELL AND DISPOSAL V1-ELL PERMIT REQUIREMENTS
(a) No person acting either for himself or acting as an agent, employee, independent
contractor, or servant of any person shall drill any Well or Disposal Well, assist in
any way in the site preparation, re-working, Fracturing or operation of any Well or
Disposal Well or to conduct any activity related to the production of Gas without
first obtaining a Permit issued by the Building Official in accordance with this
Resolution. Such activities include, but are not limited to, initial site preparation,
re-working, Drilling, operations, construction of rigs, Fresh Water Fracing Pit or
tank batteries, Fracturing and pressurizing.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 5
(b) The Operator must apply for and obtain a Permit for the Drilling of each Well or
Disposal Well. The Operator shall neither apply for nor obtain a "blanket" Permit
for more than one (1) Well. A Disposal Well permit will only be issued for
disposal of Brackish Water from oil and gas exploration and production,
treatment or transportation of hydrocarbons within the boundaries of Dallas/Fort
Worth International Airport property. All Disposal Wells must deposit Brackish
Water into the Ellenberger formation. Each new Well or Disposal Well
established at the ground surface will be considered a new Well or Disposal Well
as applicable.
(c) An existing Permit shall not constitute authority for the re-entering and Drilling of
a Well the subject of Abandonment. An Operator shall obtain a new Permit in
accordance with the provisions of this Resolution if the Operator is re-entering
and Drilling an abandoned Well.
(d) When a Permit has been issued to the Operator for the Drilling, re-entering,
activating or converting of a Well, such Permit shall constitute sufficient authority
for Drilling, operation, production gathering or production maintenance, repair,
re-working, testing, plugging and Abandonment of the Well and/or any other
activity associated with mineral exploration at an Operation Site. An amended
Permit shall be obtained before such Well may be modified for purposes of re-
drilling, deepening or converting such Well to a depth or use other than that set
forth in the then-current Permit for such Well.
(e) Any person who intends to re-work a Well using a Drilling rig or to engage in
Fracturing a Well after initial Completion shall give written notice to, and receive
written approval from, the Building Official. The notice must identify where the
activities will be conducted and must describe the activities in detail, including,
but not limited to the duration of the activities and the time the activities will be
conducted. The notice must also provide the address and twenty-four (24) hour
telephone number of the person conducting the activities.
(f) A Permit shall automatically terminate, unless extended, if Drilling is not
commenced within one year from the date of the issuance of the Permit. A
Permit may be extended by the Building Official upon written request by the
Operator and proof that the regulatory standards of the requested Permit for
such location have not changed.
(g) Permits required by this Resolution are in addition to and are not in lieu of any
permit, which may be required by any other governmental agency.
(h) No Permit shall be issued for any Well to be drilled within the floodway identified
by FEMA on the most current FIRM. Wells proposed in the floodplain outside of
the floodway shall comply with the requirements of the Building Official.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 6
(i) No Permit shall be issued for any Well to be drilled that is not in compliance with
this Resolution.
(j) By acceptance of any Permit issued pursuant to this Resolution, the Operator
expressly stipulates and agrees to be bound by and comply with the provisions
of this Resolution. The terms of this Resolution shall be deemed to be
incorporated in any Permit issued pursuant to this Resolution with the same
force and effect as if this Resolution was set forth verbatim in such Permit.
(k) Operator must provide to the Building Official, a copy of all H-5 and mechanical
integrity tests required by the Commission.
SECTION 7
PERMIT APPLIC/aT1ON
(a) Every application for a Permit issued pursuant to this Resolution shall be on
forms required by the Building Official, shall include payment of the construction
permit and plan review fees and shall be signed. by the_Operator, or some person
duly authorized to sign on his behalf, and filed with the Building Official. The
application shall include the following information:
(1) The date of the application and type of Permit requested.
(2) Map showing proposed transportation route and road(s) for equipment,
chemicals or waste products used or produced under the Permit.
(3) Proposed Well name and Well depth.
(4) Name, telephone number, fax number, physical address of individual
designated to receive notice, and, if possible, a-mail address.
(5) Names and addresses of representatives or Operator's agent with
supervisory authority over the Drill Site or Operation Site and atwenty-four
(24) hour telephone number.
(6) Location and description of all improvements and structures within eight
hundred feet (800') of the Well. Such locations and descriptions shall be
prepared by a Registered Professional Land Surveyor.
(7) A site plan of the proposed Drill Site and Operation Site showing the
location of all improvements and equipment, including the location of the
proposed Well and other facilities including, but not limited to, Fresh Water
Fracing Pit, Disposal Well, tanks, pipelines, compressors, separators and
storage tanks or storage sheds. All site plans must include the following
criteria:
Part Nine -Oil and Gas Exploration and Production
Park Nine - Pg. 7
a. Location of proposed Buildings and structures indicating sizes in square
feet.
b. The location and intensity of exterior lighting fixtures.
c. The location of mechanical equipment.
d. Outside storage areas.
e. Curb cut locations.
f. Parking, loading, and maneuvering areas.
g. The location, materials and dimensions of screening improvements as
required.
h. Waste disposal locations.
i. Streets immediately adjacent to the Operation Site.
j. Drill Site and Operation. Site plans shall be submitted on a sheet size of
24" x 36" minimum, or as approved by the Building Official.
k. Airport boundaries where applicable.
I. Date the drawing was prepared with name, address, and phone number
of preparer.
m. North arrow, at a maximum scale of 1:50 immediately adjacent to the
Drill Site or Operation Site.
n. Title Block identifying the Drill Site or Operation Site location.
o. Vicinity location map at 1" = 2000'.
p. Location of 100-year flood limits where applicable.
q. Texas NAD83 State Plane Coordinates for all four corners.
(8) Copy of all reports and permits required by the Commission, specifically
including a copy of the approved Commission Form W-1, H-5 and/or P-4.
(9) A description of public utilities required during Drilling and Production.
(10) A description of the water source to be used during Drilling.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 8
(11) A copy of the Erosion Control Plan as required by the Airport Board.
(12) A copy of the determination by the TCEQ of the depth of useable quality
ground water.
(13) A copy of the TCEQ permit.
(14) A statement, under oath, signed by the Operator or designated
representative, that the information submitted with the application is, to the
best knowledge and belief of the Operator or designated representative,
true and correct.
(15) Three copies of a Hazardous Material Management Plan and additionally,
all material safety data sheets for all hazardous materials that will be
located, stored, transported and/or temporarily used on the Drill Site shall
be provided to the Building Official.
(16) Three copies of the Hazardous Materials Inventory Statement.
(17) Operator shall submit to the Building Official, for review and approval, an
Emergency Response Plan establishing written procedures to minimize any
hazard resulting from Drilling, Completion or producing of a Gas Well. Said
plan shall use existing guidelines established by the Commission, TCEQ,
Texas Department of Transportation, the Fire Code and/or the USEPA. A
copy of the Emergency Response Plan shall be kept on site.
(18) A map showing the location of all underground transmission pipelines.
SECTION 8
PERIViITTING PROCEDURE
(a) All Well Permit applications will be filed through the Building Official.
(b) It is the responsibility of the Building Official to review and approve or disapprove
all applications for Permits based on the criteria established by this Resolution.
(c) After the filing of a completed application, payment of permit and plan review
fees and remittance of all insurance and security per the requirements of this
Resolution for a Permit, the Building Official will determine whether the Permit
application shall be approved or denied.
(d) The provisions of this Resolution shall apply to any application for a Permit that
is filed with the Building Official.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 9
(e) If all the requirements of this Resolution are met, the Building Official shall issue
a Permit for the activity for which the Permit application was made.
(f) If the Building Official denies a Permit application, the Building Official shall notify
the Operator in writing of such denial stating the reasons for the denial. The
Operator may cure those conditions that caused the denial and resubmit the
application to the Building Official for approval and issuance of the Permit.
SECTION 9
AMENDED GAS WELL PERMITS
(a) An amended Permit may be issued for, but not limited to, the following changes
in Drill Site or Operation Site activities:
(1) Re-drilling;
(2) Deepening beyond one hundred fifty feet (150') of the permitted depth;
(3) Site access; and
(4) Locations and/or quantities of equipment as determined by the Building
Official;
(b) Applications for amended Permits shall be in writing, shall be signed by the
Operator, and shall include the following:
(1) A description of the proposed amendments;
(2) Any changes to the information submitted with the application for the
existing Permit (if such information has not previously been provided to the
Airport Board);
(3) Such additional information as is reasonably required by the Building
Official to demonstrate compliance with the Permit;
(4) Such additional information as is reasonably required by the Building
Official to prevent imminent destruction of property or injury to persons; and
(5) An amended site plan.
(c) All applications for amended Permits shall be filed with the Building Official for
review. Incomplete applications may be returned to the applicant, in which case
the Building Official shall provide a written explanation of the deficiencies.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 10
(d) If the activities proposed by the amendment are not materially different from the
activities covered by the existing Permit then the Building Official shall approve
or disapprove the amendment after the application is filed.
(e) If the activities proposed by the amendment are materially different from the
activities covered by the existing Permit, and do not create a risk of destruction
of property or injury to persons, then the Building Official shall approve or
disapprove the amendment. If, however, the activities proposed by the
amendment are materially different and, in the judgment of the Building Official
might create a risk of destruction of property or injury to persons that were not
associated with the activities covered by the existing Permit or that were not
otherwise taken into consideration by the existing Permit, the Building Official
may require the amendment to be processed as a new Permit application.
SECTION 10
SUSPENSION OR REVOCATION OF WELL PERMITS
(a) If an Operator (or its officers, employees, agents, contractors, or representatives)
fails to comply with any requirement of a Permit (including any requirement
incorporated by reference as part of the Permit), the Airport Board shall give
written notice to the Operator specifying the nature of the failure and giving the
Operator a reasonable time to cure, taking into consideration the nature and
extent of the failure, the extent of the efforts required to cure, and the potential
impact on the health, safety, and welfare of the public. In no event, however,
shall the cure period be less than ten (10) days unless the failure presents a risk
of imminent danger to property or injury to persons or unless the failure involves
the Operator's failure to provide periodic reports as required by this Resolution.
(b) If the Operator fails to correct the noncompliance, the Airport Board may
suspend or revoke the Permit pursuant to the provisions of this Resolution.
(c) No person shall carry on any operations performed under the terms of a Permit
issued under this Resolution during any period of any suspension or revocation
of the Permit or pending a review of the decision or order of the Airport Board in
suspending or revoking the Permit. Nothing contained herein shall be construed
to prevent the necessary, diligent and bona fide efforts to cure and remedy the
default or violation for which the suspension or revocation of the Permit was
ordered for the safety of persons or as required by the Building Official or the
Fire Chief.
(d) If the Operator does not cure the noncompliance within the time specified in this
Resolution, the Airport Board, upon written notice to the Operator, may notify the
Commission and request that the Commission take any appropriate action.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 11
SECTION 11
PERIODIC REPORTS
(a) The Operator shall notify the Building Official of any changes to the following
information within ten (10) days after the change occurs:
(1) The name, physical address, telephone number, and fax number of the
Operator;
(2) The name, address, and telephone number of the person designated to
receive notices from the Airport Board (which person must be a resident of
Texas that can be served in person or by registered or certified mail); and
(3) The Operator's emergency action response plan (including "drive-to-maps"
from rights-of-way to each Drill Site or Operation Site).
(b) The Operator shall notify in writing the Building Official of any change to the
name, address, and twenty-four (24) hour phone number of the person(s) with
supervisory authority over Drilling or operations activities within one (1) business
day.
(c) The Operator shall provide a copy of any "incident reports" or written complaints
submitted to the Commission and a copy to the Airport Board within thirty (30)
days after the Operator has notice of the existence of such reports or complaints.
(d) Beginning on December 31St after each Well is completed, and continuing on
each December 31St thereafter until the Operator notifies the Building Official that
there has been an Abandonment of the Well and the Operation Site is restored,
the Operator shall submit a written report to the Building Official identifying any
changes to the information that was included in the application for the applicable
Permit that have not been previously reported to the Building Official.
SECTION 12
BOND, LETTERS OF CREDIT, INDEMNITY INSURANCE
(a) General requirements. The Operator shall be required to:
(1) Comply with the terms and conditions of this Resolution and the Permit
issued hereunder.
(2) Promptly clear each Drill Site and Operation Site of all litter, trash, waste
and other substances used, allowed, or occurring in the operations, and
after Abandonment or Completion grade, level and restore such property to
the same surface conditions as nearly as possible as existed before
operations as determined by the Building Official.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 12
(3) Promptly pay all fines, penalties and other assessments imposed due to
breach of any terms of the Permit.
(4) Promptly restore to its former condition any property damaged by the
Operator.
(b) Bond, irrevocable letter of credit. Prior to the issuance of a Permit the Operator
shall provide the Building Official with a security instrument in the form of a bond
or an irrevocable letter of credit as follows:
(1) Bond. A bond shall be executed by a reliable bonding or insurance
institution authorized to do business in Texas, acceptable to the Airport
Board. The bond shall become effective on or before the date the Permit is
issued and shall remain in force and effect for at least a period of six (6)
months after the expiration of the Permit term or until there has been an
Abandonment of the Well and the Operation Site is restored, whichever
occurs last. The Operator shall be listed as principal and the instrument
shall run to the Airport Board, as obligee, and shall be conditioned that the
Operator will comply with the terms and regulations of this Resolution and
all other laws and regulations. The original bond shall be submitted to the
Building Official.
(2) Letter of Credit. A letter of credit shall be issued by a reliable bank
authorized to do business in Texas and shall become effective on or before
the date the Permit is issued. The letter of credit shall remain in force and
effect for at least a period of six (6) months after the expiration of the Permit
term or until there has been an Abandonment of the Well and the Drill Site
or Operation Site is restored, whichever occurs last. The Airport Board
shall be authorized to draw upon such letter of credit to recover any fines,
penalties or costs to remedy assessed under this Resolution. Evidence of
the execution of a letter of credit shall be submitted to the Building Official
by submitting an original signed letter of credit from the banking institution.
(3) The principal amount of any security instrument shall be fifty thousand
dollars ($50,000) for any single Well. After Completion of a Well, the
Operator may submit a request to the Building Official to reduce the existing
bond to ten thousand dollars ($10,000) for the remainder of the time the
Well produces without reworking. During reworking operations, the amount
of the bond or letter of credit shall be maintained at fifty thousand dollars
($50,000). If at any time after no less than a fifteen (15) day written notice
to the Operator, the Airport Board shall deem any Operator's bond or letter
of credit to be insufficient, it may require the Operator to increase the
amount of the bond or letter of credit up to a maximum of two hundred fifty
thousand dollars ($250,000) per Well.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 13
(4) Whenever the Building Official finds that a default has occurred in the
performance of any requirement or condition imposed by this Resolution, a
written notice shall be given to the Operator. Such notice shall specify the
work to be done, the estimated cost and the period of time deemed by the
Building Official to be reasonably necessary for the completion of such
work. After receipt of such notice, the Operator shall, within the time therein
specified, either cause or require the work to be performed, or failing to do
so, shall pay over to the Airport Board one hundred twenty-five percent
(125%) of the estimated cost of doing the work as set forth. in the notice. In
no event, however, shall the cure period be less than thirty (30) days unless
the failure presents a risk of imminent destruction of property or injury to
persons or unless the failure involves the Operator's failure to provide
periodic reports as required by this Resolution. The Airport Board shall be
authorized to draw against any irrevocable letter of credit or bond to recover
such amount due from the Operator. Upon receipt of such monies, the
Airport Board shall proceed by such mode as deemed convenient to cause
the required work to be performed and completed, but no liability shall be
incurred other than for the expenditure of said sum in hand. In the event
there has not been a proper Abandonment of the Well under the regulations
of the Commission, such additional money may be demanded from the
Operator as is necessary to properly plug and abandon the Well and
restore the Drill Site or Operation Site in conformity with the regulations of
this Resolution.
(5) In the event the Operator does not cause the work to be performed and fails
or refuses to pay over to the Airport Board the estimated cost of the work to
be done as set forth in the notice, or the issuer of the security instrument
refuses to honor any draft by the Airport Board against the applicable
irrevocable letter of credit or bond, the Airport Board may proceed to obtain
compliance and abate the default by way of civil action against the
Operator, or by criminal action against the Operator, or by both such
methods.
(6) When there has been a proper Abandonment of the Well or Wells covered
by said irrevocable letters of credit or bond in conformity with all regulations
of this Resolution, and in conformity with all regulations of the Commission
and notice to that effect has been received by the Airport Board, or upon
receipt of a satisfactory substitute, the irrevocable letter of credit or bond
issued in compliance with these regulations shall be terminated and
cancelled.
(c) Insurance. The Operator must at all times maintain the specific coverages listed
below.
(1) Environmental pollution liability coverage. Operator shall purchase and
maintain in force for the duration of the Permit, insurance for environmental
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 14
pollution liability applicable to bodily injury; property damage, including loss
of use of damaged property or of property that has not been physically
injured or destroyed; cleanup costs; and defense, including costs and
expenses incurred in the investigation, defense or settlement of claims; all
in connection with any loss arising from the insured site. Coverage shall be
maintained in an amount of at least one million dollars ($1,000,000) per
loss, with an annual aggregate of at least ten million dollars ($10,000,000).
a. Coverage shall apply to sudden and accidental pollution conditions
resulting from the escape or release of smoke, vapors, fumes, acids,
alkalis, toxic chemicals, liquids or gases, waste material or other irritants,
contaminants or pollutants.
b. The Operator shall maintain continuous coverage and shall purchase
extended coverage period insurance when necessary. The extended
coverage period insurance must provide that any retroactive date
applicable to coverage under the policy precedes the effective date of
the issuance of the Permit by the Building Official.
(2) Control of Well. The policy should cover the cost of controlling a Well that
is out of control, re-drilling or restoration expenses, seepage and pollution
damage as first party recovery for the Operator and related expenses,
including, but not limited to, loss of equipment, experts and evacuation of
residents, in the amount of five million dollars ($5,000,000) per
occurrence/no aggregate, if available, otherwise an aggregate of ten million
dollars ($10,000,000). Five hundred thousand dollars ($500,000) sub-limit
endorsement may be added for damage to property for which the Operator
has care, custody and control.
SECTION 13
SETBACK REQUIREMENTS
The following are minimum setbacks.
(a) It shall be unlawful to drill, re-drill, deepen, re-enter, activate or convert any Well
or Disposal Well, the center of which, at the surface of the ground, is located:
(1) Within six hundred feet (600') from any Building; or
(2) Within one hundred feet (100') from any Building accessory to, but not
necessary to the operation of the well; or
(3) Within seventy-five feet (75') of any existing or planned right of way for
street, highway or rail; or
(4) Within two hundred feet (200') of any existing potable water well.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 15
(b) Tank batteries, separators and compressors and their associated vents and
flares shall be located at least three hundred feet (300') from any Street or
Building not used in operations on the Drill Site or Operations Site, nor less than
five hundred feet (500') from any flammable bulk storage facility.
(c) Fresh Water Fracing Pits shall be located at least one hundred feet (100') from
any Street or Building.
(d) The measurement of all distances shall be calculated from the proposed Well
bore, Disposal Well bore, tank battery, separator, compressor or Fresh Water
Fracing Pit in a straight line, without regard to intervening structures or objects
to the closest exterior point of the object listed in items (a) through (c) above.
The above calculations shall be prepared by a Registered Professional Land
Surveyor.
(e) As to any public park, residence, religious institution, hospital building, school or
other public building that is outside the boundaries of the Airport, the distances
set out in subsections (a) through (c) of this section may not be reduced without
both of the fallowing:
(1) Written notarized waivers granted by all the surface owners must be filed,
at the expense of the Operator, in the applicable county records. All
waivers must identify the property address, block and lot number,
subdivision name and plat volume and page number.
(2) With an approved variance obtained in accordance with procedures
outlined under Section 20 of this Part.
(f) As to any Building that is within the boundaries of the Airport, the distances set
out in subsections (a) through (c) of this section may be reduced with an
approved variance in accordance with procedures outlined under Section 20 of
this Part but may not be reduced to less than that permitted by the Fire Code.
SECTION 14
ON SITE AND TECHNICAL REGULATIONS
(a) Abandoned Wells. All Wells shall be abandoned in accordance with the rules
of the Commission; however, all Well casings shall be cut and removed to a
depth of at least three feet (3') below the surface unless the Airport Board
agrees in writing otherwise. No Building shall be built over an abandoned Well.
A well marker, with the well number displayed on it, must be welded to the top
of the cut off well pipe.
(b) Blowout prevention. In all cases, blowout prevention equipment shall be used
on all wells being drilled, worked-over or in which tubing is being changed.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 16
Protection shall be provided to prevent blowout during petroleum or gas
operations as required by and in conformance with the requirements of the
Commission and the recommendations of the American Petroleum Institute.
The Operator must equip all Drilling Wells with adequate blowout preventers,
flow lines and valves commensurate with fihe working pressures involved as
required by the Commission.
The ram-type blowout preventers, valves, and manifolds shall be pressure
tested as follows:
1.) at the time of installation,
2.) whenever any seal subject to test pressure is broken,
3.) following related repairs and
4.) at 30 day intervals thereafter.
A period of more than thirty (30) days between blowout preventer tests may be
allowed, with the Building Official's approval, when well operations prevent
testing, provided the tests will be conducted as soon as possible before normal
operations resume. The record of communications with the Building Official
shall be entered in the driller's log.
During drilling and completion operations, the ram-type blowout preventers
shall be tested by closing at least once each trip, and the annular-type
preventer shall be tested by closing on drill pipe once each week. All of the
above described tests and/or drills shall be recorded in the drilling log and
made available to the Building Official upon request.
(c) Hazardous materials storage. All chemicals and/or hazardous materials shall
be stored in such a manner as to prevent, contain, and facilitate rapid
remediation and cleanup of any accidental spill, leak, or discharge of a
hazardous material. Operator shall have all material safety data sheets for all
hazardous materials on site. All applicable federal and state regulatory
requirements for the proper labeling of containers shall be followed. All
hazardous materials and/or special hazards at the Well sites shall be protected
in accordance with National Fire Protection Association standards, and the Fire
Code. Appropriate pollution prevention actions shall be required and include,
but are not limited to, chemical and materials raised from the ground (e.g.,
wooden pallets), bulk storage, installation and maintenance of secondary
containment systems, and protection from storm water and weather elements.
(d) The following requirements shall apply to all Fracturing operations performed
on a Well:
(1) A watchperson shall be required at all times during such operations; and
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 17
(2) At no time shall the Well be allowed to flow or vent directly to the
atmosphere without first directing the flow through separation equipment
or into a portable tank.
(e) Compliance. Operator shall comply at all times with all applicable federal, state
and Airport Board requirements. In the event of any conflicts between the
provisions of this Resolution, and the Commission rules and regulations, the
more restrictive provision shall apply. Whenever necessary to protect health,
safety or welfare, the Building Official or the Fire Chief may direct any Operator
to locate, relocate, remove or replace any Well surface facilities located within
a particular Operation Site.
(f) Discharge. No person shall place, deposit, discharge, or cause or permit to be
placed, deposited or discharged, any oil, naphtha, petroleum, asphalt, tar,
hydrocarbon substances or any refuse including wastewater or brine from any
gas operation or the contents of any container used in connection with any gas
operation in, into, or upon any Streets, lots, storm drain, ditch or sewer,
sanitary drain or any body of water or any property of the Airport.
(g) Drill stem testing. All open hole formation or drill stem testing shall be done
during daylight hours, with adequate advance notification thereof to the
Building Official to enable him to be present during such testing. Drill stem
tests may be conducted only if the Well effluent during the test is produced
through an adequate gas separator to storage tanks and the effluent remaining
in the drill pipe at the time the tool is closed is flushed to the surface by
circulating drilling fluid down the annulus and up the drill pipe.
(h) Drip pans and other containment devices. All materials on location (liquids,
semi-liquids and solids) and any tanks, containers, pumps, lubricating systems,
engines, fuel and chemical storage tanks or systems containing such materials
shall be provided with drips pans or other containment devices appropriate to
the risks and hazards that those materials pose to workers, the public and the
environment.
(i) Dust, vibration, odors. All Drilling and production operations shall be conducted
in such a manner as to minimize, so far as practicable, dust, vibration, or
noxious odors, and shall be in accordance with the best accepted practices
incident to Drilling for the production of Gas and other hydrocarbon
substances. All equipment used shall be so constructed and operated so that,
vibrations, dust, odor or other harmful or annoying substances or effect will be
minimized by the operations carried on at any Drilling or production site or from
anything incident thereto; nor shall the site or structures thereon be permitted
to become dilapidated, unsightly or unsafe. Proven technological
improvements as identified by the Building Official in industry standards of
Drilling and production in this area may be adopted as they become available if
capable of reducing dust, vibration and odor.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 18
Q) Electric lines. All electric lines to production facilities shall be located in a
manner compatible to those already installed in the surrounding area.
(k) Emergency Response Plan. Prior to the commencement of any Gas or other
hydrocarbons site activities, Operator shall submit to the Building Official an
Emergency Response Plan establishing written procedures to minimize any
hazard resulting from Drilling, Completion or producing of a Gas Well. Said
plan shall use existing guidelines established by the Commission, TCEQ,
Texas Department of Transportation and/or the USEPA. The Emergency
Response Plan shall be kept current with any additions, modifications, and/or
amendments concerning all construction-related activities, natural gas
operations and, and/or natural gas production. Those updates to the Plan
which might materially impact the needs or actions of first responders or the
DFW Airport Emergency Management Plan shall be submitted to the approved
distribution list as soon as practical. A copy of the Emergency Response Plan
shall be kept on site.
(I) Explosives. Use of explosives within Airport property shall require an
Operational Permit issued by the DFW Department of Public Safety Fire
Prevention Office. Each use of explosives will be limited to a single period of
time, individual locations and use for jet perforation of wells or other technical
applications such as pipe recovery, as described to, and approved by, the
DFW DPS Fire Prevention Office prior to use.
(m) Fire prevention; sources of ignition. Firefighting apparatus and supplies as
approved by the Fire Department and required by any applicable federal, state,
local law, or the Fire Code shall be provided by the Operator, at the Operator's
cost, and shall be maintained on the Drill Site at all times. The Operator shall
be responsible for the maintenance and upkeep of such equipment. At a
minimum, the Operator shall provide at each Drill Site at least four portable fire
extinguishers, the size, rating, distribution and maintenance of which shall be in
accordance with the National Fire Protection Association Standard #10 and
Standard #30. The Fire Department may require more fire extinguishers based
on an evaluation of the hazards at the individual sites. Each Well shall be
equipped with an automated valve that closes the Well in the event of an
abnormal change in operating pressure. All wellheads shall contain an
emergency shut off valve to the well distribution line. Lightning protection
equipment shall be installed as required at every site in accordance with the
National Fire Protection Association Standard 780. Tank battery facilities shall
be equipped with a remote foam line and a lightning arrestor system.
(n) Gas emission or burning restricted. No person shall allow, cause or permit Gas
to be vented into the atmosphere or to be burned by open flame except as
provided by law or as permitted by the Commission.
--
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 19
(o) Grass, weeds, trash. Each Drill Site and Operation Site shall be kept clear of
high grass, weeds, and combustible trash.
(p) Lights. No person shall permit any lights located on any Drill Site or Operation
Site to be directed in such a manner so that they shine directly on Streefis or
Buildings. To the extent practicable, and taking into account safety
considerations, Drill Site and Operation Site lighting shall be directed
downward and shielded so as to both prevent direct illumination of and
minimize glare on Streets and Buildings within six hundred feet (600').
(q) Muffling exhaust. Exhaust from any internal combustion engine, stationary or
mounted on wheels, used in connection with the Drilling or for use on any
production equipment shall not be discharged into the open air unless it is
equipped with an exhaust muffler, or mufflers or an exhaust muffler box
constructed of noncombustible materials sufficient to suppress noise and
prevent the escape of noxious gases, fumes or ignited carbon or soot. All
Fracturing operations shall be conducted during daylight hours unless the
Operator has notified the Building Official that Fracturing will occur before or
after daylight hours, and the Building Official has approved of such procedures.
(r) Organic solvents. Organic solvents, such as trichloroethylene and carbon
tetrachloride, shall not be used for cleaning any element, structure, or
component of the Derrick, drilling rig, platform, and/or associated equipment,
tools, or pipes. To the maximum extent practicable, high flash point mineral
spirits shall be used.
(s) Pipe dope for thread protection. Lead-free pipe dope shall be substituted for
API specified pipe dope.
(t) Pits. All Drilling and Wells drilled shall utilize a Closed Loop System. Fresh
Water Fracing Pits must be netted at all times to exclude access by waterfowl.
(u) Private roads and Drill Sites. Prior to the commencement of any Drilling, all
roads used for access to the Drill Site and the Operation Site itself shall be at
least twenty-two feet (22') wide, have an overhead clearance of fourteen feet
(14') and shall be an All-Weather Hard Surface and maintained in accordance
with the Fire Code, and to be non-erodible. In particular cases these
requirements governing surfacing of roads may be altered at the discretion of
the Fire Chief after consideration of all circumstances including, but not limited
to, the following: distances from Streets and Buildings; topographical features;
nature of the soil; and exposure to wind. All access roads must be kept clean
and unobstructed at all times.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 20
(v) Signs (Refer to Part 2 for sign permitting requirements).
(1) A sign shall be immediately and prominently displayed at the gate on the
temporary and permanent site fencing erected pursuant to this Resolution.
Such sign shall be of durable material, maintained in good condition and,
unless otherwise required by the Commission, shall have a surface area
of not less than sixteen (16) square feet with contrasting lettering not less
than four inches (4") tall and shall be lettered with the following:
a. Location Name and Pad Name;
b. Name of Operator;
c. The emergency 911 number; and
d. 24 Hour telephone numbers of two (2) persons responsible for the
Well who may be contacted in case of emergency.
(2) Permanent weatherproof signs reading "DANGER NO SMOKING
ALLOWED" in both English and Spanish shall be posted immediately
upon Completion at the Operation Site fencing at the entrance of each
Operation Site and tank battery or in any other location approved or
designated by the Fire Department. Sign lettering shall be four inches (4")
in height and shall be red on a white background or white on a red
background. Well and lease designation signage shall be posted in fihose
locations and sizes as required by the Commission in Rule 3.3
Identification of Properties, Wells, and Tanks.
(w) Storage of equipment. On-site storage is prohibited on the Operation Site. No
equipment shall be stored on the Drill Site or Operation Site, unless it is
necessary to the everyday operation of the Well. Lumber, pipes, tubing and
casing shall not be left on the Operation Site except when Drilling or Well
servicing operations are being conducted on the Operation Site. No vehicle or
item of machinery shall be parked or stored on any Street, or upon any
Operation Site which constitutes a fire hazard or an obstruction to or
interference with fighting or controlling fires except that equipment which is
necessary for Drilling or production operations on the Drill Site or Operation
Site. The Fire Department shall determine whether equipment constitutes a
fire hazard.
(x) Storage tanks. All tanks intended to contain hydrocarbons and permanent
structures shall conform to the API specifications unless other or additional
specifications are approved by the Fire Department. All tanks shall require a
Fire Code permit and application must be made in accordance with the Fire
Code. All storage tanks shall be equipped with a secondary containment
system including lining with an impervious material. The secondary
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 21
containment system shall be a minimum of one and one-half (1-1/2) times the
contents of the largest tank in accordance with the Fire Code. Drip pots shall
be provided at the pump out connection to contain the liquids from the storage
tank. All tanks shall be set back pursuant to the standards of the Commission
and the Fire Code. Each storage tank system shall be equipped with a level
control device that will automatically activate a valve to close the Well in the
event of excess liquid accumulation in the tank. No meters, storage tanks,
separation facilities, or other above ground facilities, other than the wellhead
and flow lines, shall be placed in a floodway identified by FEMA on the most
current FIRM. Meters, storage tanks, separation facilities, or other above
ground facilities proposed in the floodplain shall be outside of the floodway and
shall be subject to approval by the Building Official.
(y) Swabbing, bailing and purging Wells. No person shall begin the operation of
swabbing a Well without first complying with the provisions of this Section. In
swabbing, bailing or purging a Well, all deleterious substances removed from
the borehole shall be placed in appropriate tanks and no substances shall be
permitted to pollute any surface or subsurface fresh water. No Well shall be
swabbed before a device, commonly known as a lubricator, has been placed
on the flow casing above all outlets or flow lines of the Well. The lubricator
shall be not less in diameter than the flow casing and equipped with an
adequate oil saver or stuffing box at the top. The total inside length of the
lubricator shall be not less than five feet (5') more than the total length of swab
and turn back on swab line. The lubricator shall have a nipple not less than
two inches (2") in diameter nor more than four inches (4") in length, placed not
more than six inches (6") from the top of the flow line or lines between the gate
valve on the flow lines and flow casings. The nipple shall be provided with a
gate valve not less than two inches (2") in size. All equipment and parts of the
lubricator shall be of a type designed and tested to withstand a pressure of
3,000 pounds per square inch. All pressure tests shall be by the hydrostatic
method.
(z) No refinery, processing, treating or absorption plant of any kind, shall be
constructed, established or maintained within the Airport except as necessary
to render gas into a quality suitable for delivery to third party pipelines. Natural
gas fractionation will require a separate permit.
(aa) Surface casing. Surface casing shall be in full compliance with the applicable
rules and regulations of the Commission. Surface casing shall have a
centralizer in the middle of the shoe joint, a centralizer on the top of the second
joint of casing, and centralizers every fourth joint. Surface casing must be new
pipe of API grade J or K or higher grade and have a minimum burst pressure
rating of 2,900 psi. In the event a rupture, break or opening occurs in the
surface or production casing, the Operator or drilling contractor shall promptly
report the incident to the Building Official. Immediate action shall be taken to
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 22
repair such casing and the Building Official shall be given the opportunity to
witness the repairs.
(bb) Valves. Each Well must have a shutoff valve to terminate the Well's
production. The Fire Department shall have access to the Well site to enable it
to close the shut-off valve in an emergency.
(cc) Storage. Any permanent, temporary or portable tank, vessel, container, pit or
impoundment used for storage of products, materials or wastes shall be
selected and maintained to be fit for the purpose and capacity in which it will be
used. Any such storage shall only be used for materials and wastes from oil
and gas exploration and production activities within the boundaries of
Dallas/Fort Worth Airport. All waste shall be disposed of in such time, place
and manner as to comply with the air and water pollution control regulations of
the Federal Government, the State, this Resolution and any other applicable
requirement of the Airport Board.
(dd) Watchperson. The Operator must keep a watchman or security personnel on
site during the Drilling or re-working of a Well when other workers are not on
the premises.
(ee) Installation of pipelines on, under or across Airport property. The Operator
shall apply to the Airport Board for a Permit to use the Airport for the purpose
of constructing, laying, maintaining, operating, repairing, replacing and
removing pipelines. Prior to installation, the owner of the pipeline shall submit
to the Building Official the pipeline design criteria, including but not limited to,
operating pressures, pipeline gradient and elevation to sea level, location, pipe
ASTM grade, and pipe wall thickness. Prior to and subsequent to installation
of each segment of new or replacement pipeline, the pipe and pipeline must
receive and pass on-site inspection of compliance with the design criteria and
the process of installation. All new or replacement pipe or pipelines shall be
covered and must be at least 48 inches below the existing ground level as
verified and approved by the Building Official. Operator shall:
(1) Not interfere with or damage existing water, sewer or gas lines or the
facilities of public utilities located on, under or across a Street.
(2) Furnish to the Building Official a site plan showing the location of such
pipelines.
(3) Design, construct, maintain and operate natural gas pipelines in
accordance with 49 U.S.C. 60101, et seq.; 49 Code of Federal
Regulations (CFR) Part 191, Transportation of Natural and Other Gas by
Pipeline; Annual Reports, Incident Reports, and Safety-Related Condition
Reports; 49 CFR Part 192, Transportation of Natural and Other Gas by
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 23
Pipeline: Minimum Federal Safety Standards; and 49 CFR Part 193,
Liquefied Natural Gas Facilities: Federal Safety Standards.
(4) Grade, level and restore such property to the same surface condition, as
nearly as practicable, as existed prior to the laying of the pipeline.
(5) If a pipeline becomes unsafe or is not properly maintained, or in the event
a leak is detected, the Operator of the line shall immediately evaluate the
leak or release and either shut in the pipeline or, as soon as possible,
shall initiate repairs according to the procedure in section (oo) below.
(6) As mandated by DOT requirements under CFR 192.701, each owner or
operator of a gas pipeline for which a Permit is required under this
Resolution shall have it surveyed at least twice each year with intervals
not to exceed 7.5 months for the purpose of determining whether it is in
safe condition and free from leaks, breaks or open spaces. The owner or
operator shall provide a copy of the leakage survey report required under
DOT CFR 192.706 supported by an affidavit by the person making the
survey to the DFW Department of Public Safety Fire ,Prevention Office,
within 30 days of completion of the survey. For failure to timely make the
survey and report, or if the report discloses or it otherwise appears that
any line is leaking, defective or unsafe, the pipeline shall be closed and
shut-in until such time as the leak has been repaired, or a repair plan or
report has been approved by the Building Official.
(7) The location of all new or replacement pipe or pipelines shall be marked
by the owner(s) thereof or by the person installing or operating the pipe or
pipeline. Marker signs shall be placed at all locations where pipe or
pipelines cross property boundary lines and at each side of a Street which
the pipe or pipeline crosses. The top of all marker signs shall be a
minimum of four feet (4') above ground level, and the support post must
be sufficient to support the marker sign and shall be painted yellow or
such other color as may be approved by the Building Official. All marker
signs shall comply with US Department of Transportation standards
regarding size, shape, color, installation, positioning, maintenance and
other related signage requirements. It is the joint and severable
responsibility of the owner and the operator of any and all pipelines to
maintain the markers in accordance with this Section.
(ff) Streets. No Permit shall be issued for any Well to be drilled within any Street,
and no Street shall be blocked, encumbered, or closed due to any Exploration,
Drilling or production operations.
(gg) Vehicle routes. Vehicles associated with Drilling and/or production in excess of
three (3) tons shall be restricted to those arterials or routes designated by the
Airport.
Part Nine -Oil and Gas Exploration-and Production -
Part Nine - Pg. 24
(hh) Tank specifications for a Gas Well. All tanks and permanent structures shall
conform to the API specifications unless other specifications are approved by
the Airport Board. The top of the tanks shall be no higher than twelve feet (12')
above the terrain surrounding the tanks.
(ii) All Drilling, re-entry and operations at any Well shall be conducted using the
best available technology. All casing, valves, Blowout Preventers, drilling
fluids, tubing, bradenhead, Christmas tree and wellhead connections shall be
of a type and quality consistent with sound engineering practices. The setting
and cementing of casing and running of drill stem tests shall be performed in a
manner consistent with the best available technology. All persons engaged in
Drilling or production operations shall observe and follow the recommendations
and regulations of the API and the Commission, except in those instances
specifically addressed by this Resolution.
(jj) Upon Completion of the Well, the Operator shall provide a copy of the
Commission Completion Report W15, and certify by affidavit that the Well has
been completed according to good engineering practices. The affidavit shall
stipulate the number of sacks of cement, the class of cement, blended
materials, weighfi of cement in pounds per gallon, cement displacement
pressure, final pumping pressure and whether checkvalves held the pressure.
Commencement and completion times of such operation shall be stipulated.
The affidavit must be completed by a cementing service company and signed
by both the Operator and the cementing service company.
(kk) No person shall commence any operation to change the equipment of a Well
for the purpose of cleaning, repairing or reconditioning any such Well, before
notifying the Building Official that such operation is to be commenced. No
person shall commence such operation unless he receives approval. The
Building Official shall give approval for converting from natural to artificial
production if it appears that the provisions of this Resolution have been and
are being complied with.
(II) In no case shall Gas or air be transported through any pipeline at a working
pressure in excess of 1,000 pounds. If it is necessary to use greater working
pressure, a gas or air booster plant shall be installed not closer than 75 feet
from the Derrick floor of a Well or tank battery and the compressor unit not less
than 100 feet from the Derrick floor of the Well being served. In no event shall
more than 1,500 pounds working pressure be used in flowing a Well by
artificial means.
(mm) All Gas gathering lines and pipelines on DFW Airport shall be designed,
installed, tested and maintained in accordance with the most current version of
49CFR192 -Transportation of Natural or Ofiher Gas by Pipeline: Minimum
Federal Safety Standards. All permanent fresh water and Brackish water
HDPE lines shall be tested to ASTM D-2837 following installation or repair.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 25
(nn) At each Well where air or gas lift is used, there shall be placed on the air or gas
lift an indicating pressure gauge which shall show the working pressure of air or
gas delivered to the Well at all times. All gauges installed on lines shall be
tested and corrected every six (6) months.
(oo) The Building Official shall inspect all pressure lines in use at any Well or at any
project to ensure that tubing, fittings, equipment or connections are reasonably
tight, safe and free from leaks. If it becomes necessary to change or remove
any pipeline, the entire expense of change or removal shall be borne by the
owner of the line requiring repair. Each leak noted shall be classified by a
qualified person as to its risk to people and property based on the leak
location, line use and content, line pressure, surrounding land use and other
considerations. Each leak shall be classified upon discovery, and a repair
schedule shall be developed to make repairs as soon as possible, but not to
exceed one month. The leak shall be monitored regularly until repairs are
made. All such repair plans shall be submitted to and approved by the Building
Official.
(pp) All pipelines, connections and fixtures installed or used for the purpose of gas
transportation shall be operated and maintained in a safe manner at all times
so as to prevent all leakage or escape of their contents.
(qq) The Building Official shall have the authority to require the immediate shutting
in or closing of any Well if he finds there exists, within a 100-foot radius of any
Well, any Gas or gasoline vapor in a quantity sufficient to constitute, in his sole
judgment, or in the sole judgment of the Fire Chief, a fire hazard. The Well
shall remain shut in or closed in until the hazard and its cause have been
remedied.
(rr) In the event of a fire or discovery of a fire, smoke, or unauthorized release of
flammable or hazardous materials ,the Operator shall immediately report such
condition to the Fire Department.
(ss) Every Disposal Well shall be constructed so as to seal the injection zone from
the upper portion of the casing. Cement shall be circulated to the surface for
injection zone casing. The annulus between the casings shall be filled with a
non-corrosive fluid, then sealed and a 1/4-inch female fitting with cutoff valve
shall be attached so that the pressure annulus may be measured by the
Building Official by attaching a gauge with a '/4-inch male fitting. The annulus
between the production casing and the injection tubing shall be pressure tested
to a pressure at least 250 psi greater than the injection pressure proposed for
the Well. The Building Official shall be given the opportunity to witness and
approve the pressure testing. A copy of all H-5 test reports must be provided
to the Building Official. A pressure shall be maintained in the annulus sufficient
to monitor the fluids in the annulus. Any significant deviation from the
established pressure shall be cause to shut down the Well, and may result in
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 26
cancellation of the operating Permit, until the. established pressure can once
again be maintained.
(1) The DFW Airport Permit for a Disposal Well shall reflect the maximum
injection pressure as permitted by the Commission. Exceeding this
injection pressure shall be considered a violation of this Section.
(2) Injection lines for such wells shall be buried to a minimum depth of four
feet (4'), and shall be pressure tested (static) annually at a minimum of
150 percent of the pressure normally encountered at the injection pump
discharge for a period of hours to be fixed by the Building Official. The
Building Official shall be notified in writing five (5) days in advance of such
test and may supervise it. Test results shall be filed with the Building
Official upon completion.
(3) Before performing any down-hole work on a Disposal Well, the Operator
shall notify the Building Official at least five (5) days in advance of
performing the work, or as soon as practical in the event of emergency
repair work. The Building Official shall be given the opportunity to witness
the installation of tubing and packer in the Disposal Well. The annulus
between the injection tubing and the production casing shall then be
pressure tested as required by Commission Rule 3.9.12 Testing. The
Building Official shall be given the opportunity to witness the pressure
testing of this annulus.
(4) The Operator of the well shall submit to the Building Official all reports and
notifications at the same frequency that such reports and notifications are
required under TX RRC Rule 3.9 Disposal Wells, or its equivalent.
SECTION 15
SCREENING
(a) Throughout the entire Exploration, Drilling, and production process there
shall be screening improvements (fences, walls, Berms and landscaping)
required during each phase of the process if the Drill Site or Operation Site is
visible from a Building or Street, exclusive of construction roads, haul roads or
access roads. Without regard to visibility, each Fresh Water Fracing Pit that is
open to the atmosphere or surface shall be screened.
(1) During Drilling. A temporary chain link fence with all-weather screening
fabric at least six feet (6') in height shall be established around the entire
Operation Site to obscure view of the Drilling activities. A secured
entrance gate shall be required. All gates are to be kept locked when the
Operator or his employees are not within the enclosure. A "Knox Padlock"
or "Knox Box with a key" shall be provided to access the Well site to be
used only in case of an emergency.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 27
(2) Completion through Abandonment (production phase). A painted
architectural metal fence or other approved fencing and/or screening shall
be required to enclose and visually screen the Well and all associated
equipment. An earthen Berm may also be required. The masonry walls,
Berms, and landscaping shall be in compliance with standard engineering
and design practices and shall meet the following minimum requirements:
a. The painted architectural fence or other approved fencing and/or
screening material and design shall be generally compatible with the
design of similar facilities, Building and structures on and/or adjacent
to the site as approved by the Building Official; and
b. Painted architectural fences shall be at least eight feet (8') in height.
(3) Each Fresh Water Fracing Pit shall be surrounded by a temporary chain
link fence with all-weather screening fabric at least six feet (6') in height.
A secured entrance gate shall be required. All gates are to be kept locked
when the Operator or his employees are not within the enclosure. A
"Knox Padlock" or "Knox Box with a key" shall be provided to access the
Well site to be used only in case of an emergency. If the Fresh Water
Fracing Pit is open to the atmosphere or the surface, it shall be covered
by netting sufficient to inhibit access to the pit by fowl.
(b) Gate specifications. All temporary fences and masonry walls shall be equipped
with at least one (1) gate. The gate shall meet the following specifications:
(1) At least one gate shall be not less than twelve feet (12') wide and be
composed of two (2) gates., each of which is not less than six feet (6') wide,
or one (1) sliding gate not less than twelve feet (12') wide. If two (2) gates
are used, gates shall latch and lock in the center of the span;
(2) The gates shall be of chain link construction, with all-weather screening
fabric, that meets fihe applicable specifications, or of other approved
material that, for safety reasons, shall be at least as secure as a chain link
fence;
(3) The gates shall be provided with a combination catch and locking
attachment device for a padlock, and shall be kept locked except when
being used for access to the site; and
(4) Operator must provide the Fire Department with a "Knox Padlock" or "Knox
Box with a key" to access the Well site to be used only in case of an
emergency.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 28
SECTION 16
CLEANUP AND MAINTENANCE
(a) Cleanup after well servicing. After the Well has been completed or there has
been an Abandonment, the Operator shall clean the Drill Site or Operation Site,
complete restoration activities and repair all damage to property caused by such
operations within sixty (60) days.
(b) Clean-up after spills, leaks and malfunctions. After any spill, leak or malfunction,
the Operator shall remove or cause to be removed to the satisfaction of the Fire
Department and the Building Official all waste materials from any property
affected by such spill, leak or malfunction. Clean-up operations must begin
immediately. If the Operator fails to begin clean-up within twenty-four (24) hours,
the Airport Board shall have the right to contact the Commission in order to
facilitate the removal of all waste materials from the property affected by such
spill, leak or malfunction.
(c) Painting. All production equipment shall be painted and maintained at all times,
including wellheads, pumping units, tanks, and Buildings. When requiring
painting of such facilities, the Building Official shall consider the deterioration of
the quality of the material of which such facility or structure is constructed, the
degree of rust, and its appearance. Paint shall be non-reflective and of a neutral
color, compatible with surrounding uses. Neutral colors shall include sand, gray
and unobtrusive shades of green, blue and brown, or other neutral colors
approved by the Building Official.
(d) Blowouts. In the event of the loss of control of any Well, Operator shall
immediately take all reasonable steps to regain control regardless of any other
provision of this Resolution and shall notify the Building Official and Fire Chief as
soon as practicable. If in the opinion of the Building Official or the Fire Chief, a
danger to persons and/or property exists because of such loss of Well control
and that the Operator is not taking or is unable to take all reasonable and
necessary steps to regain control of such Well, the Building Official may then
employ any well control expert or experts or other contractors or suppliers of
special services, or may incur any other expenses for labor and material which
the Building Official deems. necessary to regain control of such Well. The Airport
Board shall then have a valid lien against the interest in the Well of all working
interest owners to secure payment of any expenditure made by the Airport Board
pursuant to such action of the Building Official in gaining control of said Well.
SECTION 17
PLUGGED AND ABANDONED WELLS
(a) Surface requirements for the Abandonment of a Well. Whenever Abandonment
occurs pursuant to the requirements of the Commission, the Operator shall be
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 29
responsible for the restoration of the Well site to its original condition as nearly
as practicable, in conformity with the regulation of this Resolution.
(b) Abandonment shall be approved by the Building Official after restoration of the
Drill Site and/or Operation Site has been accomplished in conformity with the
following requirements at the discretion of the Building Official:
(1) The Derrick and all appurtenant equipment thereto shall be removed from the
site;
(2) All tanks, towers, and other surface installations shall be removed from the
site;
(3) All concrete foundations, piping, wood, guy anchors and other foreign
materials regardless of depth, except surface casing, shall be removed from
the site, unless otherwise directed by the Commission;
(4) If any soil was contaminated, it shall be removed in accordance with local,
State and Federal regulations;
(5) All holes and depressions shall be filled to grade with clean, compactable
soil;
(6) All waste, refuse or waste material shall be removed; and
(7) During Abandonment, Operator shall comply with all applicable sections in
this Resolution.
(c) Abandoned Well requirement. The Operator shall furnish the following to the
Building Official:
(1) A copy of the approval of the Commission confirming compliance with all
Abandonment proceedings under state law; and
(2) A notice of intention to abandon under the provisions of this Section and
stating the date such work will be commenced. Abandonment may then be
commenced on or subsequent to the date so stated.
(d) Abandonment requirements prior to new construction. A Well Site or Drill Site
where there has been an Abandonment shall meet the most current
Abandonment requirements of the Commission prior to the issuance of any
Permit for development of the property. No structure shall be built over an
abandoned Well.
(e) The Operator can only abandon a Well if the Building Official has reviewed and
approved the Abandonment.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 30
SECTION 18
TECHNICAL ADVISOR
The Airport Board may from time to time employ a technical advisor or advisors who are
experienced and educated in the gas industry or the law as it pertains to gas matters.
The function of such advisor(s) shall be to advise, counsel or represent the Airport
Board on such matters relating to gas operations within the Airport as the Airport Board
may want or require and the effect thereof, both present and future, on the health,
welfare, comfort and safety of the public. In the event such technical advisor(s) is (are)
employed for the purpose of advising, counseling or representing the Airport Board
relative to an Operator's unique and particular set of. circumstances, case or request
relating to this Resolution, then the cost for such services of such technical advisor(s)
shall be assessed against and paid for by such Operator in addition to any fees or
charges assessed pursuant to this Resolution. Prior to the employment of a technical
advisor, the Airport Board shall inform the Operator of the intended scope of work and
the estimated costs and expenses.
SECTION 19
MEANS OF APPEAL
Refer to Part One, Construction and Fire Prevention Standards Resolution for Board of
Appeals.
SECTION 20
VARIANCE RESOLUTION COIVIIlIIITTEE
The Airport Board hereby establishes a Variance Resolution Committee for Gas
Exploration and Production, hereinafter referred to as the Variance Resolution
Committee, for the purpose of considering variances to the requirements of Part Nine.
The Variance Resolution Committee shall consist of the following Airport staff positions:
Vice President, Commercial Development or successor department
Vice President, Department of Public Safety or successor department
Vice President, Finance or successor department
Vice President, Operations or successor department
Vice President, Planning or successor department
(a) An Applicant for a Permit required by this Part may apply for a variance from the
requirements of this Part by submitting to the Building Official a written request
for variance. The request must include the following:
(1) Description of the requested variance and an explanation of why it should be
granted;
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 31
(2) Description of alternatives considered and why each is not the preferred
alternative;
(3) Description of the economic consequences if the variance is not granted;
and
(4) Description of how the level of health, safety and welfare of the public will be
maintained if the variance is granted.
(b) The Building Official shall forward copies of the variance request to the Variance
Resolution Committee members. On a case-by-case basis, the Variance
Resolution Committee shall consider the following in granting a variance:
(1) Whether the operations proposed are safe and reasonable under the
circumstances and conditions prevailing in the area, considering the
particular location and the character of the improvements located there;
(2) How the operations proposed compare to available alternatives;
(3) Whether the operations proposed would conflict with the orderly growth and
development of the Airport;
(4) The economic consequence if the variance is not granted;
(5) Whether the operations proposed adequately protect the health, safety and
welfare of the public; and
(6) Whether the operations proposed provide acceptable access for fire
personnel and fire fighting equipment.
(c) Approval of a variance requires that a minimum of three Variance Resolution
Committee members vote in favor of the approval. The Variance Resolution
Committee shall notify the Airport tenants affected by any request for variance
and allow them to address the request in writing within twenty (20) days of the
notice. Only variances that would result in a setback distance between any Well
or Disposal Well and a Building to less than the minimum setback outlined in
Section 13 of this Part will be deemed to affect an Airport tenant.
The Variance Resolution Committee shall not be required to hold public
hearings, except upon request of two Committee members. The Variance
Resolution Committee shall notify the Airport Board in writing of each variance
request at least twenty (20) days prior to the granting of such variance. Upon
request of two voting Airport Board members, a variance shall be placed on a
public meeting agenda of the Airport Board. The Variance Resolution Committee
shall not thereafter grant the variance request without consent of the Airport
Board.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 32
The details of each action granting or denying the requested variance shall be
recorded and entered in the files of the Office of the Building Official, and the
Building Official shall forward a letter to the Applicant stating whether the
Variance Resolution Committee has approved or denied the variance request
and listing any conditions placed upon an approval. The Variance Resolution
Committee shall report each such action to the Airport Board on at least a
quarterly basis.
SECTION 21
SEVERABILITY CLAUSE
It is the intention of the Airport that the phrases, clauses, sentences, paragraphs and
sections of this Resolution are severable, and if any phrase, clause, sentence,
paragraph or section of this Resolution shall be declared unconstitutional or
unenforceable by the valid judgment or decree of any court of competent jurisdiction,
such unconstitutionality or unenforceability shall not affect any of the remaining
phrases, clauses, sentences, paragraphs and sections of this Resolution.
Part Nine -Oil and Gas Exploration and Production
Part Nine - Pg. 33
Star-Telegram
400 W. 7TH STREET
FORT WORTH, TX 76102
(817 390-7761
Federal Tax ]:D 22-3148254
Bill To:
CITY OF FORT WORTH/CITY SECRET
1000 THROCKMORTON ST
FORT WORTH, TX 76102-6312
Attu EVELYN . HIGHTOWE:tZ
CITY OF FORT WORTH PUBLIC NOTI I3580
Sales Discount
Misc Fee
r~ r
l1t-t~. ~S Z `~G~.1,1 g0~-? ~~54~~
~~aaq ~-- l ~c~~ ~
INVOICE ~ 'r~ e~
_.:~.~
Customer ID: CTT21
Invoice Number: 295514681
Invoice Date: 3/30/2008
Terms: Net due in 21 days
Due Date: 3!31/2008
PO Number:
Order Number: 29551468
Sales Rep: 073
Description: CITY OF FORT VJO
- Publication Dates: 3/28/2008 - 3/30/2008
~1 ` Ctrl ~ D~ `Lure ~L
- - - - - Ra.#e ~mt~i
s _
1 340 340 LINE $5.28 $5,389.10
~~ -tee
t~' i
F4'v
~~
~,. ~. ,
~E,' ~ rf ~~~ `t
f t t '-1
;;; .
.'L\
-:\
- - -v
2
THE STATE OF TEXAS '~
County of Tarrant
Before me, a Notary Public in and for said County and State, this day persi
Telegram, published by the Star-Telegram, Inc. at ForE Worth, in Tamsnt C
attached clipping of an advertisement was published in th bove named F
(817) 390-7501
Signed
SUBSCRIBED AND SWORN TO BEFORE ME, THIS Monday, Marc 1,
a
Notary Public
Net Amount:
CHRIS?`f L HOLLAND
fiY COt~Iht15SIQN EXPIflES
jury 31, aoaa
($5,297.10)
$10.00
~xoa.oo
e..8. 1
-Texas; and who, after being duly swum, did
on the list~~~&~~:~~L dt?S'~
nator for the Star-
se and say that the
TELEGRAM
:•~!4{1'~a~uiknhi~ Ec~;r~c~tl~..~~ ~~nf~~.cr~i-
Thank You For Your Payment
Remit To: Star-Telegram
P.O. BOX 901051
FORT WORTH, TX 76101-2051
~J~: if2J~~~.}3iU`I 'rry~: €:.:1 :?f i ;IC~~t
:STttt't+.,IiiYOStY`tJ: i'.';s":t=}l f:.:?. ~ i'1't'C:#.;t.
1 t.
.ter fF~j l{'JL~ (1}'~T.c~;yfII t!['S F.~ .t •E ~":7!:. ..!~,
1"T1 PTiy.+...- ~<.i11 L lv.." .. ~ •i~f i
mer Name: CITY OF FORT WO
TH/CTT
Invoice Amount: $102.00
PO Number:
Amount Enclosed: ~
i
- ~,peu5epao
as RlFiuip~o»e s }!
.pue '4~JOM }JOj 30
R}!7 a4} 3o Ja~ey7
ay} 3o suo!s!noJd
- ay} y;!M a~uepJO7~e
u! 'noel ~Cq pannbaJ
se uol;e~!lgnd pue '.
a6essed s}! Ja}}e pue
woJ} RIa}e!paww!
}~a}3a a~{e; ^eys
a~ueu!pJO s!y}-;eUl
•asua}}o
a;eJedas e a}n;!}s
-uo7 peys ;s!xa o}
pa};!wJad s! uo!}e to
-1n e ;ey} nep-y7e3
•asn3aJ 30 6u!dwnp
.ay} Jo 'uo!;e}!ues
+pue y}leay 7!Ignd
'R;a3es aJ3 0; 6u!}ej
-aJ asua}~ o y7ea Jo}
I (00.OOOZS) sJepo^
'~.puesnoy,L oM1 ue }
`aJOw Jo (00'005 )
,stepoO paJpunH-
pau3 aq I1e45 69Z-OT
LOOZ'oN uol}nlosab
pao a]ueu!pJO s!o~CUe
isuolSMOJ ay; 3
30 uawa7JO3ua aU}
5}S ISaJ OtIM JO y;!M
'gldWo7 0; sasn3aJ
]O s}]al6au 'S~IWo
'sRagos!p 'sa}elo
-In -oyM uo!}e.lodm~
Jo wn; 'uosJad Rudy
NO11~Y71"1
9 N 101 /~
D J.11119
~ 9NIOIn
l7 59N1
QL
1V N2i31N1
121Od
03H1dO69Z
'ON NO11
jO h1i7 3H1 dO
"1l7Nf1O7 Lll7 3Hl
J.9 37NVN1O~0 Ntl
:Annz-sn--C7.OS-C 'ON
:pue •asnep n~le~~a
'uol}del) =8002
!'SZ 47JeW 'tCepsanl
~. uo play 6ul;aaw
'. Jeln6aJ ~!ay; ;e
Ilauno7 ~}!7 y~oM
aao~ a4~ nq Pa}dope
aaaM sa7ueu!pJo
~u[MOl 03 ay} ;ey}
uan!6 ~gaJay s! a7!;oN
H711ON 7118f1d
Hit1OM
121Od 30 J.117
n