HomeMy WebLinkAboutContract 40923-A2 �-;UY SECRETARY CONTRACT MO. Z3Z AMENDMENT No . 2 TO CITY SECRETARY CONTRACT `VHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, L.P. , (ENGINEER) made and entered into City Secretary Contract No. 40923, (CONTRACT) which was authorized by M&C C-24491 on the 28th day of September, 2010 in the amount of $263, 800 . 00 . WHEREAS, the contract was subsequently revised by amendment No. l in the amount of $10, 000 administratively authorized on September 6, 2013; WHEREAS, the CONTRACT involves engineering services for the following project: Water Main and Sanitary Sewer Relocations along State Highway 114 to Martin Ranch Road F.M. ; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 2 , 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $351, 163 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that � al4 the total fee paid by the City for all work and services d; r shall be an amount of $624, 963 . 00 . OFFICIAL RECORD Page -1- -,!1TY MI-CREW R11 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. UXECUTE1 D and E {ECTIVT as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dunaw As oc' es, L.P. Jay J. Chapa Tom Galbreath, ASIA, RLA Assistant City Manager President DATE: �� �pZ�llp DATE: .S' s- / eh iS wlLOC, P� APPROVAL RECOMMENDED : EXEC a rivE d/cE P/LcSto�/T Christopher Harder, P.E. Acting Assistant Director, Water Department APPROVED AS TO FORM AND M&C: C-27703 T.EGAT.ITY: Date: May 03 2016 Douglas W. Black Senior Assistant City Attorney ATTEST* r J. Kyer City Secre IT' $ _tel. OFFICIAL RECORD C97Y SECRETARY � `. WOR' "H9 4X Page -2- �__ DUNAWAY DA No. 5000155.004 February 2, 2016 Mr. Robert Sauceda, P.E. Project Manager City of Fort Worth Water Department Fort Worth, Texas 76102 Reference: Amendment No. 2 State Highway 114 Part 15 Interstate Highway 35 West Water and Sanitary Sewer Relocation City Project No. 01515 Dear Mr. Sauceda: Dunaway Associates, L.P. is pleased to present this Amendment No. 2 for the following additional services that are beyond our original scope of services. TxDOT has decided to expand the State ROW in the area around Interstate Highway 35 West from State Highway 114 to Eagle Parkway to construct continuous frontage roads. Relocation of the City utilities in the same area will be required to occur prior to TxDOT's road construction. Dunaway proposes to provide additional survey, geotechnical borings, easement preparation, and construction pian design to address TxDOT's design changes as with the nearby State Highway 114 Part 1 project(DOE No. 6465). As part of this effort, Dunaway will also prepare and submit TxDOT utility reimbursement package to cover the City's design and construction costs. SCOPE OF WORK 1. Field Topographic Survey for an additional 5,200 LF of Water Main & 1,500 LF of Sanitary Sewer parallel to and crossing Interstate Highway 35 West. 2. Geotechnical borings for 6 locations for proposed By Other Than Open Cut installations on both sides of Interstate Highway 35 West. 3. Preparation of Ten (10) additional Permanent Easements. 4. Design of an additional additional 5,200 LF of Water Main & 1,500 LF of Sanitary Sewer parallel to and crossing Interstate Highway 35 West. 5. Preparation of TxDOT utility reimbursement package. ® Amendment No. 2 State Highway 114 Part 1B Interstate Highway 35 West Water and Sanitary Sewer Relocation February 2, 2016 Page 2 FEE Dunaway proposes to provide the above described scope of work for a LUMP SUM fee of $361,163. Only those services specifically mentioned in the Scope of Work section are offered as a part of this proposal. A summary of the total project is as follows: Original Contract $263,800 Amendment#1 $ 10,000 Amendment#2 $351,163 Total Project $624,963 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY A SOCIATES P. vr� Kervin Campbell, P.E. Principal/Director of Public Sector Services B156-4 Amendment#2 Ltr-kmc 16.0503 M&C Review Page I of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORTTWOR�TFll COUNCIL ACTION: Approved on 5/3/2016 - Ordinance No. 22188-05-2016 & 22189-05-2016 DATE: 5/3/2016 REFERENCE NO.: **C-27703 LOG NAME: 60SH114P1A2- D U NAWAY CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 40923 with Dunaway Associates, L.P., in the Amount of$351,163.00 for a Revised Amount of $624,963.00 for the Water Main and Sanitary Sewer Relocations Along F.M. 156 from State Highway 114 to Martin Ranch Road and Adopt Appropriation Ordinances (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$381,544.00 and Sewer Capital Projects Fund in the amount of$138,619.00 for a total amount of$520,163.00; and 2. Authorize execution of Amendment No. 2 to City Secretary Contract No. 40923 with Dunaway Associates, L.P., in the Amount of$351,163.00 for a revised amount of$624,963.00 for the Water Main and Sanitary Sewer Relocations along F.M. 156 from State Highway 114 to Martin Ranch Road project. DISCUSSION: On September 28, 2010 (M&C C-24491), the City Council authorized an Engineering Agreement with Dunaway Associates, L.P., in the amount of$263,800.00 for the Water Main and Sanitary Sewer Relocations along F.M. 156 from State Highway 114 to Martin Ranch Road project. The Agreement was subsequently revised by one amendment in the amount of$10,000.00 which was administratively authorized on September 10, 2013. Amendment No. 2 will provide for the following: • Design of existing water and sewer relocations to facilitate the widening of State Highway 114 at the IH-35W intersection by the Texas Department of Transportation. The existing 24-inch water and 18-inch sanitary sewer mains are in direct conflict with the proposed highway improvements. • Additional coordination with Oncor Electric, Texas Department of Transportation and Franchise Utilities. • Additional easement preparation. • Additional service during construction. • Additional geotechnical investigations. • Additional subsurface utility engineering. • Additional traffic control plans. Dunaway Associates, L.P., proposes to provide the necessary additional services for a lump sum fee of $351,163.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $169,000.00 (water: $109,000.00; and sewer: $60,000.00) is required for program management, real property acquisitions, material testing and inspection. Appropriations for the Water Main and Sanitary Sewer Relocations along F.M. 156 from http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22125&councildate=5/3/2016 5/4/2016 M&C Review Page 2 of 3 State Highway 114 to Martin Ranch Road project will consist of the following: Description Existing Additional Future Project Total* p A ro riations Appropriations A ro riations $351,163. $Engineering $ 273,800.00 0.00 $ 624.963.00 Construction $ 284,589.00 $ 0.00 $4,050,000.00 $4,334,589.00 Project Management, Real Property Acquisitions, $1,548,014.00 $169,000.00 $ 450,000.00 $2,167,014.00 Inspection, Testing and Contingencies Project Total $2,106,403.0-0—]F— $520,163.00 $4,500,000.00 $7,126,566.00 * Numbers rounded for presentation. Appropriations for the Water Main and Sanitary Sewer Relocations along F.M. 156 from State Highway 114 to Martin Ranch Road project will consist of the following by fund: Fund Appropriations* Water Capital Fund 59601 $2,407,767.00 Water Capital Fund 59605 $2,280,000.00 Sewer Capital Fund 59607 $ 218,799.00 Sewer Capital Fund 59608 $2,220,000.00 Project Total $7,126,566.00 * Numbers rounded for presentation. M/WBE OFFICE - Dunaway Associates, L.P., is in compliance with the City's M/WBE Ordinance by committing to an additional 20 percent M/WBE participation on this Amendment No. 2. The City's goal on this amendment is 12 percent. This project is located in COUNCIL DISTRICT 2, Mapsco 642 L and 642Q. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budget as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. The Fiscal Year 2016 Water Operating Budget includes appropriations of$26,068,353.00 for the purpose of providing pay-as-you-go funding for capital projects. After this transfer for Fiscal Year 2016, the balance will be $14,913,647.00. The Fiscal Year 2016 Sewer Operating Budget includes appropriations of $26,300,046.00 for the purpose of providing pay-as-you-go funding for capital projects. After this transfer for Fiscal Year 2016, the balance will be $20,820,373.00. Existing Additional Future Fund J1 Appropriations A ro riations Appropriations Project Total* Water Capital Fund 59601 $2,026,223.00 $381,544.00 J $ 0.00 11 $2,407,767.00 Water Capital Fund 59605 $ 0.00 $ 0.00 $2,280,000.00 $2,280,000.00 Sewer Capital Fund 59607 $ 80,180.00 11 $ 38,619.00 $ 0.00 11 $ 218,799.00 Sewer Capital Fund 59608 $ 0.00 $ 0.00 $2,220,000.00 $2,220,000.00 Project Total $2,106,403.00 $520,163 $4,500,000.00 $7,126,566.00 * Numbers rounded for presentation. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 M1) 59601 0600430 4905420 C01515 C017ZZ 2016 $381,544.00 1 59601 0600430 5330500 C01515 C01730 2016 $272,544.00 http://apps.cfwnet.org/council_packet/mc review.asp?ID=22125&councildate=5/3/2016 5/4/2016 M&C Review Page 3 of 3 1 59601 1 0600430 5110101 C01515 C01730 2016 $40,000.00 1 59601 0600430 5710010 C01515 C01741 2016 $40,000.00 1 59601 0600430 5310350 C01515 C01742 2016 $10,000.00 1 59601 0600430 5310350 C01515 C01773 2016 $2,000.00 1) 59601 0600430 5540101 C01515 C01781 2016 $500.00 1 59601 0600430 5330500 C01515 C01784 2016 $2,000.00 1) 59601 0600430 5310350 C01515 C01784 2016 $8,500.00 1) 59601 0600430 5310350 C01515 C01785 2016 $6,000.00 1) 59607 0700430 4905420 C01515 C017ZZ 2016 $138,619.00 1 59607 0700430 5330500 C01515 C01730 2016 $78,619.00 1 59607 0700430 5110101 C01515 C01730 2016 $25,000.00 1 59607 0700430 5710010 C01515 C01741 2016 $18,000.00 1 59607 0700430 5310350 C01515 C01742 2016 $5,000.00 1 59607 0700430 5310350 C01515 C01773 2016 $2,000.00 1 59607 0700430 5540101 C01515 C01781 2016 $500.00 1) 59607 0700430 5330500 C01515 C01784 2016 $2,000.00 1) 59607 0700430 5310350 C01515 C01785 2016 $4,000.00 1) 59607 0700430 5310350 C01515 C01784 2016 $3,500.00 FROM Fund Department Accountl Project Program Activity Budget Reference# Amount ID I ID Year (Chartfield 2) 596071 0700430 1 5330500 1 C01515 I I C01730 1 2016 1 $78,619.00 59601 0600430 1 5330500 1 C015151 C01730 1 2016 1 $272,544.00 Submitted for City Manager's Office by: Jay Chapa (5804) Oriqinatinq Department Head: John Carman (8246) Additional Information Contact: Roberto C. Sauceda (2387) ATTACHMENTS 60SH114P1A2-DUNAWAY MAP .pdf 60SH114P1A2-DUNAWAY sewer AORev.docx 60SHI 14P1A2-DUNAWAY water AORev.docx Dunaway LP CPN 01515 Pt 1 B.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=22125&councildate=5/3/2016 5/4/2016 CERTIFICATE OF INTERESTED PARTIES C-C1171703 FORM 1295 1 0f 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-14333 Dunaway Associates, LP Fort Worth, TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 02/17/2016 being filed. City of Fort Worth Date Acknowledge 3 Provide the identification number used by the governmental entity or state agency to track or identify the contr6et,and provide a description of the goods or services to be provided under the contract. 01515 State Highway 114 Part 113 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear,or affirm,and of perjury,that the above disclosure is true and correct. ..,...�..wr+.. 04 Notary 1' mk. State orTerax r• Signature o authorize agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me, by the said KN I this the l f day of 20��,to certify which,witness my hand and seal of office. c Signature f o er admin tering oath Printed name of officer administering oathTitle of o ice dministerii g oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.34944