Loading...
HomeMy WebLinkAboutContract 44649-A1 MW 'CITY y�l(ouq-►�I AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. 44649 WHEREAS, the City of Fort Worth (CITY) and Wade Trim, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 44649, (the CONTRACT) which was authorized by M&C C-26320 on the 9th day of July, 2013 in the amount of $ 524, 244 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Westcliff Drainage Improvements Project; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 15, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $47, 710 . 00 . (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $571, 954 . 00 . 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth "� ((1){ 8UL RECORD Professional Services Agreement Amendment Template ny p Cn� V SE C R E M��Ry PMO Official Release 8/1/2012 Page 1 of 3 � ' , 0 7 11 7K EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Wad rim, C. Jesus J. Chapa David Spei r, P.E. Assistant City Manager Vice President DATE: /'� — 16 DATE: APPROVRECOMMENDED: Douglaspran sig, P. E. Directorportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney ATTEST: `e �o�'" 0000 �X�;<<i . O Y000000 a rY a r ° City Secretary yy E L RECORD City of Fort Worth SE Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Ij'g'�g9 ` ' Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 44649 Amendment No. 1 Department Fund-Account-Center Amount TPW 59651-0200431-5330500—C01669-CO2830-- $ 47, 710 . 00 Total : $ 47, 710 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 IN WADETRim Debbie Willhelm, P.E. February 15, 2016 Project Manager Transportation and Public Works Stormwater management Division City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Ref: Westcliff/ Phase II A - Surrey Street Dear Ms. Willhelm Westcliff project will require a change order/amendment to allow for additional services for bidding and construction engineering. Wade Trim, Inc. respectfully requests a fee of$47,710 to assist the CITY during the bid phase and construction phase of the project. I am available to discuss with you any questions regarding our fees. Wade Trim, Inc. Change Order, Bid and Construction Phase Services - $47,710 Total requested - $47,710 Feel free to contact me if you have any questions. Sincerely, David Speicher, P.E. Wade Trim, Inc. Wade Trim, Inc. 682.237.7718 Direct 105-C North Oak Street 877.533.9873 Roanoke,TX 76262 682.237.7719 Fax www.wadetrim.com 0 N S H I P S 0 N A F 0 U N D A T 1 0 N 0 ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements Projects The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE The objective of this project is to amend the existing Westcliff agreement to include Bid Phase and Construction Phase Services for the construction of stormwater and water main improvements for Phase 2A— Surrey Street. WORK TO BE PERFORMED Task 5. Bid Phase Services Task 6. Construction Phase Services TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The Awf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 1 of 22 procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzsaw. • Assist the CITY with assembling and awarding contracts for construction, materials, equipment, and services. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings • Final Design Drawings shall be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file and DWF format. There shall be one (1) PDF file and one(1) DWF file (created from CAD application of drawing) for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing filess and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053—org3.pdf and K-0320_org5.pdf 11. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "—org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 2 of 7 Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Buzzsaw. • In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name—"W-1956—SHT01.dwg", "W- 1956—SHT02.dwg", etc. II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155—SHT01.dwg", "X-12755—SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • 1 sets of construction documents will be made available on Buzzsaw for plan holders and/or given to plan viewing rooms. • 5 sets of construction documents will be printed and made available for purchase by planholders and/or given to plan viewing rooms. • 2 sets of 11 x 17 size plans and specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to Buzzsaw. DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 3 of 7 E. CFW Data Spreadsheet TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • The ENGINEER shall provide conformed construction drawings depicting any addendums made to the Bid Set for contractor and CITY use. • The ENGINEER shall provide confirmed contract books upon execution of documents for contractor and CITY use. • After the pre-construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Buzzsaw. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the"Final' project walk through and assist with preparation of final punch list. 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As-Built Survey o Red-Line Markups from the Contractor o Red-Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 4 of 7 • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red-lined drawings shall be returned to the CITY with the mylars. • Record Drawings shall also be submitted as an Adobe Acrobat PDF format (version 6.0 or higher) file and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Buzzsaw. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817) 392-8426. File numbers will not be issued to a project City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 5 of 7 unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • 8 Conformed Construction Drawings (11 x 17) • 8 Conformed Construction Drawings (22 x 34) (Full Size) • 6 Conformed Executed Contract Documents • 18 Site visits are assumed. (3 visits per Month) • 5 Submittal reviews are assumed. • 5 RFI's are assumed. • 1 Change Orders are assumed. • One copy of full size (22"x34") mylars will be delivered to the CITY DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Final Punch List items F. Record Drawings Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. • Construction management and inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 6 of 7 • Services related to warranty claims, enforcement and inspection after final completion. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 7 of 7 m 00 0 0 0 0 0 O N O O (H O O mO dd- 0 0 0 0 0 0 0 0 0 0 1 N � O J � N 0 E z z C N J 3 O y 0 r O O O O O O O 0 0 0 D0 0 0 0 0 0 0 0 0? 0 f0 0 O fA �» Efl fA fA fA fA fA fH �» i3 (A EA fA V3 .9 EA (A EA (p U) N W W F H V » W WU U S J X co W v mw o () a m o a z o W a y yU w 2 O O O O O O O O O O 0 0 0 0 do 00200n EA fA 69 fA EA fA f9 'f) (A fA (A R fA N F r (n x F LU c L p o CL o 0 0 w u3 0 » 0 v > o 0 0 c ~ CL W x �p W m C M N fA O C z O U w o U) ca TTS w 0 N Y p N 0 0 0 0 0 0 0 0 0 O O O p O O O O O O O O y O a) tH fA to EA fA EA EA 69 fA EA vi 69 to EA A to U3 EA fA EA rJU chi v _ U) ❑ 3 z C7 � o (n U Z � y O O o d D U N N W U_ O O (n y o Zn zca M U) 3 7 C 4 2 W O im U) m C3 ._. Q p U a` ~ w N i O y n W � N C t OI 01 � N j IC O O O O ❑ N N C y 0 O O to W w v m L y C O O N 0 ~ C m d 3 0 O o Q) r c rn2 a0i > v 0 w O S v 3 > O. N O ON O or m o W U v o az E IDL U) Y ❑ °i E a oo L T a u Y E m E o rn a .m m m in m U m d U O O o rn r E 0 L (6 N cV U C pd N U N pj C) CL a N O.H f0 W o m — o — c E a 2 o OQ o p. U U d 2 to H w U N N N N N N N O N co N o7 V l0 (O I'- y m 0) O 0) W O O) m F Q) O N M M M M M M N City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/9/2013 DATE: Tuesday, July 09, 2013 REFERENCE NO.: **C-26320 LOG NAME: 20SW WESTCLIFF DRAINAGE DESIGN SUBJECT: Authorize Engineering Agreement with Wade Trim, Inc., in the Amount of$524,244.00 for the Design of the Westcliff Drainage Improvements Project (COUNCIL DISTRICTS 3 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of an engineering Agreement in the amount of$524,244.00 with Wade Trim, Inc., for the design of the Westcliff Drainage Improvements Project. DISCUSSION: The Engineering Agreement recommended by this Mayor and Council Communication will provide for the design services for the Westcliff Drainage Improvements Project, which is needed to reduce the probability of home flooding in the Westcliff North and Westcliff South Drainage Basins (south of Berry Street, north of Bilglade Road, east of Manderly Place and west of Cockrell Avenue). Wade Trim, Inc., was selected to design this project based on a Request for Qualifications (RFQ) process. They propose to perform the design services for a lump sum fee of$524,244.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. M/WBE Office: Wade Trim, Inc., is in compliance with the City's BIDE Ordinance by committing to 16 percent SBE participation on this project. The City's SBE goal on this project is 14 percent. This project is located in COUNCIL DISTRICTS 3 and 9. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P227 531200 203280166930 $524,244.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Logname: 20SW WESTCLIFF DRAINAGE_DESIGN Page 1 of 2 Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Vibhuti Pandey (2424) ATTACHMENTS 1. 01669 Westcliff Drainage Map.pdf (Public) 2. 01669 Westcliff Drainage.pdf (CFW Internal) 3. 142. 20SW Westcliff Drainage Design(FAR funds verification 6-11-13 JCT).docx (CFW Internal) 4. FAR-01669-00003-Desi_ n.pdf (CFW Internal) Logname: 20SW_WESTCLIFF DRAINAGE DESIGN Page 2 of 2 CERTIFICATE OF INTERESTED PARTIES FORM 1295 101`1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-44190 Wade Trim,Inc Roanoke,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/22/2016 being filed. City of Fort Worth Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. 44649 Bid and Construction Phase Services 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT �... I swear,or affir ,undergpen perjury,t t the above disclosure is true and correct. KIM STRANGE oar au®% Notary Public,State of Texas Comm.Expires 01-07-2017 or Notary:���� Notary ID 129254046 Al Signatur f authorized aft of contracting usi s entity AFFIX NOTARY STAMP/SEAL ABOVE TT�� �^ Sworn to and subscribed before me,by the said -t_J w\A '( t this the day of 20 to certify which,witness my hand and seal of office. Signature of officer administ oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.645