Project Namel Rockwood Golf Course Renovation City Sec# 1 47212
Client Project#(s)l 01199
Contractorl Heritage Links PM1 Scott Penn Inspectorl Adilda Cazorla
Change Order Submittal# L_ Date 3/1/2016
Dept. PARD Contract Time
Totals CD
Original Contract Amount $4,488,307.90 $4,488,307.90 260
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $4,488,307.90 $4,488,307.90 260
Go to ADD&DEL Tabs to Enter CO Backup $32,739.25 $32,739.25
Revised Contract Amount $4,521,047.15 $4,521,047.15 260
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $32,739.25 $32,739.25
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.730%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $5,610,384.88
JUSTIFICATION (REASONS)FOR CHANGE ORDER
Item 1-7.)Drainage system design revisions per Owner and Architect. Plan reference Sheet 11 -Drainage Plan revised 10-26-2015 and 2-29-
16. Items 8-16.) Added nursery green construction per Owner. Location determined in field per Owner and Architect.
A
Maty J er, rty
oM
RE�EtVED
UM
_ r ��
CtN�V FOR,
OFFICIAL RECORD cros �ra�,Y mob.
CITY SECRETARY
FT.WORTH,TX 9 s E �;
FORT WORTH City of Fort Worth
Change Order Additions
Project Name I Rockwood Golf Course Renovation City Sec# 47212
Client Project# F 01199
Contractor Heritage Links PM Scott Penn Inspector Adilda Cazoria
Change Order Submittal# Date 3/1/2016
ADDITIONS
ITEM LTb71T7= DEPT Qty Unit ni os o a
Drainage Modifications
olid Pipe PARD 20.00000000 If
2 2° olid Pipe PRD 5 5. 0 M s-----$T67. 5
Drainage Modifications -
olid Pipe PARD 5 If 3.
olid Pipe PAD 5 5. If 5
5 8"Solid Pipe PARD 575. f $23.15
Flared EndSection PARD 0 0 0 ea 5 5.
7 Pipe Restocking Fee PARD s 0.
Nursery GreenConstruction:
trip Sod in Area of Disturbance PRD s 5. 0
Core Green/Shape Surrounds PAD 7,5 sf
Solid utfall Pipe PRD 200.00000000 f
perforated Smile Drain PARD 5H0000000 It
Greens Mix Installation("Depth) PARD 5,000.00000000 sf . 5
3 Fine Grade Green Surface and Surrounds PARD 0 Is ,7 5.
Grassing-Sprigging Green(miniverde Bermuda) PAD1.00000000 Is 3,20. 0
5 Grassing-Sod Green Surrounds(419 Bermuds) PARD 1.00000000 Is 5 .
16 Irrigation Modificiations(2 new heads,pipe,and wire) PARD Is 0.
PARD $59,147.75
Sub Total Additions
Change Order Additions Page 2 of 4
For:rwoarH City of Fort Worth
Change Order Deletions
Project Name Rockwood Golf Course Renovation City Sec# 47212
Client Project# 01199
Contractor Heritage Links PM Scott Penn Inspectorr Adilda Cazoda
Change Order Submittal# 0 Date 3/1/2016
DELETIONS
QtyITEM nit nit os ata
ramage o iciahons -
'Pipe PARD 5. If 5
110"Pipe PARD 240.00000000i I(
sump P D ea 5
Drainage Modifications 2-29-16:
4 6'
- -
6'Solid Pipe PARD If 5
5 Solid Pipe PARD 410.00000000 if $10.15
6 olid Pipe PRD 525k0000000 I
7 olid Pipe PARD 575. 0 5
PARD $26.408.50
bub Total Deletions
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Change Order
M/SBE iSub Type of Service Amount for this CO
NA
Total $0.00
Previous Change Orders
c0# DATE AMOUNT
NA
Total $0.00
CFW Change Order Approval Pa- COAppOI Page 1 of 3
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/PACS/01199 - Rockwood Golf Course Renovation/Contractor/Change Orders/Change Order 1 Breakdown.XIs
Attachments(0)
No Attachments have been added to this form.
https://projeetpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 5/12/2016
CFW Change Order Approval Pa- COApp01 Page 2 of 3
FORTWORTH. Cityof Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 1
Change Order No.: Pa - COApp01 Date Started: 2016-04-11
City Sec. No.: 47212 Date Due: 2016-05-31
Project Name: Rockwood Golf Course Renovation
01199 DOE Numbers:
Project Numbers:
Project Rockwood Golf Course Renovation
Description:
Project Manager: Scott Penn City Inspector: Adilda Cazorla
Contractor: Heritage Links
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
Park and Recreation $ 32,739.25 39007-0800450-5740010--C01199-1 0
Total Cost: $ 32,739.25 Total Requested Days: 0
Approval Status:
https://projectpoint.buzzsaw.com/ bz_web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 5/12/2016
CFW Change Order Approval Pa- COApp01 Page 3 of 3
Approved: Yes
Comments: Funding verified
User: Debra Rose
Date: 2016-04-13 10:48 AM
Approved: Yes
Comments:
User: Doug Wright
Date: 2016-04-14 1:59 AM
Approved: Yes
Comments:
User: Scott Penn
Date: 2016-04-14 8:55 AM
Approved: Yes
Comments:
User: Joel McElhany
Date: 2016-04-14 8:58 AM
Approved: Yes
Comments:
User: Richard Zavala
Date: 2016-04-14 12:31 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-04-18 4:27 PM
Approved: Yes
Comments:
User: Susan Alanis
Date: 2016-04-18 5:00 PM
Action Required:
https://projeetpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 5/12/2016