Loading...
HomeMy WebLinkAboutContract 39375-A1 MAIo `13�5'A i SECIMM AMENDMENT No. l ITRACT . ,17 X% TO CITY SECRETARY CONTRACT No. 39375 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 39375, (the CONTRACT) which was authorized M&C # 23846 on the 13 day of October, 2009 in the amount of $ 245, 973 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Chapin Road at Santa Clara Channel Bridge Replacement and Cravens Road at Wildcat Branch Bridge Replacement; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 21, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $7,325. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $253, 298. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth Professional Services Agreement Amendment Template �'9 �/ �1 PMO Official Release 8/1/2012 t L � Page 1 of 3 APPROVED: City of Fort Worth ENGINEER Kimley-Horn and Associates, Inc. Jesus Chapa Brian iroecker Assistant City Manager Vice President DATE: �/ DATE: APPR L RECOMMENDED: 6,/4 a W Douglas 6. Wiersig, P. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: ouglas W. Black Assistant City Attorney ATTEST: M r J. r �� o City Secr ry �o 0 'T City of Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment Template CITY SECRETARY PMO Official Release 8/1/2012 F, u Page 2 of 3 7 FUNDING BREAKDOWN SHEET City Secretary No. 39375 Amendment No. 1 Department FID Amount TPW 39403-0200431-5330500--C00259-CO2632-2016- $7, 325 . 00 Total : $7325 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 1 Kimley))) Horn April 21, 2016 Mr. Tariqul Islam Ci of Fort Worth TPW suite s5o City � 801 Cherry Street,Unit 11 5001 James Ave Fort worth,Texas Fort Worth,TX 76115 76102-6803 Re: Chapin and Cravens Bridge Replacement Project City Secretary Contract#39375 Additional Services—Construction Phase KHA No. 061018066 Dear Mr. Islam: Kimley-Horn and Associates,Inc. (Engineer)will provide additional services to develop record drawings and increase the contract amount to accommodate increased FEMA fees for LOMB submittals since original contract date. Our scope of services, schedule,and fee are below. SCOPE OF SERVICES Part E—Construction Phase Services The Engineer will perform the following services: 1. Record Drawings The Engineer will prepare record drawings for Chapin Road at Santa Clara Channel and Cravens Road at Wildcat Branch. The record drawings will be revisions to the construction drawings that reflect changes during the construction process reported to the Engineer by the City or Contractor that are considered to be significant. The record drawings are not guaranteed to be"as built",but will be based on the information made available. One(1)set of signed Record Drawings and one(1)electronic copy of Record Drawings will be provided to the City. 2. Preparation of Letter of Map Revisions (LOMR) The Engineer will include increased fees for FEMA submission in the contract.The original contract included$4,600 per each FEMA submission, and the current fee for LOMR is $8,250. The Engineer will include unused survey budget($3,625)to cover a portion of the fee increase, but will supplement the contract to accommodate the remaining increase SCHEDULE The Engineer will provide the additional services within a reasonable length of time as expeditiously as practical. ■ TEL 512 418 4533 Kimley>>>Horn FEE The contract budget will be amended with the additional fees as follows: Record Drawings: $3,650.00 LOMR fee increase: $3,675.00 Total Additional Services: $7,325.00 The original contract amount is $245,973.00. The revised contract amount, including this request will be$253,298.00. Kimley-Horn requests the amount of$7,325.00 for the additional services. NMBE None of these services will be performed by our M/WBE subconsultant. This will revise our total contract M/WBE participation percentage to 22.2%. Our M/WBE goal for this project is 17%. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. f r 'an Boeck ,P.E. Vice President F- C6 cli [§5 §/$ �#` ef£ �ss0 #J 0 \\\\\ \��\(D(n w I - §§*G` § §; CL k / \ w - ƒ ; w co \ LU ) \\ \\ GO : G » : ? \ uj / 2 ? \ , 2 (\ \ @ k� \ �\ moo. _ ]2 ( �� Lf) ) =wm =o � mXao E ) 2} /} 7 ? UJ3E §o o $ % I = E» / \~ z :3 0 > mtaM 2� aJ2Fe \ 0 & 0 \\ \\ ] � ] . � } 0 m \ � � Q !!\\ ] $ / ■ }& 3 i E � 3 k \�}IL \\ )))\ )60 & �c% \/\ //7