Loading...
HomeMy WebLinkAboutOrdinance 22212-05-2016 ORDINANCE NO. 22212-05-2016 AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER & SEWER BOND 2015A FUND IN THE AMOUNT OF $5,000.00, FROM AVAILABLE FUNDS, FOR THE PURPOSE OF FUNDING DESIGN OF THE REPLACEMENT, REMOVAL AND/OR MODIFICATION OF THE PRIMARY AREA SWITCHGEAR; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH;AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2015-2016 in the Budget of the City Manager,there shall also be increased estimated receipts and appropriations in the Water & Sewer Bond 2015A Fund in the amount of$5,000.00, from available funds, for the propose of funding Design of the Replacement,Removal and/or Modification of the Primary Area Switchgear. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance No. 21873-09-2015 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED AS TO FORM AND LEGALITY: maw, Douglas W.Black, 4ry J.Kayser, Sr.Assistant City Attorney City Secretary ADOPTED AND EFFECTIVE:May 17,2016 Ordinance No.22212-05-2016 Page 1 of 1 Nx s _ 3 Village Creek Water Reclamation Facility (VCWRF) N F 1, I.rs 1 n 4 �t t 3. I l lr . sad 1 1�- Al J' . fit r; = � � ; Pi A NE jami m _ IT 11 I��1 0 1 i i J� �C Switchgear Improvement Locations 0P {. . 4; Feet ` 1" 3 El Switchgear Improvement Location 0 300 600 FORT WO RT H COPYRIi=HT_J,S CITY GP FORT W GRTH Village Creek Water Reclamation Facility (VCWRF) °""T"URL'ED THIS DATA IS TO BE USED FOR A GRAPHICAL REPRESEHTATIDH 0111't THE ACCURACY IS HOT TO BE TAKEN,USED AS DATA PRODUCED Fug'. Switchgear Improvements -Ph.1 Primary Area Etl GPNEERIHG PURPOSES OR BY AREGISTERED PRPFESGD]IIAL VJI WAT SUftVE'fOR THE TRTNE CCURAGYOF.i1D'DATF H F)t1SIBLiI: City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 5/17/2016 - Ordinance No. 22212-05-2016 & Resolution No. 4629-05-2016 DATE: Tuesday, May 17, 2016 REFERENCE NO.: **C-27720 LOG NAME: 60VCWRF SWITCHGEAR IMPROVEMENTS - PH1 PRIMARY AREA SUBJECT: Authorize Execution of an Engineering Agreement with Gupta and Associates, Inc., in the Amount of $517,782.00 for Design of the Replacement, Removal and/or Modification of the Primary Area Switchgear at the Village Creek Water Reclamation Facility, Adopt Reimbursement Resolution and Adopt Appropriation Ordinance (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an Engineering Agreement with Gupta and Associates, Inc., in the amount of $517,782.00, for design of the replacement, removal and/or modification of the primary area switchgear at the Village Creek Water Reclamation Facility; and 2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Replacement, Removal and/or Modification of Primary Area Switchgear at Village Creek Water Reclamation Facility Project and adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Water& Sewer Bond 2015A Fund in the amount of $5,000.00. DISCUSSION: The City of Fort Worth owns and operates the Village Creek Water Reclamation Facility (VCWRF). The VCWRF was started in the 1950's as a five million gallons per day (MGD) plant, currently permitted for an annual average flow rate of 166 MGD and a two hour peak flow of 369 MGD. The VCWRF has a complex electrical system with a medium voltage dual feed system, with sub-stations for each process or facility including single or dual transformers and two 5 MW turbine generators. Most of the electrical equipment has been in service for over 40 years and has reached the end of its useful life. Much of it is obsolete, difficult to maintain or obtain spare parts for and showing signs of corrosion. In addition some of electrical equipment is undersized for the current plant load and may not be safe to operate or maintain. On September 24, 2013 (Mayor and Council Communication (M&C) C-26477), the City Council awarded the execution of an Engineering Agreement with National Field Services to conduct a power study, which included an electrical equipment evaluation, short circuit study, protective device coordination study, arc flash analysis, field labeling of arc flash hazards and SKM Model development and training. That study identified several electrical areas needing attention, including the need to replace some equipment. Because of the size of the project and financial limitations, these improvements will be designed and implemented in a number of phases organized in terms of critical needs and process areas. Phase 1 has been identified to be the primary area switchgear electrical system, which is also the oldest and in most need of improvements. It is anticipated that this project will not increase the operating budget for the Logname: 60VCWRF SWITCHGEAR IMPROVEMENTS - PHI PRIMARY AREA Page 1 of 4 VCWRF and this Engineering Agreement will determine if there will be any long-term future operating budget impact. Gupta and Associates, Inc. (Gupta and Associates) has been selected as the consulting firm to develop the design plans as well as prepare the construction documents for the various electrical equipment improvements at the VCWRF. Gupta and Associates is proposing to do the necessary design and prepare the construction contract documents for the primary area switchgear equipment for the above identified fee. City staff considers this fee to be fair and reasonable for the scope of services proposed. This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Direct Purchase Note (DPN) program will be used to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City portfolio (currently approximately one-percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short-term financing source, another funding source will be required, which could mean issuance of securities under the DPN program or earlier issuance of Water and Sewer revenue bonds than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. The City Council adopted the Water Department's Fiscal Year 2016 - 2020 Five-Year Capital Improvement Plan on February 2, 2016 (M&C G-18662). This City Council-adopted plan includes this specific project, with funding identified through the DPN program to be reimbursed with future revenue bonds. In accordance with the provisions of the Financial Management Policy Statements, Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within the next three years. This debt must be issued within approximately three years to provide reimbursement for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be made whole through other financing methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax- exempt bond proceeds. Funding for the Replacement, Removal and/or Modification of Primary Area Switchgear at VCWRF Project is depicted in the following table: F Existing Additional Future Description Appropriations Appropriations Appropriations Project Total* (Engineering $517,782.00 _� $ 0.00 $ 300,000.00 $ 817,782.00 construction [ $ 0.00 0.00 $7,000,000.00 $7,000,000.00 T_ e_ _ Project Planning, Project Management, Inspection, Testing and Contingencies $95,018.00 $5,000.00 __ $ 200,000.00 $ 300,018.00 Project Total F $612,800.00 $5,000.00 $7,500,000.00 $8,117,800.00 *Numbers rounded for presentation purposes. Funding for the Replacement, Removal and/or Modification of Primary Area Switchgear at VCWRF Project is depicted in the following table by fund: F__.____--Fund Appropriations* Water/Sewer DPN FUND 56005 $ 612,800.00 Logname: 60VCWRF SWITCHGEAR IMPROVEMENTS - PHI PRIMARY AREA Page 2 of 4 Water&Sewer_Bond 2015A 56007 1 $ 5,000.00 Future Revenue Bond $7,500,000.00 - _ �{ Project Total $8,117,800.00 * Numbers rounded for presentation. Engineering services are anticipated to commence in May 2016. With a contract time of 12 months, it is estimated to be completed by April 2017. The construction is anticipated to start in August 2017, with an estimated construction time of 12 months. M/WBE OFFICE - Gupta and Associates is in compliance with the City's BDE Ordinance by committing to 32 percent SBE participation on this project. The City' s goal on this project is 12 percent. Additionally, Gupta and Associates is a certified M/WBE firm. In addition to the contract amount, $64,218.00 is required for project contingency allowance and $30,000.00 is required for project management and associated Staff time for the Water Department. An additional $5,000.00 is required to clear negative balances for Staff salaries. This project serves the entire city and is located in COUNCIL DISTRICT 5, Mapsco 90J. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funding in the Water and Sewer DPN is already appropriated and available in the project as directed by the Fiscal Year 2016 Water& Wastewater Capital Improvement Plan and that, upon approval of the attached appropriation ordinance, funds are available as directed by M&C G-18375 in the Water& Sewer Bond 2015A Fund for the transfer from unspecified funding to the Replacement, Removal and/or Modification of Primary Area Switchgear at VCWRF Project as depicted in the table below: Existing Additional Future Project FF lAppropriations JAppropriations JAppropriations I Total* iNater/Sewer DPN FUND 56005 $612,800.00 $ 0.00 $ 0.00 $ 612,800.00 1 atet & ^ Sewer Bond 2015A 156007 $ 0.00 $5,000.00 $ 0.00 $ 5,000.00 Future Revenue Bond $ 0.00 $ 0.00 $7,500,000.00 $7,500,000.00 p5r,iect Total $612,800.00 $5,000.00 $7,500,000.00 $8,117,800.00 * Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year Chartfield 2 2)560071 0700430 4905430 CO2648 C03030 2016 $5,000.00 56007 0700430 5110101 CO2648 C03030 2016 $5,000.00 2)560051 0700430 5330500 CO2648 C03030 2016 517,782.00 2)560051 0700430 5110101 CO2648 C03030 2016 1 $95,018.00 Logname: 60VCVWRF SWITCHGEAR IMPROVEMENTS - PHI PRIMARY AREA Page 3 of 4 FROM Fund Department ccoun Project Program ctivity Budget Reference # Amount ID ID Year Chartfield 2 1 560051 0700430 15330500 1 CO2648 I I C03030 1 2016 1 $517,782.00 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Farida Goderya (8214) Logname: 60VCWRF SWITCHGEAR IMPROVEMENTS - PHI PRIMARY AREA Page 4 of 4