Loading...
HomeMy WebLinkAboutOrdinance 9056A. ,- ORDINANCE NOo ~~ ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OP HULEN STREET AND PORTIONS OF SUNDRY OTHE~t STREETS , AVENUES AND PUELIC PLACES IN THE CITY OF PORT WORTH, TEXASa DECLARING THE CONTRACT WITH J.L. Bertram Construction & En~ineerin~OR THE CONSTRUCTION OI' SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING TME CAPTION OF SAME IN THE MINUTE EOOR OF THE CITY COUNCIL OF FORT WORTHY TEXAS, AND EY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITYy AND PROVIDING AN EFFECTIVE DATEo ,~ WHEREASa the City of Fort Worths Texasa has heretofore entered into a contract with .T.T.. B rtram ('.nnStrn~rinn R, F.ngin[~aring , for the making and Construction of certain street improvements on the hereinafter described portions of streetsp avenues and public places in said Citya tom~iita HULEN STREET From Oakmont Parkway to North 2231 Feet, known and des- ignated as Project No. 029-036687, to be improved by a seven-inch thick~°eoncrete pavement with seven-inch high superimposed concrete curb on a six-inch thick lime stabilized subg.rade, so that the finished roadway will consist of two thirty-six feet wide traffic lanes with a twenty-eight feet wide median. Seven-inch thick concrete turn lanes and median openings will be construct- ed-where specified O ~ ~ I. m~. tivHENEAS, by sundry proceedings heretofore passed by the City Council of the Gity of Fort Worth, Texas, including Ordinance No. 8777 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above. described portions of streets, avenues and public places and against; the real and true owners thereof; and, wHEiiEA3, the City Council of the Oity of Fort ~'~orth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No, 8777 , and 4~HEiir:AS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in comglete accordance Frith the contract therefor; NULu, TtiEtt~'OHx,, BE IN ORDAIhiED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, 'TEXr1S, `PHAT Ie The improvements on each of t ho portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance Frith the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted a,nd allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after diving; effect to such credit, if arty, are hereby enumerated and itemized as follows: J ~ ~ r + r i 7 III. When each of the certificates has been duly executed as hereinabove providedq same shall be delivered to the Tax Assessor-Collector as part payment of the contract price, xv. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worths T'exass and by filing the complete ordinance in the appropriate Ordinance Records of said Citye V. 'This ordinance shall take effect and be in full force and effect from Brad after the date of its passagee PASSED AND APPROVED THIS V~ day of ~ 19~, APPROVED AS `TO FORM AND LE(aALITY: ity Attorney. PROJECT N0. 029-036687, HiJI.EN STREET FROM OAKMONT PARKWAY TO NORTH 2231 FEET, to be Lnproved w:lth seven-inch thick concrete pavement with seven-inch high superimposed concrete curb on a aix-inch thick lime stabilized subgrade, so that the finished roadway will consist of two thirty-sin feet wide traffic lanes with a twenty-eight feet wide median. Seven-inch thick concrete turn lanes aid median openings w:lll be construced where specified. BLOCK OWNER LOT ZONING FRONTAL RATE AMOUNT ASSESSMENT WEST SIDE R. BURIQETT SURVEY - ABSTRACT N0. 1922 1442.0' Adjusted to: (50' Drai nage Esm't) Cassco Land Co., Inc. TR.1 V. 1129 1392.0' Pavement $43.73 60,872.16 Overton Park National P. 630 1382.0' Curb 1.38 1,907.16 Bank Bldg., Suite 614 "F" b "C" 1392.0' R.O.W. Prep. b.05 8,421.60 2200 South I~ulen St. 1392.0' Storm Drain 55.50 77,256.00 Fort Worth, Texas 76109 1392.0' Top Soil b 2.28 3,173.76 Seeding 1392.0' St. Lights b 2.66 3,702.72 Trf. Markers 155,333.40 FITTURE STREET INTERSECTS (80'): Casco Land Co., Inc. TR.1 V. 1129 699.0' Pavement $43.73 30,567.27 Overton Park National P. b30 699.0' Curb 1.38 964.62 Bank Bldg., Suite 614 "C" 699.0' R.O.W. Prep. 6.05 4,228.95 2200 South Hulea St. 699.0' Store Drain 55.50 38,794.50 Fort Worth, Texas 76109 699.0' Top Soil b 2.28 1,593.72 Seeding 699.0' St. Lights b 2.66 1,859.34 Trf. Markers 78,008.40 EAST SIDE R. BLTR.'~TT SURVEY - ABSTRACT N0. 1922 C.O. Edward's Estate TR.1 V. 1129 1613.0' Pavement $43.73 70,536.49 Overton Park National P. 630 1613.0' Curb 1.38 2,225.94 Bank Bldg., Suite 614 "CR" 1613.0' R.O.W. Prep. 6.05 9,758.65 2200 South Hulen St. 1613.0' Storm Drain. 55.50 89,521.50 Fort Worth, Texas 76109 1613.0' Top Soil b 2.28 3,677.64 Seeding 1613.0' St. Lights b 2.66 4,290.58 Trf. Markers 180,010.80 LEDGESTONE DRIVFy INTERSECTS (60') C.O. Edward's Estate TR.1 V. 1129 548.0' Pavement $43.73 23,964.04 Overton Park National P. 630 548.0' Curb 1.38 756.24 Bank Bldg., Suite b14 „CR„ 548.0' R.O.W. Prep. 6.05 3,315.40 2200 South Hulen St. 548.0' Stoma Drain 55.50 30,414.00 Fort Worth, Texas 76109 548.0' Top Soil b 2.28 1,249.44 Seeding 548.0' St. Lights b 2.66 1,457.68 Trf. Markers 61,156.80 TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) $474,500.40 TOTAL COST 'PO CITY OF FORT WORTH $243,916.27 TOTAL CONSTRUCTION COST. ... $718,425.67 -1- .x:^ MAS DER FILE 1 QTY MANAGE 1 ,COUNTING 2 ftANSPGRTATIGNJPU6 C~ • • ~' ~~t~ ~~~ 1F~rt '~~'®rth, ~~xas NT pgGE DATE NUMBER CE SUBJECT:HUlen Street (Oal~aont Parkway 2 c u/,~~1r~84 **FP-1892 to 2231' North) i or -- Final Council action is requested on the subject project. Project Description Project Name Project Number: Contract Number: Contractor: Contract Awarded: Work Order Dated: Work Order Effective On or Before: Work Began: Co ntract Time Began: Project Substantially Complete and Final Inspection Made: Punch List Completed: Contract Time Provided: Contract Time Used: Contractor Affidavit Received Hulen Street (Oalanont Parkway to 2231' North) 29-036687-00 13002 J. L. Bertram Cstr. & Engr., Inc. March 8, 1983, (M&C C-6798) April 11, 1983 April 18, 1983 April 25, 1983 April 18, 1983 December 15, 1983 January 10, 1984 127 Working Days 95 Working Days February 3, 1984 Project Cost Original Bid Price: Change Order No. 1 Revised Bid Price: Final Contract Price: Partial Payments Previously Made• Amount: Final Payment Due: $706,070.35 $ 5,160.00, $711,230.35 $671,425.86 9 $657,059.60 $ 14,366.26 (M&C C-6986) 7-12-83 Deviation from Revised Price Final measured quantities at contract unit prices yield an earned total price: for this contract of $671,425.86 which is $39,804.49 (5.60%) under the revised price. This underrun is the result of approximately 5800 cubic yards of unneeded borrow and a penalty of $15,464.80 for deficient pavement thickness in addition. to other minor underruns on estimated quantities in the contract documents. Financing `~ ~? Sufficient funds are available for the recommended final payment to be made froml the Project No. 29-036687-00 account. Compliance with Specifications The project has been completed in accordance with the requirements of they contract. DATE REFERENCE SUBJECT Final payment - Hulen Street 2PAGE 2 3/20/84 NUMBER **FP-1892 (Oakmont Parkway to .2231' North) f o Recommendation It is recommended that the above project be accepted by an Ordinance and final payment in the amount of $14,366.26 be made to J. L. Bertram Construction and Engineering, Inc. UAI : dx APPROV~p pY CITY COUNCIL MAP, ~Q , 1984 . /~ a s ~~~u~v tY Secret ~~~~ ary of ehe - 2`ity ,of F~ w .R3tttt Tex 1. SUBMITTED FOR THE ~~ CITY MANAGER'S ~ DISPOSITION BY COUNCIL. - PROCESSED BY OFFICE BY ^ APPROVED ORIGINATING I.:I OTHER (DESCRIBE) DEPARTMENT HEAD• Gary L. Santerre CITY SECRETARY FOR ADDITIONAL INFORMATION ~d® pted Or finance NoA CONTACT Wm. Massey Ext. 7910 BATE I, /~ /, 11