HomeMy WebLinkAboutContract 46588-FP1 Departr t of TP &W Const. 5ervlces
: CITY SECRET
,1� +�Date
Project anager i�OI�TRACT O.Risk Managemen Ca — 1 WORTH®
D.O.E. Brotherton
s
CFA Westerman/Scanned
The Proceeding people have been confacted con erring the request for final
payment i£have released this project for such payment. TION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy 7 PROJECT COMPLETION 5%0 1 C,0237
D.O.E.Na: 7315
--- 06,V4 0z3'7k
Regarding contract 117315 for O'DONNEL'S ADDITION as required by the WATER DEPARTMENT as
approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&-Public Works Department has accepted the project
as complete. �! r7v
� 1 a
Original Contract Prices: i�� $418,265.00
MAY 210 20.16
Amount of Approved Change Orders: $16,000.00 Ns I &2
Revised Contract Amount: Sy—"— � ���
'"" $434,265.00
Total Cost Work Completed: $434,265.00
Less Deductions:
Liquidated Damages: Days Q$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $434,265.00
Less Previous Payments: $0.00
Final Payment Due $434,265.00
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
— efZ ��Gcf,� _ _ _
Accepted — -- ------ / � ---- — Date — --
Asst. Director, WATER DEPARTMENT
Asst. City Manager Date
Comments: P265-541200-604150237683,P275-541200-704130237683
EM�ILE.D
MAY 2 0 2016
Init�el: L `PCZ OFFICIAL RECORD
CITY SECRETARY
FT.W®RTHRI
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name ODONNEUS ADDITION
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02376
DOE Number 7315
Estimate Number 1 Payment Number I For Period Ending 3/17/2016
CD
City Secretary Contract Number 117315 Contract Time 12ED
Contract Date 4/32015 Days Charged to Date 250
Project Manager Lona Contract is 100.00 Complete
Contractor MCCLENDON CONSTRUCTION COMPANY,INC.
P.O.BOX 999
BURLESON, TX 76097
Inspectors LAYER / VEGA
Thursday,March 17,2016 Page 1 of 5
City Project Numbers 02376 DOE Number 7315
Contract Name O'DONNEL'S ADDITION Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/17/2016
Project Funding
UNIT I:WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 DUCTILE IRON WATER FITTINGS 1.21 TN $15,200.00 $18,392.00 1.21 $18,392.00
W/RESTRAINT
2 6"WATER PIPE 60 LF $52.00 $3,120.00 60 $3,120.00
3 8"WATER PIPE 473 LF $61.00 $28,853.00 473 $28,853.00
4 10"WATER PIPE 863 LF $66.00 $56,958.00 863 $56,958.00
5 FIRE HYDRANT 3 EA $4,750.00 $14,250.00 3 $14,250.00
6 CONNECTION TO EXISTING 16"WATER MAIN 1 EA $15,000.00 $15,000.00 1 $15,000.00
7 6"GATE VALVE 3 EA $1,450.00 $4,350.00 3 $4,350.00
8 8"GATE VALVE 4 EA $1,775.00 $7,100.00 4 $7,100.00
9 10"GATE VALVE 3 EA $2,450.00 $7,350.00 3 $7,350.00
10 16"X 10"TAPPING SLEEVE&VALVE I EA $10,650.00 $10,650.00 1 $10,650.00
11 VALVE BOX ADJUSTMENT I EA $200.00 $200.00 1 $200.00
12 TRENCH SAFETY 1396 LF $5.00 $6,980.00 1396 $6,980.00
13 1"DOMESTIC WATER SERVICE W/METER 1 EA $2,500.00 $2,500.00 1 $2,500.00
CO#1
14 2"IRRIGATION SERVICE W/METER CO#1 I EA $3,500.00 $3,500.00 1 $3,500.00
15 1"DOMESTIC WATER METER W/1.5"TAP TO 3 EA $2,500.00 $7,500.00 3 $7,500.00
MAIN CO#2
16 1"IRRIGATION SERVICE W/METER CO#2 I EA $2,500.00 $2,500.00 1 $2,500.00
——————————————————————————————————————
Sub-Total of Previous Unit $189,203.00 $189,203.00
UNIT II:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 --------------------------------------
1 8"SEWER PIPE CSS BACKFILL 20 LF $120.00 $2,400.00 20 $2,400.00
2 8"DIP SEWER PIPE CSS BACKFILL 20 LF $140.00 $2,800.00 20 $2,800.00
3 POST-CCTV INSPECTION 814 LF $2.00 $1,628.00 814 $1,628.00
4 MANHOLE VACUUM TESTING 9 EA $200.00 $1,800.00 9 $1,800.00
5 EXPLORATORY EXCAVATION OF EXISTING 2 EA $4,800.00 $9,600.00 2 $9,600.00
UTILITIES
6 CONCRETE COLLAR 8 EA $550.00 $4,400.00 8 $4,400.00
7 20"CASING BY OTHER THAN OPEN CUT 170 LF $550.00 $93,500.00 170 $93,500.00
8 8"DIP SEWER PIPE 127 LF $96.00 $12,192.00 127 $12,192.00
Thursday,March 17,2016 Page 2 of 5
City Project Numbers 02376 DOE Number 7315
Contract Name O'DONNEL'S ADDITION Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/17/2016
Project Funding
9 8"SEWER PIPE 133 LF $58.00 $7,714.00 133 $7,714.00
10 6"SEWER SERVICE 8 EA $1,440.00 $11,520.00 8 $11,520.00
11 8"SEWER PIPE 514 LF $71.00 $36,494.00 514 $36,494.00
12 4'MANHOLE 8 EA $5,975.00 $47,800.00 8 $47,800.00
13 4'SHALLOW MANHOLE i EA $3,250.00 $3,250.00 1 $3,250.00
14 4'EXTRA DEPTH MANHOLE 36 VF $150.00 $5,400.00 36 $5,400.00
15 EPDXY MANHOLE LILNER 15 VF $250.00 $3,750.00 15 $3,750.00
16 TRENCH SAFETY 814 LF $1.00 $814.00 814 $814.00
-----------------------------------
Sub-Total of Previous Unit $245,062.00 $245,062.00
--------------------------------------
Thursday,March 17,2016 Page 3 of 5
City Project Numbers 02376 DOE Number 7315
Contract Name O'DONNEL'S ADDITION Estimate Number I
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 3/17/2016
Project Funding
Contract Information Summary
Original Contract Amount $418,265.00
Change Orders
Change Order Number 1 $6,000.00
Change Order Number 2 $10,000.00
Total Contract Price $434,265.00
(Q0.(mdf-�Y'2' x, Total Cost of Work Completed $434,265.00
Co ntr o J Less %Retained/ $0.00
Date // w Net Earned $434,265.00
' -5 G- /�
Inspection up i r Earned This Period $434,265.00
j Retainage This Period $0.00
7 Date i !�
PLess Liquidated Damages
Project Manager '
/' Days @ /Day $0.00
Date S LessPavement Deficiency $0.00
Asst iireector/TP W-Infrastructure Design and Construction Less Penalty $0.00
6� - /-I(, Date 7c'�l'` Less Previous Payment $0.00
W58irector/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $434,265.00
-13
Thursday,March 17,2016 Page 4 of 5
City Project Numbers 02376 ! MAY 20 2016 i l��j DOE Number 7315
Contract Name O'DONNEL'S ADDITION ` Estimate Number 1
Contract Limits �)� _ r.E Payment Number 1
Project Type WATER&SEWER ~'~ For Period Ending 3/17/2016
Project Funding
Project Manager Long City Secretary Contract Number 117315
Inspectors LAYER / VEGA Contract Date 4/3/2015
Contractor McCLENDON CONSTRUCTION COMPANY,INC. Contract Time 120 CD
P.O.BOX 999 Days Charged to Date 250 CD
BURLESON, TX 76097 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $434,265.00
Less %Retained $0.00
Net Earned $434,265.00
Earned This Period $434,265.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days(Qa $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $434,265.00
Thursday,March 17,2016 Page 5 of 5
Inb 3- L/ 237(v
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: O'Donnels Addition
PROJECT NO.: 02376 CONTRACTOR: McClendon
DOE NO.: 7315
PERIOD FROM:04/03/15 TO: 01/15/16 FINAL INSPECTION DATE: 22-Mar-16
WORK ORDER EFFECTIVE:4/3/2016 CONTRACT TIME: 120 O WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 250
PREVIOUS
PERIOD 0
TOTALS
TO DATE 250
*REMARKS:
-
CONTIVACT& DATE INSPECTOR 6 DATE
ENGINEERING DEPART�1ENT
s The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,Thi 76012-6311
(817)392-7941 •Fax:(817)392-7845
V"
FORT ORT
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: O'Donnels"s Addition
PROJECT NUMBER: 2376
DOE NUMBER: 7315
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 6" PVC 60
Yes 8" PVC 873
Yes 10" PVC 863
FIRE HYDRANTS:3 VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 1" Copper 40
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 8" PVC 133
Yes 8" DIP sewer pipe 127
Yes 8" PVC 514
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 6" PVC 220
TRANSPORTATION AND PUBLIC WORKS
I
:
I r '
9 7- -
i
jy 'v'
7o !.`-1
y a n 1
I 9 r 1.
r
t C -
v s
r :•n �m -
t� c.
` t
I
� z
t
n
O
M
C,
ID
CD
cr
0
CD
I n r� rr
c
q ! : , ` ✓
Et
c p t i I-
u { „5 is _
J
lm
� Z j
1-0
4 2
Y i JS kY
_ H
s I _
c
X
m
C
M
S
c
C' =
A t �/` m
h Z
t i _
1 � 4
p :
(D r,i
CD
CC� .. ✓-
G '
_R
^Q
CD
UJ _
- K:
CD _
r
Vi
i
- G
T
I f
i
i
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
McClendon Construction O'Donnel's Addition
DOE Inspector DOE Number
Alex Vega 7315
DOE Inspector Project Manager
2 Water 2 Waste Water ❑ Storm Drainage ❑ Pavement Aaron Long
Initial Contract Amount Project Difjtculty
$418,265.00 0 Simple O Routine O Complex
Final Contract Amount Date
$434,265.00 3/22/2016
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 1 45
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 1 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 346
BONUS POINTS(25 Maximum)(B)
III)CONTRACTOR'S RATING TOTAL SCORE(TS) 346
Maximum Score(MS)=448 or sum of applicable element score maximums which= 408
Rating(fTS/MS] x 100%) 346 / 408 = 85%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
u --
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,T176012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 3/22/2016
Name of Contractor Project Name
McClendon Construction O'Donnel's Addition
DOE Inspector Project Manager
Alex Vega Aaron Long
DOE Number Project Difficulty Type of Contract
7315 0 Simple O Routine O Complex O Water 2 Waste Water ❑ Storm Drainage ❑ Pavement
Initial Contract Amount Final Contract Amount
$418,265.00 $434,265.00
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector y 1 Accuracy of Plans to Existing Conditions
Z-
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3
3 Accuracy of Measured Quantities 13 Applicability of Specifications 3
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
I Change Order Processing Time 3 Communication Z
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor -7,--/,
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
, s The City of Fort Worth•1000 Thtockmorton Street•Fort Worth,TY 76012-6311
(817)392-7941 •Fax: (817)392-7845
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRAt�1T
Before me,the undersigned authority, a Notary Public in the state and county
aforesaid, on this day personally appeared Justin Blair, Treasurer of McClendon
Construction Company,Incorporated,known to me to be a credible person, who being
by me duly swom,upon his oath deposed and said;
That all persons,firms, associations, corporations or other organizations
furnishing labor and/or materials have been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
O']Donnel's Addition
(—� Justin Blair
Subscribed and sworn before me on this Y=' day of
20
fljotary Public in Tarrant
County,Texas
+''�'• MAFSORTER
MY CG.:•••;,aION EXPIRES
Septernber.17,2016
Otr•nc
CONSENT OF ArchirccT
SURETY COM P--k NY Cona-actor
TO FINAL. PAYMENT Surctr -
AIA DOCUNI'Wi G:07 08icr
PROJECT: bond No.— IAt0 43
roan:�,addre:s;) O'Donnel's Addition Lots 1-2,Block 1;Future bots 1-6,Block 2-City Project No.02375
Water,Sewer,Paving,Street Lighting&Drainage Improvements
TO:t()��rcl;l ARCHITECT'S PROJECT NO:
City of Fort Worth,Texas
1000 Throckmorton Drive CONNTR:-,SCT FOR: Construction
Fort worth,Tai 76108 CONTRACT AMOUNT: $2,253,259.25
CONTRACTOR:
CO1N'fRACT IMT : 4/3/2015
McClendon Construction Company,Inc.
PO Box 996
Burleson,TX 76097
in.accordance\vith the provisions of the Contract bem'een the Owner and the Contractor as indicated above,tine
Merchants Bonding Company
15950 Dallas Parkway,Suite 400
Dallas,Texas 75248 SLRET 11 COINIPA1NY
on bond of there iwwr t name wt(i adtli'cs,o1 c t,.:111nc10
McClendon Construction Company,Inc.
PO Box 996
Burleson,Texas 76097
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final paprient to the Contractor shall not
relieve the Surety Company of any of its oblisarions to(here insert name and address of oxmcr)
City of Fort Worth,Texas y
1000 Throclmnorton Drive OWNER,
�iLR
Fort Worth,Texas 76108
as set forth in the said Surety Company's bond.
IN, WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 13th day of January, 2016
Soret\ t~~onnpatiy '
Merchants Bonding CI/Ompaany
Signau:rc of Ay hc1�id�Reslresentau�•e
�(Seal): --� Betty J.Reeh-Attorney-In-Fact
'CiOe
NOTE: Mis form is to be used as a eompaltioo document to AIA DOCII•IflNT(7706.CONTRAC'TOR'S MT—IDAV IT OF PAYFIENT OF
DEWS AND CLAIMS,Current iidition
AIA DOCUME.NTCi707•CONSEKIOFS1.IRFTYC'ON1PANYTOF;;tALPAl'MLNT•APRl1.197012 TIOK•:11,t: ONE
PAGE
t01970-THE AMERICAN INS'1'I"LUTE OF ARCHITECTS, 1735 NF.\V YORK.AVE,NW,WASIICNGTON,D.C.20006
SRCHANTS
BONDING COMPANY.
POWER OF ATTORNEY
Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,
INC.,both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint,
individually,
Betty J Reeh; Bryan K Moore; Gary Wayne Wheatley; Michael D Hendrickson; Pat J
Moore
their true and lawful Attomey(s)-in-Fact,to make,execute,seat and deliver on behalf of the Companies,as Surety,bonds,undertakings
and other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of:
SEVEN MULLION FIVE HUNDRED THOUSAND($7,500,000.00)DOLLARS
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adapted by the
Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants
National Bonding,Inc.,on October 24,2011.
"The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attomeys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company
thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship
obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation.It is fully understood that consenting to the State ofFlorida
Department of Transportation making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner-
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 15th day of August 2015
i .,M",rr, .•...•.
1014 •' MERCHANTS BONDING COMPANY(MUTUAL)
G
:'���• '� Q ; \RP.... • MERCHANTS NATIONAL BONDING,INC.
U'. 2uD3 'c`,_ •y 1933 c;
Q:' By
STATE OF IOWA
COUNTY OF Dallas ss. .....4'`','
• President
On this 15th day of August , 2015 ,before me appeared Larry Taylor,to me personally known,who being by me sworn did say that
he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seals affixed
to the foregoing instrument are the Corporate seals of the Companies;and that the said instrument was signed and sealed in behalf of the
Companies by authority of their respective Boards of Directors.
or I P WENDY WOODY
_ g Commission Number 734654
My Commission Expires
owP June 20, 2017
Notary Pubfi ,. County,Iowa
(Expiration of notary's commission
does not invalidate this instrument)
I,William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is still in full force and effect and has not been amended or revoked. /
In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this ,3 day of-_S5k�v� Z�ff
..........
< , '�`�?`• yip•.
`4: ` z: _o Secretary /
2003 •�yJ. 193 :'y:
POA 0014(6/15) "��,r,,,r.,��,..�• .....
t-
ti AAcCLENDON CONSTRUCTION CO., INC.
P.O. Box 999 Burleson, texas /6097 (317)295.0066- Fax(o i r)290-6796
February 4.2016
(11 c71 I t-art \Vorki
.\tut: Al x vc"!
Re: O'Donnel•s Addition
Alox.
Per Hour recluest this letter is hero_ttritten to notil\•you that no liquid;lice(dantauws trill be
asseseJ on this j)I-0jcct, delays on the Project acre clue to circumstances outside 0I-0ur
control and thcrelore Iiquiilated danut�,,es are noarranted.
Respect;hll.'
•;austin Blair —
"I•reastn•er
MCClcndon COnsn'uction CO.. Inc.
r.
Drew 1t••inborn
General Panner
DG Enterprises. I