Loading...
HomeMy WebLinkAboutContract 44282-CO3 F��T WORTH City of Fort Worth CITYCi2ETe creta CONTRACT�. Change Order Request Project Name:I Vickery Boulevard Water and Sanitary Sewer Relocations, Phase II City Sec No.: 1 44282 Project No.(s): P253-609170143487 and P258-702170143487 I DOE No. 4608 CityProj.No.:l 01434 Project Description: Water and Sanitary Sewer Main Relocation on West Vickery Boulevard,South Jennings Avenue,Lipscomb Streeet and West Daggett Avenue Contractor: Conatser Construction TX,LP Change Order# Q Date: 8/18/2014 City Project Mgr. Roberto C.Sauceda CityInspector: I Quincy Jones 71 Phone Number: 817-392-2387 71 Phone Number:1 817-992-0873 -� Dept. Water P2 Sec A Sewer P2 Sec B Sewer P3 Con.56 Totals Contract Time (Calendar days) Original Contract Amount $516,805.00 $393,580.00 $595,140.00 $1,505,525.00 230 Extras to Date $197,636.40 $197,636.40 060 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $516,805.00 $591,216.40 $595140.00 $1,703,161.40 290 Amount of Proposed Change Order $37,030.00 $37,030.00 Revised Contract Amount $553,835.00 $591,216.40 $595,140.00 $1,740,191.40 290 Original Funds Available for Change Orders $15,504.00 $29,662.00 $45,166.00 Remaining Funds Available for this CO $15,504.00 $15,504.00 Additional Funding(if necessary) $21,526.00 $21,526.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 15.5 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,881,9061 JILISMICATICN(REASONS)FOR CROGE 0 The change order will provide increased pay item quantities of 6, 8 and 16 inch water mains and 6 foot wide asphalt pavement repair that were necessary to complete the project. � 000006,0 0� C7 0 o0 cn FJ o m o ¢moo *0 0 Atte by: �� ad iv aa* °o0u000 4b Mary J. r Pity e It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Conatser Construction TX, LP Jesse Martinez ' 1 Dab z7 nam I f Comcd Ac l im MBC Number N/A M&C Date Approved NIA I FOR-' WO City of Fort Worth Change Order Additions Project Name Vickery Boulevard Water and Sanitary Sewer Relocations, Phase II City Sec No.: 44282 Project No.(s): P253-609170143487 and P258-702170143487 DOE No.= City Proj.No.: 01434 Project Water and Sanitary Sewer Main Relocation on West Vickery Boulevard,South Jennings Avenue,Lipscomb Streeet and Description West Daggett Avenue Contractor Conatser Construction TX,LP Change Order: 0 Date: 8!18/2014 City Project Mgr. Roberto C.Sauceda City Inspector F-Quincy Jones DESCRFPTtON ADDITIONS DEPT Qty Unit Unit Cast Total 1 6 inch Water Pipe Water P2 Sec A 70.00 LF $45.00 $3,150.00 2 8 inch Water Pipe Water P2 Sec A 41.00 LF $50.00 $2,050.00 4B 16 inch Waer Pipe PVC Water P2 Sec A 47.00 LF $90.00 $4,230.00 24 6 foot Wide Asphalt Pvmt Repair Water P2 Sec A 690.00 LF $40.00 $27,600.00 Water P2 Sec A $37,030.00 Sewer P2 Sec B Sewer P3 Con.56 Page 2 of 4 Additions Sub Total $37,030.00 FORT WC>RTH City of Fort Worth ~' Change Order Deletions Project Name Vickery Boulevard Water and Sanitary Sewer Relocations, Phase II City Sec No.: 44282 Project No.(s): P253-609170143487 and P258-702170143487 DOE No. 4608 City Proj.No.: Q1434 Project Description Water and Sanitary Sewer Main Relocation on West Vickery Boulevard,South Jennings Avenue, Lipscomb Streeet and West Daggett Avenue Contractor Conatser Construction TX, LP Change Order: 111 Date 1 8/18/2014 City Project Mgr. I Roberto C.Sauceda City Inspector: Quincy Jones DELETIONS ITEM DESCR TM DEPT Qty Unit Unit Cost Toul Water P2 Sec A Sewer P2 Sec B Sewer P3 Con.56 Page 3 of 4 IDeletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4