Loading...
HomeMy WebLinkAboutContract 45844-A1 C L�1EC AC ' COMTVACT AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. WHEREAS, the City of Fort Worth (CITY) and Baird, Hampton & Brown, Inc. , (ENGINEER) made and entered into City Secretary Contract No . 45844, (the CONTRACT) which was authorized by M&C C-26833 on the 10th day of June, 2014 in the amount of $1, 000, 000 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: North Riverside Drive from North Tarrant Parkway to Old Denton Road; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposals dated January 19th and February 26, 2016, a copy of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $392, 000. 00 . (See Attached Funding Breakdown Sheet, Page -3-) . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 392, 000 . 00. 3 . City of Fort worth OFFICIAL RECORD Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 CITY SECRETARY Page 1 of 3 FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Baird, Hampton & Brown, Inc. � n Jay Chapa Konstantin P.E. Assistant City Manager President r J DATE: ��` '( DATE: APP VAL RECOMMENDED: (N (�.J Dougl W. Wiersig, Py- Director, .Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: C-27695 Date: 5-3-16 Douglas W. Black ' Z7 SA Assistant City Attorney ATTEST: fORr A O p� Mary J. er City Se ret ry °® City of Port Worth OFFICIAL:RECORDProfessional Services Agreement Amendment TemplatePMO Official Release 8/1/2012 CITY SEARYPage 2 of 3FT�V�OT FUNDING BREAKDOWN SHEET City Secretary No. 45844-A1 Amendment No. 1 Department Fund - Dept. - Account - Project - Activity - Year - Reference Amount TPW 34014 - 0200431 - 5330500 - CO2272 - CO2330 - 2016 - 14010199 $286, 400. 00 TPW 59561 - 0200431 - 5330500 - CO2272 - CO2330 - 2016 - 14010199 $105, 600. 00 Total. $392,000.00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 BAIRD, HAMPTON & BROWN, INC. = MB ENGINEERING & SURVEYING February 26, 2016 Michael Weiss, PE, Prj. Mgr. Transportation&Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Tel 817-392-8485,Email michael.weiss@fortworthgov.org RE: EXPEDITE DESIGN SERVICES-CONTRACT TASK ORDER#4 N. Riverside Drive(N.Tarrant Parkway to Old Denton) Mr. Weiss, As requested,we've evaluated the additional time and effort required,to complete the referenced Task Order within an expedited schedule. Our original project schedule provided for approximately five months to complete the design and prepare the bid documents.The City requested schedule reduces this time to two months; a significant acceleration to the schedule. To meet this schedule we've added design staff to the project team and propose to work overtime... there is no other way to complete this assignment within the desired schedule. We, BHB,seldom require our staff to work a significant amount of overtime; and propose they be compensated for this extraordinary effort. The overall project scope and effort, as defined in Task Order#4, remain unchanged... and we only request the not-to-exceed amount be increased to accommodate the cost premium associated with the required overtime.This cost premium has been estimated as follows: (Overtime Hours/Week)X(Number of Weeks)X(Number of Staff)X(Average Labor Rate)... X(Overtime Premium Labor Cost) =24 X 8 X 6 X$39.27 X 50%=$22,620 Specifically we request the not-to-exceed amount of$466,599 be increased by$22,620,to a total, not- to-exceed amount,of$489,219 for this task order. We understand the schedule is critical, and we propose to continue working on this project while our request is evaluated. Thank you, BAIRD, HAMPTON &BROWN i Konstantine Bakintas, PE Principal, Sr. Civil Engineer 4550 SH 360,Ste 180,Grapevine,Texas 760511 Tel:817-251-85501 Fax:817-251-8810 TBPE Firm#44 1 TBPLS Firm#10011302 1 www.bhbinc.com BAIRD, HAMPTON & BROWN, INC. MB ENGINEERING & SURVEYING January 19, 2016 Michael Weiss, PE, Prj. Mgr. Transportation&Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Tel 817-392-8485,Email michael.weiss@fortworthgov.org RE: PROFESSIONAL SERVICES CONTRACT TASK ORDER#4 N. Riverside Drive(N.Tarrant Parkway to Old Denton) Mr. Weiss, As requested,we've re-evaluated the time and effort required,to modify the substantially complete (final) plans,specifications and estimates, and to incorporate the revised roadway cross-section. Our scope of work and fee proposal is included herewith in the form of the City's standard Level of Effort Spreadsheet,Task Order#4,and updated Project Schedule. Specifically,the revision provides for a 24-ft wide parkway,a 16-ft median, an 8-to 10-ft space between the multi-use trail and the curb line, relocation of the franchise utilities to within this space, and installation of street lights within the median. See enclosed roadway cross-sections. The enclosed scope of work also provides for updating of the previously completed SUE to document the relocated franchise utilities—work which we believe will be underway shortly.This new SUE data will be shown and noted on the plans as relocated utilities—the original location of these utilities will also be shown. We've coordinated with Storm Water Management(SWM)and have included the regrading and reshaping of Victoria and Emerywood Channels.This additional SWM scope of work has been estimated to cost a total of$780,000;see enclosed opinion of probable cost. We understand the schedule is critical, and we propose to continue working on this project while you review this request for Task Order#4. Thank you, Baird, Hampton&Brown I1 ( -- Konstantine Bakintas, PE Principal 4550 SH 360,Ste 180,Grapevine,Texas 760511 Tel:817-251-85501 Fax:817-251-8810 TBPE Firm#44 1 TBPLS Firm#10011302 1 www.bhbinc.com ATTACHMENT "A Channel" Scope for Engineering Desiqn Services for Channel Improvements—TASK ORDER#4 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. OBJECTIVE The objective of this Task Order Agreement is to modify the substantially complete final plans, specifications and estimates, and to incorporate changes to the roadway cross- section. Specifically, the revision provides for a 24-ft wide parkway, a 16-ft median, an 8- to 10-ft space between the multi-use trail and the curb line, relocation of the franchise utilities to within this space, and installation of street lights within the median. This revisions will be performed consistently with the scope of work described in Task Order#3. Furthermore, the agreement provides for the preparation of construction plans for dredging and regrading of(Victoria Channel) the existing trapezoidal channel, from N. Riverside eastward 625 linear feet, to (Emerywood Channel) an unnamed tributary to Big Fossil Creek (BFC-2); and then south approximately 925 linear feet along said tributary. This Attachment "A—Channel" is a supplement to Attachment "A" of Task Order#3 which provides for the construction plans for North Riverside Drive, from North Tarrant Parkway to Old Denton Road, as a four-lane divided arterial street, with two-lane roundabouts at Thompson Road and Summerfields Boulevard. WORK TO BE PERFORMED Task 1. Design Management— N/A, See Attachment A—Street for Task Order#3 Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services— N/A, See Attachment A_Street for Task Order#3 Task 6. Construction Phase Services— N/A, See Attachment A_Street for Task Order#3 Task 7. ROW/Easement Services— N/A, See Attachment A_Street for Task Order#3 Task 8. Survey Services— N/A, See Attachment A_Street for Task Order#3 Task 9. Permitting — N/A, See Attachment A—Street for Task Order#3 Task 10. Plan Submittal Checklists— N/A, See Attachment A—Street for Task Order#3 TASK 1. DESIGN MANAGEMENT—N/A TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The purpose of the conceptual design is for the ENGINEER to identify, develop, communicate through the defined deliverables, and recommend the design concept that successfully addresses the design problem, and to obtain the CITY's endorsement of this concept. ENGINEER will utilize concepts and criteria contained in the current CITY— iSWM Criteria Manual for Site Development and Construction for conceptual planning and design. ENGINEER will develop the conceptual design of the infrastructure as follows. City of Fort Worth,Texas Attachment A_Channel—Task Order#3 PMO Release Date:07/23/2012 Page 1 of 22 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research and make efforts to obtain pertinent information to aid in coordination of the proposed improvements with any planned future improvements that may influence the project. ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including; utilities, agencies (such as TxDOT and railroads), CITY Master Plans, CITY drainage complaint files, existing applicable drainage studies, FEMA floodplain and floodway maps, existing models of project area (if any) and property ownership as available from the Tax Assessor's office. 2.2. Drainage Computations • ENGINEER will delineate the watershed based on contour data and field verification and document existing street, right-of-way and storm drain capacities for the subject site. A drainage area map will be drawn at maximum 1" = 200' scale from available 2-foot contour data with the contours labeled. Data source and year will be provided by the CITY. Calculations regarding channel capacities and design discharge (100-year frequency) will be provided. Other frequencies as required by iSWM criteria may be appropriate for outfalls and sensitive locations. Capacities of existing storm drain will be calculated and shown. All calculations shall conform to CITY criteria delineated in the current CITY iSWM Criteria Manual for Site Development and Construction. • The contributing drainage area is significant and the ENGINEER shall develop an appropriate hydrologic model. At this time, the ENGINNEER anticipates developing a HEC-HMS model with a modified hydrograph to better conform to the previously completed rational method analyses. • ENGINEER shall develop a hydraulic (HEC-RAS) model of the channel; consisting of a segment of Victoria Channel (east-west reach) and Emerywood Channel (north-south reach) 2.3. Subsurface Utility Engineering— N/A 2.4. The Conceptual Design Package shall include the following: N/A TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings shall include the following: • Drainage area maps showing proposed improvements with drainage calculations and hydraulic computations in accordance with the current iSWM Criteria Manual for Site Development and Construction. • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument#8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 2 of 5 (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall project easement layout sheet(s). • Preliminary iSWM Checklist in accordance with the current iSWM Criteria Manual for Site Development and Construction • Plan and profile drawings of proposed channel improvements, including existing lot layout with property ownership, streets, curb lines, fences, existing utilities and existing easements within the project limits. • ENGINEER shall incorporate a single span pedestrian bridge to replace the existing box-culvert pedestrian bridge located northeast of the N. Riverside Elementary School. • No less than two bench marks per channel plan/profile sheet. • The ENGINEER will prepare standard and special detail sheets that are not already included in the City's standard details. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. ASSUMPTIONS • All storm water calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • 4 borings at a bore depth of 10 to 30 feet will be provided; along with foundation recommendation for the pedestrian bridge. • 1 electronic copy of the geotechnical report will be delivered to the CITY. • 1 full size 22"X34"electronic PDF set of plans will be delivered for Utility Clearance. • 2 full size 22"X34" plans will be delivered for Constructability Review. • 2 half size 11"X17" drawings will be delivered for Preliminary Design. • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • All submitted documents and checklists will also be uploaded to the designated project folder in Buzzsaw. ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings B. Preliminary iSWM Checklist City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 3 of 5 C. Utility Clearance drawings D. Geotechnical Report E. Documentation of key design decisions (Project Decision Log) F. Estimates of probable construction cost TASK 4. FINAL DESIGN (90 PERCENT)AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans and specifications included iSWM Construction Plan shall be submitted to CITY per the approved Project Schedule. • Final iSWM Checklist in accordance with the current CITY iSWM Criteria Manual for Site Development and Construction. • The ENGINEER shall submit a final design estimate of probable construction cost with the final design plans submitted. This estimate shall use ONLY standard CITY bid items. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. ASSUMPTIONS • All storm water calculations and design shall conform to the current CITY iSWM Criteria Manual for Site Development and Construction. • All work is covered under the US COE Nationwide channel maintenance Permit, NWP 41, Reshaping of Existing Drainage Ditches, requiring a Pre-Construction Notification only. • 2 half size11"X17" and 1 full size 22"X34"drawings and 2 specifications will be delivered for the 90% design. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • 2 half sizel 1"X17" and 1 full size 22"X34" drawings and 2 specifications will be delivered for the 100% design. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. DELIVERABLES A. 90% construction plans specifications. B. 100% construction plans and specifications. C. Final iSWM Checklist City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 4 of 5 D. Documentation of key design decisions (Project Decision Log). E. Detailed estimates of probable construction cost for the authorized construction project, including summaries of bid items and quantities using the CITY's standard bid items and format. TASK 5. BID PHASE SERVICES - N/A, See Attachment A_Street for Task Order#3 TASK 6. CONSTRUCTION PHASE - N/A, See Attachment A_Street for Task Order#3 TASK 7. ROW/EASEMENT SERVICES - N/A, See Attachment A_Street for Task Order#3 TASK 8. SURVEY- N/A, See Attachment A_Street for Task Order#3 TASK 9. PERMITTING. N/A, See Attachment A_Street for Task Order#3 A Pre-Construction Notification under the Nationwide Reshaping of Existing Drainage Ditches Permit will be provided. TASK 10. PLAN SUBMITTAL CHECKLISTS- N/A, See Attachment A_Street for Task Order#3 City of Fort Worth,Texas Attachment A PMO Release Date:07/23/2012 Page 5 of 5 ATTACHMENT B COMPENSATION—TASK ORDER#4 Design Services for N. RIVERSIDE DRIVE N. Tarrant Parkway, south approximately one-mile to Old Denton Road City Project No. 02272 I. Compensation A. The ENGINEER shall be compensated for personnel time, non-labor expenses, and subcontract expenses in performing services for Task Order No. 4 up to $466,699.00, and shall be based on time and materials as summarized in Exhibit B-1 —Engineer Invoice and Section IV—Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. 111. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. ATTACHMENT B COMPENSATION—TASK ORDER#4 IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Baird, Hampton & Project Management and $398,745.00 85.46% Brown, Inc. Engineering through Preliminary Plans—Task Order#4 Proposed MBE/SBE Sub-Consultants Globe Engineering Geotechnical Investigation $9,959.00 2.13% ANA Consultants ROW& Constr. Easements $13,200.00 2.83% ANA Consultants Drainage & Constr. Easements $12,000.00 2.57% ANA(Rios Group) Sub-Surface Utilities— Level B $21,595.00 4.63% Stantec (Savant) Traffic Signal Modifications $11,100.00 2.38% Non-MBE/SBE Consultants n/a TOTAL $466,599 100% Project Number& Name Total Fee MBE/SBE Fee MBE/SBE 02272 -Task Order#1 253,835.00 144,834.00 57.06% 02272 - Task Order#2 344,219.00 32,500.00 9.44% 02272 -Task Order#3 287,367.00 21,860.00 7.61% 02272—Task Order#4 466,599.00 67,854.00 14.54% Subtotal for Task 1, 2, 3 &4 1,352,020.00 267,048.00 19.75% Total Contract for 02272— N. Riverside Drive $1,000,000.00 $200,000.00 20.00% City SBE Goal = 20% Consultant Committed Goal = 20% ;a; a;; /\/\\/ ƒ - - - - - - - - - - - - - - cli'i k /! , „� �,�, , ;a.;-®.--® § # 2® \k � op F 77 = o = »a R$ m » J - #� > � f - �2 % £ 8 + 0 & B7 LUo ._ � � ; ) _ _:( » , � e ! ( j [ ;.__., l;,2= 2,,� E!`!!:!!e;! \ _.,_„ TI ,,: 1 �2�2 2 A 1�2 �2�2'I I'll N 3 !!" /§[� 12 o _ - _ - _ : ! - ! : �[r -a : a ® {§) {2 (/\( \ \\\\\\ \�/�\k$ƒ \: - - 2 -:.6 § �)/ � ;\) c :;2\f< k:E\� �/))� \ I)j\§\;\§/( t - \t« - - - k k\«\\)// `!! )f!!${§;/\ {§ - - §!#! f :*»!&;3\3! ) )f\fl _ {\j\/\\\\}}}/ }\\)laaj/!!»J4}\) }\zaa«,: J: 3\& \z3«Ja })/J\�\}\\}\ \}� Hdu_!_s_g ,\„�,,, d ym yN # F � J t7 F U 0 000 00000000 000n o 00 0 0 0 0 00 on mo 0 on o 0 0000�n o oon o vo ao- N �p dW f9 vi M�9 M N rv��dW Y W Nva v �r r o � owe - w w H K U W O O_ K � a w v w w w n m w w 3 c � z a w <N TF m c� ��R .^� --ono o - - - -��w - - - - - - - - - - - - A U e»w e» w w wwwww e»w » w w w vs 0 r E o m m N m O d d an d d d a U w d d d N od m d�p o N d d r w W `o a a N m d d d N m d d d d m m m d d m m m O C a�w N N N m m m d d d N N N N .-N N U �m O� aow Ir W I a E y d a m a o 0 min v N JN �^ 4 ANN o f m z d y v- N.._N w a a N ming yoro 2 NNaoam aN m inD „oro o u a m a= ci v E N t vo, '0 N a" _ __ c� d E N $ o.a E p ci _F d g - c V w N c .` E E`u c a w o 2 a c a m a �i ` `m a ao a'o v, w a. E o F m w `m `m m u= in U c- co- u a wro'�°° wro?Yr'n�z Ewc .E-w€f of w y E of m 15 Lo n2 uamo oc � o3`6MdVv »»» xNari � „>9 L a � �y- dim a`�U B ¢QF- UU QQd I7�U ILLK KKK F NDU o M dm m .-Nn dv� z N MSN Flc�l N M = r )/ \§\i \k k 1 �\()~ �\ ){) \\\MIa §a;aaaa/a . {\\\\\\\\ k � \ { ! ) \@§§ ) \\,}„�[, k « ~ y | ) o \ \\\\\� /\! \\ jL� ! !); ) 4 . 9£ZL #300 -N ----X 'db NOIN30 O10 Di 'MNd iNVMVi 'N woad – 3AR10 301S83AI8 H18ON F V o LL�C fib Z O W Z CyFF � O O N m Q� t7- J 71 :M::, �� WO U to ani +U+Pe2 ¢ d O� DO a CFe p O 'Irl r z _o xm Erl. Z d N W W 3 t1 O Z o z O� >a o.� 3 11 Q mWsi X �E O as pF N s U V) Z U z Z a fi 8x � o ` t z. x – w .M.O.a p�_ - -� of- n T 0 �_ 1 = e 3o w - - �/1 tJi Z 3 m U aa o i - �N - !E_ m o - � U d � � _ w _ tiw Otis w -- �� ' I 9 0 3 N � AZFL O FO F ooo . z .M.O.a t wail- 3v I I -- -- m � I 3 At `111 - 1I =11= 1.6 r--,I 3 i Ro 1 li lilll Ir- - il Mo•a Ii�I II i l it I I!=1 II •goad--- – =1 �r w—.z,�= 9CZL #300 ---N -----X 'Oa NO1N30 010 Ol '.IMNd 1NV88V1 'N Woad — 3AIa0 30IS83AId Hl2JON ) Z 0 Z W~ O C) �o w n t q�AB O Q W U l=xi ���� O aLa U U) LL rn € o-1 3 ¢ tY >o m �c `oll o Z O� �a o d. o t=a [If a mw , 2Q K s o as � mz ❑OSE o V) zC) ZZ Z a � sU a 11 R < o M•o•a•doaa52 - _ - -- 3 1 �w a N \ =w 2 U s4 o �. 16 -U 0 mo F o 3 — UU oo } j O _ F m yj — 3 � � o I a r- I r � rg� 0 oa — 6 � a 0 m m of \ c. o m\ 1 C1 g I \I o a rc o i i — — a 3 mp aw a =oQ� 3j3 70 a•doaa I 1 9£Z1 #300 -N -----X 'Oil NO1N30 010 01'J.MNd 1NV88Vl 'N N08J - 3AI80 34IS83AIa HlaON N w� LLoC k ti as Y -d �2p!no zmj•o �? O O o 0 o W Z F 0 4 z \ e E]g X U O K W � Raqwz�'n•- G ma�A m Q> o N J J c i n W 0 U7 P a N F =VIE Q D!) }O ¢ m z WY an o z oft E,e r.- O H d m r a O� E o d d C) N a na m d N ZU Z z a � z Ui < Q o 0 �S •M•o a•aoaa - -- -- - r I L rca a - •i n r _ d rc O H �45 _ O 04 aL \ � w 3 NN < a K 0 o i = i - O � W N �I \ _ = _ = - _ oa o � om z� I U i - -lii = I 2U m Z . Q-z =0Q 33 L II-ILI 41=1 �i>o •M•o'a'doaa m� �o ;a QQ Y= Q E 0 O li o' O� e ,oQ Ma 0o Q o s Y O¢{ m P' u n� t y E 02EH. O W 9 K Q a Qi o - r J - ------- - - ----------- -- ------------ -----=------------------------ r � E Z 4 �►via-1 - - -- 0 0 o a 0 o O m m m t _ 0 yy E a "i 0 4 C a R u E E F FE a3LL � LL 33 LLLLLLLLLL X33 3 �LL�3 LL �3LL � ��33 3333��3g�� A A s 8 EE IF E A G e 3 w¢ c o b 6 c b rorty A H e = o E �': 16 E H b N E Q p y .p g E y E'U o A E IS R EU 2 >. s 8 � A 1}p g $c c a 3 r e E E m 3.0 q U O rcI¢ i I o o nv.n R'aNRPA'd39N8A8.'n9"2AigAt.p?Re :&3:`Se&: v'.`vYv"i.X--iR6VR��.B`y �n ao 5000 Thompson Terrace Colleyville, Texas 76034 CONSULTANTS, !.L,t:. (81 7)335-9900 Fax (817)335-9955 AUTHORIZATION FOR PROFESSIONAL SERVICES PROJECT NAME: N. Riverside Dr. PROJECT LOCATION: Fort Worth,TX PROJECT No.: 140180 CLIENT: BHB Engineering and Surveying CONTACT: Konstantine Bakintas, P.E. ADDRESS: 4550 S.H. 360, Suite 180. Grapevine, TX 76051 SCOPE: Subsurface Utility Engineering (SUE)for Adjusted (Relocated) Utilities on the N. Riverside Dr. Project as provided by The Rios Group Introduction TRG will perform the SUE work required for this project in general accordance with the recommended practices and procedures described in ASCE Publication CI/ASCE 38-02 (Standard Guideline for the Collection and Depiction of Existing Subsurface Utility Data). As described in the mentioned ASCE publication, four levels have been established to describe the quality of utility location and attribute information used on plans. The four quality levels are as follows: ❑ Quality Level D(QL"D")—Information derived from existing records. ❑ Quality Level C(QL"C")-QL"D"information supplemented with information obtained by surveying visible above-ground utility features(i.e. valves, hydrants, meters,manhole covers,etc.). ❑ Quality Level B(QL"B")—Two-dimensional (x,y) information obtained through the application and interpretation of non-destructive surface geophysical methods. Also known as"designating"this quality level provides the horizontal position of subsurface utilities within approximately one foot. ❑ Quality Level A(QL"A")—Also known as"locating",this quality level provides precise three dimensional (x,y, z) information at critical locations by exposing specific utilities. Non-destructive vacuum excavation equipment is used to expose the utilities at specific points which are then tied down by survey. It is the responsibility of the SUE provider to perform due-diligence with regard to records research(QL"D")and acquisition of available utility records. The due-diligence provided for this project will consist of visually inspecting the work area for evidence of utilities, requesting records from utility owners identified within the project limits, and reviewing utility record information available from ANA. Utilities that are not identified through these efforts will be here forth referred to as"unknown"utilities. TRG personnel will scan the defined work area using electronic prospecting equipment to search for"unknown"utilities. However, TRG makes no guarantee that any"unknown"utility will be identified through the scanning process. ANA Project#060700 CLIENT SATISFACTION IS OUR BUSINESS Scope of Work Based on information provided by ANA, TRG has developed a preliminary scope for the SUE work required for this project. The scope of work may be modified, with ANA's concurrence, during the performance of the SUE fieldwork if warranted by actual field findings. Tile scope of work includes Quality Level"B"only. QL"B"SUE will be performed along the alignment of the newly adjusted utilities within the 5,400 LF of N. Riverside Drive project for the purpose of this proposal We have three(3)utilities(1.5—telecommunication, 1 —gas, 0.5—miscellaneous)along the entire alignment. Surveying required to tie in the SUE will be provided by TRG, using control provided by ANA. Designating Procedures Prior to beginning field designating activities,TRG's field manager will review the project scope of work and available utility records. Once these initial reviews are complete, the field manager and technicians will begin designating the approximate horizontal position of known subsurface utilities within the specified project limits. A suite of geophysical equipment(electromagnetic induction, magnetic)will be used to designate metallic/conductive utilities (e.g. steel pipe, electrical cable, telephone cable). Non-metallic/non-conductive utilities will be designated using other proven methods,such as rodding,and probing. Where access is available, a sonde will be inserted into the utility line(e.g. PVC gravity sewer pipe)to provide a medium for signal transmission, which can then be designated using geophysical equipment. Accurate collection and recording of designated utilities is a critical component of the SUE process.TRG has developed a proven method of collecting and recording survey information once the utilities have been designated in the field. Each utility will be labeled with a unique ID code. For example, if two buried electric cables exist on the project, one will be labeled EI and the other E2. Paint and pin flags will be used to designate the utilities in the field. A labeled pin flag or paint mark will be used to mark each location where a survey shot is required. Shot points will typically be placed at 100-foot intervals on utilities running parallel to the alignment and at 50-foot intervals on utility crossings. The locations will be numbered sequentially for each individual utility line. For example, if there are 50 shots required on buried electric line E1, the points will be numbered E1-1 through E1-50. Preliminary field sketches depicting the designated utilities will be prepared for use during subsequent surveying activities. These sketches will also be used to check the survey information for completeness and accuracy. Deliverables TRG will produce a SUE file depicting the type and horizontal location of the designated utilities. TRG will utilize its standard SUE line styles and symbology. Signed and sealed SUE plans will be prepared upon request. Schedule TRG can commence work upon receipt of a notice to proceed(NTP)and utility adjustment plans. We estimate that the field investigation and the required surveying can be completed in 3 work weeks(weather permitting). We estimate that deliverables can be completed within 2 weeks after completion of field work. Estimated Fees TRG proposes to perform the above services on a unit price basis as detailed in the attached Table 1. Based on the assumed quantities,the estimated cost of the work is Eighteen Thousand Four Hundred Fifty and 00/100 Dollars($18,450.00). Table 1 The Rios Group, Inc. Itemized Fee Breakdown of SUE Services for ANA, N. Riverside Dr. ANA Project#060700 2 i da Direct Expenses Rate Units lUnd -�------ �— —.—_-._'--�--Desc- p---o-n -------_-_-�- ---_-__-u_-------�T--o----a-1 - Note: Admin-/Permit $500.00 0.0 LS $ Mobilization $2,000.00 LS _ $ Traffic Control $1.000.00 1_ 0.0 —I l $ Survey $1,750.00 0.0 Dailr$ - Sub-Total $ OL"B","C&D" Rate _ Units U_nit_Descri tlonl Sub-total --------------------- -------�---- --------------- --___-_----__----- QL"B"by LF $1.25 ; 14,200 �� — LF $ 17,750.00 OL"B"Dally $2,350.00 ____ �- QL"C&D" $0.35 2,000 t ------------ -------------------- LF $ 700.00 Sub-Total SUE QL "A"Test Holes) ------------------------------ --------------- ------------------ Depth )In Pavement Using Assumed Outside Assumed Coring Machine Quantity Pavement Quantity --------------------- 0-4 ft. $ 1,050,00 0 $ 850.00 0 $ - ------------ 4-8 ft. $ 1,350.00 --------------------- ---- -$----1_150_00 0 --- ------- ------- $----------------- 8-12 ft. ___ $ $__ 1.650.00 0 - 1,450.00 0 - ---------------- ------------•- ---------------- ---------^---- ----------------- 12-18 ft. $ 2,500.00 j..... _ 0 t $ 2,300_00;_ 0 I $ OL"A"Dally -$-------3,300.00 I - 0.0 --;-- ---Dail - ------ ----- -'-$ --------- QL"A"Sub-Total 0 0 $ Total Estimated Cost $ Total Estimated Cost $18,450.00 Total for SUE includes 10%service fee= 20,295.00 ANA will provide new or additional control if needed for Subsurface Utility Engineering (SUE) Compensation: $1,300.00 TOTAL COMPENSATION (For SUE Services): $21,595.00 NOTES: 1) QLB SUE will include adjusted underground utilities belonging to franchised utility owners only(telecommunication,gas, electric). 2)Adjustment plans must be provided by BHB Engineering and Surveying since available utility records will not reflect change from the adjustments. 3)QLB SUE is priced above as 1 project.Rios will designate and then survey all adjustments at the same time. 4)QLB SUE scope does NOT include water,sanitary,storm,signal and overhead utlities. Services covered by this authorization shall be performed in accordance with PROVISIONS stated on the attached form. Approved for CLIENT Accepted for A.N.A. Consultants, L.L.C. By: By: Konstantine Bakintas, PE Edward Khalil, RPLS Title: Principal, Civil Engineer Title: Director of Survey Date: Date: January 13, 2016 ANA Project#060700 3 s� J—_ EXHIBIT `B' Hourly Rate Schedule Work Title Hourly Rate Principal $185.00 Controller $165.00 Senior Associate $150.00 Engineer/Associate $125.00 Surveyor/Associate $130.00 Engineer Intern/Jr. Associate $95.00 Designer $90.00 Survey Technician $85.00 Survey Crew $150.00 Word Processor/Secretary $38.00 Any extra work that is not in the Scope of Work, the Consultant fees will be based on the above hourly rates schedule. ANA Project#060700 4 s- PROVISIONS AUTHORIZATION TO PROCEED ARBITRATION Signing this form shall be construed as authorization by CLIENT for A.N.A. All claims,disputes, and other matters in question arising out of,or to proceed with the work, unless otherwise provided for in the relating to,this Authorization or the breach thereof may be decided by authorization. arbitration in accordance with the rules of the American Arbitration Association then obtaining. Either CLIENT or A.N.A. may initiate a LABOR COSTS request for such arbitration, but consent of the other party to such A.N.A.'s Labor Cost shall be the amount of salaries paid A.N.A.'s procedure shall be mandatory. No arbitration arising out of,or relating employees for the work performed on CLIENTS Project plus a stipulated to this Authorization may include,by consolidation,joinder,or in any percentage of such salaries to cover all payroll-related taxes,payments, other manner,any additional party not a party to This Authorization. premiums,and benefits. LEGAL EXPENSES DIRECT EXPENSES In the event legal action is brought by CLIENT or A.N,A.against the A.N.A's Direct Expense shall be those costs incurred on or directly for the other to enforce any of the obligations hereunder or arising out of any CLIENT'S Project including but not limited to necessary transportation dispute concerning the terms and conditions herebycreated,the losing costs including milage at A.N.A.'s current rate when Its automobiles are party shall pay the prevailing party such reasonable amounts for fees, used,meals and lodging,laboratory test and analyses,computer services, cost and expenses as may be set by the court. word processing services, telephone, printing and binding charges. Reimbursement for these EXPENSES shall be on the basis of actual PAYMENT TO A.N.A., L.L.C. charges when furnished by A.N.A.Consultants,L.L.C. Monthly invoices will be issued by A,N.A.for all work performed under the terms of this agreement. Invoices are due and payable on receipt. OUTSIDE SERVICES Interest at the rate of 1.5%per month will be charged on all past-due When technical or professional services are furnished by an outside amounts,unless not permitted by law,in which case, interest will be source,when approved by the CLIENT,an additional amount of 10%shall charged at the highest amount permitted by law. be added to the cost of these services forA.N.A's administrative cost. LIMITATION OF LIABILITY COST ESTIMATES A.N.A.'s liability to the CLIENT for any cause or combination of causes Any cost estimates provided by A.N.A.will be on a basis of experience and is in the aggregate, limited to an amount no greater than the fee earned under this agreement. judgement,but since It has no control over market conditions or bidding procedures A.N.A.cannot warrant that bids or ultimate construction costs will not vary from these cost estimates. ADDITIONAL SERVICES PROFESSIONAL STANDARDS Services in addition to those specified in Scope will be provided by A.N.A.if authorized in writing by CLIENT. Additional services will be A.N.A.shall perform its professional services pursuant to the standard of paid for by CLIENT as indicated in attached Basis of Compensation or care which would be applied by a reasonable and prudent registered as negotiated. professional engineer in the State of Texas providing services under the same or similar scope of service for the same or similar types of projects. SALES TAX WARRANTY In accordance with the State Sales Tax Codes, certain surveying services are taxable. Applicable sales tax is not Included in the above A.N.A.'s services are professional services limited to the exercise of proposed fee. Sales tax at an applicable rate will be indicated on judgment and the rendering of advice and opinions and,as such,A.N.A. invoice statements. makes no warranty,express or implied. TERMINATION SURVEYING SERVICES In accordance with the Professional Land Surveying Practices Act of Either CLIENT or A.N.A.may terminate this authorization bygiving 30 days 1989, the client is informed that any complaints about surveying written notice to the other party. In such event CLIENT shall forthwith pay services may be forwarded to the Texas Board of Professional Land A.N.A. in full for all work previously authorized and performed prior to Surveying,7701 North Lamar,Suite 400,Austin,Texas 78752,(512) effective date of termination. If no notice of termination is given, 452-9427. relationships and obligations created by this Authorization shall be terminated upon completion of all applicable requirements of this In case any one or more of the provisions contained in this Authorization. Agreement shall be held illegal,the enforceablllty of the remaining provisions contained herein shall not be impaired thereby. ANA Project#060700 5 Stantec Consulting Services Inc. Stantec 2435 N Central Expressway Suite 750,Richardson TX 75080-2793 January 11,2016 File: 1981 1 1 XXX Attention: Konstantine Bakintas, PE Baird, Hampton & Brown, Inc. 4550 SH 360,Suite 180 Grapevine,TX 76051 Dear Mr. Bakintas, Reference: N.Tarrant and Riverside Signal Modification Stantec is looking forward to the opportunity to serve your traffic engineering needs. The following details our proposal for your project and identifies the fee associated with the work. Scope of Services Stantec will provide traffic engineering services to Baird, Hampton, and Brown, Inc. (Client) as detailed below. The scope is based on our understanding of what will be required by the City of Fort Worth (City). It is assumed for this scope of work that the permanent traffic signal designs will be developed using City of Fort Worth standards and specifications. Any change to the scope of work based on additional requirements by the City or changes in the roadway geometry by the Client may result in an increase in the fee associated with the project. Prerequisites 1. Detailed,scaled survey base file containing existing and proposed edge of pavement, existing and proposed underground and overhead utilities, existing and proposed drainage structures, and other relevant survey data in CADD format. Task p: Permanent Traffic Signal Modification Stantec will design permanent modifications to one existing signal at the intersection of N. Tarrant Parkway and Riverside Drive. The purpose of the signal modification is to account for the roadway realignment that began after signal modification plans reached a 90%design effort. After the base files with the new alignment have been received from the client, Stantec will conduct a field review if necessary to verify signal pole locations for the signal modification. Roadway and utility information will be verified during the field visit. The information verified will include the lane configurations, any existing traffic control devices, and existing signal equipment. Stantec may need access to the existing signal cabinet and pull boxes to field verify the equipment and conduit fills. Design with community in mind January 11,2016 Konstantine Bakintas, PE Page 2 of 4 Reference: N.Tarrant and Riverside Signal Modification Stantec engineers will meet with City engineers to discuss signal design requirements for the traffic signal design based on the new alignment. This meeting will be scheduled to occur on the same day as the field visit (if the field review is necessary). Stantec engineers will use the proposed pavement base file provided by the Client to prepare permanent signal design plans. The designs will use standard signal poles to replace the ones required to be moved due to the construction of the eastern leg of the intersection. Once the signal design parameters have been discussed with the City and the Client, Stantec will prepare proof Final plans for inclusion in the roadway design plays. The sheets will contain the following sheets: 1. General Notes Sheets 2. Traffic Signal Layout Sheet 3. Traffic Signing Sheet 4. Charts and Details Sheets 5. TxDOT and/or City Standard Sheets Stantec will submit the proof Final design package to the City for review. Once review comments are received, a final signed and sealed design package will be prepared to address review comments.A summary of quantities and engineer's opinion of probable cost will also be prepared along with the final design package. The design sheets will be printed on 11" x 17" size sheets of standard paper or delivered as electronic PDF files. Deliverables 1. Signed and Sealed Signal Modification Plans. 2. Specifications, Estimates, and bid documents necessary for the signal modification. 3. Record Drawings Assumptions and Exclusions The scope and fee do not include temporary signal design, traffic control plan design, communication design, roadway design, signal warrant or other traffic analysis, signal timing, roadway illumination beyond placing a luminaire on each pole, or meetings beyond what is stated in the scope. Design with community in mind January 11, 2016 Konstantine Bakintas, PE Page 3 of 4 Reference: N.Tarrant and Riverside Signal Modification We assume that all review and approval authority for this project resides with the City of Fort Worth. No coordination with TxDOT or any other agency is included. No attendance at pre-bid meetings, bid openings, or pre-construction meetings is included in this scope of services. It also does not include any review of contractor submittals. If needed, they may be added at an additional hourly fee. Schedule We request 6 weeks to develop the initial signal design plans; however we will work with the Prime firm to meet reasonable City deadlines. Task A: Permanent Traffic Signal Modification $11,100 lump sum Task B: hourly, plus expenses, as requested Any tasks completed that are outside the above defined scope will be performed on an hourly basis, and an upset limit will be established. The upset limit is the amount of money that may be billed without further authorization and a best estimate of what is realistic to complete the task with the information available. You may choose to authorize an increase should you feel that the scope warrants a change. This agreement is also subject to the Stantec Professional Services Terms and Conditions attached to this proposal as Exhibit A. If you agree with the terms of this proposal, please sign in the space provided and return the signed copy to our office. After we receive a signed copy of the scope of work and additional information identified on the previous page,we will commence work on this project. Please return the signed document via email or fax to our Dallas office at 214.468.8266 and keep a copy for your file. If you have any questions, please feel free to contact Jennifer Butcher at 817.886.4740. Thank you for the opportunity to present this proposal. We look forward to working with you on this project. Design with community in mind January 11,2016 Konstantine Bakintas, PE Page 4 of 4 Reference: N.Tarrant and Riverside Signal Modification Regards, STANTEC CONSULTING SERVICES INC. Jniferutcher, PE, PTOE Associate, Senior Project Manager Phone: (817) 886-4740 Fax: (214) 468-8266 Jennifer.Butcher@stantec.com By signing this proposal, Baird, Hampton & Brown, Inc. authorizes Stantec to proceed with the services herein described and the Client acknowledges that it has read and agrees to be bound by the attached Professional Services Terms and Conditions. This proposal is accepted and agreed on the_day of February, 2016. Per: Baird, Hampton & Brown, Inc. Print Name &Title Signature Attachment: Stantec Professional Services Terms and Conditions jib u:\198111032\admin\signal modification\n torrant_riverside signal modification v3.docx Design with community in mind ® Stantec PROFESSIONAL SERVICES TERMS AND CONDITIONS Page 1 of The following Terms and Conditions are attached to and form part of a proposal for services to be performed by Consultant and together,when the CLIENT authorizes Consultant to proceed with the services, constitute the AGREEMENT. Consultant means the Stantec entity issuing the Proposal. DESCRIPTION OF WORK: Consultant shall render the services described in the Proposal(hereinafter called the"SERVICES")to the CLIENT. DESCRIPTION OF CLIENT: The CLIENT confirms and agrees that the CLIENT has authority to enter into this AGREEMENT on its own behalf and on behalf of all parties related to the CLIENT who may have an interest in the PROJECT. TERMS AND CONDITIONS: No terms,conditions,understandings,or agreements purporting to modify or vary these Terms and Conditions shall be binding unless hereafter made in writing and signed by the CLIENT and Consultant. In the event of any conflict between the Proposal and these Terms and Conditions, these Terms and Conditions shall take precedence. This AGREEMENT supercedes all previous agreements, arrangements or understandings between the parties whether written or oral in connection with or incidental to the PROJECT COMPENSATION: Payment is due to Consultant upon receipt of invoice. Failure to make any payment when due is a material breach of this AGREEMENT and will entitle Consultant, at its option, to suspend or terminate this AGREEMENT and the provision of the SERVICES. Interest will accrue on accounts overdue by 30 days at the lesser of 1.5 percent per month (18 percent per annum) or the maximum legal rate of interest. Unless otherwise noted, the fees in this agreement do not include any value added,sales,or other taxes that may be applied by Government on fees for services.Such taxes will be added to all invoices as required. NOTICES: Each party shall designate a representative who is authorized to act on behalf of that party.All notices,consents, and approvals required to be given hereunder shall be in writing and shall be given to the representatives of each party. TERMINATION: Either party may terminate the AGREEMENT without cause upon thirty (30) days notice in writing. If either party breaches the AGREEMENT and fails to remedy such breach within seven (7) days of notice to do so by the non- defaulting party, the non-defaulting party may immediately terminate the Agreement. Non-payment by the CLIENT of Consultant's invoices within 30 days of Consultant rendering same is agreed to constitute a material breach and, upon written notice as prescribed above,the duties,obligations and responsibilities of Consultant are terminated.On termination by either party, the CLIENT shall forthwith pay Consultant all fees and charges for the SERVICES provided to the effective date of termination. ENVIRONMENTAL: Except as specifically described in this AGREEMENT,Consultant's field investigation,laboratory testing and engineering recommendations will not address or evaluate pollution of soil or pollution of groundwater. PROFESSIONAL RESPONSIBILITY: In performing the SERVICES, Consultant will provide and exercise the standard of care, skill and diligence required by customarily accepted professional practices normally provided in the performance of the SERVICES at the time and the location in which the SERVICES were performed. LIMITATION OF LIABILITY: The CLIENT releases Consultant from any liability and agrees to defend, indemnify and hold Consultant harmless from any and all claims, damages, losses, and/or expenses, direct and indirect, or consequential damages,including but not limited to attorney's fees and charges and court and arbitration costs,arising out of,or claimed to arise out of, the performance of the SERVICES, excepting liability arising from the sole negligence of Consultant. It is further agreed that the total amount of all claims the CLIENT may have against Consultant under this AGREEMENT,including but not limited to claims for negligence, negligent misrepresentation and/or breach of contract, shall be strictly limited to the lesser of professional fees paid to Consultant for the SERVICES or $50,000.00. No claim may be brought against Consultant more than two (2) years after the cause of action arose. As the CLIENT's sole and exclusive remedy under this AGREEMENT any claim, demand or suit shall be directed and/or asserted only against Consultant and not against any of Consultant's employees,officers or directors. Consultant's liability with respect to any claims arising out of this AGREEMENT shall be absolutely limited to direct damages arising out of the SERVICES and Consultant shall bear no liability whatsoever for any consequential loss, injury or damage incurred by the CLIENT,including but not limited to claims for loss of use,loss of profits and/or loss of markets. INDEMNITY FOR MOLD CLAIMS: It is understood by the parties that existing or constructed buildings may contain mold substances that can present health hazards and result in bodily injury, property damage and/or necessary remedial measures. If, during performance of the SERVICES, Consultant knowingly encounters any such substances, Consultant shall notify the CLIENT and,without liability for consequential or any other damages, suspend performance of services until the CLIENT retains a qualified specialist to abate and/or remove the mold substances.The CLIENT agrees to release and waive all claims, including consequential damages, against Consultant, its subconsultants and their officers, directors and employees arising from or in any way connected with the existence of mold on or about the project site whether during or after completion of the SERVICES.The CLIENT further agrees to indemnify and hold Consultant harmless from and against all claims,costs, liabilities and damages,including reasonable attorneys' fees and costs,arising in any way from the existence of mold on the project site whether during or after completion of the SERVICES, except for those claims, liabilities, costs or damages caused by the sole gross negligence and/or knowing or willful misconduct of Consultant. Consultant and the CLIENT waive all rights against each other for mold damages to the extent that such damages sustained by either party are covered by insurance. Professional Services Terms and Conditions on S1anNe1 Forms>Company Forms>Risk Management>Standard Form Agreements ® Stantec PROFESSIONAL SERVICES TERMS AND CONDITIONS Page 2 of 2 DOCUMENTS: All of the documents prepared by or on behalf of Consultant in connection with the PROJECT are instruments of service for the execution of the PROJECT. Consultant retains the property and copyright in these documents,whether the PROJECT is executed or not. These documents may not be used for any other purpose without the prior written consent of Consultant. In the event Consultant's documents are subsequently reused or modified in any material respect without the prior consent of Consultant, the CLIENT agrees to defend, hold harmless and indemnify Consultant from any claims advanced on account of said reuse or modification. Any document produced by Consultant in relation to the Services is intended for the sole use of Client.The documents may not be relied upon by any other party without the express written consent of Consultant, which may be withheld at Consultant's discretion.Any such consent will provide no greater rights to the third party than those held by the Client under the contract,and will only be authorized pursuant to the conditions of Consultant's standard form reliance letter. Consultant cannot guarantee the authenticity, integrity or completeness of data files supplied in electronic format ("Electronic Files"). CLIENT shall release, indemnify and hold Consultant, its officers, employees, Consultant's and agents harmless from any claims or damages arising from the use of Electronic Files. Electronic files will not contain stamps or seals, remain the property of Consultant,are not to be used for any purpose other than that for which they were transmitted,and are not to be retransmitted to a third party without Consultant's written consent. FIELD SERVICES: Consultant shall not be responsible for construction means,methods,techniques,sequences or procedures, or for safety precautions and programs in connection with work on the PROJECT, and shall not be responsible for any contractor's failure to carry out the work in accordance with the contract documents. Consultant shall not be responsible for the acts or omissions of any contractor,subcontractor,any of their agents or employees,or any other persons performing any of the work in connection with the PROJECT. Consultant shall not be the prime contractor or similar under any occupational health and safety legislation. GOVERNING LAW/COMPLIANCE WITH LAWS: The AGREEMENT shall be governed, construed and enforced in accordance with the laws of the jurisdiction in which the majority of the SERVICES are performed. Consultant shall observe and comply with all applicable laws, continue to provide equal employment opportunity to all qualified persons, and to recruit, hire, train, promote and compensate persons in all jobs without regard to race, color, religion, sex, age, disability or national origin or any other basis prohibited by applicable laws. DISPUTE RESOLUTION: If requested in writing by either the CLIENT or Consultant,the CLIENT and Consultant shall attempt to resolve any dispute between them arising out of or in connection with this AGREEMENT by entering into structured non- binding negotiations with the assistance of a mediator on a without prejudice basis. The mediator shall be appointed by agreement of the parties. If a dispute cannot be settled within a period of thirty (30) calendar days with the mediator, if mutually agreed, the dispute shall be referred to arbitration pursuant to laws of the jurisdiction in which the majority of the SERVICES are performed or elsewhere by mutual agreement. ASSIGNMENT: The CLIENT and Consultant shall not,without the prior written consent of the other party,assign the benefit or in any way transfer the obligations under these Terms and Conditions or any part hereof. SEVERABILITY: If any term, condition or covenant of the AGREEMENT is held by a court of competent jurisdiction to be invalid,void,or unenforceable,the remaining provisions of the AGREEMENT shall be binding on the CLIENT and Consultant. Professional Services Terms and Conditions on StanNet Forms>Company Forms>Risk Management>Standard Form Agreements GLOBE Engineers, Inc. Geotechnical #Environmental #Materials Testing June 24,2015 Proposal No:15226P Konstantine Bakintas, PE Baird,Hampton&Brown, Inc. 4550 SH 360,Suite 180 Grapevine, TX 76051 RE: Geotechnical Investigations for Reconstruction of Pedestrian Bridge& Chanel Dredging/Regrading N. Riverside&Princess Victoria Ct. Fort Worth, TX Globe Engineers, Inc. (GEI) is pleased to submit the following proposal for a soil investigation. The purpose of the study is to explore subsurface soil conditions and to develop recommendations for the Pedestrian Bridge Reconstruction and Emerywood and Victoria Channel Dredging and Regrading. Field explorations will consist of four (4) core borings that will be drilled below existing ground surface as presented in boring map plan and at the following locations: Two (2)core borings at depths of thirty(30)feet each at bridge embankment, and Two(2)core borings at depths of ten(10)feet in channel area Suitable representative portions of all samples will be sealed and packaged for transportation to our laboratory. A laboratory-testing program will be planned to determine the pertinent physical properties of soils and to develop an engineering analysis. The findings, conclusions, and recommendations of GEI will be presented in an engineering report. The estimated cost of this service will not exceed$9,959.00 without your prior approval. Detail estimate is presented in appendix A. Laboratory tests that will be performed on the selected soil samples in order to evaluate the engineering properties of the soil are in accordance with the indicated standards listed below. Laboratory Tests Standard Tests Atterberg Limits(LL/PL/PI) ASTM D-4318/Tex-104E/105-E/106-E Soil Moisture Content and Unit Weight ASTM D-22161 D-72631 Tex-103E Unconfined Compressive Strength ASTM D-2166/D-7012 Soils Classification ASTM D-2487 Sieve Analysis and Hydrometer ASTMD-1140/D-422/D-6913/Tex110E/111-E Free Swell Test(if needed) ASTM D-4546 Potential Vertical Rise(PVR) Tex-124-E Upon your acceptance of this estimate, we will begin the field exploration. Drilling rig access to site is required. During drilling activity, Globe Engineers and its subcontractors are not responsible for any damages if any to surface vegetation, sprinkler systems, paving, or subsurface utility lines. This investigation will be completed submitting a written report within two weeks upon completion of drilling. Total fee is due upon delivery of report. 10%fee will be added to all invoices that are not paid within 30 days. 17819 Davenport Rd.,Suite 240,Dallas,TX 75252♦Office:(972)713-3030♦ Fax:(972)713-3029 7524 Sand Street,Fort Worth,TX 76118♦Office:(817)284-5151♦ Fax:(817)284-5154 i► X10 GLOBE Engineers, Inc. Geotechnical #Environmental #Materials Testing Respectfully submitted for the firm: .fart Sam"i Fay Saremi, PE, PMP Principal NOTICE TO PROCEED The above Proposal and Terms and Conditions are understood and accepted. Builder/General Contractor: Owner: Signature Date Signature Date Contact Name : Contact Name Contact Number: Contact Number: 17819 Davenport Rd.,Suite 240,Dallas,TX 75252♦Office:(972)713-3030♦ Fax:(972)713-3029 7524 Sand Street,Fort Worth,TX 76118♦Office:(817)284-5151♦ Fax:(817)284-5154 /+111 �r GLOBE Engineers, Inc. Geotechnical#Environmental #Materials Testing Boring Location Plan — 10 ft Deep Born for Re-Gran{ - f VKtnna Charwl Remove Siltation and c-yade Channel t0 Remove ago r 3 n a Longitudinal Reconstruct Slope of 0.50% Concrete Rip-Rap t 2 LF at Cc-luence i Ij 1 i -3- F --5t ., •� na-Erik LCV.E,na ''-311-1C P°_r*r7s T 1 a_ Rtnwve and Reomstruct i' 1 D-41 Deep Borng t :Concrete Rp-Rap fx Re-Grading [ M, Control Section [me^rweoo corona f 91 i t ► � � w f B1/B2 @ Pesestrian Bridge 30' deep each B3/B4 @ Channel area 10' deep each 17819 Davenport Rd.,Suite 240,Dallas,TX 75252♦Office:(972)713-3030 Fax:(972)713-3029 7524 Sand Street,Fort Worth,TX 76118♦Office:(817)284-5151♦ Fax:(817)284-5154 GLOBE Engineers, Inc. Geotechnical#Environmental #Materials Testing Geotechnical Engineering Reconstruction of Pedestrian Bridge & Channel Dredging/ Regrading N. Riverside & Princess Victoria Ct, Fort Worth, Texas Attachment A Unit Price Description Unit Qty ($) Total ($) 1) Project Coordination Coordination Hr 8 $ 90.0 $ 720.0 $ 720.00 2) Drilling Drilling Mob/Demob Trip 1 $ 350.0 $ 350.0 Contineous Sampling Ft 80 $ 16.0 $ 1,280.0 Traffic Control Hr 0 $ 45.0 $ - Coring existing pavement Ea 2 $ 100.0 $ 200.0 Site Engineer Hr 8 $ 90.0 $ 720.0 $ 2,550.00 3) Testing&Analysis Sample Prep Ea 18 $ 10.0 $ 180.0 Water Content Ea 18 $ 8.5 $ 153.0 Unit Weight Ea 18 $ 30.0 $ 540.0 Liquid/Plastic/PI Ea 18 $ 52.0 $ 936.0 Finer than 200 Sieve Ea 18 $ 32.0 $ 576.0 Unconfined Compression Ea 18 $ 38.0 $ 684.0 $ 3,069.00 4 Additional Testing Free Swell Tests Each 0 $ 150.0 $ - Sulfate Testing Each 0 $ 50.0 $ - Lime Series Determination Each 0 $ 215.0 $ - $0.00 6) Engineering& Reporting Engineering Evaluation Hr 20 $ 130.0 $ 2,600.0 Clerical Hr 30 $ 34.0 $ 1,020.0 $ 3,620.00 TOTAL ESTIMATE $ 9,959.00 Note: 2 Borings @ 30'deep each at Pedestrian Bridge/2 Borings @ 10'deep eachat Channel Area. Site access is needed prior to drilling mobilization. 17819 Davenport Rd.,Suite 240,Dallas,TX 75252♦ Office:(972)713-3030♦ Fax:(972)713-3029 7524 Sand Street,Fort Worth,TX 76118♦Office:(817)284-5151♦ Fax:(817)284-5154 4- 5000 Thompson Terrace Collowille. Texas 76034 CONSULT.. (8 17)335-9900 a --- Fax (817)335-995: AUTHORIZATION FOR PROFESSIONAL SERVICES PROJECT NAME: N. Riverside Dr. PROJECT LOCATION: Fort Worth, TX PROJECT No.: 1401802 CLIENT: BHB Engineering and Surveying CONTACT: Konstantine Bakintas, P.E. ADDRESS: 4550 S.H. 360, Suite 180. Grapevine, TX 76051 SCOPE: General– A. Easements Upon final determination of proposed Drainage Easements,ANA will provide the following: 1. Permanent Drainage Easements or Temporary Construction Easements (Determination to be made by Project Manager), (approximately 10) a) Real Property Descriptions b) Maps of Survey Compensation: 10 X 1200.0=$12,000.00 TOTAL COMPENSATION: $12,000.00 Services covered by this authorization shall be performed in accordance with PROVISIONS stated on the attached form. Approved for CLIENT Accepted for A.N.A. Consultants, L.L.C. By: By, Konstantine Bakintas, PE Edward Khalil, RPLS Title: Principal, Civil Engineer Title: Director of Survey Date: Date: October 30, 2015 ANA Project#060700 CLIENT SATISFACTION IS OUR BUSINESS EXHIBIT `B' Hourly Rate Schedule Work Title Hourly Rate Principal $185.00 Controller $165.00 Senior Associate $150.00 Engineer/Associate $125.00 Surveyor/Associate $130.00 Engineer Intern/Jr. Associate $95.00 Designer $90.00 Survey Technician $85.00 Survey Crew $145.00 GPS Survey Crew $150.00 S eclfication Writer $60.00 Reproduction $30.00 Word Processor/Secretar $38.00 Any extra work that is not in the Scope of Work, the Consultant fees will be based on the above hourly rates schedule. ANA Project#060700 2 PROVISIONS AUTHORIZATION TO PROCEED ARBITRATION Signing this form shall be construed as authorization by CLIENT for A.N.A. All claims, disputes,and other matters in question arising out of,or to proceed with the work, unless otherwise provided for in the relating to,this Authorization or the breach thereof may be decided by authorization. arbitration in accordance with the rules of the American Arbitration Association then obtaining. Either CLIENT or A.N.A. may initiate a LABOR COSTS request for such arbitration, but consent of the other party to such A.N.A.'s Labor Cost shall be the amount of salaries paid A.N.A.'s procedure shall be mandatory. No arbitration arising out of,or relating employees for the work performed on CLIENTS Project plus a stipulated to this Authorization may Include, by consolidation,joinder,or in any other manner,any additional party not a party to this Authorization. percentage of such salaries to cover all payroll-related taxes,payments, premiums,and benefits. LEGAL EXPENSES DIRECT EXPENSES In the event legal action Is brought by CLIENT or A.N.A.against the A.N.A's Direct Expense shall be those costs incurred on or directly forth other to enforce any of the obligations hereunder or arising out of any dispute concerning the terms and conditions hereby created,the losing CLIENT'S Project including but not limited to necessary transportation costs including milage at A.N.A.'s current rate when its automobiles are party shall pay the prevailing party such reasonable amounts for fees, cost and expenses as may be set by the court. used,meals and lodging,laboratory test and analyses,computer services, word processing services, telephone, printing and binding charges. Reimbursement for these EXPENSES shall be on the basis of actual PAYMENT TO A.N.A., L.L.C. charges when furnished by A.N.A.Consultants,L.L.C. Monthly Invoices will be issued by A.N.A.for all work performed under the terms of this agreement. Invoices are due and payable on receipt. OUTSIDE SERVICES Interest at the rate of 1.5%per month will be charged on all past-due When technical or professional services are furnished by an outside amounts,unless not permitted by law,in which case, interest will be source,when approved by the CLIENT,an additional amount of 10%shall charged at the highest amount permitted by law. be added to the cost of these services for A.N.A's administrative cost. LIMITATION OF LIABILITY COST ESTIMATES A.N.A.'s liability to the CLIENT for any cause or combination of causes Any cost estimates provided by A.N.A.will be on a basis of experience and is In the aggregate, limited to an amount no greater than the feeearned under this agreement. judgement,but since it has no control over market conditions or bidding procedures A.N.A.cannot warrant that bids or ultimate construction costs will not vary from these cost estimates. ADDITIONAL SERVICES Services in addition to those specified in Scope will be provided by PROFESSIONAL STANDARDS A.N,A,if authorized in writing by CLIENT. Additional services will be A.N.A.shall perform its professional services pursuant to the standard of paid for by CLIENT as indicated in attached Basis of Compensation or care which would be applied by a reasonable and prudent registered as negotiated, professional engineer in the State of Texas providing services under the same or similar scope of service for the same or similar types of projects. SALES TAX WARRANTY In accordance with the Stale Sales Tax Codes, certain surveying services are taxable. Applicable sales taxis not included in the above A.N.A.'s services are professional services limited to the exercise of proposed fee. Sales tax at an applicable rale will be indicated on judgment and the rendering of advice and opinions and,as such,A.N.A. Invoice statements, makes no warranty,express or implied. TERMINATION SURVEYING SERVICES In accordance with the Professional Land Surveying Practices Act of Either CLIENT or A.N.A.mayterminatethisauthorizationbygiving30days 1989, the client Is informed that any complaints about surveying written notice to the other party. In such event CLIENT shall forthwith pay services may be forwarded to the Texas Board of Professional Land A.N.A. in full for all work previously authorized and performed prior to Surveying,7701 North Lamar,Suite 400,Austin,Texas 78752,(512) effective date of termination. If no notice of termination is given, 452-9427. relationships and obligations created by this Authorization shall be terminated upon completion of all applicable requirements of this In case any one or more of the provisions contained In this Authorization. Agreement shall be held Illegal,the enforceability of the remaining provisions contained herein shall not be impaired thereby. ANA Project#060700 3 OPC for N. Riverside Dr—Channel Budget.xls Baird, Hampton&Brown 10/27/2015 Engineering&Surveying 817-251-8550 www.bhhinc.com Engineer's Budgetary Opinion of Probable Cost for N. Riverside Drive from Old Denton Rd.to North Tarrant Pkwy. CHANNEL DREDGING, REGRADING & PEDESTRIAN BRIDGE City of Fort Worth,Texas Oct-15 Item Extended Number Spec Item Description Quantity Unit Unit Price Price 1 3125.0101 SWPPP >_ 1 acre(Implement&Maintain) 1 LS 5,000.00 5,000.00 2 0241.1000 Remove&Dispose of Conc. Rir Rap 16,200 SF 2.25 36,450.00 3 0241.0900 Remove Misc.Conc. Structure(Bridge Hdwls.) 2 LS 3,500.00 7,000.00 4 0241.0900 Remove Misc.Conc. Structure(Box Culverts) 4 LS 2,500.00 10,000.00 5 3126.0101 Unclassified Channel Excavation 8,000 CY 16.00 128,000.00 6 3137.0101 Concrete Riprap 1,800 SY 65.00 117,000.00 7 3341.2003 Single Span Pedestrian Bridge w/Railing 1 EA 50,000.00 50,000.00 8 9999.0001 Bridge Abutment w/Conc. Pierss 2 EA 10,000.00 20,000.00 9 9999.0002 Bridge Installation(w/crane) 1 LS 10,000.00 10,000.00 10 9999.0003 Concrete Wall(2'Height) 3,000 SFF 30.00 90,000.00 11 9999.0004 Turf Reinforcement Matt 12,950 SY 7.50 97,125.00 12 3292.0400 Seeding, Hydromulch 12,950 SY 3.25 42,087.50 Subtotal for Drainage Improvements $ 612,663 Contingency 14% $ 87,338 Total for Channel Dredging&Regrading $ 700,000 Geotechnical Investigation 1.64% $ 11,489 Topographic Surveying 0.00% $ - Stream(H&H)Modeling 3.17% $ 22,200 Plans, Specs& Estimates 4.11% $ 28,782 Construction Support 0.41% $ 2,840 Easement Documents 1.64% $ 11,489 Subtotal for Professional Services $ 76,800 Contingency 4% $ 3,200 Total for Professional Services $ 80,000 TOTAL FOR PROJECT $ 780,000 1 of 1 M&C Review Page 1 of 3 Official site of the City of Fort Worth, Texas FORTS oniI CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 5/3/2016 REFERENCE ** 20N RIVERSIDE DESIGN DATE: 5/3/2016 NO.: C-27695 LOG NAME: AMENDMENT 1-02272 CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: Authorize Execution of Amendment No. 1 to the Engineering Services Agreement with Baird, Hampton, & Brown, Inc., in the Amount Not to Exceed $392,000.00 for the Design of North Riverside Drive from North Tarrant Parkway to Old Denton Road for a Revised Project Design Phase Cost of$1,392,000.00 (2004 BOND PROGRAM) (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1 to the Engineering Services Agreement with Baird, Hampton & Brown, Inc., in the amount not to exceed $392,000.00 for the design of North Riverside Drive from North Tarrant Parkway to Old Denton Road for a revised project design amount of$1,392,000.00. DISCUSSION: The 2014 Bond Program provides funding for improvements to North Riverside Drive from a two-lane roadway to a four-lane divided arterial street from North Tarrant Parkway to Old Denton Road. Two new travel lanes will be constructed on the west side of the existing roadway and the existing pavement on the east half will be rehabilitated or replaced. The project includes turn lanes, median openings, sidewalks, streetlights, roundabouts and shared use paths as necessary to improve overall connectivity. On June 10, 2014 (M&C C-26833), the City Council authorized the execution of an Engineering Services Agreement with Baird, Hampton, & Brown, Inc., in an amount not to exceed $1,000,000.00 for the design of North Riverside Drive from North Tarrant Parkway to Old Denton Road. This Amendment No. 1 for professional services will provide for additional engineering services for the design of North Riverside Drive. These revisions include changes to the proposed cross section to provide wider parkways with 10 foot wide shared use paths, a 16 foot wide center median and 11 foot travel lanes in accordance with the proposed Master Thoroughfare Plan amendment and complete streets initiative. Baird, Hampton, & Brown, Inc., will also design improvements to the existing Victoria and Emerywood Channels for the TPW Stormwater Division, as well as provide additional Subsurface Utility Investigations and Right-of-Way/Easement exhibits and legal descriptions. The total cost of Amendment No. 1 to be performed by Baird, Hampton, & Brown, Inc., will not exceed $392,000.00. Staff considers this not-to-exceed cost to be fair and reasonable for the anticipated services to be performed. The budget for the reconstruction of North Riverside Drive from North Tarrant Parkway to Old Denton Road consists of the following: N. Riverside Dr. Stormwater Water/Sewer PROJECT BUDGET (2014 CIP) Funds Funds Total Design Contract Budget $1,000,000.00 $ 0.00 $ 0.00 $1,000,000.00 Design Contract Amendment No. 1 $ 286,400.00 $ 105,600.00 $ 0.00 $ 392,000.00 City Project Management, Design Coordination $ 89,500.00 1 $ 0.00 $ 0.00 $ 89,500.00 Total Design $1,375,900.00 1 $ 105,600.00 $ 0.00 $1,481,500.00 http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22102&councilda... 5/20/2016 M&C Review Page 2 of 3 Right-of-Way and Easement Acquisition Coordination $ 2,510,000.00 $ 0.00 $ 0.00 $2,510,000.00 Utility Relocations $ 100,000.00 $ 0.00 $ 0.00 $ 100,000.00 Total ROW, Utilities $ 2,610,000.00 $ 0.00 $ 0.00 $2,610,000.00 Construction Costs $ 5,387 000.00 $ 773,000.00 $200,000.00 $6,360,000.00 City Project Management, Inspections, Quality Control/Assurance and Coordination $ 618,100.00 $ 50,400.00 $ 16,000.00 $ 684,500.00 Construction Project Contingencies $ 1,609,000.00 $ 171,000.00 $ 44,000.00 $ 1,824,000.00 Total Construction $ 7,614,100.00 $ 994 400.00 $260,000.00 $ 8,668,500.00 TOTAL PROJECT BUDGET $11,600,000.00 $1,100,000.00 $260,000.00 $12,760,000.00 This design/engineering contract will be funded through the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014). Construction is anticipated to commence in Fall 2016 and to be substantially complete by Spring 2018. M/WBE OFFICE — Baird, Hampton & Brown, Inc., is in compliance with the City's BDE Ordinance by committing to an additional 14 percent SBE participation on this Amendment No. 1. The City's SBE goal on this amendment or extra work is 10 percent. The project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as appropriated, of the 2014 Bond Program Fund and the Stormwater Capital Projects Fund. Appropriations Pending Expenditures/ Remaining Balance after Funding Source to Date Encumbrances M&C approval 2014 CIP $11,600,000.00 $1,493,668.00 $10,106,332.00 Stormwater Funds $ 1,100,000.00 $ 105,600.00 $ 994,400.00 TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year I (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) ffl 4014 0200431 5330500 CO2272 CO2330 2016 $286,400.06 9651 0200431 5330500 CO2272 CO2830 2016 $105,600.00 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (6157) Additional Information Contact: Mike Weiss (8485) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22102&councilda... 5/20/2016 M&C Review Page 3 of 3 ATTACHMENTS 20N_RIVERSIDE_DESIGN_02272_MAP.pdf BHB Form 1295- Cert of Interested Parties.pdf http://apps.cfwnet.org/council_packet/mc_review.asp?ID=22102&councilda... 5/20/2016 MAYOR AND COUNCIL COMMUNICATION MAP 20N RIVERSIDE DESIGN 02272 S-A IeRL0 2,500 5,000 �..J � r 81 C �` ° W sHlve —� W Feet O y TARRANT -i m aQ ti HARMON i G� ' or�•r..� S�`` %8 RANG 6 A RO CK w Fe `. PAR', �5..yn► --� f ,;s9 �.._ LM SUMMERFIELDS a>f I �• OAS P s..:� C .._ .. ..� rr � 1` I I f z "'ENEPOL H r- 13Z z s I _ TA 37 o' \' YN " 3 Vit._ BASSWOOD t � �{ _ a t wi BOAZ �� RD �Z' CJ ram ,I PKyAlyW e � , NARRANT P Y �yT _ N`fEf7iZ,ff ;� 1 I ATAUGAAm �CANTI#EL ,FO IL 7 �`�E�<��+f'�'�_ A 7HLEY_ RN NNDUSr Ii IAL �LL sANsd�.. G'R�EF-A K .O LOOP Z O Zr 820 r. 11 NOf'EIH �Ns EAST 'NORTHERN -- p e fr <y - CROSS? Z m . 4y1 yam_ I MCLEAN M t �. W lzo 14 Lsi_ MEACHAM up , CR b S rn m m 0) 4 MIDWA'Y- Q 2 28TH SH 1 WATAUGA �V ° k> C3, ,Q �n W Ip_ 99 _ 2 1ST QP WHITE !G� SETTL'EMENT Y (% Z 0 250 500 .{O 7TH 28 "Q O LANCASTER-' ° R NORTH RIVERSIDE DRIVE (NORTH TARRANT PARKWAY TO OLD DENTON ROAD) -- MCKERY (pyrght 2014Cty 0,F-Worn.Uaaat,—d apmduct'nniaavbia6 rt of appfcabh hwa. CITY PROJECT# 02272 This prod_t is for W.—tWnal purposes and may not hen ave beprepared furor be suaabi a for Hgal,engmaerng,or surveyi ng purposes td.-not represent an 11-he-91011d survey and rapresen6 onH the approxvnah wlaNa bcaEon of prape.ly—daeies The Cit,of Fof Worthassumes nor p,,ub€tyforhe acarracy of s,H dah. CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-40415 Baird,Hampton&Brown,Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/14/2016 being filed. City of Fort Worth Transportation and Public Works Department Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. 45844 Professional engineering design services for roadway improvements 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary Bost, Ian Fort Worth,TX United States X Watters, Richard Fort Worth,TX United States X Nave,Shannon Fort Worth,TX United States X Strevey,Tracy Fort Worth,TX United States X Randall,Kenneth Fort Worth,TX United States X Mcllraith, Michael Fort Worth,TX United States X Bakintas, Konstantine Fort Worth,TX United States X Baird,John Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE �A Sworn to and subscribed before me,by the said C"�+'� l "` - this the ,l y day of R r� 20 to to certify which,witness my hand and seal of office. .e Joh V1 U), i3t, Signature of officer administering o Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.645 CERTIFICATE OF INTERESTED PARTIES FORM 1295' 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-40415 Baird, Hampton&Brown, Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/14/2016 being filed. City of Fort Worth Transportation and Public Works Department Date Ae w edged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. 45844 Professional engineering design services for roadway improvements 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary Bost,Ian Fort Worth,TX United States X Watters, Richard Fort Worth,TX United States X Nave,Shannon Fort Worth,TX United States X Strevey,Tracy Fort Worth,TX United States X Randall, Kenneth Fort Worth,TX United States X Mcllraith,Michael Fort Worth,TX United States X Bakintas,Konstantine Fort Worth,TX United States X Baird,John Fort Worth,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. c� Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said K-er�k ��1't'L" this the day of A r+ 20to certify which,witness my hand and seal of office. i F L Jf` /I C�, Int C otAl,,. Signature of officer administering o8v Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.645