Regarding contract 117511 for VILLAS AT BARBER CREEK as required by the eS�=Sf7/G S
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $311,543.75
Amount of Approved Change Orders: ($281,923.92) Ns 1
Revised Contract Amount: $29,619.83
Total Cost Work Completed: $29,619.83
Less Deductions:
Liquidated Damages: Days®$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $29,619.83
Less Previous Payments: $0.00
Final Payment Due $29,619.83
ffm d=— & •of- Zo/(o M"
Recom ended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
AcceptedDate
Direc or, TRANSPORTATION PUBLIC WORKS
Asst. City Manager Date
Comments: C205-541200-207760265583
E1Vl'AI1ED
JUN _ 2016 OFFICIAL RECORD
CITY SECRETARY
Initial: ` FT.WORTH,TX
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name VILLAS AT BARBER CREEK
Contract Limits
Project Type STORM DRAIN Q PAVING
City Project Numbers 02655
DOE Number 7511
Estimate Number I Payment Number 1 For Period Ending 5/10/2016
CD
City Secretary Contract Number 117511 Contract Time 12CD
Contract Date Days Charged to Date 160
Project Manager Ehia Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors LAYER / SLATEN
Tuesday,May 10,2016 Page 1 of 4
City Project Numbers 02655 DOE Number 7511
Contract Name VILLAS AT BARBER CREEK Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN&PAVING For Period Ending 5/10/2016
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
--- ——————— --- - - --- - -- ---
2 TRENCH SAFETY 220 LF $2.00 $440.00 220 $440.00
3 21"RCP CLASS Ill 195 LF $50.00 $9,750.00 195 $9,750.00
4 24"RCP CLASS 111 25 LF $55.00 $1,375.00 25 $1,375.00
5 4'STORM JUNCTION BOX I EA $4,000.00 $4,000.00 1 $4,000.00
6 10'CURB INLET I EA $3,000.00 $3,000.00 1 $3,000.00
7 4'DROP INLET I EA $4,000.00 $4,000.00 1 $4,000.00
9 21"RCP BEND 45 DEGREES 2 NS $500.00 $1,000.00 2 $1,000.00
-------------------------------- ----
Sub-Total of Previous Unit $23,565.00 $23,565.00
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
—
I HYDRATED LIME CO#t 0.2732 TN $175.00 $47.81 0.2732 $47.81
2 8"LIME TREATMENT CO#1 12.34 SY $3.00 $37.02 12.34 $37.02
3 6"CONC PVMT CO#1 10 SY $34.50 $345.00 10 $345.00
4 4"CONC SIDEWALK CO#1 180 SF $3.25 $585.00 180 $585.00
5 BARRIER FREE RAMP 2 EA $1,200.00 $2,400.00 2 $2,400.00
8 BARRIER FREE RAMP 2 EA $1,200.00 $2,400.00 2 $2,400.00
9 6"CONC CURB&GUTTER CO#1 80 LF $3.00 $240.00 80 $240.00
--------------------------------------
Sub-Total of Previous unit $6,054.83 $6,054.83
--------------------------------------
Tuesday,May 10,2016 Page 2 of 4
City Project Numbers 02655 DOE Number 7511
Contract Name VILLAS AT BARBER CREEK Estimate Number 1
Contract Limits Payment Number I
Project Type STORM DRAIN do PAVING For Period Ending 5/10/2016
Project Funding
Contract Information Summary
Original Contract Amount $311,543.75
Change Orders
Change Order Number 1 ($281,923.92)
Total Contract Price 529,619.83
Date Total Cost of Work Completed i $29,619.83
Contra r Less %Retained 50.00
Date �6 Net Earned $29,619.83
Inspection Su or Earned This Period $29,619.83
Zr/ Retainage This Period $0.00
Date f/ Less Liquidated Damages
Project Manager
Days Q /Day $0.00
Date LessPavement Deficiency $0.00
'rec or/fPW-Infrastructure Design and Construction Less Penalty $0.00
w. Date Less Previous Payment $0.00
Direct Contracting DepartrneY Plus Material on Hand Less 15% $0.00
Balance Due This Payment $29,619.83
Tuesday,May 10,2016 Page 3 of 4
City Project Numbers 02655 DOE Number 7511
Contract Name VILLAS AT BARBER CREEK Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN&PAVING For Period Ending 5/10/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117511
Inspectors LAYER / SLATEN Contract Date
Contractor CONATSER CONSTRUCTION TxLP Contract Time 120 CD
5327 WICHITA ST Days Charged to Date 160 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $29,619.83
Less %Retained $0.00
Net Earned $29,619.83
Earned This Period $29,619.83
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $29,619.83
Tuesday,May 10,2016 Page 4 of 4
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Villas at Barber Creek CHANGE
CONTRACT: Unit II Water Unit II Sewer, Unit III Drainage, Unit IVPaving ORDER No:
CFA# 2015-064 CITY PARTICIPATION: No
CITY PROJECT# 2655
DOE# 7511
WATER PROJECT# P265-6071502655-00
SEWER PROJECT# P275-7071302655-00
FILE# K-2414
INSPECTOR: Connor Slaten Phone No: 817-727-7671
PROJECT MANAGER: Fred Ehia Phone No: 817-392-8424
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE STREET LIGHTS CONTRACT
Developer Developer Developer Developer Developer DAYS
Cost ftow CostCost Cost Cost Mood
ORIGINAL CONTRACT ;140,046.00 $121,605.00 $277,978.75 ;33,565.00 ;0.00
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE ;140,046.00 ;121,605.00 ;277,978.75 $33,565.00 ;0.00 120
AMOUNT OF PROP.CHANGE ORDER (;271,923.92) 310,000.00) _
REVISED CONTRACT AMOUNT ;140,046.00 ;121,605.00 ;6,054.83 Otl ;23,565.00 ctb ;0.00 120
TOTAL REVISED CONTRACT AMOUNT
PER UNIT 3140,046.00 ;121,605.00 ;6,054.83 $23,565.00 ;0.00
REVISED COST SHARE Dev.Cost: $291,270.83 City Cosa $0.00
TOTAL REVISED CONTRACT $291,270.83
Revised:10-12-2011 Page 1
You are directed to make the follovArngChanges in the contract documents:
CITY BID ITEM
PAY ITEM# # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit III Drainage 1 -12 SY Concrete Rip Rap 575.00 $900.00
Unit III Drainage 8 -1820 SF Concrete Flume $5.00 $9100.00
Unit IV Paving 1 -134.7268 TN Hydrated Lime $175.00 $23,577.19
Unit IV Paving 2 -6,087.66 SY 8"Lime Treatment $3.00 $18,262.98
Unit IV Paving 3 -4931 SY 6"Concrete Pavment $34.50 $170,119.50
Unit IV Paving 4 -8885 SF 4'Conc.Sidewalk $3.25 S28,876.25
Unit IV Paving 6 -1 EA Barrier Free Ramp,Type M-2 $1,200.00 $1,200.00
Unit IV Paving 7 -1 EA Barrier Free Ramp,Type M-3 $1,200.00 S1,200.00
Unit IV Paving 9 -2396 LF 6"Conc.Curb and Gutter $3.00 $7,188.00
Unit IV Paving 10 -5 EA Rdwy Ilium Assembly Ty 8,11,D-25 and D-30 $4,000.00 $20,000.00
Unit IV Paving 11 -2 EA Furnish/Install Alum Sign Ground Mount Cit Std. $750.00 1 $1,500.00
REASONS FOR CHANGE ORDER All Improvements are private for paving and street lights and city inspador la not doing Inspection on tom.To pudic water,sower,and drainage
Improvements within easements by Final Plat wil be Inspected,The drainage total was delated by$9,100 which Is to private drainage flume Mem 8.
RECiOM MI IIM: APPROYEW. APPROVED:
Adams Engineering Brickstone DevoWment LP Conatser Construction TX,LP
By. Dr. By.
Name: Derxds Lana PE Name: Ron Lawwwk weld Name: Btoak Huggins
Tltk: Civil Enalnser,Adams Enoinaarina Title: Proisot Manaaar Title: Viae4Aroakkaat
Revised:10-12-2011 Paye 2
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.1
NAME OF PROJECT: Villas at Barber Creek
PROJECT NO.: .02655 CONTRACTOR: Conatser Conshuction
DOE NO. 7511
PERIOD FROM 11/16/15 TO: 05/10/16 FINAL INSPECTION DATE: 17-May-16
WORK ORDER EFFECTIVE 11/168015 CONTRACT TIME 120 O WD®CD
DAY
OF[ DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTHr
GED CREDITED MONTH CHARGED CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 160
PREVIOUS
PERIOD
TOTALS
TO DATE 160
*REMARKS:
- 1� - I S-►v -llv
CO CTOREEE HDATE ECTOR DATE
ENGINEERING DEPARTMENT
! a City of Fort Worth•1000 orton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH RE":02/2V07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 5/10/2016
Nano of Contractor Project Nmne
Conatser Construction Villas at Barber Creek
Elnapeetor Project Manager
Connor Slaten Fred Ehia
DOE Nmtrber Project Difficulty Type of Contract
7511 0 Simple 0 Routine 0 Complex ❑Water ❑Waste Water 0 Storm Drainage p Pavement
hutial contract Amount Final Contract Amount
$311,543.75 $29,619.83
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEbMWr RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION IPLANS&SPECIFICATIONS
1 Availability of Inspector U 1 Accuracy of Plans to Existing Conditions r
2 Knowledge of actor H 2 Clarity&Sufficiency of Details �{
3 Accuracy of Measured Quantities N 3 ApRhLcability of Specifications
4 Display Of Professionalism b 4 Accuracy of Plan Quantities t
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting Valve Crews,Labs 1 Knowledge And/Or Problem Resolution �{
ADMINISTRATION 2 Availability of Project Manager W
1 Change Order Processing Time y 3 Communication y
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
IM COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
Mw City of Fort Worth-1000 71rockozortan Street-Fort Worth,TX 76012-6311
(817)392-7941-Frx:(817)392-7845
FORTWORTH REV:02/20'°'
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Conatser Construction Villas at Barber Creek
DOE Inspector DOENumber
Connor Slaten 7511
DOE Inspector Project Manager
❑Water ❑Waste Water 2 Storm Drainage [D Pavement Fred Ehia
Initial Contract Amount Project Dieulty
$311,543.75 O Simple OO Routine O Complex
Final Contract Amount Date
$29,619.83 5/10/2016
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT x APPLICABLE /N) RATING 0-4 MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Promty Restoration 5 Y 4 20 20
12 After Hours R nse 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 446
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 416
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]•100%) 446 / 448 — ism
Performance Category Bnewhat
<20%=Inadequate 20%to<40%-Deficient 40%to<60%=,Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDIN XPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspec or �C= Signature Contractor
Signature DOE Inspector's SupervisorMRT
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth•1000 Thmckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fam(817)392-7845
Brick1tone Developiment, L.T.
10501 Alta Vista Road
Keller,TX 76248
817/379-0727
May 4, 2016
Mr. Brock Huggins
Conatser Construction TX,LP
P O BOX 15448
Fort Worth,TX 76119
RE: Barber Creek
City of Fort Worth,State of Texas
Dear Mr. Huggins,
Brickstone Development,LP hereby acknowledges that Conatser Construction TX,LP has
completed the Water and Paving portions of the above captioned project in a timely
manner. Although the contractual time was exceeded Brickstone Development, LP will not
assess any penalties or liquidated damages due to time extensions.
If you have any questions,please feel free to contact our office.
Si ereiy,
Ron Lewandowski
BRICKSTONE DEVELOPMENT,LP
President of General Partner
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document 6707
Bond No 0149478
PROJECT:
(name, address)Villas at Barber Creek
Fort Worth,TX
TO (Owner)
8RICKSTONE DEVELOPMENT,LP AND CITY OF ARCHITECT'S PROJECT N0:CFA No.2015-064
FORT WORTH CONTRACT FOR:
Water,Sewer,Paving,Drainage&Street Lights Improvements to
Serve Villas at Barber Creek
L, CONTRACT DATE:
CONTRACTOR:CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here Insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (fire insert name and address of Contractor►
CONATSER CONSTRUCTION TX,L.P.
5327 Wichita St.
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here Insert name and address of Owner)
BRICKSTONE DEVELOPMENT,LP AND CITY OF FORT WORTH
OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 4th day of May,2016
BERKLEY INSURANCE COMPANY
Surety Company
Attest: / r �� '?7•°I��/�/
(Seal): ffignatme of Aa6mized Rep[ro=tative
Robbs Morales Attometin-Fact
Title
NOTE: TNN form is to be used as a companion document to ALA DOCUMENT 6706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Cterent Edith
ONE PAGE
No. BI-7280f
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich, CT,has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Vena DeLene
Marshall;Sophinie Hunter; Robbi Morales; or Kelly A. IYesibrook of Aon Risk Services Sontlewest, Inc. of Dallas, TX its true
and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute,seal, acknowledge and deliver any
and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall
exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed
and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof, This Power of Attomey is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
s of attorney authorizing and qualifying the attorney-in-fact named therein
Secretary are hereby authorized to execute power
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
== manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
= though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF, the Company has cause' these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this 'flay of 2-01-5..
Attest: Berkley Insurance Company
_. (Seal) By4eeman
/ Ble
r\/
Ira Safter
Senior Vice President&Secretary is Preside
WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY" SECURITY PAPER..
STATE OF CONNECTICUT)
ss:
COUNTY OF FAIRFIELD )
= Sworn to before me, a Notary Public in the State of Connecticut, this�.'(7 da of eJ 2015, by Ira S. Lederman and
Jeffrey M. Hafter who are sworn to me to be the Senior Vice President and Secre ryl an the Senior Vice Pre idem, respectively, of
Berkley Insurance Company. MARIA C.RUNDBAKEN
NOTARY PUBLIC
MY COMMISSION EXPIRES Notary Public, State of Connecticut
APRIL 30,2019
CERTIFICATE
I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a
true, correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
and that the authority of the Attomey-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached, is in full force and effect as of this date.
Given under my hand and seal of the Company,this 4 th day of May 2016
(Seal)
A a
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group,
Inc., general partner of Conatser Construction TX,LP, known to me to be a credible person,who
being by me duly sworn,upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full;and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
VILLAS AT BARBER CREEK
WATER AND SANITARY SEWER, STORM DRAIN,
PAVING AND STREET LIGHT IMPROVEMENTS
DOE#: N/A
City Project#: 215-064
CITY OF FORT WORTH
STATE OF TEXAS
CON ATSE ONSTRUCTION TX,LP
Brock Huggins
Subscribed and sworn to before me this 5'h day of May,201