Loading...
HomeMy WebLinkAboutContract 44322 r CllY SECRETARY D.O.E. FILE CONTRACT SECRETARY L CONTRACT NO. coNwcTOR'S BONDING CO. FORT WORTH CONSTRUCTION'S COPY CLIENT DEPARTMENT PROJECT MANUAL FOR THE CONSTRUCTION OF Alliance Airport Security Upgrade Fence and Gates City Project No. 1978 Betsy Price Tom Higgins Mayor City Manager t� • '' '' t Y 181E Prepared for a JE44E L WCOY The City of Fort Worth 84779 G A-Ak t� �1 NOVEMBER 2012 - Jacobs Engineering Group Inc TBPE REG#62773 ID �► 17403�,,. �Ct OF.4E� 0ppIC1a RECORD CITY SliCRX E I V E 0 MAR 2 9 7i1f3 •SIrpRt 03-05-13P12:29 RCVD City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/5/2013 DATE: Tuesday, March 05, 2013 REFERENCE NO.: *"C-26134 LOG NAME: 55AFW SECURITY IMPROVEMENTS (01978) SUBJECT: Authorize Execution of a Contract with Commercial Fence, Inc., in the Amount of$603,824.12 for Construction of Security Improvements at Fort Worth Alliance Airport (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with Commercial Fence, Inc., in the amount of$603,824.12 for construction of Security Improvements at Fort Worth Alliance Airport. DISCUSSION: This project will consist of demolition, removal and installation of fencing, removal and installation of motorized gates including new security cameras and closed-circuit television systems. R The project was advertised for bid in the Fort Worth Star-Telegram on November 15, 2012 and November 25,2012. On December 20, 2012,the following bids were received: Bidder Alternate Alternate Base Bid 1 11 2 1 Total Commercial Fence, 0451,934.31§71,276.441$80,613.341$603,82-. . Corbet Group, Inc. $502,745.70$78,850.0 84,000.65 665,596.35 Greater Southwest Contractors, Inc. 525,792.2 77,632.0 88,044.60$691,468.80 C Green Sca in , L.P. g540,287.50086,700.5 $96,706.75 723,694.7 Philli s May Corporation 10676,333.0 81,355.0 094,933.00$852,681.00' Time of completion: 77 working days Staff recommends that the bid, including the two alternates, submitted by Commercial Fence, Inc., be selected and that the contract be awarded to Commercial Fence, Inc. Federal Aviation Administration grant funds will be used for this project. Existing land credits will be used for the City's 10 percent in-kind match. M/WBE Office: Commercial Fence, Inc., is in compliance with the Citys BDE Ordinance by committing to 25 percent DBE participation on this project. The City's DBE goal on this project is 25 percent. Alliance Airport is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital http://apps.cfwnet.org/ecouncil/prinbnc.asp?id=18059&print=true&DocTyp... 3/15/2013 r budget, as appropriated, of the Airports Grant Fund. FUND C€NTERS: TO Fund/Account/Centers FROM Fund/Account/Centers r GR 14 531120 055218542810 $603.824.12 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Bill Welstead (5402) Additional Information Contact: Ruseena Johnson (5407) ATTACHMENTS 1. 1978 Exhibit.pdf (Public) 2. Commercial Fence Inc MSBE.pdf (CFW Intemal) 3. Construction FAR (01978).pdf (CFW Intemal) 4. GR14 218542 Available Funds 2 7 13.pdf (CFW Intemal) http://apps.cfwnet.org/ecouncil/prinbnc.asp?id=180 5 9&print=true&DocTyp... 3/15/2013 000000-1 TABLE OF CONTENTS Page 1 of 2 SECTION 00 00 00 TABLE OF CONTENTS Division 00-General Conditions 00 11 13 Invitation to Bidders r 0011 14 Summary of Work 0021 13 Instructions to Bidders 003300 Submittals 0035 13 Conflict of Interest Affidavit 004100 Bid Form 00 42 43 Proposal Form Unit Price 0043 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 004526 Contractor Compliance with Workers'Compensation Law 00 45 39 Disadvantaged Business Enterprise Goal 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 007300 Supplementary Conditions 09o► 00 74 00 Wage Rates Division 01 -General Requirements 01 31 19 Preconstruction Meeting 0131 20 Project Meetings 01 74 23 Cleaning 0177 19 Closeout Requirements 01 78 56 Operations and Maintenance END OF SECTION ■ CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 Revised November 9.2011 000000-2 TABLE OF CONTENTS Page 2 of 2 r INTENTIONALLY LEFT BLANK 1 CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 Revised November 9,2011 , 001113-1 INVITATION TO BIDDERS Page I of 2 SECTION 00 11 13 ■ INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of Alliance Airport Security Upgrade-Fence and Gates will be received by the City of Fort Worth Purchasing Office: City of Fort Worth Purchasing Division 1000 Throckmorton Street Fort Worth,Texas 76102 until 1:30 P.M. CST,Thursday,December 20,2012,and bids will be opened publicly and read aloud at 2:00 PM CST in the Council Chambers. GENERAL DESCRIPTION OF WORK The major work will consist of the(approximate)following:Demolition of approximately 2747 LF of Chain Link Fence and Ornamental Fence.Removal of four(4)motorized Gates.Install 1960 LF of chain link fence, 1225 LF of ornamental Fence, 100 LF of new Ornamental motorized gates(four) with Security cameras,and CCTV Systems. NOTE m Both DBE forms and Quality Assurance submittals(Section 16780 Access Control and Security Systems,paragraph 1.06 A& B,must be submitted to the City within five(5) f working days after the bid date. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at http://www.fortworthgov.org/purchasing//and clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The Contract Documents may be downloaded,viewed,and printed by interested contractors and/or suppliers. Copies of the Bidding and Contract Documents may be purchased from Jacobs Engineering Inc at 777 Main Street, Fort Worth, Texas 76102 or contact Jeffery Peterman (817) 735-6155: The cost of Bidding and Contract Documents is:$25.00 s PREBID CONFERENCE A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO BIDDERS at the following location,date,and time: DATE: November 29, 2012 TIME: 12:30 PM CST PLACE: Alliance Airport a 2221 Alliance Air Services +1M CrrY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 ■ Revised Nov 12,2012 s 0011 13-2 INVITATION TO BIDDERS Page 2 of 2 Fort Worth, TX 76177 LOCATION: Conference Room CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject bids. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Jeffery Peterman,Jacobs Engineering Group Inc Email: jeff.peterman@jacobs.com Phone: (817) 735-6155 ADVERTISEMENT DATES November 15, 2012 November 29, 2012 END OF SECTION I I 9 I CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised Nov 12,2012 011100-1 SUMMARY OF WORK Pagel of 3 1 SECTION 01 1100 2 SUMMARY OF WORK 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to" to 1. Division 0-Bidding Requirements,Contract Forms,and Conditions of the Contract 11 2. Division 1 -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 13 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor,materials,and equipment,and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project,such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list,then the item shall 27 be considered as a subsidiary item of Work,the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys,or other public places 34 or other rights-of-way as provided for in the ordinances of the City, as shown in the 35 Contract Documents,or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools,materials,and equipment for construction 37 purposes may be stored in such space,but no more than is necessary to avoid • 38 delay in the construction operations. CITY OF FORT WORTH Security Improvements ■ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No.1978 Revised July 1,2011 i 011100-2 SUMMARY OF WORK , Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed , 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks,the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise,clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the ' 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to,all trees,shrubbery,plants, 18 lawns,fences,culverts,curbing,and all other types of structures or improvements, ' 19 to all water,sewer,and gas lines,to all conduits,overhead pole lines,or 20 appurtenances thereof,including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation,company,individual,or other,either as owners or occupants, 28 whose land or interest in land might be affected by the Work. ' 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act,omission,neglect,or misconduct in the manner or method or 31 execution of the Work,or at any time due to defective work,material,or , 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight,and/or at all times to 38 provide site security. 39 c. The cost for all fence work associated with easements, including removal, 40 temporary closures and replacement,shall be subsidiary to the various items bid 41 in the project proposal,unless a bid item is specifically provided in the , 42 proposal. CITY OF FORT WORTH Security Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No.1978 Revised July 1,2011 01 11 00-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] I2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] I4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] I6 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] I9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] I11 END OF SECTION I 12 Revision Log IDATE NAME SUMMARY OF CHANGE I 13 I I I t I CITY OF FORT WORTH Security Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No.1978 Revised July 1,2011 I INTENTIONALLY LEFT BLANK 0021 13-1 INSTRUCTIONS TO BIDDERS Page 1 of 10 SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 00-GENERAL CONDITIONS. 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof 1.2.1. Bidder: Any person, firm,partnership,company,association,or corporation acting directly through a duly authorized representative,submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person,firm,partnership,company,association,or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided)makes an award. 2. Copies of Bidding Documents " 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2.City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confcr a license or grant for any other use. 3. Prequalification of Bidders(Prime Contractors and Subcontractors) 3.1.The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s)for a project to submit such additional information as the City,in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project,and construction schedule, R to assist the City in evaluating and assessing the ability of the apparent low bidder(s)to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame.Based upon the City's assessment of the submitted information,a recommendation regarding the award of a contract will be made to the ' City Council. Failure to submit the additional information, if requested,may be grounds for rejecting the apparent low bidder as non-responsive.Affected contractors will be notified in writing of a recommendation to the City Council. 3.2.In addition to prequalification,additional requirements for qualification may be required within various sections of the Contract Documents. 4. Examination of Bidding and Contract Documents,Other Related Data, and Site CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 002113-2 INSTRUCTIONS TO BIDDERS Page 2 of 10 4.1.Before submitting a Bid,each Bidder shall: 4.1.1. Examine and carefully study the Contract Documents and other related data identified in the Bidding Documents(including"technical data"referred to in Paragraph 4.2.below).No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. ■ 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost,progress,performance or furnishing of the Work. 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost, progress,performance or furnishing of the Work. 4.1.4.Study all: (i)reports of explorations and tests of subsurface conditions at or ■ contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site(except Underground Facilities)that have been identified in the Contract Documents as containing reliable "technical ■ data"and(ii)reports and drawings of Hazardous Environmental Conditions,if any, at the Site that have been identified in the Contract Documents as containing reliable"technical data." ■ 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish.All additional information and data ■ which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents.No information given by the City other than that contained in ' the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Perform independent research,investigations,tests,borings,and such other means ■ as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project.On request,City may provide each Bidder access to the site to conduct such examinations,investigations, ■ explorations,tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations,investigations,tests and studies. ■ CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 ■ Revised July 1,2011 002113-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work,time required for its completion,and obtain all information required to make a proposal.Bidders shall rely exclusively and solely upon their own estimates, investigation,research,tests,explorations,and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal is prima-facie evidence that the Bidder has made the investigation,examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. 4.1.8. Promptly notify City of all conflicts,errors,ambiguities or discrepancies in or between the Contract Documents and such other related documents.The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may ® be deemed necessary for fulfillment of the intent of the Contract Documents. II 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification of: 4.2.1. Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any,on the plans are for general information only. Neither the City nor the Engineer guarantees that the data shown is representative of conditions which actually exist. 4.2.2. Those drawings of physical conditions in or relating to existing surface and subsurface structures(except Underground Facilities)which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. Copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents,but the"technical data" contained therein upon which Bidder is entitled I to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any"technical data" or ` any other data,interpretations,opinions or information. 1 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) that Bidder has complied with every requirement of this Paragraph 4,(ii)that without M exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means,methods,techniques,sequences or procedures of construction(if any)that may be shown or indicated or expressly required by the Contract Documents,(iii)that Bidder has given City written notice of all conflicts,errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc.,have not been resolved through the interpretations by City as described in I Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 W 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 10 4.4.The provisions of this Paragraph 4,inclusive,do not apply to Asbestos,Polychlorinated biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract ' Documents. 5. Availability of Lands for Work,Etc. 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities,construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing ' facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2.Outstanding right-of-way,easements,and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way,easements,and/or permits are not obtained,the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- • way,easements,and/or permits,and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to ' City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions received after this day may not be responded to.Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth ■ 1000 Throckmorton Street Fort Worth,TX 76102 Attn: Ruseena E.Johnson, City of Fort Worth Fax: (817) 392-5413 Email:Ruseena.Johnson@fortworthgouorg Phone: (817)392-5407 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 10 6.3.Addenda or clarifications may be posted via Buzzsaw at<Insert Link to Documents>. 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or W INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will R transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five (5)percent of Bidder's maximum Bid price on form attached issued by a surety meeting the requirements of Paragraphs 5.01 of the General Conditions. 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and deliver the complete Agreement within 10 days after the Notice of Award,City may consider Bidder to be in default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have a reasonable chance of receiving the award will be retained by City until final contract execution. 8. Contract Times The number of days within which,or the dates by which,Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or-Equal" Items The Contract,if awarded,will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or"or-equal"items. Whenever it is indicated or specified in the Bidding Documents that a"substitute"or"or- equal"item of material or equipment may be furnished or used by Contractor if acceptable to City,application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A.,6.05B.and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors,Suppliers and Others CITY OF FORT WORTH Security Upgrade e STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 002113-6 INSTRUCTIONS TO BIDDERS Page 6 of 10 11.1. In accordance with City Ordinance No. 15530(as amended),the City has goals for the participation of minority business and women business enterprises in City contracts.A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the MBE/WBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor Waiver Form and/or Good Faith Effort Form(with"documentation)and/or Joint Venture Form as appropriate.The Forms including documentation must be received by the City no later than 5:00 P.M.CST, five(5)City business days after the bid opening date. The Bidder shall obtain a receipt from the City as evidence the documentation was received.Failure to comply shall render the bid as non-responsive. 11.2. No Contractor shall be required to employ any Subcontractor, Supplier,other person or organization against whom Contractor has reasonable objection. 12. Bid Form ,1.. The Bid Form is included with the Bidding Documents; additional copies may be obtained from the City. 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item,alternative,and unit price item listed therein. In the case of optional alternatives,the words "No Bid," "No Change," or'riot Applicable"may be entered. Bidder shall state the prices, written in ink in both words and numerals,for which the Bidder proposes to do the work contemplated or furnish materials required.All prices shall be written legibly. In case of discrepancy between price in written words and the price in written numerals,the price in written words shall govern. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner,whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 Revised July 1,2011 002113-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, E addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, marked with the City Project Number,Project title,the name and address of Bidder,and 1 accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation"BID ENCLOSED"on the face of it. 14. Modification and Withdrawal of Bids 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.After all Bids not requested for withdrawal are opened and publicly read aloud,the Bids for which a withdrawal request has been properly filed may,at the option of the City,be returned unopened. 14.2. Bidders may modify their Bid by electronic communication at any time prior to the time set for the closing of Bid receipt. 15. Opening of Bids Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An abstract of the amounts of the base Bids and major alternates(if any)will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may,at City's sole discretion,release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 10 17.1. City reserves the right to reject any or all Bids,including without limitation the rights to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder,whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by City. City also reserves the right to waive informalities not involving price,contract time or changes in the Work with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies , between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 1 among the Bidders,Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, , Bidder is in arrears on any existing contract or has defaulted on a previous contract,Bidder has performed a prior contract in an unsatisfactory manner,or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers,and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs,maintenance requirements, performance i data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. i 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility,qualifications, and financial ability of Bidders,proposed Subcontractors, Suppliers and other persons and , organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization,work of a value not less than 35%of the value embraced on the Contract,unless otherwise approved by the City. 17.5. If the Contract is to be awarded,it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a ' comparable contract in the state in which the nonresident's principal place of business is located. CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 Revised July 1,2011 002113-9 INSTRUCTIONS TO BIDDERS 1091� Page 9 of 10 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded,City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by the City. 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement. Within 14 days thereafter Contractor shall sign and deliver the required number of counterparts of the Agreement to City with the required Bonds,Certificates of Insurance,and all other required documentation. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION y I e f �* CITY OF FORT WORTH Security Upgrade g STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 N Revised July 1,2011 i 0021 13-10 INSTRUCTIONS TO BIDDERS Pale 10 of 10 INTENTIONALLY LEFT BLANK CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No: 1978 , Revised July 1,2011 0041 00 BID FORM SECTION 00 41 00 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth, Texas 76102 FOR: Alliance Airport Security Upgrade City Project No.: 1978 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract.Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance,will do so pending contract award,and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent, collusive,or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering,giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. "coercive practice" means harming or threatening to harm,directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 77 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 _imp_25921438749)ds ORIGINAL BI004100 4.2. Bidder accepts the provisions of the:Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones}within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form,Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. DBE Forms (optional at time of bid) f. Prequalification Statement,Section 00 4512 g. Conflict of Interest Affidavit,Section 00 3513 'If necessary,CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project.Only this figure will be read publicly by the City at the bid opening. 6.2. it is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by muitiplying the unit bid prices for each pay Item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid #REFI 7. Bid Submittal This Bid is submitted on: ;`.>• t. ?i '.>. bytheent' named below. Respectfu ubmitted, Receipt is acknowledged of the following Addenda: Initial B Addendum No. 1: (Signature) Addendum No. 2: Addendum No. 3: Addendum No. 4: (Printed Name) Title. -'414WEE ,�, Company. •: Corporate Seal: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 I tmp 25921438749.jds i 004100 BID FORM Address: .. :s54i :. ;:. ;. ..•::::.;•::::••.;.,, ::;:.:::::::::•:::•:::;;;; ::v:i�;:;•:�<::::{,':<_�:�;:•:<;`�:<�\''";:?ti;y{-`;�ti;.••r:`'%;�`3:: f ti',`,: 2:_:;ii?:ti tj?? is?•`•::;�;t; �x�ti� Statef »..:>::';:•>:•::•>,::::<«<:::< • •: o Incorporation: �,.�,�i•� �'<' �''�:' ::: "��?�::: :z <�;:>�<::':< Phone: END OF SECTION 1 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Farm Revised 20120327 Vnp}5921438749.)ds 004243 BID PROPOSAL SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BIDDERS Bidder's Application BASE BID .:.... . •::::•:••:+::fit>':9. � tl#t:::i::::::Si ::?_:;` ?:>:::;:;:;:;:::a:;:;�:::;;:;,•'•:>:::�:$< :`:;;::::r:•':: :;:;::2: :; :::.... � :.::::.,_; 1 1 LS Constnicfion.and traffic Control (NS-04 W-5.1) at four thousand,sevenhundred&thirty-seven DOLLARS .,d eighty-seven CENTS $ `34,737.87 2 1 IS: Clearing and Grubbing(P-151-4:1) atfourty-three thousand,and eighty-nine_ DOLLARS and thirty-three PENTS s s43,089.33 3 1 LS TemportaryAir and WatcrPollution,Soil Erosion,and SiitationCcntrol(P-156-5.1) eight hundred and twenty-nine DOLLARS and thirty-three CENTS $ 3.829.33 4 1,950 LF Chain Link f=ce,(P-1625.1) ateighty-two thousand,six hundred and fifty-thrtjlLARS and CENTS CENTS s s 82,653.73 5 [ LS Removal o£..Chain Link Fcacc (P-162-52)' at th irteen thousand,sixty-six DOLLARS and sixty-mne tvls s s 13,066.69 6 1 LS Temporary Chain Lank Fence,k'P-162-53) at six thousand,and thirty-three DOLLARS and thirty-three cil�ls s 36,033.33 T 1,225 LF Ornamental Fence.(SS P,162A.5.1) at ne hundred,five thousand eight hundred and eighty-two DOLLARS and CENTS s s 105,882.00 8 1 EA Ornamental Fence Gate-4 foot width(SS-P-162A-5,2) at one thousand,four hundred and eighty-nine DOILARS and CENTS s s 1,489.39 9 2 'FA Ornam=tal Fence Gate 2VIbot(SS-P-162A-5_.2) sixteen thousand,nine hundred and fifty-eightDOLLARS and. sin'-seven s z 16,958.67 CENTS '10 1 LS Removal 4 Ornamental Fcncc (SS-P-162A-5.4) at eight thousand,one hundred and sixty-six DOLLARS and sixty-seven cENXTs s s 8,166.67 11 1 IS Contibl Room.(64116-5.01)' ateleven thousand,eight hundred and eighty-eig]5t0l74RS and eighty-nine CENTS s s 11,888.89 r CQY CFFatT R'OYTA srA1'¢URD,rzft�SsanCA'PI@1D cummiC8 SsnsYyImpmvomnota Cityrr*ct 16:1978 00 42 43-6 AlUawa coq z UQ 42 43 12 1 IS Basic Electrical Requirements(16010-5.01) EIDFROPOSAL at twenty-nine thousand four hundred and sevenvu . and fourty-four CENM $ $ 29,474.44 13 1 IS Gate Controllers(16660-5.01) at twenty five thousand four hundred and ninety DOLLARS and sixty-seven eEtM $ $25,490.67 14 1 LS Access Camtrol and Security Systems(16780-5.01) atone hundred and two thousand,one hundred seventy-seven DOLLARS and thirty-thrm CEMS $ $102,173.33 TOTAL BASE BID(EXIBIT AREAS 2,5A AND 5B) q5, y,`3 q TOTAL OF TTEhIS 1 THROUGH 16= , �- at four hundred and fifty-one thousands nine hundred and thirty-four DOLLARS and twenty-six CS f r CnY OFFORT WOrm STANDARD CamilmucTi •rspEaFxATmKDocumENC3 ChyPmJeet M:1978 004243-7 9seo�yImpmWemenca . A18anneAhpea 004243 BID PROPOSAL ADDITIVE NO 1 BID(EXHIBIT AREA 3) 15 lis Construction and Traffic Control (NS-0-400-5.1) at five hundred and thirty-three DOLLARS and thirty-three CENTS $ $533.33 16 1 LS Removal of Cham Link Fence (P-162-52) at six hundred and sixty-six DOLLARS and sixty-seven CENTS $ S 666.67 17 1 LS Temporary Cham Link Fence(P-162-5.3) at one thousand,six hundred DOLLARS and 0 CENTS s_ s 1,600.00 18 100 LF Ornamental Fence,(SS-P-162A-5.1) at eleven thousand,six hundred forty-nine DOLLARS and thirty-three _CENTS $ s 11,649.33 19 1 EA Ornamental Fence Gate-4 foot width(SS-P-1 62.A-5.2) at one thousand,four hundred and eighty-nine DOLLARS = and thirty-three CENTS s $1489.33 20 1 EA Ornamental Fence Gat.-,-30 foot width(SS-F-162A-5.4) at eleven thousand,two forty-eight DOLLARS and 0 CENTS $ $ 11,248.00 21 1 LS Basic Electrical Requirements(16010-5.01) at nine thousand,four thirty-seven DOLLARS r and seventy-eight CENTS $ s_2,437.78 22 1 LS Gate Controllers(16660-5.01) at twelve thousand,seven hundred and forty-fiveDOUARS and thirty-three C> vTs $ $ 12,745.33 23 1 LS Access Control and SeeuritySyst®s(16780-5.01) at twenty-one thousand,nine hundred and six DOLLARS and sixty-seven CENTS $ Is 21,906.67 TOTAL ADDITIVE NO 1 BID(EXHIBIT AREA 3) TOTAL OF ITEMS 15 THROUGH 23= S _7- Z7 Co- 3 at seventy-one thousand,two hundred and seventy-six DOSS and forty-forty - CENTS _ TOTAL BASE BED+ADDITIVE NO1 s 523x2/0 -7 i at five hundred and twenty-three thousand,two hundred and ten DOLLARS and seventy CENTS CnY OFFMT VAMM SrANX4RD CONSCRWMCIfWSC3ECATMKDOCUMENM Cay Pmisct bb: 00 42 43-8 9�IapmvA4od . aup 1 ADDITIVE NO 2 BID(EXHIBIT AREA 4) 00 4243 PTr)P12 rYZ AT •� �}9 .......... y��yA� }}���� Li• ..............�C!:i:?•??:w.:....... .......uNt•:::...::....::.??.i-i•:;-.;......,p........::.::}:.:}:•?:i i•}.�::v:.:iitiiiii•}:iii{•:{LiJ:i::::::?:•?:i-:•...........:.:.•.•. 1 24 1 LS Constriction and Traffic Cartrol (NS-0-460-5.1) at four hundred and sixty-six DOLLARS and sixty-seven CENTS 3 S_466.67 1 25 1 LS Removal of Chain Link Fence (P-162-5.2) at nine hundred and sixty-six DOLLARS m and sixty-seven CENTS s s-266.67 26 1 LS TemporaryCham Lmk Force(P-162-53) ,tone thousand,six hundred DOLLARS and 0 1 CENTS s 13 1,600.00 27 145 LF Ornamental Fence(SS-P-162A-5.1) at fifteen thousand,five hundred and eighty-sev[5bLLARS andseventy-seven CENTS s $15,587.77 28 1 EA Ornamental Fence Gate-24 foot(SS-P-162A-5.2) ateight thousand,nine hundred and eight DOLLARS land 0 CENTS s $ 8,908.00 29 1 LS Removal of Ornamental Fence (SS-P-162A-5.4) at one thousand,three hundred and thirty-three DOLLARS and thirty-three CENTS 3 $ 1,333.33_ 30 1 ILS Gatc Controllers(16660-5.01) attwelve,five hundred and seventy-eight DOLLARS and sixty-seven CENTS $ S12,578.67 ® 31 1 LS Basic Electrical Requirements(16010-5.01) at seventeen thousand,two hundred and sixty-fiyfbLLAM and fifty-six CENTS s s 17265.56 32 1 LS Access Control and Security Systems(16780-5.01) at twenty one thousand,nine hundred and six DOLLARS Ind sixty-seven $ s 21.906.67 U TOTAL ADDITIVE NO 2 BID(EXHIBIT AREA 4) TOTAL OF MEMS 24 THROUGH 32= $ •y`z T 1 at eighty thousand,six hundred and thirteen DOLLARS and thirty-three QTS S2y,I TOTAL BASE BID+ADDITIVE NO 1&2 s 1 at six hundred and twelve thousand,eight hundred and twenty-four DOU" and three CENTS 1 1 1 1 1 MY osacarr WORM srnrmARDCONSMvcrMsrecncA77wDocumExrs 9ear3yImpM%ftM " 1 cmrmpalb:tats 004243-9 AMaweAkpon 00 43 37 VENDOR COMPLIANCE TO STATE LAW SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that,in order to be awarded a contract as low bidder,nonresident bidders(out-Cd'-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at,an amount 'lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresidents principal place of business Is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of � ;, ,our principal place of business, are required to be � tiL; percent lower than resident bidders by State Law. A copy of the statute Is attached. Nonresident bidders in the State of \ ti ',our principal plane of business, are not required to underbid resident bidders. B.The pdndpal place of business of company or our parent company or majority owner is In the State of Texas. BIDDER: Company Name Here By: Inted Name H e D Cul 11, Jr. Commercial Fence Co. Inc. Address Here PO Box 1354 Address Here or Space Pasadena, TX. 77501 Si na re City,State Zip Code Here Title:Title Here President Date: 12/19/12 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form RevleW 20110627 irtp_20921438748.7d9 OD 4512 8 D FORM SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s)listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date #REF! Company Name Here or space Date Here or space #REF! Company Name Here or space Date Here or space #REF! Company Name Here or space Date Here or space #REF! Company Name Here or space Date Here or space s The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are 1Wdy prequalded for the work types listed. F BIDDER: Company Name Here �mmp�G'� ante Name H Address Here 120(6ox 35 Address Here or Space ??. _ 7751)( (Signature) City,State Zip Code Here �a.� Title: Title Here ��Q511 03-05-13A10 :29 CFMD Date: END OF SECTION R 0� ■ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Forth Revised 20120120 00 4100 00 43 13 00 42 4300 43 37 00 45 12_00 35 13-Gid Proposal Workbook.bs sl Schneider 'Electric December 12,2012 Jacobs Engineering Group,Inc Attn:Jeff Peterman Discipline Lead/Trans Program,FW RE:Alliance Airport Security Upgrade Fence and Gates Specification 16780-2 Part 1.06 Quality Assurance Dear Mr. Peterman, Please see the following specification compliance matrix outlining the credentials of Schneider Electric to adequately perform the specified security scope of work.Also attached are the required certifications for each system as well as a reference list of some of the airport projects that Schneider Electric has completed. A. Manufacturer 1. Minimum of 10 years experience in providing access control components for projects of similar nature and complexity. 1. Although this statement applies to the manufacturer,Schneider Electric(formerly TAC)has been providing security solutions for over 20 years.All manufacturers/products being provided are per the specification. 2. Maintain a 24-hour toll free telephone assistance line for installing dealer support. 1. Although this statement applies to the manufacturer,Schneider Electric provides a 24hr service department including a local dispatch center.All manufacturers/products being provided are .per the specification. B. Installer 1. The contractor shall obtain the design integration services of a security contractor.The security contractor shall provide design and shop drawings indicating all equipment locations,quantities, interconnecting cabling; equipment mounting details and programming required to provide a fully operational system that is fully integrated with the existing systems presently in use at the site. 1. Fully Comply 2. The security contractor shall have a minimum of 5 years experience as an authorized dealer installing integrated DSX Access Control Systems,Pelco CCTV Systems,Aiphone Intercom Systems,and KBC Wireless Network Systems 1. Fully Comply.Please reference the attached letters from each manufacturer. 3. The security contractor shall have a minimum staff of five factory trained technicians with certifications on DSX Access Control,Pelco IP Cameras, Aiphone IP Intercom,and KBC Wireless systems prior to bidding this project. 1. Fully Comply. Of the manufacturers listed for this project,the only one that requires formal certification training is DSX Access Control.Attached are certificates for this system. Additionally, Schneider Electric(formerly TAC)has an additional 10 Schneider Electric technicians that all have many years of experience with the systems required on this project. 4. The security contractor shall maintain on staff a Microsoft Certified Professional with a minimum of five years experience servicing IP Based Access Control,IP Cameras, and IP Intercom integrated software systems. 1. Fully Comply.Please reference the attached certificate. 5. The security contractor shall have a base service operations within 100 miles of installation site and be able to provide same day response if required. 1. Fully Comply. Our headquarters for the United States is located at 1650 W.Crosby Rd in Carrollton which is roughly 35 miles from the airport. 6. The security contractor shall provide in inventory a minimum of one specified spare PTZ camera and one specified wireless transmitter/receiver to insure minimum downtime during warranty period. 1. Fully Comply. 7. The security contractor shall provide a performance and bid bond. 1. Fully Comply. Please let me know if there are any further questions. Respectfully, Shawn Hanrahan Account Manager 972-323-3008 Shawn.Hanrahan@schneider-electric.com. Schneider Electric Partial Reference List of Airport Clients 1. Boston Logan Airport—Boston, MA 2. San Angelo Regional Airport— San Angelo, Tx 3. Palm Beach International Airport—Palm Beach, FL 4. Cleveland Hopkins Airport—Cleveland, OH 5. Buffalo International Airport—Buffalo, NY 6. Niagara Frontier—Buffalo, NY 7. Burlington Airport—Burlington, VT 8. Tucson Airport— Tucson, AZ 9. Grand Rapids Airport— Grand Rapids, MI l O.Asheville Regional Airport Authority—Asheville,NC I l.Battlecreek International Airport—Kalamazoo, MI 12.Chattanooga Metropolitan Airport—Chattanooga, TN 13.Owen Roberts Airport—Cayman Islands 14.Delta Airlines —Atlanta, GA 15.United Airlines —Denver, CO 16.Greenville Spartanburg International Airport - Greer, SC 17.San Juan Luis Munoz Marin International Airport— San Juan, PR 18.Shreveport Regional Airport— Shreveport, LA 19.Memphis Airport—Memphis, TN 20.Philadelphia.Airport—Philadelphia, PN 21.Kuala Lumpur International Airport—Malaysia UL DSX ACCESS SYSTEMS, INC. The Security Professionals'First Choice November 11,2010 To Whom It May Concern: This letter is to certify that Access Technology Systems, located in Carrollton, Texas is an authorized and factory trained dealer in good standing for DSX Access Systems. As such, Access Technology Systems has committed to maintaining a fully trained sales and technical staff and will receive the full support and resources that DSX has to offer. Access Technology Systems has been a DSX Access Systems dealer since 2003. Access Technology Systems is highly qualified to design, sell, install and service the complete line of card access and ID badging products from DSX Access Systems, and has successfully completed many large and complex projects. Access Technology Systems staff has demonstrated their exceptional capabilities by selling and installing systems for many satisfied customers over the years. They have proven themselves extremely competent in their performance. DSX Access Systems is pleased to have Access Technology Systems as a business partner, and we are confident that any customer will be eminently pleased with the quality of work and professionalism exhibited by their staff. If anyone should have any questions regarding this subject please call my office at 888- 419-8353 extension 142. S' erely, Scott Bennett National Sales Manager 10731 Rockwall Road• Dallas,Texas 75238-1219 24 Hour No.(888)419-8353•(214)553-6140• Fax (214) 553-6147 www.dsxinc.com ��; Timarron Partners %V% Professional. Experienced. Dedicated. 901 W.Wall Street•Suite 106•Grapevine.TX 76051 i Monday, September 17, 2012 h TO WHOM IT MAY CONCERN: As the designated sales representatives for Aiphone, Inc., we would like to confirm that Schneider Electric is an authorized Aiphone dealer. Please contact us with any questions regarding Aiphone, Inc. or Schneider Electric. h 7 Best Regards, TIMARRON PARTNERS, INC. b h 1 Toll Free:888-832-2995 •URL:wwwApireps.com•Fax:817-416-7337 A data delivered September 18, 2012 Re: Letter of Authorization To Whom It May Concern: This letter hereby certifies and confirms Schneider Electric as an authorized reseller for KBC Networks fiber optic, wireless and network transmission solutions. As an authorized reseller, Schneider Electric may promote, resell and distribute KBC products in accordance with out standard commercial policies. KBC Networks shall provide support as necessary to Schneider Electric in accordance with our standard customer support practices. KBC Networks is a manufacturer of high performance products specializing in video, audio, telephony, Ethernet, industrial bus communication, port switching, data communication, and network integration. Our products are remarkable for their unique construction, flexible design and consistent quality.. This allows us to deliver customers a product tailored to their every specific need. We look forward to serving the needs of our customers and welcome the opportunity to demonstrate the proven reliability and performance of KBC Networks products. We trust that Schneider Electric will prove to be a valuable partner in our present and future endeavors to satisfy our customers' needs. Please feel free to contact us at any time with any questions or concerns. Sincerely AVAoO AVOle Werner Klampfl Director, Systems Integration KBC Networks Ltd. 25699 Atlantic Ocean Drive Suite B3, Lake Forest CA 92630 USA www.kbcnetwork-s.com CROCKETf SALES PANY b h To whom it may concern, Please be advised, TAC Americas, 1650 W.Cosby Rd.,Carrollton TX 75005 is a Pelco authorized dealer. The above TAC office has personnel that are certified in Digital Sentry systems.This entitles them to purchase,install and service all Digital Sentry products. Please feet free to contact me with any questions or conmrns regarding this matter. Sincerely, Graha i J Zdcturers Repi esentative Pelco J 4303 West Lovers lane,Dallas,TX 75209 214.3503377 1 fax 214.350.3227 1 cell 214.454.7176 graham@crodcettsales.com I www.Qockettsales.com Manufacturers Representatives— Texas/Oldahoma/Loulslana/Mississippi/Arkansas/W.Tennessee tx cu rte"• � �� - -�q'•�' r .. � Q v+ !■ CU CD w CD L- N (� ® p 4! CU N ` c`a CL s . Wit; •;z- _ � l T - .: t o; - � � 1 Com_ r <.X,,,c„may 1 qs RE+f� }Srcu cu Co cn cu ,Jed., J � 1 ;,Yy 2�.-: • �iY�ai-L A 1 • cc z co CD t�e 1 • • CD 0 > s."�� �� ice::,'. • 1 - lkyx icu CD CD • 1 tLZ pp � a i c �O cu co ca o d y p cu N o 7p y O ts L. � 6pE - L O O } W U Ileof .CL D }• t Co - H •— N cn �. ON k a r ,,/^� � n co s .£ cn 4? to d�`7j ;4 r X34 V1 co •o N �-, CJ) ° J _ m L) CO N cu CH -C� - T r- N G r� o E L � C co 0 LL 0 E V +j L 0 o .CL V Y V Q C N . L- CL CL c �' cn = -r 2 0 CL C ) o er CU W .0 +._ye;•�:z=�' '�'Y:c=sY;cam •CU � N 4­0 co .. cu — O Co o co 0 P_k [CUL: ' a C �. N 'L CO a+ 'L td CU a) CU �► } toCo O " F , y `Q t o $<y ® ,v �' yC:fi "s.'rrS.r„ �2 �i �.` ��,t��.P�/r�."� °�`�'�,��'�+!"1:Yrr�c,`t�'��-y 't�•1�.7�'i�srS, .a"k�'��, ��^.r.m"'Yr,, 1� 'r m�'t��- t1��c',.. -r r .*n slur� ?Trc+n7 .. ..'7r• ecn t rLy o. rM+ '�'1t' rtl�,.,al.,�°�t`�' S .., I y�s�_�+1,p.r`Jt�" �, r�jlr, t���?�;r^ i3 � ��,,.I�•1/ - ''Y�' g y` i�: '%;, �'�;�E`�.,��+;��� �.��.��*'�Y•��.���..�r�e�����?�+��'t��,��t� .� �`„�� V�U+'t/,t iii: t T fi�� i _L?_- _�<.:•-n�_%4 _G ,. -�_��� .�-`'rr.. <ns ._ec.�.� �«y"�-. z'tne<.�'+ •i° �,'Yr ^a v NV ' .. �S• Cal co_ r ISM ' Jri c NIM, •� qr Qom, � �,�.� c•�(tt�, ` iK�V 1 1 { - i ,,: ,-. _ , _ _ _ s w -. s 3 _ - _. - _ -IVI _ �- fir,.. '� I �4 , { a t c .,. i11 - r r� ' ' a,. _ x,, 4 ?.'. ��_"f moi/ _ F '. 'Y Y - .}.. } �� f { ■■ �a z >r a; V ' � } h ��. . ` .,�, �, P g 1 X17 ffi , ��r �' 1 4" a•.is, -+•.,,y,7 y: a nom`�ll1. q ,w,� }z v e _ _ ,JU .1. �. '. 5ns r a -Eke$ sem- -3 [ '�W d w �'„`. ":.�, Y P t y{:. k - ty .� ,fir k�" -r.„w' [. 5#.„^ '. 1. .' - fi -c .. ➢'z_ Y" , x' " 7e' -� '` ' ?- s � acs: � x , •�r # .Xr. t^ fv .. A r y i£ _ ,_i� � ' p, � ~F 71A "I -. '�„. 1 'i.{ w -�r f' ss"c,V i �' =,..fit' ',1 �c._h �y Ky r = - -t��­_�L�_,.,.,-,,-,'--�—, . 'a _,. � ." .e t• a t•P s' r ... - �. � '1-'Maw } ' N, 1.�� � :v'.. S _ *�� Q) ~ , y. a -._:...". -may . i �,,,�� ­. .� � ��I I- { ,T*, F'- � ��;�'t. . L. .. . I I I I I.,- L: I � ,.—", "-,, -� * - -,- S�!,,_-�E} '� ,,,�, - ,.,,� t t % }, p -'�L:�-'_"�',­�'_'_ _��_,�'.'_`,,----,r,..L, .." �'� .... ,,� _ �_, -, , .� �,1 .__ - I _',*' ,_',,,,­�- "' --m�-, ,.�, -� '' ���,,,,,� L..�"�L,��L ,-�. , fup�-,�`trcl-,,;-,�t:,',�',-�­'-�;­',�­,�� _","",, , .-_ _�:-�v . -':, 2�E,_-�,%.--, -:J -—'e" .� _._. - , - .-1 I I I, ,­-,�'_,:­�k� �..,,��,':�, , �: �-L'll%L-�,-,W-.,�A:: - �;.�u,�,,,*� - - -­''",,,,�..', ,�', �,.,',�':�' ,­,� � , � , "..-1��IL' �'­"-L '��" ll�l ,` .,-,�,-,,.-4_�,'-��"-ty��.:L'­­,�;L'L�' ­';---,---­'­,�' V,�, .,, '_' ...��:, y��,,,��Z!�.'-,"'__-_.'_ S �:.� V�,: -,- _,_ .Y k.j'. ,,. __ ,_ I. �.i. ��Z'��'­, ,--'�j'L�_`i:' �,_'_j�_,'�,'_�;�­ � .......ll�l L- .� _,?�L -.4; ___�, '�" ' -.7o '� _; --:!z',,.':, ,�'�'L_� ,.,% _�,,,�" _ _, ,. -- ,- ,_,", ", , .. , , �, ." , ..,I L __7 � _�t, �.�__1 . _._ ., ..,� wv L 'L_" -1-lf��.1 7 '' �.��, z�­ - :� _ I .,�,.�,��:��,�,�&:��-:�_� ,__,_,�_�,.,,",* -,, - _­ *, L,' , - ,�,-L,,.��--, — ,* -, ----- � y1i(yl -!�.,.:z ' ,�:'., ,�-���, t�, . �� .., �_ , ,,;`�'�-�­Z_:-.",_�.'1�� „,,�,,, - , ` .' �, ,.:,- �� , - ��L'�-,'4'- --� ,, , ,.,'!7, �,,”_,,�,.,,�,-,.��,,!",,* 7"�, " L �� `,­' -`: , , , f '"I�'L'­�.,­',,,�.,I I,�.L,-.,�,,",�,-.'.�.� L �.r�,:�,,. � .-1 I I - l ;,,-,"' ,- . , ,- ,., ,_,�,.�*:`L-L'-'L I.:��,�l �- - _ , , - .=­, , ,,-, S"I ,,I_. " _�,_, �%�t � --,�Z���T, �._,:�!,-:,-,�,tt�&�,,- _Z� - ,, ,. . -�. ,�L.�,',,.+` -;- � �:� , . - ,, .,. , _ ,.. ` ' L J,L'� _',... L-�" .- !, , . ' - -- - - *- * ��, _.;, 7 L. �! �^ ` "" i .. V y. - _ _ _" a � ­� L,< r.° l� J r L _. .... —Q - 'L, ,�,�, .,, ,, , p , %�,'::.�t ,�w� t / LL LL LLLL J { — . 4 r :.'w•.!�•.F-�+__. _ •"'•�.u2•ws-wwyoa•F .sYfi^w•f�M�.�71L•bw•!,r. +mht .rii.w .u'.hr.a=r ,...' 003513 BID FORM SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder,offeror,or respondent(hereinafter also referred to as"you'd to a City of Fort Worth (also referred to as"City's procurement are required to complete Conflict of Interest Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure Statement(the attached CIS Form)below pursuant to state law.This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work.The referenced forms may also be downloaded from the website links provided below. hytytnoitwww.etth icy.state.tx.us/form-,'CIQ.Pdf httpj!-yyy,ethics.stateAx.usdormp./CI S.QQf CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Company Name Here By: Printed me Here Address Here Signature: Address Here or Space City,State Zip Code Here Title: Title Here END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 Vnp 25921438749.xis 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pagel of 2 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 1978. Contractor further certifies that,pursuant to Texas Labor Code, Section 406.096(b),as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: rllrv►rh 'Li'e.•Q Ft.�t ce Co, -�-�L� By: i)OL v l U( &1 -&9 Tr ompanyse Pri TD BOX 135-q Signatur . Address Ct-&OLd,e-v�. I ?750 Title: fresr'c g,,,.-, - City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME,the undersigned a thority,on this day personally appeared C� r ,known to me to be the person whose name is subscribed to the forgoing instrument,and acknowledged to me that he/she executed the same as the act and deed of q►1 Ciia-y 'E for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 4+J% day of 1201,a.6 PAMELA POOLE Notary Public otary Public in an for the Stat of Texas ff STATE OF TERAS �l ! ` My Comm F Ko February 6.2017 ENb OF SECTION CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 Revised hily 1,2011 004526-2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 2 of 2 INTENTIONALLY LEFT BLANK -XI sahl�'�7�• MP as N4 gra 1 CITY OF FORT WORTH Security Upgrade STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City No:1978 +� Revised July 1,2011 FORT WORTH City of Fort worth Disadvantaged Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY ff the total dollar value of the contract is$25,000 or more,the DBE goal is applicable. If the total dollar value of the contract is less than$25,000,the DBE goal is notapplicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Disadvantage Business Enterprises (DBE)in the procurement of all goods and services to the City on a contractual basis. The objective of the ' Policy is to increase the use of DBE firms to a level comparable to the availability of DBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Disadvantage Business Enterprise Program apply to this bid. DBE PROJECT GOALS The City's DBE goal on this project is 25%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's DBE program by either of the following: 1. Meet or exceed the above stated DBE goal,or; 2. Good Faith Effort documentation,or; . 3. Waiver documentation,or, 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the DBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be ■ evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. 1. Subcontractor Utilization Form,if received by 5:00 p.m., five (5) City business days after the bid goal is met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form,if participation is opening date, exclusive of the bid opening date. less than stated goal: 3. Good Faith Effort Form, if no received by 5:00 p.m., five (5) City business days after the bid participation.- opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form: received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. 5. Joint Venture Form,if goal is met or received by 5:00 p.m., five (5) City business days after the bid exceeded: opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S DBE PROGRAM,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions,please contact the M/WBE Office at(817)392-6104. Rev. 11/11/05 Intentionally Left Blank 1 Rev. 11/11/05 J <M m 4d A a o 3: t .rs a•o�5 $ c r Q < a z cv E � Ela e� QLuh C C A a a Q� A FE CL m — r CSU m m do ❑ C CL .SCL0 'p 9l� A 8A � .. tl�! ILS LLI m C m C = c Com« G �9a r OE 'a v� = O am cgoo co o � � 8 a � c � �a= c c E C� AnmmO mac N ��c d 'A OA2 0-3 r A vl-Sato 3A'$U. lag ,� s v � o_ c F- co _ mares � c � C as16 r. c +- oof o J O �E3 m� EJ1E c � � c LZ jL O "" oc. ' E � oma � aQg a LL aU. aciodILI a d'c V .. .. m IMS 4 a A $� Of m a C m oma S .- 1E E IL oLe LU m c0 u � m �_� E L1 Z 1i� m O. � A �O" � CiF �Ocm .a a Z � mm � � 0A �� H � u ,ca aIE $ oams' c L d a a� o 0 Z N tl) c 0 IL i7 $ of 0=t Z � I be be r Y m m W=a $ may $ m $ x $ aaw m is E w m m4NO), E c04 apeI vis �r- I� VZ W kL n AID F a N � a o � —~' o o� A ccz LL v m LL o ® � IL m 3 � 0 o LU ul p w c� m V A S �r OW i la , m o-j V3 >0 cl�o ❑ oIH (i . , (IS + i� 0 :-� CWT) r-r a 0 a a H = N �- — 40 r m i c - w .. c — � � e .- ca E •v o •• � cE o •• � c •o oE� cE oye � c d m •o .c Eoeo •o r '� Eom •o zmEo •o tmE � f U z a aaLwvz a ar� wVz a aaLwv � a (L r 0 0 T Z c Z ro N o m CL 0 log a � � � E m .`SI � I i l l I I I I 'co w � g f "ae F- 00 o o � ui032 cc '510 tr m ' $ mgr .5 � yr a z a &F c m c o PONs a 0 Z c E aE 4 J � o Q ITyz z ^ LL. ~ ~ _ �' O r Zcr o o v `'d o U.O � m m � a LL. W O r"E ~ oc } to 0 h- U. 9 VO " Eg o Me p 0 � LL LL 0 0 w � o = U) � L aI O=. 0 C . ` r CL u)IL Sr 0 Q T' cc_ ti c a� SCI . W 3 a _ z 5 IL ILm � � � p � _ � m CI df .� � CIC � l-•' � V f`, '� ~ px of -.00 a aUiWUz a dLLLW0 � � ATTACHMENT 113 Page 1 of 1 City of Fort Worth Disadvantage Business Enterprise Specifications Prime Contractor Waiver k Ce r., , 1^4'� tJda rc Prime Company Name Project Name ta.1zo )).>- IRIS Bid Opening Date Project Number If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. I`ailur to dompiete;this f min Its en irety aid be received b.the Manariing t)ei b 6ht on or efore UQ —ba 1§1 QU kgalgft dfts r exclusive of tho bid opening date, Will M$Ult n: titsbid'beirt C4#te d led 11 Olga n jv to bit!`speCiiiC�tiOlts. Will you perform this entire contract without subcontractors? Yes ✓No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this Is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? Yes V--'No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this Is your normal business practice and provide an Inventory profile of your business. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including DBE(s) on this contract, the payment therefore and any proposed changes to the original DBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less ne year. orized Signature Printed Signature Vi$,-..L,A. bCV.,d Title Contact Name (If different) • Gow.w.tr-�.�1 S=-V.a.e- 11L43 -8-1y Company Name Ph11one Number Fax Number r �£t-53 We&J5"L.- J-3yVV,i'& .r-L0- [ow.V^ e- - / t)w Address Email Address ` Y -1-1 So i I ( % I I I z City/State/Zip Date Rev.5130/03 ATTACHMENT 1C Page 1 of 4 FORT WORTH City of Fort Worth Disadvantage Business Enterprise GOOD FAITH EFFORT C o r.,w..e�c..`4,1 1=Lcu�ce. 11-�10l►,�, Prime Company Name ` - I Bid Date ���Dort-fi /T•�or XI�Jn V 1�1TGG�s I 'l 7g - Project Name �— Project Number If you have failed to secure DBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the DBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF FIRMS)which will be used in the completion of this project, regardless of whether it is to be provided by a DBE or non-DBE. On Combined Projects, list each subcontracting and or supplier opportunity through the 2"d tier. (Use additional sheets, if necessary) List of: S Subcontracting Opportunities List of: Supplier Opportunities � �L�-r►G a.� �(.Gc�-r-�c e.\ 2.) Obtain a current(not more than three(3)months old from the bid open date) list of DBE subcontractors and/or suppliers from the City's M/WBE Office. Rev.5/30/03 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than three (3) months old from the bid open date) list of DBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing t-"No 3.) Did you solicit bids from DBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes If yes, attach DBE mail listing to include name of firm and address and a dated _1,-,No copy of letter mailed. 4.) Did you solicit bids from DBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ✓Yes If yes, attach list to include name of DBE firm, aerson contacted, No phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide DBE name, date, time, fax number and documentation faxed. NOTE: If the list of DBEs for a particular subcontracting/supplier opportunity is ten or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of DBEs for a particular subcontracting/supplier opportunity is ten or more, the bidder must contact at least two-thirds of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential DBEs or information regarding the location of plans and specifications in order to assist the DBEs? Yes _filo 6.) Submit documentation if DBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the DBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in-camera access to a inspection of any relevant documentation by City personnel. Please use additional sheets, if necessary, and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection Rev.3/30/03 ATTACHMENT 1C Page 3 of 4 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain DBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the DBE(s) listed was/were contacted in good faith. It is understood that any DBE(s) listed in Attachment 1C will be 5Of ntacted he reasons for not using them will be verified by the City's M/WBE fic . ,c-a Cj �6:c � 1. Authorized Signature Printed Signature I-t b-►, s Title Contact Name and Title(if different) CC- a Company Name Phone Number Fax Number 2$33 wc3A- CA V^ CO%-^o,Address Email Email Address 1�a Sc•eke.-u ti -t -�5 o i l Z l ICf 1 ► Z City/State/Zip Date Rev_9/30/03 Joint Venture Page 1 of 4 CITY OF FORT WORTH JOINT VENTURE ELIGIBILITY FORM All questions must be answered;use"NA"if appEcable. Name of City project: aW aA 0' A joint venttae Ircrin mast be completed on RFP/Bid/Purchasing Number: 1.Joint venture information: Joint Venture Name Joint Venture Address (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture DBE firm Non-DBE firm name: name: Business Address: Business Address: y City,State,Zip: City,State,Zip: Telephone Facsimile E ail Telephone s ile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the DBE: Describe the scope of work of the non-DBE: J Rev.5/30/03 Joint Venture Page 2 of 4 3.What is the percentage of DBE_ p •ticipation on this joint venture that you wish to be counted toward meeting the project goal? �1 4.Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions,including equipment: Other applicable ownership interests: 6. Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating ---------------------------------------- b. Marketing and Sales ---------------------------------------------- C. Hiring and Firing of management personnel - --------------------------------------------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Disadvantage Business Enterprise Office will review your joint venture submission and will have final approval of the DBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's DBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's DBE Program. Rev.5/30/03 Joint Venture * Page 3 of 4 vim AFFIDAVIT ■ The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits,interviews with owners and examination of the books,records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. Name of DBE firm Name of non-DBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date r Notarization State of County of On this day of ,20 ,before me appeared and to me personally known and who,being duly sworn,did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public ■ signature Commission Expires (seal) Rev.5/30/03 Joint Venture Page 4 of 4 Intentionally Left Blank Rev.5/30/03 00 52 43-1 Agreement Pagel of4 1 SECTION 00 52 43 2 AGREEMENT 3 I THIS AGREEMENT,authorizecPJt 0 5-1 3 A 0 9 :5 8 S�Qe by and between the City of Forth 4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 5 ("City"), and Commercial Fence, Inc., authorized to do business in Texas, acting by and through 6 its duly authorized representative, ("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1.WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Security Improvements at Alliance Airport 16 Cin-Project#: 01978 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 77 days after the date when the 23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 24 3.3 Liquidated damages 25 Contractor recognizes that time is of the essence of this Agreement and that City will 26 suffer financial loss if the Work is not completed within the times specified in Paragraph 27 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 28 General Conditions. The Contractor also recognizes the delays, expense and difficulties 29 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 30 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 31 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 32 City Six Hundred Fifh7 and 110;400 Dollars ($650.00) for each day that expires after the 33 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 34 of Acceptance. CITY OF FORT WORTH Security Improrcment.c at.411iunc c Airport STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Proiccl#: 0197S Revised August 17,2012 005243-2 Agreement Page 2 of 4 36 Article 4. CONTRACT PRICE 37 City agrees to pay Contractor for performance of the Work in accordance with the Contract 38 Documents an amount in current funds of Six Hundred Three Thousand Eight Hundred Twenty- 39 Four and 12/100.......Dollars($603,824.12). 40 Article 5. CONTRACT DOCUMENTS 41 5.1 CONTENTS: 42 A. The Contract Documents which comprise the entire agreement between City and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Attachments to this Agreement: 46 a. Bid Form 47 1) Proposal Form 48 2) Vendor Compliance to State Law Non-Resident Bidder 49 3) Prequalification Statement 50 4) State and Federal documents(project specific) 51 b. Current Prevailing Wage Rate Table 52 c. Insurance ACORD Form(s) 53 d. Payment Bond 54 e. Performance Bond 55 f. Maintenance Bond 56 g. Power of Attorney for the Bonds 57 h. Worker's Compensation Affidavit 58 i. MBE and/or SBE Commitment Form 59 3. General Conditions. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued,become an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 ■ CITY OF FORT WORTH Security Improvements at Alliance Airport STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project#: 01978 Revised August 17.2012 005243-3 Agreement Page 3 of 4 75 Article 6.INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out of, or alleged to arise out of, the work and services to be performed 79 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 80 under this contract. This indemnification provision is specifically intended to operate 81 and be effective even if it is alleged or proven that all or some of the damages being 82 sought were caused, in whole or in part, by any act, omission or negligence of the city. 83 This indemnity provision is intended to include, without limitation, indemnity for 84 costs, expenses and legal fees incurred by the city in defending against such claims and 85 causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city,its officers, servants and employees,from and against any and all loss, damage 89 or destruction of property of the city, arising out of,or alleged to arise out of,the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indemnification 92 provision is specifically intended to operate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused, in whole or in part, 94 by any act,omission or negligence of the city. 95 96 Article 7.MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 99 have the meanings indicated in the General Conditions. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the City. 103 7.3 Successors and Assigns. 104 City and Contractor each binds itself, its partners, successors, assigns and legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon CITY and 111 CONTRACTOR. r 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH Security Improvements at Alliance Airport STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project#: 01978 Revised August 17,2012 00 52 43-4 Agreement Page 4 of 4 116 7.6 Other Provisions. 117 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 118 classified, promulgated and set out by the City, a copy of which is attached hereto and 119 made a part hereof the same as if it were copied verbatim herein. 120 7.7 Authority to Sign. 121 Contractor shall attach evidence of authority to sign Agreement, if other than duly 122 authorized signatory of the Contractor. 123 124 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 125 counterparts. 126 127 This Agreement is effective as of the last date signed by the Parties (`Effective Date"). 128 Contractor: City of Fort Worth / Fernando Costa By: Assistant City Manager Date /Z 000 Fa 9 Attest: o $Q t (Printed Name) City Secretary (Seal) �.�Cg 1 Title: °°t'e s/ n p °00000°00 7�a Address: ?D -bcx 135+ •O' Date: 3 1 S 3 City/State/Zip: f [,5A jtrVA , Tx I j,501 Approved as to Form and Legality: 03-05-13A10 :32 CFMD VW V�k• Date Assistant City Attorney 129 130 131 APPROVAL RECOMMENDED: 132 133 134 135 Bill i,relstead 136 OFFICIAL RECORD DIRECTOR, 137 CITY SECRETARY Fort ff orth.41,iution Svstenzs 138 FT. WORT",TX CITY OF FORT WORTH Security Improrc menls at.41hunce.4irport STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projec7#. 0197S Revised Aueu_,t 17,2012 0061 13-1 PERFORMANCE BOND Bond No.NTX2999 Page 1 oft 1 SECTION 00 61 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BV THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,Commercial Fence, Inc., known as"Principal'herein and s Merchants National Bonding, Inc. ,a corporate surety(sureties, if more than 9 one)duly authorized to do business in the State of Texas, known as"Surety"herein (whether one 10 or more),arc held and firmly bound unto the City of Fort Worth,a municipal corporation created 11 pursuant to the laws of Texas,known as"City"herein,in the penal sum of,Six Hundred Three 12 Thousand Eieht Hundred Twenty-Four and 12/100........... Dollars($603.824.12), lawful money 13 of the United States,to be paid in Fort Worth,Tarrant County,Texas for the payment of which 14 sum well and truly to be made,we bind ourselves,our heirs,executors, administrators, successors 15 and assigns,jointly and severally, firmly by these presents. 16 WHEREAS,the Principal has entered into a certain written contract with the City 17 awarded the day W 3-0 5-1 3 A 10 :5 5200 F M[which Contract is hereby referred to and 18 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment 19 labor and other accessories defined by law,in the prosecution of the Work, including any Change 20 Orders,as provided for in said Contract designated as Security improvements at Alliance Airport, 21 Cit4y Project#: 01978. 22 NOW,THEREFORE,the condition of this obligation is such that ifthe said Principal 23 shall faithfully perform it obligations under the Contract and shall in all respects duly and 24 faithfully perform the Work,including Change Orders,under the Contract,according to the plans, 25 specifications,and contract documents therein referred to,and as well during any period of 26 extension of the Contract that may be granted on the part of the City,then this obligation shall he 27 and become null and void,otherwise to remain in full force and effect. 28 PROVIDED FURTHER,that if any legal action be filed on this Bond, venue shall lie in 29 Tarrant County,Texas or the United States District Court for the Northern District of Texas.Fort 30 Worth Division. s CITY OF FORT WORTH Secwrin.Imprrnrmenr ar Affiance Airpnn STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Prnferi A: 019-A Roviood July 1,2011 ■ 0061 13-2 PERFORMANCE BOND Bond No.NTX2999 Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code,as amended, and all liabilities on this bond shall be determined in 3 accordance with the provlslons of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the day of 6 03-05-I D20 :55 CFMD 7 toll kPrci 8 Fnce, Inc 9 10 11 BY: 12 Signature I Al ICSI : ` 14 15 �� 16 (Principal)Secretary U U Name and Title 17 18 Address: PO Box 1354 • 19 Pasadena, TX 77501 20 21 v1 22 Witness as to Principe 23 SURETY: 24 Merchants National Bonding, Igc. 25 2100 Fleur Dr. -De,--Moines,IA 50321 26 27 BY: 54y1-.Zr 28 Signature u 29 30 Stacie Clark:_Attorney In at 3 l Name and Title 32 33 Address: 308 W. Parkwood Ave. 34 Ste. 104B 35 FriendswoodiTX 77546 36 37 W'gess qVIO surety Telephone Number: 281-990-6051 38 39 40 • 41 'Note: If signed by an officer of the Surety Company,there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address,both must be provided. 44 The date of the bond shal I not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH Semi&Improvewm at.4111once Airpod STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pmjed#. 01978 Rovisod July 1,2011 0061 14-1 PAYMENT BOND Bond No.PaX2999 Page 1 oft 1 SECTION 00 6114 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Commercial Fence. Inc., known as "Principal" herein, and 8 Merchants National Bonding. Inc. , a corporate surety 9 (sureties). duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corparation created pursuant to the taws of the State of Texas, known as "City" herein, in the 12 penal sum of Six Hundred Three Thousand Eight Hundred Twenty-Four and '12/100.......... 13 Dollars ($603,824.12), lawful money of the United States, to be paid in Fort Worth, Tarrant 14 County, Texas, for the payment of which sum well and truly be made, we bind ourselves, our 15 heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: _ 17 WHEREAS, Principal has entered into a certain written Contract -,vith City, awarded the 18 day of 03-05-13 A 1 1 : 1 1 ,QFOM D , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein,to furnish all materials,equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Security Improvements at Alliance Airport. City Project#01978. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code,as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 acwrdans-ti with the provisions of said statute. 30 CrrYOF FORT WOR T14 SecuriA.Imprnvementsat Alliance 4irlKoi STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS rmjed4i0l97n Revisod July 1.2011 0001 14-2 PAYMENT BOND Bond No.NTX2999 Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED I2 this instrument by duly authorized agents and officers on this the day of 3 03-05-13AI1,201 0.111) 4 PR P —`` C m ence, Inc ATTEST: BY: _ _ (� (1�,,� ,, r / Signature ft, Ol Uva 11�11�7( :fits Q4�k r1 yeG0.Qrtbi (Principai) Secreto V iName and Title Address: PO Box 1354 Gey, Pasadena. TX 77501 Witness as to Princ 1 SURETY: Merchants National Bonding. Inc. 2100 Fleur Dr. -Des Moines,IA 50321 ATTEST: BY: 57Gct. Signature �- Stacie Clark-Attorney In Facty_ (Surety)Secretary Name and Title Address: 308 W. Parkwood Ave. Ste. 1048 _ Y Friendswood,TX 77546 i ess 4to Surety Telephone Number: 281-990-6051 5 6 Note: if signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address,both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. I I END OF SECTION 12 CITY OF FORT WORTH &curtly hnpravemmb d.41Wwe Aoporl STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Prvjcd#01978 Revised July 1,2011