HomeMy WebLinkAboutContract 44335 CITY SECRETARY ) CONTRACT NO.,. r r FORTWORTH SPECIFICATIONS AND CONTRACT DOCUMENTS = SEWER MAIN REPLACEMENTS CONTRACT 2013A PROJECT NUMBERS: SEWER-P258-701170204683 CITY PROJECT NO. 02046 TPW/DOE NO. 6984 NOVEMBER 2012 BETSY PRICE THOMAS M. HIGGINS MAYOR CITY MANAGER S. FRANK CRUMB, P.E.-DIRECTOR WATER DEPARTMENT OF . 4 OFFICIAL RECORD �'•�$ f RECEIVED APR - 312 SECRETARY M&C - Council Agenda Page 1 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, March 05, 2013 REFERENCE NO.: C-26145 LOG NAME: 60SR2013A-CIRCLEC SUBJECT: Authorize Execution of a Contract with William J. Schultz Inc. d/b/a Circle "C" Construction Company in the Amount of$1,000,000.00 for Sewer Main Replacements, Contract 2013A, at Various Locations Throughout the City of Fort Worth, Provide for Project Costs and Contingencies for a Project Total in the Amount of $1,149,300.00 and Adopt Appropriation Ordinance (ALL COUNCIL DISTRICTS) ...._.. ....... RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$1,149,300.00 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$1,149,300.00; and 3. Authorize the execution of a contract with William J. Schultz Inc. d/b/a Circle "C" Construction Company in the amount of$1,000,000.00 for Sewer Main Replacements, Contract 2013A. DISCUSSION: The work to be performed under this contract consists of replacing and/or relocating sewer mains, services, and other pertinent construction required to provide sewer service to individual customers or developers. The bid documents included a stipulation that the total quantities listed may not reflect actual quantities and that the amount budgeted for the projects is $1,000,000.00. Final payments will be made based on actual measured quantities. The project was advertised in the Fort Worth Star-Telegram on November 29, 2012 and December 6, 2012. On December 27, 2012 the following bids were received: —1i J� BIDDERS BID AMOUNT TIME OF CONTRACT http://apps.cfwnet.org/ecouncil/pn*ntmc.asp?id=18087&print=true&DocType=Print 3/5/2013 M&C - Council Agenda Page 2 of 3 r William J. Schultz Inc. dba Circle "C" Const. $1,561,872.50 365 Calendar Days Co. Conatser Construction TX, LP $1,915,497.50 Arc Contracting Services, LLC $2,665,597.50 Atkins Bros. $2,920,972.50 M/WBE Office: William J. Schultz Inc. d/b/a Circle "C"Construction Company is in compliance with the City's BDE Ordinance by committing to 13 percent MBE participation and documenting good faith effort. William J. Schultz Inc. d/b/a Circle"C" Construction Company identified several subcontracting and supplier opportunities. However,the WBEs contacted in the areas identified did not submit the lowest bids. The City's goal for this project is 15 percent. In addition to the construction cost, a $30,000.00 contingency is provided for possible change orders; and $119,300.00 is required for design, real property acquisitions, design survey, construction staking, material testing and as-built mapping. This project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and the adoption of the attached appropriation ordinance,funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers 182)P258 476045 7011702046ZZ $1,149,300.00 3)P258 541200 701170204683 $1,000,000.00 2)P258 511010 701170204630 $30.000.00 1)PE45 538040 0709020 $1.149.300.00 2) P258 541100 701170204641 $5,000.00 2)P258 531350 701170204642 $5,000.00 2)P258 531200 701170204651 $5,000.00 2)P258 531350 701170204651 $3,000.00 2) P258 531200 701170204652 $5,000.00 2)P258 531350 701170204652 $10.000.00 2)P258 531350 701170204653 $5Q00.00 2)P258 531350 701170204673 $2,000.00 2)P258 511010 701170204680 $5,000.00 2) P258 533010 701170204681 $300.00 2)P258 533030 701170204681 $1,000.00 2)P258 541200 701170204683 $1.030.000.00 2)P258 531200 701170204684 $7,000.00 2)P258 531350 701170204684 $2,000.00 2)P258 531350 701170204685 $30.000.00 http://apps.cfwnet.org/ecouncil/printinc.asp?id=18087&print=true&DocType=Print 3/5/2013 M&C - Council Agenda Page 3 of 3 2)P258 531350 701170204691 $1,000.00 2)P258 531350 701170204692 $1,000.00 2)P258 531350 701170204693 $1,000.00 2)P258 531350 701170204694 $1,000.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8207) Additional Information Contact: Adolfo Lopez (7829) ATTACHMENTS 1. 60SR2013A-CIRCLEC AO13.doc (Public) 2. 60SR2013A-CIRCLEC COMPLIANCE.pdf (CFW Intemal) 3. SOS R2013A-CIRCLEC FAR.pdf (CFW Intemal) 4. PE45-538040-0709020.docx (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=18087&print=true&DocType=Print 3/5/2013 FORTWORTH SEWER MAIN REPLACEMENTS CONTRACT "2013A" "MSR2013A" PROJECT NUMBER: P258-7011702046 D.O.E. NO. 6984 ADDENDUM I Release Date: December 17, 2012 Information to Bidders: 1. Replace MWBE documents contained within the Specifications and Contract Documents with the attached MBE documents, per the Business Diversity Enterprise Ordinance 20020-12-2011. Please acknowledge receipt of the Addendum in the bid proposal and on the outside of the sealed envelope. S. Frank Crumb, P.E. Receipt Acknowledged: Director ter Department By: . J7-Deeter, E. Engineering Services WATER DEPARTMENT ENGINEERING AND FISCAL SERVICES THE CM OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAX 817-392-8195 0 Printed on recycled paper FORT WORTH City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000,then a MBE subcontracting goal may be applicable. If the total dollar value of the contract is$50,000 or less,then an MBE subcontracting goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. MBE PROJECT GOALS The City's MBE goal on this project is__L5_% of the total bid(Base bid applies to Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established for this project,then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no MBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at(817)212.2674. Rev. 5/30/12 ATTACHMENT IA Page 1 of 4 FORT WORTH City of Fort Worth MBE Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: M/W/DBE NON-M//WDBE _ BID DATE City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER % Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to its supplier is considered 2nd tier ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority rt business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks P from non-MBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev.5/30/12 FORTWORTH ATTACHMENT 1A Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firm's SBE certification if they have not previously registered with the City's M/WBE Office,which may be contacted for verification. Please not that only certified MBEs will be counted to meet an MBE goal. Attach N NCTRCA Certificate ° SUBCONTRACTOR/SUPPLIER T n Detail Detail Company Name i Subcontracting Supplies Dollar Amount Address e M W S M Work Purchased Telephone/Fax r B B B B E E E E I' ❑❑ ❑ E f ❑ ❑ r ❑ ❑ ❑ ❑ h ❑ ❑ Rev.5/30!12 FoR�Wx ATTACHMENT 1A Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. Please list MBE firm's first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE,please attach a copy of the firms SBE certification if they have not previously registered with the City's MANBE Office which may be contacted for verification. Please note that only certified MBEs will be counted to meet an MBE goal. Attach N NCTRCA Certificate 0 SUBCONTRACTOR/SUPPLIER T n Detail Detail Company Name I Subcontracting Supplies Address e M w S M Work Purchased Dollar Amount Telephone/Fax r B B B B E E E E ® 0 Eli i Rev.5/30/12 ATTACHMENT IA FORT WORTH Page a of a Total Dollar Amount of MBE Subcontractors/Suppliers $ Total Dollar Amount of Non-MBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval o Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Authorized Signature Printed Signature Tile Contact NameMitle(if different) r Company Name Telephone and/or Fax Address E-mail Address r Citylstate op [fate Rev.5/30/12 ATTACHMENT 1C Page 1 of 3 FORT WORTH City of Fort Worth MBE Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: M/W/DBE NON-M//WDBE BID DATE City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER % If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m.five(5) City business days after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets,if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev.5/30/12 ATTACHMENT1C Page 2 of 3 2.) Obtain a current(not more than two(2)months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. Yes Date of Listing [a-Yes 3.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail,exclusive of the day the bids are opened? El Yes (If yes,attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) No 4.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (If yes,attach list to include name of MBE firm, ep rson contacted,phone number and date and time of contact) No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, ' at least ten calendar days prior to bid opening by facsimile(fax), exclusive of the day the bids are opened? , Yes (If yes,attach list to include name of MBE firm,fax number and date and time of contact In addition,if the fax is returned as undeliverable,then that"undeliverable confirmation"received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or"undeliverable confirmation" documentation may render the GFE non-responsive.) No 6.) Did you solicit bids from MBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email,exclusive of the day the bids are opened? _[ayes (if yes,attach email confirmation to include name of MBE firm,date and time.In addition,if an email is returned as undeliverable,then that"undeliverable message"receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or"undeliverable message"documentation may render the =No GFE non-responsive.) NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method i must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? Yes RNo 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? Yes No Rev.5/30112 ATTACHMENT 1C Page 3 of 3 9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? II Yes (If yes,attach all copies of quotations.) No 10.) Was the contact information on any of the listings not valid? Yes (If yes,attach the information that was not valid in order for the MANBE Office to address the corrections needed.) __ JNo 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets,if necessary, and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of Rev.5130112 ATTACHMENT 1C Page 4 of 3 contract and may result in a determination of an irresponsible offeror and debarment from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the MBE(s) listed wastwere contacted in good faith. It is understood that any MBEs) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Printed Signature Title Contact Name and Title(if different) Company Name Phone Number Fax Number Address Email Address City/State/Zip Date Rev.5/30/12 ATTACHMENT 1 B FORT WORTH Page 1 of 1 City of Fort Worth Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: M/ /DBE NON-M/04DBE BID DATE City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO,then you must complete ATTACHMENT 1 C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before 5:00 p.m.,five(5)City business days after bid opening,exclusive of the bid opening date,will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. Authorized Signature Printed Signature Title Contact Name(if different) Company Name Phone Number Fax Number Address Email Address City/StateiZip Date Rev.5/30/12 Joint Venture Page 1 of 3 FORT NORTH CITY OF FORT WORTH MBE Joint Venture EhLyibility Form All questions must be answered,use"N/A"if not applicable Name of City project: A joint venture fora must be completed on raph project RFP/Bid/Purchasing Number: 1.Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture MBE firm Non-MBE firm name: name: Business Address: Business Address: City,State,Zip: City,State,Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: Describe the scope of work of the non-MBE: �v.SI`3dl"1 Joint Venture Page 2 of 3 3.What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4.Attach a copy of the joint venture agreement. w 5.List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions,including equipment: Other applicable ownership interests: 6. Identify by name,race,sex and firm those individuals(with titles)who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amountsipercentages change from the originally approved information, then the participants must inform the City's MNVBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and M may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev.5/30/12 a f Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall - agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits,interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or-----willful misrepresentation of facts. --- ----- ------------- ------------------------------------------------------------------- Name of MBE firm Name of non-MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of ,20 ,before me appeared and to me personally known and who,being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public sigtswre Commission Expires (seat) Rev.5/30/12 SPECIAL CONTRACT DOCUMENTS FOR SEWER MAIN REPLACEMENTS CONTRACT 2013A PROJECT NUMBER(S): SEWER—P258-701170204683 CITY PROJECT No. 02046 TPW/DOE NO. 6984 THOMAS M. HIGGINS S. FRANK CRUMB CITY MANAGER DIRECTOR WATER DEPARTMENT ■ CITY OF FORT WORTH, TEXAS SEWER MAIN REPLACEMENTS CONTRA CT 2013A PROJECT NUMBERS: SEWER -P258-701170204683 CITY PROJECT No. 02046 TPWIDOE NO. 6984 S. FRANK CRUMB, P.E. DIRECTOR WATER DEPARTMENT 2012 APPROVED /Z ANDREW T.CRONBERG,P.E.,ASSISTANT DIRECT ATER DEPARTMENT APPROVED OA S bV �- 1 2 TONV SHO LA,P.F-,PR 0 GRA M MA NA GER, WATER DEPARTMENT RECOMMEND DATE 9 SHORT FORM NOTICE TO BIDDERS Sealed proposals for the following: FOR: SEWER MAIN REPLACEMENTS CONTRACT 2013A PROJECT NUMBER: SEWER—P258-701170204683 CITY PROJECT NO.02046 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST. FORT WORTH TX 75102-6311 will be received at the Purchasing Office until 1:30p.m.,December 27,2012 and then publicly opened and read aloud at 2:00p.m.in the Council Chambers.General Contract Documents and Specifications for this project will be available for pick-up on Thursday,November 29,2012 at the office of the Water Department,Design Services,927 Taylor Street,Fort Worth,Texas 76102. For additional information,please contact Adolfo Lopez,Project Manager,City of Fort Worth—Water Department at Telephone Number: (817)392-7829 or by email: adolfo.lopezCafortworthtexas.gov. Advertising Dates: November 29,2012 December 6,2012 COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: SEWER MAIN REPLACEMENTS CONTRACT 2013A PROJECT NUMBER: SEWER—P258-701170204683 CITY PROJECT NO. 02046 Addressed to: CITY OF FORT WORTH •� PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 will be received at the Purchasing Office until 1:30 p.m.,December 27,2012 and then publicly opened and read aloud at 2:00 p.m.in the Council Chambers.General Contract Documents and Specifications for this project maybe obtained in the office of the Water Department,Design,services,927 Taylor St.,Fort Worth,Texas 76102. These documents contain additional information for prospective bidders. NOTICES All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes"of the State of Texas with respect to the payment of prevailing wage rates and City of Fort Worth Ordinance no. 7400(Fort Worth City Code Sections 13-A-221 through 13-A-29)prohibiting discrimination in the employment practices. Bid security may be required in accordance with Special Instructions to Bidders. The City of Fort Worth reserves the right to reject any and/or all bids and waive any and/or all formalities. No bid maybe withdrawn until the expiration of ninety(90)days from the date bids are opened.The award of contract,if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Addenda Index and Receipt form(s). Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by „ contacting the Water Department at(817) 392-7829. Bidders, using the printed copy, shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s)and submit the complete specification book or face rejection of the bid as non-responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time deadline stated below or the bidder may request a copy of said forms from the City of Fort Worth Project Manager named in this solicitation. In accordance with the City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City of Fort Worth contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM,GOOD FAITH EFFORT FORM(with"Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must .� be received no later than 5:00 p.m.,five(5)City of Fort Worth business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the City of Fort Worth received the Documentation. Failure to comply shall render the bid non- responsive. COMPREHENSIVE NOTICE TO BIDDERS Bidders are hereby informed that the Director of the Water Department reserves the right to.evaluate and recommend to the City of Fort Worth City Council the bid that is considered to be in the best interest of the City of Fort Worth. The managing department for this project is the Water Department. The Water and Sanitary Sewer improvements,if applicable,must be performed by a contractor who is pre-qualified by the Water Department at the time of bid opening. The procedure for the pre-qualification is outlined in the "Special Instruction to Bidders(Water f Sewer) For additional information,please contact Adolfo Lopez,Project Manager,City of Fort Worth— Water Department at Telephone Number: (817)392-7829 or by email: adolfo.lopez@fortworthtexas.gov. THOMAS M. HIGGINS MARY J. KAYSER CITY MANAGER CITY SECRETARY B Hyl �j 01 /e� Y T Sholola,P.E Water Department Engineering&Fiscal Services k Advertising Dates: November 29,2012 December 6,2012 i SPECIAL INSTRUCTIONS TO uILDERS 1) PREQUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7)calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project,it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(5%)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition,the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion,will determine the adequacy of the proof required herein. ' 3. BONDS: A performance bond, a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. 09/10/04 1 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City.. The provisions of Right to Audit,under paragraph L of Section Cl: Supplementary Conditions To Part C —General Conditions,pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE:. Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 4 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms,conditions 09/10/04 2 or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,employees, subcontractors,program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract,a maximum age limit for such employment unless the.specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend,indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM("with Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. ' Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or women business enterprise (WBE)on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3) years. 12. FINAL PAYMENT,ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment(less retainage)from the city for each pay period. 09/10/04 3 b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)final quantities,or(ii)liquidated damages,city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall attempt to resolve the differences within 30 calendar days.. 09/10/04 4 PART B -PROPOSAL This proposal must not be removed from this book of Contract Documents. TO: Thomas M. Higgins City Manager Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of six-inch through fifteen-inch sanitary sewer mains and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: SEWER MAIN REPLACEMENTS CONTRACT 2013A SEWER PROJECT NO: P258-701170204683 CITY PROJECT NO: 02046 Pursuant to the foregoing Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions,hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully u complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance i Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: R ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) 'I �, B-1 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO, QUAD 1 1 Y BID PRICES WRITTEN IN WORDS PRICE AMOUNT 1. BID- 75 L.F. Pipe-Sewer-6 Inch-0 to 6 Ft PVC 00321 Pipe(Misc Only); Per Linear Foot: l i., /4, Dollars a o 00 and 4 0 Cents $ 30. $ t ZSO. 2. BID- 75 L.F. Pipe-Sewer-6 Inch-6 to 8 Ft PVC 00325 Pipe(Misc Only); Per Linear Foot: //,',fy /w u Dollars 0 a o 0 and .070 Cents $ $ Zy00. 3. BID- 75 L.F. Pipe-Sewer-6 Inch-8 to 10 Ft PVC 00326 Pipe(Misc Only); Per Linear Foot: &,'.-fc, � "_g Dollars 00 00 and o Cents $ 33. _$ ?J/75- 4. BID- 50 L.F. Pipe-Sewer-6 Inch-10 to 12 Ft PVC 00323 Pipe(Misc Only); Per Linear Foot: oi•a ADollars p0 '00 and n Cents $38• $ /900 5. BID- 750 L.F. Pipe-Sewer-8 Inch-0 to 6 Ft PVC 00334 Pipe(Misc Only); Per Linear Foot: 1/0 0 4., iv Dollars -rs G and n o Cents $ $ 10000 6. BID- 1000 L.F. Pipe-Sewer-8 Inch-6 to 8 Ft PVC 00344 Pipe(Misc Only); Per Linear Foot: r 6 �--,, o Dollars p u and o Cents $ B-2 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 7. BID- 1000 L.F. Pipe-Sewer-8 Inch-8 to 10 Ft PVC 00347 Pipe (Mist Only); Per Linear Foot: Dollars a and o Cents $ Ys, 00 $ ys000, o 8. BID- 400 L.F. Pipe-Sewer-8 Inch-10 to 12 Ft PVC 00336 Pipe (Mist Only); Per Linear Foot: Dollars oG oG and na Cents $ SO $ l000 o , 9. BID- 100 L.F. Pipe-Sewer-8 Inch-12 to 14 Ft PVC 00338 Pipe (Mist Only); Per Linear Foot: Dollars o p o G and n o Cents $ $ sSoo. 10. BID- 100 L.F. Pipe-Sewer-8 Inch-14 to 16 Ft PVC 00340 Pipe (Mist Only); Per Linear Foot: 5-1Xff ri'v-t Dollars o G 00 and no Cents $ 11. BID- 100 L.F. Pipe-Sewer-8 Inch-16 to 18 Ft PVC 00341 Pipe(Mist Only); Per Linear Foot: SQ u e n fN A'v c Dollars o U 40 and h v ICents $ _ $ �SDO 12. BID- 100 L.F. Pipe-Sewer-10 Inch-0 to 6 Ft PVC 00230 Pipe(Mist Only); Per Linear Foot: r 4 y l W o Dollarso d U and n o Cents $ Z $ y20 v r B-3 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 13. BID- 100 L.F. Pipe-Sewer-10 Inch-6 to 8 Ft PVC 00240 Pipe(Mise Only); Per Linear Foot: Xo �y �v e, Dollars a and no Cents $ "T, " c' $ yso0. o 14. BID- 100 L.F. Pipe-Sewer-10 Inch-8 to 10 Ft PVC 00242 Pipe(Mise Only); Per Linear Foot: Dollars and rn v Cents $ `�P,, O G $ yo 0 o, o G 15. BID- 50 L.F. Pipe-Sewer-10 Inch-10 to 12 Ft PVC 00231 Pipe(Mise Only); Per Linear Foot: t' �fy Two Dollars and Cents o G $ SZoo. o 16. BID- 50 L.F. Pipe-Sewer-10 Inch-12 to 14 Ft PVC 00233 Pipe(Misr Only); Per Linear Foot: Six Dollars a O G and " Cents $ CG $ .?coo o 17. BID- 50 L.F. Pipe-Sewer-10 Inch-14 to 16 Ft PVC 00236 Pipe(Mise Only); Per Linear Foot: Sf,Alsi tie Dollars 0 � and 07A00� Cents $ (o $ 3yod, 18. BID- 50 L.F. Pipe-Sewer-10 Inch-16 to 18 Ft PVC 00237 Pipe(Mise Only); Per Linear Foot: l3�o�Tr. Dollars 0 Cl and no Cents $ B-4 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 19. BID- 50 L.F. Pipe-Sewer-12 Inch-0 to 6 Ft PVC 00249 Pipe (Misc Only); Per Linear Foot: t or n i n Dollars v d o 0 and Cents $ Zl9 20. BID- 50 L.F. Pipe-Sewer-12 Inch-6 to 8 Ft PVC 00254 Pipe (Misc Only); Per Linear Foot: �—,- o e Dollars o G 00 and Cents 21. BID- 50 L.F. Pipe-Sewer-12 Inch-8 to 10 Ft PVC 00255 Pipe (Misc Only); Per Linear Foot: r �'f V 4`'r Dollars o u and n o Cents $ $ 27DD. 22. BID- 50 L.F. Pipe-Sewer-12 Inch-10 to 12 Ft PVC 00251 Pipe (Misc Only); Per Linear Foot: SfXfc, Dollars G G and Cents $ t/,D $ J000, o 23. BID- 50 L.F. Pipe-Sewer-12 Inch-12 to 14 Ft PVC Pipe (Misc Only); Per Linear Foot: S/,& Dollars G G) and no Cents $ G $ 24. BID- 50 L.F. Pipe-Sewer-12 Inch-14 to 16 Ft PVC Pipe (Misc Only); Per Linear Foot: Soyan 7y 1c"4'e Dollars 6 o o and n a Cents $ $ B-5 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 25. BID- 50 L.F. Pipe-Sewer-12 Inch-16 to 18 Ft PVC Pipe (Misc Only); Per Linear Foot: 5 A I F v -e Dollars o c) o G and n 6 Cents $ 95- 26. 9 26. BID- 50 L.F. Pipe-Sewer-15 Inch-0 to 6 Ft PVC 00261 Pipe(Misc Only); Per Linear Foot: -Ie Dollars G and Y) u Cents $ S-7 $ 2G SO• G 27. BID- 50 L.F. Pipe-Sewer-15 Inch-6 to 8 Ft PVC 00263 Pipe(Misc Only); Per Linear Foot: 711,r1y t/ Dollars C) 00 and ria Cents $ ✓J $ Z7._0. 28. BID- 50 L.F. Pipe-Sewer-15 Inch-8 to 10 Ft PVC 00264 Pipe (Misc Only); Per Linear Foot: Dollars p G and n v Cents 29. BID- 50 L.F. Pipe-Sewer-15 Inch-10 to 12 Ft PVC 00262 Pipe (Misc Only); Per Linear Foot: Dollars O 0 0 and n d Cents 3250, 30. BID- 50 L.F. Pipe-Sewer-15 Inch-12 to 14 Ft PVC Pipe (Misc Only); Per Linear Foot: sPl�Pn Dollars G `' a and h e Cents $ B-6 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 31. BID- 50 L.F. Pipe-Sewer-15 Inch-14 to 16Ft PVC Pipe(Misc Only); Per Linear Foot: E/0�/ Dollars o v a and )7,'n Cents $ 32. BID- 50 L.F. Pipe-Sewer-15 Inch-16 to 18Ft PVC Pipe(Misc Only); Per Linear Foot: �in�fy Dollars o O o G and r,u Cents $_ $ ysDO. 33. BID- 50 L.F. Pipe-Sewer-6 Inch-0 to 6 Ft Ductile 00320 Iron Pipe(Misc Only); Per Linear Foot: �fy Dollars D U p and h o Cents 34. BID- 50 L.F. Pipe-Sewer-6 Inch-6 to 8 Ft Ductile 00324 Iron Pipe(Misc Only); Per Linear Foot: / -/x xf"v Dollars o O U and ,,ej Cents $ '5-Z 35. BID- 50 L.F. Pipe-Sewer-6 Inch-8 to 10 Ft Ductile 00327 Iron Pipe(Misc Only); Per Linear Foot: 4";,o Dollars p Q 00 and 1120 Cents $ $ 27,5^D 36. BID- 50 L.F. Pipe-Sewer-6 Inch,10 to 12 Ft Ductile 00322 Iron Pipe(Misc Only); Per Linear Foot: S/XX Dollars 6 G and r o Cents $ $ 30 0, 0 B-7 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 37. BID- 50 L.F. Pipe-Sewer-8 Inch-0 to 6 Ft Ductile 00333 Iron Pipe (Misc Only); Per Linear Foot: "r 4e Dollars o U and "a Cents $ G 38. BID- 50 L.F. Pipe-Sewer-8 Inch-6 to 8 Ft Ductile 00345 Iron Pipe (Misc Only); Per Linear Foot: Si •C/w Aw o Dollars a o G and r,o Cents $ 6Z. $ ,?/DO. 39. BID- 50 L.F. Pipe-Sewer-8 Inch-8 to 10 Ft Ductile 00346 Iron Pipe(Misc Only); Per Linear Foot: S;lcfy Dollars D 0 and n Cents $�� 40. BID- 50 L.F. Pipe-Sewer-8 Inch-10 to 12 Ft Ductile 00335 Iron Pipe(Misc Only); Per Linear Foot: S¢von i �'�� Dollars D � and /7,0Cents $ 00 41. $ c�7S0 41. BID- 50 L.F. Pipe-Sewer-8 Inch-12 to 14 Ft Ductile 00337 Iron Pipe(Misc Only); Per Linear Foot: e 2* �� fry Dollars _ 06 p and Cents $ � $ yZS� o 42. BID- 50 L.F. Pipe-Sewer-8 Inch-14 to 16 Ft Ductile 00339 Iron Pipe(Misc Only); Per Linear Foot: -.0«4 *e Dollars p U and �� Cents $ B-8 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 43. BID- 50 L.F. Pipe-Sewer-8 Inch-16 to 18 Ft Ductile 00342 Iron Pipe (Misc Only); Per Linear Foot: one �iana�rPa��i'J Dollars a U o a and n o Cents $ 1015- 44. /O1$-44. BID- 50 L.F. Pipe-Sewer-8 Inch-18 to 20 Ft Ductile 00343 Iron Pipe (Misc Only); Per Linear Foot: �/7Q �/L��7C�'I'P Q Tid1n O11aTS Q Q 00 and- _ n a Cents $ Z�10 $ GDOO 45. BID- 50 L.F. Pipe-Sewer-10 Inch-0 to 6 Ft Ductile 00229 Iron Pipe (Misc Only); Per Linear Foot: J,/XXy �'vc Dollars o O and n o Cents $ �S_ $ 3Z,SQ,o G 46. BID- 50 L.F. Pipe-Sewer-10 Inch-6 to 8 Ft Ductile 00241 Iron Pipe (Misc Only); Per Linear Foot: SwPDollarso v and n o Cents $ '417Q$ 33s D' 47. BID- 50 L.F. Pipe-Sewer-10 Inch-8 to 10 Ft Ductile 00243 Iron Pipe (Misc Only); Per Linear Foot: y Dollars 0 Q and #7 y Cents $ 7o $ 3,50 48. BID- 50 L.F. Pipe-Sewer-10 Inch-10 to 12 Ft Ductile 00232 Iron Pipe (Misc Only); Per Linear Foot: sP!/P/11Lv �d e Dollars e) o �. and �7 d Cents $7Y $ 9 B-9 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 49. BID- 50 L.F. Pipe-Sewer-10 Inch-12 to 14 Ft Ductile 00234 Iron Pipe(Misc Only); Per Linear Foot: 2i4X A. Dollars O U o G, and a Cents $ `7000 50. BID- 50 L.F. Pipe-Sewer-10 Inch-14 to 16 Ft Ductile 00235 Iron Pipe (Misc Only); Per Linear Foot: -,71n t 7y Dollars O U o a and no Cents 51. BID- 50 L.F. Pipe-Sewer-10 Inch-16 to 18 Ft Ductile 00238 Iron Pipe(Misc Only); Per Linear Foot: pr!a /�u.sc�i�4�f Dollars O U 00 and ny Cents $ //0 $ sS 00 52. BID- 50 L.F. Pipe-Sewer-10 Inch-18 to 20 Ft Ductile 00239 Iron Pipe(Misc Only); Per Linear Foot: QI?t �tano�ri��s.+� /- �So11ars _ d 0 and "�' Cents $ 2,5 $ GZS^O 53. BID- 50 L.F. Pipe-Sewer-12 Inch-0 to 6 Ft Ductile 00250 Iron Pipe(Misc Only); Per Linear Foot: �S'�ytn fu Dollars 0 and n a Cents $ 70 $ 54. BID- 50 L.F. Pipe-Sewer-12 Inch-6 to 8 Ft Ductile 00233 Iron Pipe(Misc Only); Per Linear Foot: Dollars O r} p d and o r� Cents $ 7Z $ 3000 B-lo ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 55. BID- 50 L.F. Pipe-Sewer-12 Inch-8 to 10 Ft Ductile 00256 Iron Pipe (Misc Only); Per Linear Foot: i-earn 1w Dollars U and n,01, Cents $7J� $ 37 O o G 56. BID- 50 L.F. Pipe-Sewer-12 Inch-10 to 12 Ft Ductile 00252 Iron Pipe (Misc Only); Per Linear Foot: 'el'a v Dollars o O o O and Cents $ ,06 ^ $ y000 57. BID- 50 L.F. Pipe-Sewer-12 Inch-12 to 14 Ft Ductile Iron Pipe (Misc Only); Per Linear Foot: Dollars O _ p G o O and n 4 Cents $_p�� $ Z d 58. BID- 50 L.F. Pipe-Sewer-12 Inch-14 to 16 Ft Ductile Iron Pipe (Misc Only); Per Linear Foot: 12,e �i vP Dollars O G o O and 17,U Cents 59. BID- 50 L.F. Pipe-Sewer-12 Inch-16 to 18 Ft Ductile Iron Pipe (Misc Only); Per Linear Foot: D/7P Dollars C) U o 0 and Cents 60. BID- 50 L.F. Pipe-Sewer-12 Inch-18 to 20 Ft Ductile Iron Pipe(Misc Only); Per Linear Foot: 017e j ac el 4 Dollars C9 and nth --T Cents $ 13 0 $ GSDO B-11 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 61. BID- 50 L.F. Pipe-Sewer-16 Inch-0 to 6 Ft Ductile 00270 Iron Pipe (Misc Only); Per Linear Foot: Dollars O CJ 040 and no Cents $ ' $ 000 62. BID- 50 L.F. Pipe-Sewer-16 Inch-6 to 8 Ft Ductile 00272 Iron Pipe(Misc Only); Per Linear Foot: wa Dollars 06 G ane Cents $ T_ $ `//,O o 63. BID- 50 L.F. Pipe-Sewer-16 Inch-8 to 10 Ft Ductile 00273 Iron Pipe (Misc Only); Per Linear Foot: e lq. 7lu -, a e Dollars _ O U and n o Cents $ _ $ yZs`O 64. BID- 50 L.F. Pipe-Sewer-16 Inch-10 to 12 Ft Ductile 00271 Iron Pipe(Misc Only); Per Linear Foot: -axf fig Dollars p C) o G and h o Cents $_ � $ ySSOD 65. BID- 50 L.F. Pipe-Sewer-16 Inch-12 to 14 Ft Ductile Iron Pipe(Misc Only); Per Linear Foot: 121'n el y / o Dollars C) o G and ,17o Cents $ _ $ �7SD 66. BID- 50 L.F. Pipe-Sewer-16 Inch-14 to 16 Ft Ductile Iron Pipe(Misc Only); Per Linear Foot: 017t Lfl2zlljg���.• l Dollars p U oa and no Cents $ B-12 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AiviOUNT 67. BID- 50 L.F. Pipe-Sewer-16 Inch-16 to 18 Ft Ductile Iron Pipe(Misc Only); Per Linear Foot: 017 Dollars o G and 120 Cents $ /3a $ (101,5_00 68. BID- 50 L.F. Pipe-Sewer-16 Inch-18 to 20 Ft Ductile Iron Pipe (Misc Only); Per Linear Foot: 0171 ro,1�//,;-pollars and h Cents $ Z Ys $ �ZSO 69. BID- 75 L.F. Pipe-Sewer-6 Inch-0 to 6 Ft SDR26 Pipe; Per Linear Foot: Dollars O o a and Cents $ 3S $ ZS 70. BID- 75 L.F. Pipe-Sewer-6 Inch-6 to 8 Ft SDR26 Pipe; Per Linear Foot: Dollars 00 00 and 19 U Cents $ $ Z 77S� 71. BID- 75 L.F. Pipe-Sewer-6 Inch-8 to 10 Ft SDR26 Pipe; Per Linear Foot: 7"�j0/I Dollars 00 and 4n Cents $�° $ 3DB O 72. BID- 50 L.F. Pipe-Sewer-6 Inch-10 to 12 Ft SDR26 Pipe; Per Linear Foot: /4/_v e Dollars 00 and n0 Cents $ $ Z Z S-0 B-13 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 73. BID- 750 L.F. Pipe-Sewer-8 Inch-0 to 6 Ft SDR26 Pipe; Per Linear Foot: G 7nr!u �w v Dollar,Tr yz o D o p and no Cents $ 74. BID- 1000 L.F. Pipe-Sewer-8 Inch-6 to 8 Ft SDR26 Pipe; Per Linear Foot: �, Q o r Xg r. . Dollars d o and f �o Cents $ $ pp o 0 75. BID- 1000 L.F. Pipe-Sewer-8 Inch-8 to 10 Ft SDR26 Pipe; Per Linear Foot: o Dollars y� o G and n a Cents $ $ '/- 90DD 76. BID- 400 L.F. Pipe-Sewer-8 Inch-10 to 12 Ft SDR26 Pipe; Per Linear Foot: 'yl.. Au/ Dollars 2 00 00 and a Cents $ s $20800 77. BID- 100 L.F. Pipe-Sewer-8 Inch-12 to 14 Ft SDR26 Pipe; Per Linear Foot: 71�M-y s;.e Dollars d 0 o U and ,1 o Cents $ . ��, $ 6-6 D D 78. BID- 100 L.F. Pipe-Sewer-8 Inch-14 to 16 Ft SDR26 Pipe; Per Linear Foot: J/X fy �w o Dollars V and s�o Cents $ l2. $ Zoo B-14 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 79. BID- 100 L.F. Pipe-Sewer-8 Inch-16 to 18 Ft SDR26 Pipe; Per Linear Foot: SPl�P/7 he /l, �_Dollars 00 o G and 40 Cents $ 72 $ 70,00 80. BID- 100 L.F. Pipe-Sewer-10 Inch-0 to 6 Ft SDR26 Pipe; Per Linear Foot: Dollars _ o & o and n o Cents $ `/S $ 4/15-00 81. BID- 100 L.F. Pipe-Sewer-10 Inch-6 to 8 Ft SDR26 Pipe; Per Linear Foot: Dollars o G a p and n a Cents 82. BID- 100 L.F. Pipe-Sewer-10 Inch-8 to 10 Ft SDR26 Pipe; Per Linear Foot: A > fw �� Dollars v and Cents $�_ $ s2D0 83. BID- 50 L.F. Pipe-Sewer-10 Inch-10 to 12 Ft SDR26 Pipe; Per Linear Foot: n Dollars 3000 O U o O and d Cents $ $ 84. BID- 50 L.F. Pipe-Sewer-10 Inch-12 to 14 Ft SDR26 Pipe; Per Linear Foot: 'Pi f Dollars and r)D Cents $ p $ ,3 Yc O o B-15 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 85. BID- 50 L.F. Pipe-Sewer-10 Inch-14 to 16 Ft SDR26- Pipe; Per Linear Foot: Seven A �v a Dollars d 0 o U and n o Cents $ 7,S_ $ , 75-0 86. BID- 50 L.F. Pipe-Sewer-10 Inch-16 to 18 Ft SDR26 Pipe; Per Linear Foot: e/Q /4, Dollars 06 o O and v Cents $ 4a— $ yZSO 87. BID- 50 L.F. Pipe-Sewer-12 Inch-0 to 6 Ft SDR26 Pipe; Per Linear Foot: 7-1�r Ie r Dollars 00 o G and 440 Cents $ S,-/ $ 2 70 0 88. BID- 50 L.F. Pipe-Sewer-12 Inch-6 to 8 Ft SDR26 Pipe; Per.Linear Foot: r'1"Iy ,fie Dollars O O O 0 and n o Cents s , $ 28D b 89. BID- 50 L.F. Pipe-Sewer-12 Inch-8 to 10 Ft SDR26 Pipe; Per Linear Foot: Dollars p Q o and Cents $ to 6 $ 90. BID- 50 L.F. Pipe-Sewer-12 Inch-10 to 12 Ft SDR26 Pipe; Per Linear Foot: c-f Dollars and 'no Cents $ B-16 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 91. BID- 50 L.F. Pipe-Sewer-12 Inch-12 to 14 Ft SDR26 Pipe; Per Linear Foot: ,'eve,? 7 a c.r Dollars 0 p o 0 and n Cents $ 7 q $,370 D 92. BID- 50 L.F. Pipe-Sewer=12 Inch-14 to 16 Ft SDR26 Pipe; Per Linear Foot: Dollars U o a and ' o Cents $ �57 u $ /- coo 93. BID- 50 L.F. Pipe-Sewer-12 Inch-16 to 18 Ft SDR26 Pipe; Per Linear Foot: rl�t�e7� Dollars d G U and h o Cents $ 94. BID- 50 L.F. Pipe-Sewer-15 Inch-0 to 6 Ft SDR26 Pipe; Per Linear Foot: Se Dollars G' o D and n v Cents $ 70 $ 3540 95. BID- 50 L.F. Pipe-Sewer-15 Inch-6 to 8 Ft SDR26 Pipe; Per Linear Foot: .feyz12 i 4,o Dollars (� o and /20 Cents $z� $ 36oy 96. BID- 50 L.F. Pipe-Sewer-15 Inch-8 to 10 Ft SDR26 Pipe; Per Linear Foot: sp", Dollars U o U and ,,2 Cents $ 7S^ $ ,37SG B-17 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 97. BID- 50 L.F. Pipe-Sewer-15 Inch-10 to 12 Ft SDR26 Pipe; Per Linear Foot: BiQ.4 409 Dollars o C � and he Cents $ 0,0 $ 000 98. ,. BID- 50 L.F. Pipe-Sewer-15 Inch-12 to 14 Ft SDR26 Pipe; Per Linear Foot: 1';4;,e Dollars 00 o C/ and r'v Cents $ d�^ $ VZS'd 99. BID- 50 L.F. Pipe-Sewer-15 Inch-14 to 16 Ft SDR26 Pipe; Per Linear Foot: rJin��ii fv Dollars �j o O d and /�o Cents $ / S $ y7,SO 100. BID- 50 L.F. Pipe-Sewer-15 Inch-16 to 18 Ft SDR26 Pipe; Per Linear Foot: Ont fic.n elxe!!�/r n Dollars 0 U 00 and n o Cents $ ��O $ SSOO 101. BID- 50 L.F. Sewer Service-4 Inch-Bore&Jack 00357 Ductile Iron w/Pressure Grout; Per Linear Foot: 0,7 t "/",.ff!� Dollars 0 d 00 and .1070 Cents $ /00 $ 5-000 102. BID- 50 L.F. Pipe-Sewer-6 Inch-Bore&Jack 00328 Ductile Iron w/Pressure Grout; Per Linear Foot: r o fy Dollarsp 4 d and o Cents $ ! D_ $ 2000a B-18 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 103. BID- 100 L.F. Pipe-Sewer-8 Inch-Bore &Jack 00348 Ductile Iron w/Pressure Grout; Per Linear //Foot: T/our Iic1ndir c/ Dollars 00 and no Cents $ 4100 $ Y,0,0-0 4, 104. BID- 100 L.F. Pipe-Sewer-10 Inch-Bore &Jack 00244 Ductile Iron w/Pressure Grout; Per Linear Foot: Toth h�.��.�..� Dollars 0 G o 40 and 2 v Cents $ 106 $ /poo 0 105. BID- 100 L.F. Pipe-Sewer-12 Inch-Bore &Jack 00257 Ductile Iron w/Pressure Grout; Per Linear Foot: 7C, � Dollars 00 o O and_ n o Cents $ D d $ Doo 0 106. BID- 100 L.F. Pipe-Sewer-16 Inch-Bore &Jack 00274 Ductile Iron w/Pressure Grout; Per Linear Foot: / U toter 4,*el,-,-r Dollars ° and ,,d Cents $ 3,110 D $ YDooo 0 107. BID- 500 L.F. Inspection-Pre-Construction Cleaning 00202 &TV of San. Sewer Lines; Per Linear Foot: T�vs Dollars 00 00 and—4a Cents $ _ $ zu"Od 108. BID- 1500 L.F. Inspection-Post-Construction Cleaning 00201 &TV of San. Sewer Lines; Per Linear Foot: /4.,0 Dollars -Too O and ho Cents $ -T $ 31s,00 B-19 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 109. BID- 2000 L.F. Trench Safety System> 5 Ft Depth; 00372 Per Linear Foot: 6ne Dollars d U o d and rw Cents $ $ Zoo 0 110. BID- 5 E.A. Sewer-Cut and Plug Existing Mains 00367 All Sizes,Any Depth,Anytime; Per Each: //v* 4ar Dollars 00 o 0 and o Cents $ J`~y O $ ZSo 0 111. BID- 5 E.A. Dehole-0 to 5 Ft Depth; 00539 Per Each: Dollars O v G 0 and n o Cents $ J-0,0 $ Z S O b 112. BID- 5 E.A. Dehole-5 to 10 Ft Depth; 00541 Per Each: On.f/.Wo.#cn d Dollars 00 00 and .9 v Cents $ 1006 $ 5-000 113. BID- 5 E.A. Dehole-10 to 20 Ft Depth; 00540 Per Each: Ont //Oa'rarn ooe :42...e Dollars v U and Cents $ /S00 $ 76-00 o c� 114. BID- 40 E.A. Mobilization-Job Move In; 00124 Per Each: 0 0/2t &aalzeal Dollars o and y!p Cents $ Z $ yD000 ° B-2o ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 115. BID- 20 E.A. Mobilization-Emergency Situation 00125 Job Move In; Per Each: L10 l!o rsan Z Dollars 00 a and 190 Cents $ 2000 $ pppd � 116. BID- 40 E.A. Manhole-Std. 4 Ft Dia. 00213 (to 6 Ft Depth); Per Each: ?Z.rr Th10"r.0n c� Dollars 00 c o and n o Cents $3D00 $ /20000 117. BID- 20 V.F. Manhole-Std. 4 Ft Dia.-Added Depth 00214 (Over 6 Ft Depth); Per Vertical Foot: 04.0 4V aim �,�/ Dollars o C) o O and 070 -T Cents $ 16-0 $ 3000 118. BID- 20 E.A. Manhole-Drop-Std. 4 Ft Dia. 00207 (to 6 Ft Depth); Per Each: 1/ T�i.r Th ouS4 n U� Dollars d o a d and y Cents $ 3Yo v $ G8000 119. BID- 10 V.F. Manhole-Drop-Std. 4 Ft Dia.-Added 00208 Depth (Over 6 Ft Depth); Per Vertical Foot: Dollars 00 a �, and a Cents $ /�D $. /SD 120. BID- 10 E.A. Manhole-External Drop into an Existing Manhole up to 6 Ft Depth of Drop; Per Each: ,f,,x /an01'e a/ Dollars 4,00 U and „o Cents $ [�D D $ DOD U B-21 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 121. BID- 10 V.F. Manhole-Additional Depth Over 6 Foot of External Drop into an Existing Manhole; Per/Vertical Foot: Trema h�.�c✓r P c� Dollars o v 0 ,0 and Cents $ Zoo $ Z000 122. BID- 10 V.F. Manhole-Paint and Coating-Interior 00211 Protective Coating; Per Vertical Foot: ,owe hl,,* /e a, Dollars and 7 a Cents $ /�'S $ /915-0 123. BID- 20 E.A. Manhole-Shallow Std. 4 Ft Dia. 00212 (Shallow Cone); Per Each: / wa T�70 Ucfd n f&,o 4ce,,7 Dollars o v and Cents $ ZZo-o $ yyoao a 124. BID- 5 E.A. Sewer-Wastewater Access 00964 Device (All Depths); Per Each: hc. rr Dollars o 0 0 o d Cents $ 060 $ QD d 125. BID- 5 E.A. Manhole-Type A 5 Ft Dia. 00950 (to 6 Ft Depth); Per Each:: /,oa/ 7hczesa12 c/ Dollars 0 0 0 and 4 o Cents $ 1100 $ Z,000 0 126. BID- 5 V.F. Manhole-Type A 5 Ft Dia.-Added 00951 Depth (Over 6 Ft of Barrel Section); Per Vertical Foot: /W0 hundi'ac� Dollars p C o U and s?o Cents $ Zoo $ /e,00 B-22 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 127. BID- 5 E.A. Manhole-Fiberglass 4 Ft Dia. 00209 (to 6 Ft Depth); Per Each: 7[s•o �nouSlfrJ� r�c� Dollars 00 00 artd 4 .0 Cents $2 d0 $ `/D 00 128. BID- 5 V.F. Manhole-Fiberglass 4 Ft Dia.-Added 00210 Depth(Over 6 Ft Depth); Per Vertical Foot: Ont huna� n',l',lf�, Dollarso U p o and 40 IfCents $ IS-0 $ 75-0 129. BID- 40 E.A. Manhole-Vacuum Test; 00217 Per Each: Dollars 00 100 and n do Cents $ /S0 $ o 0 0 130. BID- 80 E.A. Collar-Manhole(5 Ft x 5 Ft); 00196 Per Each: thi...t Dollarso G and /�D Cents $ 30 D $ Z�OoD O 131. BID- 80 E.A. Manhole-Watertight Insert 00218 (30" Plastic); Per Each: Dollars O d U and n a Cents $ SO $ Z 0 0 132. BID- 10 E.A. Manhole-Watertight Insert-Locking 00954 Stainless Steel (30"); Per Each: a ° Dollarse)�f /s and ne Cents $ D O B-23 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 133. BID- 10 E.A. Manhole-Adjustment and Seal 00849 Existing Manhole; Per Each: /'0&r hip»air e,' Dollars 00 00 and 40 Cents $ YD O $ 41,006 134. BID- 40 E.A. Manhole-Remove Existing Sewer 00206 Manhole; Per Each: Dollars 00 00 and Cents $ SDy $ ZooO a 135. BID- 5 E.A. Wastewater Access Device— Remove; Per Each: 7C" h ur����' Dollars 00 00 andy Cents $ 200 $ Xs"10 0 136. BID- 40 E.A. Manhole-Remove Existing Sewer Manhole Cone Section and Raise or Lower Rim Maximum 3 Ft; Per Each: tDN" h..nill o tJ Dollars p U and n u Cents $ y00 $ /GDOd 0 137. BID- 10 E.A. Manhole-Abandon Existing Sewer 00205 Manhole; Per Each: *0_&f / U n W.,.0 41 Dollars 0 0 and 40 Cents $ yo o $ A/Do O o G 138. BID- 100 C.Y. Pressure Grout Existing Sewer Pipe; Per Each: 0M h a g1W/P,011w ar/ Dollars fi 0 0 and 'dy Cents $ /Z D $ /ZD 0 O B-24 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 139. BID- 60 E.A. Sewer Service-4 Inch Service Tap; 00355 Per/Each: /l i..f / Dollars 00 and n o Cents $ 300 $ /000,0 O 140. BID- 40 E.A. Sewer Service-6 Inch Service Tap; 00361 Per Each: a. �.r,c%< ✓ Dollars o 0 c �, and n d Cents $ `/DO 141. BID- 20 E.A. Sewer Service-8 Inch Service Tap; 00366 Per Each: Teu.hu., rr� Dollars '00 o 0 and n o Cents $ Yoo $ O 0o O 142. BID- 250 L.F. Sewer Service-4 Inch-SDR26 San. Sewer 00358 Service Line Replacement/Installation; Per Linear Foot: / Dollars o U o d and ny Cents 143. BID- 100 L.F. Sewer Service-6 Inch-SDR26 San. Sewer Service Line ReplacemenvInstallation; Per Linear Foot: Dollars CJ o U and r,o c Cents $ 144. BID- 100 L.F. Sewer Service-8 Inch-SDR26 San. Sewer Service Line Replacement/Installation; Per Linear Foot: &..,r fu 4'r.r Dollars p U and s• Cents B-25 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 145. BID- 100 E.A. Sewer Service-4 Inch-2 Way Clean 00356 Out(PVC); Per Each: on• fi�,,,e+�ia� � Dollars 00 o a and ao Cents $ /SD $gip 146. BID- 100 E.A. Sewer Service-6 Inch-2 Way Clean 00362 Out(PVC); Per Each: �/lt �J!/AO//A'tifI AyPollars _ O O Q C� and .�d Cents $ lSS $ 147. BID- 100 E.A. Sewer Service-8 Inch-2 Way Clean 00364 Out(PVC); Per Each: coo Xsrndi•al�'�fy fro Dollars 00 O and h C) Cents $ /S S $ 1,fa—o D 148. BID- 100 E.A. Sewer Service-4-Inch Cast Iron Sanitary Sewer Service Two-Way Cleanout; Per Each: ons�Nn�.u�S�d�h�ci Dollars O U - and Cents $ 170 $ 170D o O 149. BID- 100 E.A. Sewer Service-6-Inch Cast Iron Sanitary Sewer Service Two-Way Cleanout; Per Each: oA�hu •%Si�rrnl�f✓e Dollars _ o C) p D and a Cents $ / $ 7S"a p 150. BID- 100 E.A. Sewer Service-8-Inch Cast Iron Sanitary Sewer Service Two-Way Cleanout; Per Each: DAP�un�/ted cSPOog/y ��z Dollars e C) and a v Cents $ / 75' $ /7Sa o.o o B-26 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 151. BID- 1 E.A. Sewer Plumbing-Plumbing Permit for San. Sewer Service Inspection; Per Each: Twenty-Two Dollars and Fifty Cents $ 22.50 $ 22.50 152. BID- 100 L.F. Sewer Plumbing-4 Inch-SCH 40 San. 00352 Sewer Private Plumbing Line Installation or Replacement, Including Cleanouts as Required,by Licensed Plumber; Per Linear Foot: t66Dollars o d o a and no Cents $ ,575- $ SOD 153. BID- 100 C.Y. Fill Material-Flowable Fill, 00544 in Lieu of Backfill; Per Cubic Yard: oris �i�.,�..�i��w.���Dollars '00 o � and n C) Cents $ /Zo $ Zoo 0 154. BID- 25 C.Y. Subgrade-Crushed Limestone for 00493 Misc. Placement; Per Cubic Yard: Dam Dollars 00 o 0 and #2,6 Cents $ $ ZY 155. BID- 50 C.Y. Concrete-Type B (#2500); 00837 Per Cubic Yard: Dh,* Dollars o d U and 4o Cents $ l $ S'd 156. BID- 50 C.Y. Concrete-Type E (#1500); 00839 Per Cubic Yard: Dr,.r Dollars 00 00 and n o Cents $ / $ B-27 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 157. BID- 20 C.Y. Riprap (Concrete); 00092 Per Cubic Yard: on. Dollars 00 o d and na Cents $ $ goo 0 158. BID- 20 C.Y. Riprap-12 Inch Rock; Per Cubic Yard: ,feawItu 'u,o Dollars o 0 o U and nd Cents $ 75, 1 , O 159. BID- 20 C.Y. Riprap-18 Inch Rock; Per Cubic Yard: Dollars 00 .00 and 1740 Cents $ 60,5_ $ 17,061 160. BID- 20 C.Y. Riprap-24 Inch Rock; 00096 Per Cubic Yard: _ons G �'�iro and r!Q Cents $ //0 $ 270 O 161. BID- 50 L.F. Grass-Hydro,Mulch Seeding; 00134 Per Linear Foot: Dollars 00 o O and .,a Cents $ 6, $ ZS"o 162. BID- 50 L.F. Grass-Sod; 00137 Per Linear Foot: /rte. /v P Dollars p Q 00 and In e Cents $ $ &,'0 0 163. BID- 50 L.F. Concrete-Concrete Encasement; 00841 Per Linear Foot: fig,*17 g f a Dollars 00 and no Cents $ ZS $ /25'0 a B-28 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 164. BID- 450 S.F. Pavement-Concrete Sidewalk Replacement; Per Square Foot: Lrivton Dollars o 0 0 0 and r2 a Cents $ 7 165. BID- 450 S.F. Pavement-Concrete Driveway Replacement; Per Square Foot: elgx Dollars o O o O and -*7 o Cents $ 8 $ 3 4 0 0 166. BID- 50 L.F. Pavement-Concrete Curb and Gutter Replacement; Per!Linear Foot: V4 Dollars 00 o 0 and n a Cents $ ZS $ /ZS O 167. BID- 50 L.F. Pavement-Concrete Curb Attached to Concrete Pavement Replacement; Per Linear Foot: _ &.0 h?y �'v Dollars and 074 Cents $ ZS^ $ /ZSd 168. BID- 100 L.F. Pavement-Replace Paving in Parking Areas; Per Linear Foot: Dollars p and In Cents $ 30 $ 300 D 0 169. BID- 300 L.F. Pavement-Concrete Pavement on 2:27 Concrete Base(2000-2); Per Linear Foot: r"I"Aw /11'v.P Dollars 0 C) and 7 Cents $ SS $ /G,SO D B-29 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 170. BID- 1000 S.F. Pavement-Concrete Replacement 00459 on Existing Base; Per Square Foot: .fov Dollars a and P7 In Cents $ 7 o $ 7,0000 171. BID- 100 L.F. Pavement-Paver on Reinforced Concrete Base; Per Linear Foot: XAV,##7 AU Dollars 00 o p and n d Cents $ 70 $ 7000 172. BID- 1000 L.F. Pavement-2 Inch Min HMAC on 2:27 Concrete Base(2000-1A); Per Linear Foot: Dollars 00 o d and i, a Cents $ 38 $ S,9066- 173. 3800D173. BID- 1000 S.F. Pavement-2 Inch Min HMAC 00444 Replacement on Existing Base; Per Square Foot: S Dollars 00 v and _ „ Cents $ $ 00 0 174. BID- 100 L.F. Pavement-2-Inch HMAC on 2:27 Concrete Base; Per Linear Foot: Dollars o a and he Cents $ f Q $ DDO 0 175. BID- 100 L.F. Min 1-1/2 Inch HMAC on Reinforced Concrete Base; Per Linear Foot: SI U//!XVf v e Dollars p V andg o Cents $ 7c5� $ o o o B-30 ITEM BID APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT 176. BID- 100 L.F. Pavement-2 Inch HMAC on 01302 6 Inch Flex Base-Temporary; Per Linear Foot: x" Dollars 00 d and 4,0 Cents $ /Z $ /ZO O 177. BID- 50 E.A. Pavement-Traffic Permit for Utility 00470 Street Cut; Per Each: Seventy Five Dollars and No Cents $ 75.00 $ 3,750.00 178. BID- 50 E.A. Traffic Control Plan Design & Installation as Required; Per //Each: // -Iwo hu,7 o/re o-,' Dollars 00 o 0 and no Cents $ ZOO $ /0000 O TOTAL AMOUNT BID $ /G 00 f/7Z, `s B-31 PART B - PROPOSAL(Cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5%is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been famished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either fiunishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 365 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statue is attached. Non resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. f B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-32 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, By:_ Title: Address: pC) Telephone: 81 7 2 93 - /o G 3 (Seal) Date: /Z - Z 7 B-33 Ob FORT WORTH_ City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the MIWBE goal is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (MNVBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MNVBE PROJECT GOALS �. The City's M/WBE goal on this project is /5 %of the total bid(Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MIWBE goal,or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications The Offer �alL+r �ttie � a �. W,per 46_' 0 atppfapnate emp pyee dff i'a meparttlent arm- r' . i p , If-ft -1 W11 bek evid ce ire 4:xeceive tfiae c3zir mentati an in the tine al{t�cated; A fax d_ Y rlf r >r c eptedr 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. r statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the MIWBE Office at(817)392-6104. Rev. 11/1/05 A ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: M/W/DBE NON-M/W/DBE BID DATE City's MIWBE Project Goal: Prime's MIWBE Project Utilization: PROJECT NUMBER Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five(5)City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1st tier, a payment by a subcontractor to FW its supplier is considered 2nd tier ME ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification r Agency(NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE) is synonymous with Minority/Women Business Enterprise(M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, .but will only receive credit for the fees and commissions earned by the MNVBE as outlined in the lease agreement. Rev.5/30/03 ATTACHMENT 1A FORT WORTH Page 2 of 4 Primes are required to identify ALL subcontractorstsuppliers, regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification N (check one) o `4 SUBCONTRACTORISUPPLIER T n Company Name i N T Detail Detail Address e M w C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B T D W E E R O B C T E A R•r Rev.5/30/03 -- ATTACHMENT IA 11M FORT WORTH Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification N 11' (check one) o SUBCONTRACTORISUPPLIER T n Company Name i N T Detail Detail Address M W C X M Subcontracting Work Supplies Purchased Dollar Amount T D VY Telephone/Fax r B B E E R O B C T E A r+ E VP -* Rev.5130103 ATTACHMENT 1A FORT WORTH Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature,to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work fora period of time not less than one (1)year. Authorized Signature Printed Signature Title Contact NameMtle(if different) Company Name Telephone and/or Fax Address E-mail Address y City/StateMp Date Rev.5/30/03 ATTACHMENT 1C Page 1 of 3 FORT WORTH City of Fort Worth Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe rime PROJECT NAME: M/W/DBE NON-M/W/DBE BID DATE City's M/WBE Project Goal: PROJECT NUMBER % If you have failed to secure MNVBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity) for the completion of this project, regardless of whether it is to be provided by a MNVBE or non-MNVBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2" tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Raw na1zn1nz ATTACHMENT 1C Page 2of3 2.)- Obtain a current(not more than three (3)months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing I ! No 3.) Did you solicit bids from MNVBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? r Yes (If yes,attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.) No .•s 4.) Did you solicit bids from MNVBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (If yes,attach list to include name of M/WBE firm, ep rson contacted,phone number and date and time of contact.) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (90) or-less, the 'bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (90) or more, the bidder must contact at least two-. thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? Yes No w 6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. Please use additional sheets, if necessary, and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection l F F Ro nniznmz