HomeMy WebLinkAboutContract 44733 11 Y Ihtli TARF ✓� iONTlA .T NO. 1n COPY POk CONTRACTION CONTRACTOR'S�IOIIONIli CO. FORTWORTH SECRETARY � �� �--+.�CRYS1ANApER'i OFRCE ...��TMM•PIE COPY PROJECT MANUAL FOR - THE CONSTRUCTION OF pw CONCRETE RESTORATION (2013-11) AT VARIOUS LOCATIONS City Project No.GG01-537110-0202002 FP Betsy Price Tom Higgins Mayor City Manager 00 Douglas W. Wiersig, P.E. Director, Transportation and Public Works Department 00 George Behmanesh, P.E. Assistant Director, Transportation and Public Works Department ps ON Prepared for The City of Fort Worth ws TRANSPORTATION AND PUBLIC WORKS 2013 �n-VW"r, OF m ;�................e.•..emo•ia�i.oA G.A. BEH MANESH �... ..........................` 56244 /��® f�� pSYER����'w F0FFICIALRECOM OF SCRE REC IVie M' 2 6 m&L; Kevtew http://apps.cfwnet.org/council Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FOR7W11<TH COUNCIL ACTION: Approved on 7/9/2013 REFERENCE t* 2000NCRETE DATE: 7/9/2013 NO.: C-26312 LOG NAME: RESTORATION 2013-11 i CODE: C PUBLIC TYPE: CONSENT NO HEARING: SUBJECT: Authorize Execution of a Contract with Bradley Douglas Construction Services, LLC., in the Amount of$539,640.00 for Concrete Restoration at Eleven Locations (COUNCIL DISTRICTS 3, 4, 5, 6 and 8) RECOMMENDATION: It is recommended that the City Council authorize execution of a contract with Bradley Douglas Construction Services, LLC., in the amount of$539,640.00 for Concrete Restoration 2013-11 at eleven locations. DISCUSSION: The Concrete Restoration 2013-11 contract provides for the repair and reconstruction of failed concrete pavement at 11 locations listed on the attachment provided. Funding for this project was part of Fiscal Year 2013 General Fund. This project was advertised for bid on February 28, 2013 and March 7, 2013 in the Fort Worth Star-Telegram. On March 28, 2013, the following bids were received: BIDDERS AMOUNT Bradley Douglas Construction Services, LLC $539,640.00 Jet Underground Utilities, Inc. $627,910.00 2 CMD, Inc $686,050.00 PC Contractors, LLC $722,171.00 MSU Industries, LLC $748,695.00 MNVBE Office: Bradley Douglas Construction Services, LLC., is in compliance with the City's BDE Ordinance by committing to 48 percent MBE participation on this project. The City's MBE goal on this project is 12 percent. Additionally, Bradley Douglas Construction Services, LLC., is a certified MNVBE firm. The City reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus 25 percent of the contract award. This project is located in COUNCIL DISTRICTS 3,4, 5, 6 and 8, Mapsco 58X, 66A, 56J, 56R, 56T and 56U, 104E and 104D. FISCAL INFORMATION/CERTIFICATION: I-of 2 7/16/2013 9:34 AM A&C Review http://apps.cfwnet.org/counciljpacket/mc review.asp?ID=1851... The Financial Management Services Director certifies that upon approval of the above recommendations, funds will be available in the current operating budget, as appropriated, of the General Fund. TO Fund/Account/Centers FROM Fund/Account/Centem GG01 537110 0202002 $539.640.00 Submitted for City Managers Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: George A. Behmanesh(7914) ATTACHMENTS Location List.pdf Location Map 01.pdf Location Map 02.pdf Location Map 03.pdf Location Map 04 Rev.pdf Location Map 05 Rev.pdf Z of 2 7/16/2013 9:34 Ah 000000-1 TABLE OF CONTENTS Page 1 of 2 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 4 Division 00-General Conditions 6 000515 n ddend 7 0011 13 Invitation to Bidders 8 0021 13 Instructions to Bidders 9 0035 13 Conflict of Interest Affidavit 10 0041 00 Bid Form 11 00 42 43 Proposal Form Unit Price 12 00 43 13 Bid Bond 13 00 43 37 Vendor Compliance to State Law Nonresident Bidder 14 00 45 26 Contractor Compliance with Workers'Compensation Law 15 00 45 40 Minority Business Enterprise Goal 16 00 52 43 Agreement 17 0061 13 Performance Bond 18 0061 14 Payment Bond 19 0061 19 Maintenance Bond 20 00 61 25 Certificate of Insurance 21 00 72 00 General Conditions 22 00 73 00 Supplementary Conditions 23 24 Division 01-General Requirements 25 01 1100 Summary of Work 26 01 2500 Substitution Procedures 27 01 31 19 Preconstruction Meeting 28 01 31 20 Project Meetings 29 01 3216 Construction Progress Schedule 30 01 3233 Preconstruction Video 31 01 3300 Submittals 32 01 35 13 Special Project Procedures 33 01 45 23 Testing and Inspection Services 34 01 50 00 Temporary Facilities and Controls 35 01 55 26 Street Use Permit and Modifications to Traffic Control 36 01 57 13 Storm Water Pollution Prevention Plan 37 0158 13 Temporary Project Signage 38 01 60 00 Product Requirements 39 01 70 00 Mobilization and Remobilization 40 01 7123 Construction Staking 41 01 74 23 Cleaning 42 01 77 19 Closeout Requirements 43 01 78 39 Project Record Documents 44 45 Division 02-Existing Conditions 46 0241 13 Selective Site Demolition 47 0241 15 Paving Removal 48 49 Division 31-Earthwork CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised August 20,2012 000000-2 TABLE OF CONTENTS Page 2 of 2 r 1 3123 16 Unclassified Excavation 2 3 Division 32- Exterior Improvements 4 321123 Flexible Base Courses 5 32 12 16 Asphalt Paving 6 3213 13 Concrete Paving 7 32 13 73 Concrete Paving Joint Sealants 8 3216 13 Concrete Curb and Gutters and Valley Gutters 9 3291 19 Topsoil Placement and Finishing of Parkways 10 11 Division 33-Utilities 12 3305 10 Utility Trench Excavation,Embedment and Backfill 13 3305 14 Adjusting Manholes,Inlets,Valve Boxes,and Other Structures to Grade 14 15 Division 34-Transportation - 16 3471 13 Traffic Control 17 18 Division 9999- Special 19 9999.0001 Stamped and Stained Concrete 20 21 Appendix 22 GC-6.06.1) Minority and Women Owned Business Enterprise Compliance 23 GC-6.07 Wage Rates 24 A Street Locations 25 B Standards 26 27 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised August 20,2012 00 11 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 1113 2 INVITATION TO BIDDERS 3 RECEIPT OF BIDS 4 Sealed bids for the construction of CONCRETE RESTORATION(2013-11)AT VARIOUS 5 LOCATIONS, GG01-537110-0202002 will be received by the City of Fort Worth Purchasing 6 Office. 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth,Texas 76102 P 12 until 1:30 P.M. CST,Thursday,March 28,2013,and bids will be opened publicly and read aloud 13 at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the(approximate)following: 17 i 18 10,750 S.Y Remove Concrete 19 10,750 S.Y. 7"Concrete Pavement HES 20 10,000 L.F. Silicon Joint Sealant 21 850 C.Y. Flex Base 22 250 C.Y. Concrete HES 23 1 L.S Railroad Co-ordination 24 25 DOCUMENT EXAMINATION AND PROCUREMENTS 26 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 27 of Fort Worth's Purchasing Division website at htip://www.fortworthgov.org�purchasing/ov.or�purchasing/and 28 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site.The 29 Contract Documents may be downloaded,viewed, and printed by interested contractors and/or 30 suppliers. 31 32 Copies of the Bidding and Contract Documents may be purchased from Pamela Forehand, 817- 33 392-7913. City of Fort Worth,.TPW,2°d Floor, 1000 Throckmorton St.,Fort Worth,TX 76102. 34 35 The cost of Bidding and Contract Documents is: $30.00 36 37 PREBID CONFERENCE 38 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 39 BIDDERS at the following location,date,and time: 40 DATE: Wednesday,March 13,2013 41 TIME: 09.00 A.M. 42 PLACE: Transportation&Public Works, 1000 Throckmorton Street,Room 270 43 Fort Worth,Texas 76102 44 LOCATION: Municipal Building,2°d Floor. 45 46 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 47 City reserves the right to waive irregularities and to accept or reject bids. 48 49 INQUIItIES CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 r,. 001113-2 INVITATION TO BIDDERS Page 2 of 2 1 All inquiries relative to this procurement should be addressed to the following: 2 Attn: Tariqul Islam,City of Fort Worth 3 Email: tariqul.islam@fortworthTexas.gov 4 Phone: 817-392-2486 5 6 ADVERTISEMENT DATES 7 February 28, 2013 8 March 7, 2013 9 ` 10 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised July I,2011 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1.Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 72 7 00 -GENERAL CONDITIONS. 8 9 1.2.Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person, firm,partnership, company,association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing so 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person, firm,partnership,company, association,or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2.City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. PFequakfleeflen of Bidders (Mme Centr-aeter-s and Subeestr-aeter-s) 34 35 36 37 38 39 3.2.Eaeh Biddef unless eufmatly pfequalified,must be stessubmi to Cipf with 40 ,the deeumentatien identified in Seefien 00 41 45 11, 13IDDERS 42 43 44 the City eefftaet as pFeN4ded in PaFagraph 6.1. 45 46 rCITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 3.3.The City Fesepxes the right to rvEfai .,l;fie,t ee tmeter-w.e is the a e.,t low 2 3 , 4 , 5 te assist the City in evaNating and assessing the ability ef the appaFent lew bidder-(s)te 6 7City's 8 inkfinotien, 9 10 11 . 12 13 14 . 15 16 4. Examination of Bidding and Contract Documents,Other Related Data,and Site 17 18 4.1.Before submitting a Bid, each Bidder shall: 19 20 4.1.1. Examine and carefully study the Contract Documents and other related data 21 identified in the Bidding Documents(including "technical data"referred to in 22 Paragraph 4.2.below).No information given by City or any representative of the 23 City other than that contained in the Contract Documents and officially 24 promulgated addenda thereto, shall be binding upon the City. 25 26 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and r 27 site conditions that may affect cost,progress,performance or furnishing of the 28 Work. 29 30 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 31 progress,performance or furnishing of the Work. 32 33 34 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or 35 contiguous to the Site and all drawings of physical conditions relating to existing 36 surface or subsurface structures at the Site(except Underground Facilities)that 37 have been identified in the Contract Documents as containing reliable "technical 38 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 39 at the Site that have been identified in the Contract Documents as containing 40 reliable "technical data." 41 42 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 43 the information which the City will furnish. All additional information and data 44 which the City will supply after promulgation of the formal Contract Documents 45 shall be issued in the form of written addenda and shall become part of the Contract 46 Documents just as though such addenda were actually written into the original 47 Contract Documents.No information given by the City other than that contained in 48 the Contract Documents and officially promulgated addenda thereto, shall be 49 binding upon the City. 50 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0001-537110-0202002 Revised July 1,2011 ®, 0021 13-3 INSTRUCTIONS TO BIDDERS ' Page 3 of 9 1 4.1.6. Perform independent research,investigations,tests,borings, and such other means 2 as may be necessary to gain a complete knowledge of the conditions which will be 3 encountered during the construction of the project. On request,City may provide 4 each Bidder access to the site to conduct such examinations, investigations, 5 explorations,tests and studies as each Bidder deems necessary for submission of a 6 Bid. Bidder must fill all holes and clean up and restore the site to its former 7 conditions upon completion of such explorations,investigations,tests and studies. 8 9 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 10 cost of doing the Work,time required for its completion,and obtain all infonnation 11 required to make a proposal.Bidders shall rely exclusively and solely upon their 12 own estimates, investigation,research,tests,explorations, and other data which are 13 necessary for full and complete information upon which the proposal is to be based. 14 It is understood that the submission of a proposal is prima-facie evidence that the 15 Bidder has made the investigation,examinations and tests herein required. Claims 16 for additional compensation due to variations between conditions actually 17 encountered in construction and as indicated in the Contract Documents will not be 18 allowed. 19 20 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 21 between the Contract Documents and such other related documents.The Contractor 22 shall not take advantage of any gross error or omission in the Contract Documents, 23 and the City shall be permitted to make such corrections or interpretations as may 24 be deemed necessary for fulfillment of the intent of the Contract Documents. 25 26 4.2. Reference is made to Section 00 73 00--Supplementary Conditions for identification of: 27 28 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 29 the site which have been utilized by City in preparation of the Contract Documents. 30 The logs of Soil Borings, if any,on the plans are for general information only. 31 Neither the City nor the Engineer guarantee that the data shown is representative of 32 conditions which actually exist. 33 34 4.2.2. those drawings of physical conditions in or relating to existing surface and 35 subsurface structures(except Underground Facilities)which are at or contiguous to 36 the site that have been utilized by City in preparation of the Contract Documents. 37 38 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 39 on request. Those reports and drawings may not be part of the Contract 40 Documents,but the "technical data"contained therein upon which Bidder is entitled 41 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 42 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 43 responsible for any interpretation or conclusion drawn from any"technical data"or 44 any other data,interpretations, opinions or information. 45 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised July 1,2011 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.3.The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 2 that Bidder has complied with every requirement of this Paragraph 4,(ii)that without 3 exception the Bid is premised upon performing and furnishing the Work required by the , 4 Contract Documents and applying the specific means,methods,techniques, sequences or 5 procedures of construction(if any)that may be shown or indicated or expressly required 6 by the Contract Documents, (iii)that Bidder has given City written notice of all 7 conflicts,errors, ambiguities and discrepancies in the Contract Documents and the 8 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 9 etc.,have not been resolved through the interpretations by City as described in 10 Paragraph 6.,and(iv)that the Contract Documents are generally sufficient to indicate 11 and convey understanding of all terms and conditions for performing and furnishing the 12 Work. 13 14 4.4.The provisions of this Paragraph 4, inclusive,do not apply to Asbestos,Polychlorinated 15 biphenyls (PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 16 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 17 Documents. 18 19 5. Availability of Lands for Work,Etc. 20 21 5.1.The lands upon which the Work is to be performed,rights-of-way and easements for 22 access thereto and other lands designated for use by Contractor in performing the Work - 23 are identified in the Contract Documents. All additional lands and access thereto 24 required for temporary construction facilities,construction equipment or storage of 25 materials and equipment to be incorporated in the Work are to be obtained and paid for 26 by Contractor. Easements for permanent structures or permanent changes in existing 27 facilities are to be obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.2.Outstanding right-of-way, easements,and/or permits to be acquired by the City are listed 31 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 32 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 33 the award of contract at any time before the Bidder begins any construction work on the 34 project. 35 36 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 37 way, easements, and/or permits, and shall submit a schedule to the City of how 38 construction will proceed in the other areas of the project that do not require permits 39 and/or easements. 40 41 6. Interpretations and Addenda 42 OVA CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 6.1.All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City in writing on or before 2 p.m.,the Monday prior to the Bid opening. Questions 3 received after this day may not be responded to.Interpretations or clarifications 4 considered necessary by City in response to such questions will be issued by Addenda 5 delivered to all parties recorded by City as having received the Bidding Documents. 6 Only questions answered by formal written Addenda will be binding. Oral and other 7 interpretations or clarifications will be without legal effect. 8 9 Address questions to: 10 11 City of Fort Worth 12 1000 Throckmorton Street 'P 13 Fort Worth,TX 76102 14 Attn: Tariqul Islam,City of Fort Worth 15 Fax: 817-392-8092 16 Email: tariqul.islam@fortworthTexas.gov 17 Phone: 817-392-2486 18 19 20 6.2.Addenda may also be issued to modify the Bidding Documents as deemed advisable by 21 City. 22 23 6.3.Addenda or clarifications may be posted via Buzzsaw at <Insert Link to Documents>. 24 25 6.4.A prebid conference may be held at the time and place indicated in the Advertisement or 26 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 27 Project. Bidders are encouraged to attend and participate in the conference. City will 28 transmit to all prospective Bidders of record such Addenda as City considers necessary 29 in response to questions arising at the conference. Oral statements may not be relied 30 upon and will not be binding or legally effective. 31 32 7. Bid Security 33 34 7.1.Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 35 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 36 the requirements of Paragraphs 5.01 of the General Conditions. 37 38 7.2.The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 39 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 40 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 41 default,rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 42 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 43 other Bidders whom City believes to have a reasonable chance of receiving the award 44 will be retained by City until final contract execution. 45 46 8. Contract Times 47 The number of days within which, or the dates by which,Milesiones are to be achieved in 48 accordance with the General Requirements and the Work is to be completed and ready for 49 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 50 attached Bid Form. 51 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 9. Liquidated Damages 2 Provisions for liquidated damages are set forth in the Agreement. 3 4 10. Substitute and "Or-Equal" Items 5 The Contract,if awarded,will be on the basis of materials and equipment described in the 6 Bidding Documents without consideration of possible substitute or"or-equal" items. .� 7 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or"or- 8 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 9 City, application for such acceptance will not be considered by City until after the Effective 10 Date of the Agreement. The procedure for submission of any such application by Contractor 11 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C.of the General 12 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 13 14 11. Subcontractors,Suppliers and Others 15 16 11.1. In accordance with City Ordinance No.20020-12-2011 (as amended),the City has 17 goals for the participation of minority business enterprises in City contracts.A copy 18 of the Ordinance can be obtained from the Office of the City Secretary.The Bidder 19 shall submit the MBE Utilization Form, Subcontractor/Supplier Utilization Form, 20 Prime Contractor Waiver Form and/or Good Faith Effort Form(with 21 "documentation) and/or Joint Venture Form as appropriate.The Forms including 22 documentation must be received by the City no later than 5:00 P.M. CST, five (5) 23 City business days after the bid opening date.The Bidder shall obtain a receipt from 24 the City as evidence the documentation was received.Failure to comply shall render 25 the bid as non-responsive. 26 27 11.2. No Contractor shall be required to employ any Subcontractor, Supplier,other person 28 or organization against whom Contractor has reasonable objection. 29 30 12. Bid Form 31 32 12.1. The Bid Form is included with the Bidding Documents; additional copies may be E 33 obtained from the City. 34 35 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 36 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 37 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 38 price item listed therein. In the case of optional alternatives,the words "No Bid," 39 "No Change," or"Not Applicable"may be entered. Bidder shall state the prices, 40 written in ink in both words and numerals,for which the Bidder proposes to do the 41 work contemplated or furnish materials required. All prices shall be written legibly. 42 In case of discrepancy between price in written words and the price in written 43 numerals,the price in written words shall govern. 44 45 12.3. Bids by corporations shall be executed in the corporate name by the president or a 46 vice-president or other corporate officer accompanied by evidence of authority to 47 sign. The corporate seal shall be affixed. The corporate address and state of 48 incorporation shall be shown below the signature. 49 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 2 partner,whose title must appear under the signature accompanied by evidence of 3 authority to sign. The official address of the partnership shall be shown below the 4 signature. 5 6 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 7 member and accompanied by evidence of authority to sign. The state of formation of 8 the firm and the official address of the firm shall be shown. 9 10 12.6. Bids by individuals shall show the Bidder's name and official address. 11 12 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 13 indicated on the Bid Form. The official address of the joint venture shall be shown. 14 15 12.8. All names shall be typed or printed in ink below the signature. 16 17 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 18 which shall be filled in on the Bid Form. 19 20 12.10. Postal and e-mail addresses and telephone number for communications regarding the 21 Bid shall be shown. 22 23 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 24 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 25 to State Law Non Resident Bidder. 26 27 13. Submission of Bids 28 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 29 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 30 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 31 marked with the City Project Number, Project title,the name and address of Bidder,and 32 accompanied by the Bid security and other required documents. If the Bid is sent through the 33 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 34 with the notation"BID ENCLOSED"on the face of it. 35 36 14. Modification and Withdrawal of Bids 37 38 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 39 withdrawn prior to the time set for bid opening. A request for withdrawal must be 40 made in writing by an appropriate document duly executed in the manner that a Bid 41 must be executed and delivered to the place where Bids are to be submitted at any 42 time prior to the opening of Bids. After all Bids not requested for withdrawal are 43 opened and publicly read aloud,the Bids for which a withdrawal request has been 44 properly filed may,at the option of the City,be returned unopened. 45 46 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 47 time set for the closing of Bid receipt. 48 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised July 1,2011 002113-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 15. Opening of Bids 2 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 3 abstract of the amounts of the base Bids and major alternates(if any)will be made available 4 to Bidders after the opening of Bids. 5 6 16. Bids to Remain Subject to Acceptance 7 All Bids will remain subject to acceptance for the time period specified for Notice of Award 8 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 9 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 10 11 17. Evaluation of Bids and Award of Contract 12 13 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 14 to reject any or all nonconforming,nonresponsive,unbalanced or conditional Bids 15 and to reject the Bid of any Bidder if City believes that it would not be in the best 16 interest of the Project to make an award to that Bidder,whether because the Bid is 17 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 18 meet any other pertinent standard or criteria established by City. City also reserves 19 the right to waive informalities not involving price,contract time or changes in the 20 Work with the Successful Bidder. Discrepancies between the multiplication of units 21 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 22 between the indicated sum of any column of figures and the correct sum thereof will 23 be resolved in favor of the correct sum. Discrepancies between words and figures 24 will be resolved in favor of the words. 25 26 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 27 among the Bidders, Bidder is an interested party to any litigation against City, 28 City or Bidder may have a claim against the other or be engaged in litigation, 29 Bidder is in arrears on any existing contract or has defaulted on a previous 30 contract,Bidder has performed a prior contract in an unsatisfactory manner, or 31 Bidder has uncompleted work which in the judgment of the City will prevent or 32 hinder the prompt completion of additional work if awarded. -+ 33 34 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers,and 35 other persons and organizations proposed for those portions of the Work as to which 36 the identity of Subcontractors, Suppliers, and other persons and organizations must 37 be submitted as provided in the Contract Documents or upon the request of the City. 38 City also may consider the operating costs,maintenance requirements,performance 39 data and guarantees of major items of materials and equipment proposed for 40 incorporation in the Work when such data is required to be submitted prior to the 41 Notice of Award. 42 43 17.3. City may conduct such investigations as City deems necessary to assist in the 44 evaluation of any Bid and to establish the responsibility, qualifications,and financial 45 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 46 organizations to perform and furnish the Work in accordance with the Contract 47 Documents to City's satisfaction within the prescribed time. 48 49 17.4. Contractor shall perform with his own organization,work of a value not less than 50 35%of the value embraced on the Contract,unless otherwise approved by the City. 51 CITY OF FORT WORTH CONCRETE REATPRATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised July 1,2011 0021 13-9 INSTRUCTIONS TO BIDDERS s. Page 9 of 9 1 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 2 responsive Bidder whose evaluation by City indicates that the award will be in the } 3 best interests of the City. 4 5 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 6 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 7 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 8 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 9 comparable contract in the state in which the nonresident's principal place of a 10 business is located. 11 12 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 13 to be awarded, City will award the Contract within 90 days after the day of the Bid 14 opening unless extended in writing. No other act of City or others will constitute 15 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 16 the City. 17 18 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 19 20 18. Signing of Agreement 21 When City issues.a Notice of Award to the Successful Bidder, it will be accompanied by the 22 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 23 Contractor shall sign and deliver the required number of counterparts of the Agreement to 24 City with the required Bonds, Certificates of Insurance, and all other required documentation. 25 City shall thereafter deliver one fully signed counterpart to Contractor. 26 27 28 29 END OF SECTION CITY OF FORT WORTH CONCRETE REATPRATION(20I3-I1) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGO1-537110-0202002 Revised July 1,2011 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 3 1 SECTION 00 3513 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder, offeror,or respondent(hereinafter also referred to as"you")to a City of Fort Worth 5 (also referred to as"City")procurement are required to complete Conflict of Interest 6 Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law.This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work.The referenced forms may be downloaded from the website links provided below. 10 11 htty://www.ethics.state.tx.us/forms/CIQ.pdf 12 13 h=://www.ethics.state.tx.us/forms/CIS.pdf 14 15 Q CIQ Form is on file with City Secretary 16 17 0 CIQ Form is being provided to the City Secretary 18 19 F7 CIS Form is on File with City Secretary 20 21 0 CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 By: 28 Company (Please Print) 29 30 Signature: 31 Address 32 33 Title: 34 City/State/Zip (Please Print) 35 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 3 1 SECTION 00 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder,offeror,or respondent(hereinafter also referred to as"you")to a City of Fort Worth 5 (also referred to as"City")procurement are required to complete Conflict of Interest 6 Questionnaire(the attached CIQ Form)and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law.This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work.The referenced forms may be downloaded from the website links provided below. 10 11 http://www.ethics.state.tx.us/forms/CIQ.Pdf 12 13 http://www.ethics.state.tx.us/forms/CIS.pdf 14 15 ® CIQ Form is on file with City Secretary 16 17 ® CIQ Form is being provided to the City Secretary 18 19 © CIS Form is on File with City Secretary 20 21 © CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 Bradley Doug=las Construction By: Sharon Douslas 28 Company (Please Print) 29 30 5001 Brentwood Stair Rd#106 Signature: 31 Address 32 33 Fort Worth,Texas 76112 Title: !S 34 City/State,/Zip (Please Print) 35 36 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 003513-2 CONFLICT OF INTEREST AFFIDAVIT Page 2 of 3 CONFLICT OF INTEREST QUESTIONNAIRE FORM CIQ For vendor or other person doing business with local governmental entity Toro graattocnrrtro clam 011110w raaoo 111010 low by Na 141,sots LW RMMW"@aim OFFICEt1SEONLY This questionnaire is being fled in accordance with Chapter 176.Local Gcnvemme nt Code 0.0 rt 2wti d by a person udw has a business refadoruhip as derned by Section 176.001(1-a)wM a low gone r►rrientat eri ity and Bre person mets recluffernerft under Section 178 006(&). By IawBs*mMbmuke musi betWuilht w mmdsadmhMakwafthelacwl gi>«amwrinl eniiy not baler than ttre 7th business day alter the date Bre person becomes aware of texas Brat require the stalernert to be Pled. Sine Section 176.006.Local Govemmerk Cade. A person oortwniui an ofFense d the person knowingly violates Section 176.000, Local Governniert Mode.An offense under f0ms section is a Gass C rnisderneivw. t Naze of parson who has a business retatianship with local governswivial entity_ 2 0 Chmk tAm boa if you amAhM m opda*to a previously fled qumsborrkfom (The law requires that you file an updated completed quesbonnai=with the appropriate firing authority rat Wer than the 7th business day after the date the aigieaiy fled queshorruire becomes incomplete or ivacaaale.) Name of local govuse&nerrt officer with whom filer has ee piryraerd a business rdahons*- Name of l WK*r This section(tem 3 including sow A B.C d D) Hast be completed far each eifnaer wtti aim. fhe IW has an employment or ottrer business felationsto as defined by Section 170.001("1 Lad Covernmert Code_ Mach additicrd pages to this Form Cl4 as necessary. AL is the local gouternment ofrioer named it On section recent ug or%*to remw taxable neonre,otlw than irmesimert iroonre.from the tier of Yre questionnaire? tris ®No B. is the flex of the questionnaire recek* or N*In receive taxable iroorrre.apron Thar iarestirwrt ineome.tam or at the direction of the local goverranent officer named in this section AND the taxable income is not received tram the local d enW- [::]llis ®No C. Is Yoe filer of the questionnaire employed by a oorporaion or otier business entity wife respect to wieich Bre local ginenanent officer serves as an oftioer or drector,or holds an ownership of 10 Percent or rnoe? 0Yes, MN. D.Describe each empk nuent or business relationship with rue total government officer named in this snettin sq,V-4 P.dDing W► -ft AG*ed ffira 2007 1 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 00 41 00 BID FORM Pap 100 SECTION 00 4100 BID FORM TO: The City Manager clo:The Purchasing Department 1000 Throckmorton Street City of Fort Worth,Texas 76102 FOR: CONCRETE RESTORATION(2013-11) City Project No.: 537110-0202002 Units/Sections: CONCRETE PAVING 1. Enter Into Agreement The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1.In submitting this Bid,Bidder accepts all of the terns and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS,including without limitation those dealing with the disposition of Bid Bond. 2,2. Bidder is aware of all costs to provide the requited insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3.Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,association,organization,or corporation. 2.4.Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5.Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6.Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract For the purposes of this Paragraph: a."corrupt practice"means the offering,giving,receiving,or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b."fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels,or(c)to deprive City of the benefits of free and open competition. c."collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City,a purpose of which is to establish Bid prices at artificial,non-competitive levels. d."coercive practice"means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATIONt�ty�S Form Revised 20110627 1LCvrsed 00 41_00 00 42 43_00 43_13_00 43_37 Bid_Form-Proposal-BOnd_Vendor Comphance(1).xis 00 41 n0 BID FORM Paas 2 a0 3. PrequeNeation IL b. C. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 160 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work(and/or achievement of Milestones)within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form Section d. Vendor Compliance to State Law Non Resident Bidder,Section 00 43 37 e. MWBE Fors(optional at time of bid) f. g. Conflict of Interest Affidavit,Section 00 35 13 h. Any additional documents that may be required by Section 12 of the hist actions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount.In the space provided below,please enter the total bid amount for this project Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and geed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and thea totaling all of the extended amounts. Total Bid $4,500.00 7. Bid Submittal This Bid is submitted 011 R9unth I)a,. �ear h, the entity named below. CITY OF FORT WORTH STANDARD COPiSTAUC1iON SPF.CQiCAT10N Form Revised soutoen "W&00 41_00_00 42 43_00 43_13_00 43 37 Bid—Form-Proposal-Bond Vendor Compliance(1).xls 00 41 00 BED FORM Page 3 of 3 Respectfully submitted, Receipt is acknowledged of the Initialfollowin Addenda: Addendum No. 1: (Signature) Addendum No.2: Addendum No.3: Printed Name Here Addendum No...w (Printed Name) Tide: Title Here Company L Corporate Seal: Address: ', dress 1 fere \ddres�;}Icrc or Snaic t'm_State/ip Cokh:I Icre State of Incorporation: State Hera': Email: Yu11r 1 f i,�r. Phone. YMwr Ph<,nc tiunrbes I Ips, END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECII7CATION Form Rewed20110627 Revised 00 41_00 00 42 43 00 43_13_00 43_37 Bid Form-Proposal-Bond Vendor Compiiance(1).x6 00 42 43 BID PROPOSAL Page 1 Of 1 SECTION 00 42 43 PROPOSAL FORM Concrete Restoration 2013-11 Bradley Douglas Construction Services,LLC UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist ItemFDescription Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT 1-CONCRETE RESTORATION 01-GENERAL 1 10135.0201 Remobilization 1 01 7000 LS 1 500.00 500.00 02-EXISTING CONDITIONS 2 10241.1000 Remove Concrete Pavement 1 0241 15 SY 10,750 4.00 1 $43,000.00 31-EARTHWORK 3 13123.0101 Unclassified Excavation 1 31 2316 CY 100 $8.00 1 $800.00 4 3211.0122 Flex Base Type A GR-2 3211 23 CY 850 $10.00 $8.500.00 5 3213.0202 7"Concrete Pavement HES 321313 SY 10,750 $42.00 $451,500.00 6 3213.0208 Concrete HES extra depth) 321313 CY 250 $8.00 $2,000.00 7 3213.0700 Joint Sealant 32 13 73 LF 10,000 $0.65 $6,500.00 33-UTILITIES(SPECIAL) 6 13305.0108 Miscellaneous Adjustment Utilities 33 05 14 LS 1 $4,000.00 $4.000.00 UNIT 1-CONCRETE RESTORATION SUBTOTAL: $516,800.00 4 UNIT 2-RAISED CURB MEDIAN INSTALLATION(at Railroad Crossing) 01-GENERAL 9 10135.0101 Railroad Coordination 013513 LS 1 1 800.00 $800.00 10 10135.0102 Railroad Flagmen 01 3513 WD 5 $200.00 $1,000.00 02-EXISTING CONDITIONS 11 10241.1100 Remove Asphalt Pvmt -o241 15 SY 350 $8.00 $2.800.00 31-EARTHWORK 12 13123.0101 Unclassified Excavation 31 23 16 CY 10 $10.00 100.00 32-EXTERIOR IMPROVEMENTS 13 13212.0503 6"Asphalt Base Type B 32 12 16 SY 40 $26.50 $1.060.00 14 13216.0102 7"Conc Curb and Gutter 32 16 13 LF 450 $21.00 $9,450.00 33-UTILITIES 15 3305.0206 Imported Embedment/Backfill,Acceptable Backfill 33 05 10 CY 40 $22.00 $880.00 39-SPEACIAL 16 19999.0001-Stamped and Stained Concrete 4 inch 99 99 00 SY 225 $30.00 $6,750.00 UNIT 2-RAISED CURB MEDIAN INSTALLATION SUBTOTAL: $22840.00 BID SUMMARY UNIT 1-CONCRETE RESTORATION $516,800.00 UNIT 2-RAISED CURB MEDIAN INSTALLATION $22,840.00 TOTAL BID $539,640.00 w CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS r Form Revised 20110627 Co1FW Concrete 2013-11 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page I of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders.This law provides that, in order to be awarded a contract as low bidder, nonresident bidders(out-0f--state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications.The failure of nonresident bidders to do so will automatically disqualify that bidder.Resident bidders must check the box in Section B. A. Nonresident bidders in the State of ,our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of ,our principal place of business, are not required to underbid resident bidders. B.The principal place of business of our company or our parent company or majority owner is in the State of Texas. 0 w ]BIDDER: r_ Y / Company:f��I�t(�at !A S 5� may: ■ Address: ( /�M w(�`dJ ..?'�7`�t 2 � KTh C )D / ( ignature) r ' ' v7� Title: Tide Here �e�1 C.Q,o� Ie L w � i I Z Date: //;5 S F ■ END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 ]Copy ofRevisM 00410000424300431300433 7Bid_Fam-Piopoaal-Bood_Vendor_Complivk*1).x1s 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a),as amended,Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. GGO 1-539590-0202003 Contractor further certifies that,pursuant to Texas Labor 6 Code, Section 406.096(b),as amended, it will provide to City its subcontractor's certificates of 7 compliance with worker's compensation coverage. 8 9 CONTRACTOR: 10 11 Bradley Douglas Construction By: Sharon Douglas 12 Company (Please Print) 13 14 5001 Brentwood Stair Rd#106 Signature: A�a,4 15 Address 16 17 Fort Worth,TX 76112 Title:President/Owner 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE ME,the undersigned authority,on this day personally appeared 26 'known to me to be the person whose name is 27 subscribed to the foregoing instrument,and acknowledged to me that he/she executed the same as 28 the act and deed of for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 gTVEN UNDER MY HA-N—D A'-N—D SEAL OF OFFICE this 2 7 day of 32 Col 200. 33 34 35 ,�'v°oa �'' f'utAl' T 36 i� S3 ajg pF TEXAS Notary Pub in and for ate of Texas 37 '47E OF `'y MY Comm F,p, 0610517014 38 END OF SECTION 39 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 000515-1 ADDENDA Page 1 of I I SECTION 00 05 15 2 ADDENDA No. 1 3 4 5 The Contract and documents for this project are hereby revised or amended to clarify the followings: 6 7 Section 00 42 43--Proposal Form: 8 Bidlist Item No.4-9999.0000-Remove/Replace Mailbox is to be deleted. 9 The revised Proposal Form is attached to this addendum. 10 Please acknowledge receipt of this addendum by signing and inserting into your proposal at the 11 time of bidding.Failure to return a signed copy of this addendum may be grounds for rendering 12 the bid as nonresponsive. 13 14 Receipt Acknowledges: 15 16 By. Gf By: 17 18 19 20 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 00 45 40-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL .� Page 1 of 1 1 SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal ., 5 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE 6 subcontracting goal is not applicable. 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 10 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 00 11 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 12 13 MBE PROJECT GOAL 0 14 The City's MBE goal on this project is 12% of the total bid (Base bid applies to Parks and 15 Community .Services). Note: If both MBE and SBE subcontracting goals are established for this 16 project,then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be 17 deemed responsive. 18 19 COMPLIANCE TO BID SPECIFICATIONS 20 On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are 21 required to comply with the intent of the City's Business Diversity Ordinance by one of the 22 following: 23 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation,or 24 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation,or 25 3. Good Faith Effort documentation,or; 26 4. Waiver documentation. ,* 27 Failure to comply with the City's Business Diversity Ordinance shall result in the Bid being 28 considered non-responsive.Any questions,please contact the M/WBE Office at(817)212-2674. 29 30 SUBMITTAL OF REQUIRED DOCUMENTATION 31 The applicable documents must be received by the Managing Department, within the following 32 times allocated, in order for the entire bid to be considered responsive to the specifications 33 ferzz E d�Zaierltatin inieaarson tq theprop><i� �� a � 34 tm� uip uch � sbal 3be e'vidgye 35irnoea �" .ct► nod b�+ acce ± ; 1. Subcontractor Utilization Form,if goal is met rcccived by 5:00 p.m., five (5) City business days after }, or exceeded: the bid opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if participation is less than the bid opening date,exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form,if no MBEparticipation: the bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if firm will received by 5:00 p.m., five (5) City business days after perform all subcontracting/supplier work: the bid opening date,exclusive of the bid opening date. 5. Joint Venture Form,if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date,exclusive of the bid opening date. 36 END OF SECTION CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 �r Revised September 29,2012 005243-1 Agreement Page 1 of 4 1 SECTION 00 52 43 2 THIS AGREEMENT, authorized on July 9, 2013 is made by and between the City of Forth 3 Worth, a Texas home rule municipality,acting by and through its duly authorized City Manager, 4 ("City"), and BRADLEY DOUGLAS CONSTRUCTION SERVICES.LLC., authorized to do 5 business in Texas,acting by and through its duly authorized representative,("Contractor"). 6 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 7 follows: 8 Article 1.WORK 9 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 10 Project identified herein. 11 Article 2.PROJECT 12 The project for which the Work under the Contract Documents may be the whole or only a part is 13 generally described as follows: 14 CONCRETE RESTORATION(2013-11)AT VARIOUS LOCATIONS 15 GGO1-539590-0202002 16 Article 3.CONTRACT TIME 17 3.1 Time is of the essence. 18 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 19 Documents are of the essence to this Contract. 20 3.2 Final Acceptance. 21 The Work will be complete for Final Acceptance within 160 days after the date when the 22 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 23 3.3 Liquidated damages 24 Contractor recognizes that time is of the essence of this Agreement and that City will 25 suffer financial loss if the Work is not completed within the times specified in Paragraph 26 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 27 General Conditions. The Contractor also recognizes the delays, expense and difficulties 28 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 29 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 30 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 31 City Six Hundred Fifty Dollars ($650.00) for each day that expires after the time 32 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 33 Acceptance. CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 ■ Revised November 09,2011 005243-2 Agreement Page 2 of 4 34 Article 4.CONTRACT PRICE 35 City agrees to pay Contractor for performance of the Work in accordance with the Contract 36 Documents an amount in current funds of FTVE HUNDRED THIRTY NINE THOUSAND 37 SIX HUNDRED FORTY DOLLARS AND ZERO CENTS($539,640.00). 38 Article 5.CONTRACT DOCUMENTS 39 5.1 CONTENTS: 40 A. The Contract Documents which comprise the entire agreement between City and 41 Contractor concerning the Work consist of the following: 42 1. This Agreement. 43 2. Attachments to this Agreement: 44 a. Bid Form 45 1) Proposal Form 46 2) Vendor Compliance to State Law Non-Resident Bidder 47 3) Prequalification Statement 48 4) State and Federal documents(project speck) 49 b. Current Prevailing Wage Rate Table 50 c. Insurance ACORD Form(s) 51 d. Payment Bond 52 e. Performance Bond 53 f. Maintenance Bond 54 g. Power of Attorney for the Bonds 55 h. Worker's Compensation Affidavit 56 i. MWBE Commitment Form 57 3. General Conditions. 58 4. Supplementary Conditions. 59 5. Specifications specifically made a part of the Contract Documents by attachment 60 or, if not attached, as incorporated by reference and described in the Table of 61 Contents of the Project's Contract Documents. 62 6. Drawings. 63 7. Addenda. 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Date of the 66 Agreement and, if issued,become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 71 w CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised November 09,2011 005243-3 Agreement Page 3 of 4 72 Article 6.INDEMNIFICATION 73 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 74 expense, the city, its officers, servants and employees, from and against any and all 75 claims arising out of, or alleged to arise out of,the work and services to be performed 76 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 77 under this contract. This indemnification provision is specifically intended to operate 78 and be effective even if it is alleged or proven that all or some of the damages being 79 sought were caused, in whole or in part, by any act,omission or negligence of the city. 80 This indemnity provision is intended to include, without limitation, indemnity for 81 costs,expenses and legal fees incurred by the city in defending against such claims and 82 causes of actions. 83 84 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 85 the city,its officers,servants and employees,from and against any and all loss,damage 86 or destruction of property of the city,arising out of,or alleged to arise out of,the work 87 and services to be performed by the contractor, its officers, agents, employees, 88 subcontractors, licensees or invitees under this contract. This indemnification 89 provision is specifically intended to operate and be effective even if it is alleged or 90 proven that all or some of the damages being sought were caused,in whole or in part, 91 by any act,omission or negligence of the city. 92 93 Article 7.MISCELLANEOUS 94 7.1 Terms. 95 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 96 have the meanings indicated in the General Conditions. 97 7.2 Assignment of Contract. 98 This Agreement, including all of the Contract Documents may not be assigned by the 99 Contractor without the advanced express written consent of the City. 100 7.3 Successors and Assigns. 101 City and Contractor each binds itself, its partners, successors, assigns and legal 102 representatives to the other party hereto, in respect to all covenants, agreements and 103 obligations contained in the Contract Documents. 104 7.4 Severability. 105 Any provision or part of the Contract Documents held to be unconstitutional, void or 106 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 107 remaining provisions shall continue to be valid and binding upon CITY and 108 CONTRACTOR. 109 7.5 Governing Law and Venue. 110 This Agreement, including all of the Contract Documents is performable in the State of 111 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 112 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised November 09,2011 rs;.0_ I 3 a. awv aii fa r«du emilt but; rt aLia tod Wd ,'Omvhw of 7 Z*.cbiaF—aW r#,*n," 'Ftlr-411W r-'r I)a boa ioruiW Up Vial ttmX4 ' * r"t iiai' ArWrvkAIqr.�1 +#i!a cadf .-4 b%Yu1YI" sU 041 a vrniv#jow A-low lom sew v'3' .f alis tou ;jawhar et-mir« • ��. �r' �� ��,r��� IE#a�� if � A I1 � ry� � n a tll�ri ,ivA , rl �+r 1t ct Y 4in b5adtft• + «�c411iF�:u 9�4 +iii 'iii�J 4h. I 1p «;: �f�r�a ikq� •r!> i,�y 1 1 I� vi b ��a�ae .�,«y �r�p�1 unb 'kstavrj s,•r`tm. f,O4y n. tv "-Xvi ��w ,���r� �tk ate �poir, �� .,�[� .��•r�,-' � :� ��rC�iij��+' eta M tVW.%k ile 'td 'Woor; 9th "I ,s-, -,A.' sIwIwv ally'► 1wmm awmvml w RRYMAnva .xtiUr�yi zed _ ��� AbLal �y �Y«91. •'1'! ,fx lf"_' 25+1 41�Tjl mdf.u, r -Act f; P. 14701 1AI VU j$"j.tvt 1"9202!"W etP f-- ;?A grim.I n# .lit,�nr, loja-4.)2W rtr atil:41 �; :; +� ark i��i-11"t'i ;��;;ar•wya4, b+�( �r�l .'l�`d!'�!Y__C i�,ypa,rft;',� .arid.l �4 ���. �iIIJa,1�:r1'� r u.:ilJ.. .1. . 11'� d Oil'�%Mf.s J115"iK4, rl- i-; Mlqn CJS l I A I i_ ri: u+' i_ 1 "A' «�� ��4�iyY, P' _+',-1' -w;G��`k��'11e' ,y� tiill�l a$1r ��r I �, "Yrr� ��ry �'fw•,�',t�'� 1 �1:r`. :+ .Pim90JUU0I tImO7u,-r 'A i tla t ' itsms fAr;.c ori W4 11,10 4.A 'I�rlr r'a� .�lk�t�ililAQe�iinwlaa! �t �!� �$►7i.1 a�t'�'iS..11e5>ir T•�M'3`1. } �Iri 'a' �t511# rur r1'YS.. Jl •� 'rl t'bt4 W4 tAsn ,d '11, 4'« Od 'Al, 13 Fir►= i.r�_ ;w�:�u 'stApP+ r l'i+i Z4-R - nr►. r4 �r�.lis tar t 4++�7 ,rn ,:�i;aT,,,rt Ili JIV?Y r rill !$'vt2m-i'.'�A] Ijv+7T4 'j 0*11 1 ICS.' i�Etfi4'i tCtf .�alxrhxti;,'�J� _,,; i741'+AIrl $'Ir iyo at; ppti i«,i ,4i" v.mju j + Ar -vT is�iaa=v a�l +�h:«,off Hum i�a��s���.. +�f=�>t{� ►r e,a,:�,-,M ,1t 4 rt ��irr • ,,.ra+4s'r�1 r"itI ,r -trl1'r.���rd`,'riP3J r•#il+ p ,1,jr'`11,J'14r. I; oy 005243-4 Agreement Page 4 of 4 113 7.6 Other Provisions. 114 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 115 classified, promulgated and set out by the City, a copy of which is attached hereto and 116 made a part hereof the same as if it were copied verbatim herein. 117 7.7 Authority to Sign. 118 Contractor shall attach evidence of authority to sign Agreement, if other than duly 119 authorized signatory of the Contractor. 120 121 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 122 counterparts. 123 124 This Agreement is effective as of the last date signed by the Parties("Effective Date"). 125 C actor City of Fort Worth By: �7 Fernando Costa B A*C� Assistant City Manager (Sign e) Date 0 /.X �euc S Attest: (Printed Nam ) City Se re r; (Seal) Title: C-atljJ !� Address: mjVl(D017 �� M&C -Z 2 a� Date: �• , City/StatelZip: i t-r Y ,6,r-+t4,X 74 ?-Approved as to Form and Legality: 71m �. Date -oot es W.sleek- 4,,e.116F-10 + • *- f Assistant City Attorney 126 127 128 APPROVAL RECOMMENDED: 129 130 1 t 131 C../ w 132 Doug as Wiersig, P.E. 133 DIREC R, 134 Transportation and Public Wo 135 OFFICIAL RECORD CITY SPICRITARY FT.WORTH,TX CITY OF OR I WUR I H CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised November 09,2011 006113-I PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6113 BOND# 1010713 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we,Bradley Douglas Construction Services,LLC.,known as"Principal"herein and 8 Oklahoma Surety Company ,a corporate surety(sureties,if more than 9 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 10 or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 11 pursuant to the laws of Texas,known as"City"herein,in the penal sum of,FIVE HUNDRED 12 THIRTY NINE THOUSAND SIX HUNDRED FORTY DOLLARS AND ZERO CENTS 13 ($539,640.00), lawful money of the United States,to be paid in Fort Worth,Tarrant County, 14 Texas for the payment of which sum well and truly to be made,we bind ourselves,our heirs, 15 executors,administrators,successors and assigns,jointly and severally,firmly by these presents. 16 WHEREAS,the Principal has entered into a certain written contract with the City 17 awarded the 9 day of July,2013,which Contract is hereby referred to and made a part hereof for 18 all purposes as if fully set forth herein,to furnish all materials,equipment labor and other 19 accessories defined by law,in the prosecution of the Work,including any Change Orders,as 20 provided for in said Contract designated as CONCRETE RESTORATION(2013-11)AT 21 VARIOUS LOCATIONS,GGO1-537110-0202002 22 NOW,THEREFORE,the condition of this obligation is such that if the said Principal 23 shall faithfully perform it obligations under the Contract and shall in all respects duly and 24 faithfully perform the Work,including Change Orders,under the Contract,according to the plans, 25 specifications,and contract documents therein referred to,and as we]I during any period of 26 extension of the Contract that may be granted on the part of the City,then this obligation shall be 27 and become null and void,otherwise to remain in full force and effect. 28 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 29 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 30 Worth Division. CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0601-537110-0202002 Revised July 1,2011 006113-2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended,and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF,the Principal and the Surety have SIGNED and.SEALED 5 this instrument by duly authorized agents and officers on this the 251h day of July 6 .20 13 7 PRINCIPAL: 8 Bradley Douglas Construction Services, LLC 9 10 11 BY: 12 ign ture 13 14AAR Q.S 15 16 ( incipal cretary Name and Title 17 1s Address: 5001 Brentwood Stair Road #106 19 Fort Worth, TX 76112 20 21 22 Witness as to Principal 23 SURETY: 24 Oklahoma Surety Company 25 26 27 BY: 28 Signature 29 30 Raul F. Camps, Attorney-in-Fact 31 Name and Title 32 33 Address: PO Box 1409 34 Tulsa, OK 74101 35 k AAA fl 36 37 V1 Mess ti YoS ty Telephone Number: 972-671-9105 38 39 40 41 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address,both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) !!! STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI 537110 0202002 Revised July 1,2011 I 006114-1 PAYMENT BOND Page]of2 1 SECTION 00 6114 BOND# 1010713 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TA.RRANT § 7 That we, Bradley Doualas Construction Services, LLC., known as "Principal"herein, 8 and Oklahoma Surety Company , a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of FIVE HUNDRED THIRTY NINE THOUSAND SIX HUNDRED FORTY i 13 DOLLARS AND ZERO CENTS (5539,640.00), lawful money of the United States,to be paid 14 in Fort Worth,Tarrant County, Texas,for the payment of which sum well and truly be made,we 15 bind ourselves, our heirs,executors, administrators, successors and assigns,jointly and severally, 16 firmly by these presents: 17 WHEREAS,Principal has entered into a certain written Contract with City, awarded the 18 9 day of July,2013,which Contract is hereby referred to and made a part hereof for all purposes 19 as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as 20 defined by law,in the prosecution of the Work as provided for in said Contract and designated as 21 CONCRETE RESTORATION (2013-11) AT VARIOUS LOCATIONS, GG01-537110- 22 0202002. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code,as amended) in the prosecution of the Work under 26 the Contract,then this obligation shall be and become null and void; otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute. �y' MY OF FORT WORT" CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110.0202002 Revised July 1,2011 0061 14-2 PAYMENTBOND Page 2 of 2 1 IN WITNESS WHEREOF,the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 25th day of 3 July 2013 e 4 PRINCIPAL: Bradley Douglas Construction Services, LLC ■ ATTEST: BY: 17, Signature "A'd. J I vrA (Principaiv&ciefary Name and Title Address: 5001 Brentwood Stair Rd #106 Fort Worth, TX 76112 Witness as to Principal SURETY: Oklahoma Surety Company ATTEST: BY: La v C�✓ ` Signature Raul F. Camps, Attorney-in-Fact (Surety)Secretary Name and Title _ Address: PO Box 1409 Tulsa, OK 74101 ■ Itness aWto Surety Telephone Number: 972-671-9105 5 6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 7 bylaws showing that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address,both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH CONCRETE RESTORA11ON(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 IL 006119-1 MAINTENANCE BOND Pagel of 3 1 SECTION 00 6119 2 MAINTENANCE BOND BOND# 1010713 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Bradley Douglas Construction Services.LLC.,known as"Principal"herein and 9 Oklahoma surety Company a corporate surety(sureties,if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein(whether one 11 or more),are held and fainly bound unto the City of Fort Worth,a municipal corporation created 12 pursuant to the laws of the State of Texas,known as"City"herein,in the sum of FIVE 13 HUNDRED THIRTY NINE THOUSAND SIX HUNDRED FORTY DOLLARS AND 14 ZERO CENTS($539.640.00), lawful money of the United States,to be paid in Fort Worth, 15 Tarrant County,Texas,for payment of which sum well and truly be made unto the City and its 16 successors,we bind ourselves,our heirs,executors,administrators, successors and assigns,jointly 17 and severally,firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 the 9 day of July.2013,which Contract is hereby referred to and a made part hereof for all 21 purposes as if fully set forth herein,to furnish all materials,equipment labor and other accessories 22 as defined by law, in the prosecution of the Work,including any Work resulting from a duly 23 authorized Change Order(collectively herein,the"Work")as provided for in said contract and 24 designated as CONCRETE RESTORATION(2013-11)AT VARIOUS LOCATIONS,GGO1- 25 537110-0202002;and 26 27 WHEREAS,Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans,specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part r - 33 upon receiving notice from the City of the need therefor at any time within the Maintenance I34 Period. I� CTTY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GGOI-537110-0202002 Revised July 1,2011 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void; otherwise to remain in 5 full farce and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and al l such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being bome by the Principal and 10 the Surety under this Maintenance bond;and 11 12 PROVIDED FURTHER,that if any legal action be filed on this Bond,venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Port 14 Worth Division;and 15 - 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG01-537110-0202002 Revised July 1,2011 0061 19-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 25th day of July ' 3 20 13 4 5 PRINCIPAL: 6 Bradley Douglas Construction Services, LLC 7 8 9 BY: r 10 Si ature _ 11 A 13 OLS _ V �-t 14 (Principal)Veretary Name and Title 15 16 Address: 5001 Brentwood Stair Road #106 17 Fort Worth, TX 76112 18 19 20 Witness as to Principal 21 SURETY: 22 Oklahoma Surety Company 23 24 25 BY: �i , �Y 26 Signature 27 28 Raul F. Campa, Attorney-in-Fact 29 ATTEST: Name and Title 30 31 Address: PO Box 1409 32 (Surety)Secretary Tulsa, Ox 74101 33 34 35 ltness aSOD Surety Telephone Number: 972-671-9105 36 37 *Note: If signed by an officer of the Surety Company,there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH CONCRETE RESTORATION(2013-11) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS GG0I-537110-0202002 Revised July 1,2011 OKLAHOMA SURETY COMPANY 1437 SOUTH BOULDER, SUITE 200 •TULSA, OKLAHOMA 74119 - 918-587-7221 - FAX 918-588-1253 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the OKLAHOMA SURETY COMPANY a corporation organized and existing under and by virtue of the laws of the State of Ohio,does hereby nominate,constitute and appoint the person or persons named below,each individually if more than one is named,its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company,as surety, any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof. Brent M. Blonigan, Raul F. Campa, Rob Dreiling and Kara Pierce, individually of RICHARDSON,TX IN WITNESS WHEREOF,the OKLAHOMA SURETY COMPANY has caused these presents to be signed and attested by its appropriate officers and�l?,gorporate seal hereunto affixed this 13 day of May 2013 .`O. QpQA�l f� SEAL W' :0: ,� OKLAHOMA SURETY COMPANY + ATTEST: S N SECRETARY TODD BAZATA VICE PRESIDENT On this 13 day of May , 2013 before me personally appeared TODD BAZATA ,to me known,being duly swom,deposes and says that s/he resides in Tulsa,Oklahoma,that s/he is a Vice President of Oklahoma Surety CoMpany,the company described in and which executed the above instrument;that s/he knows the seal of the said Company;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by authority of her/his office under the By-Laws of said Company,and that s/he signed his name thereto by like authority. Commission 0 1100825 STATE OF OKLAHOMA SS 4v �q/q •',y COUNTY OF TULSA �� gLl a My C ion expire: 0%-08-15 L •.oxt 17 f k -*,,ss x•14 ONEIR G�i,+` JULIE AL HAN Notary Public "444fN1/'' This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Oklahoma Surety Company by unanimous written consent dated September 25,2009. RESOLVED: That the President,the Executive Vice President,the several Senior Vice Presidents and Vice Presidents or any one of them, be and hereby is authorized,from time to time,to appoint one or more Attorneys4n-Fact to execute on behalf of the Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,undertaking,contract of suretyship.or other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION i, SHARON HACKL Secretary of Oklahoma Surety Company,do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of September 25,2009 have not been revoked and are now in full force and effect. 32-0 Signed and sealed this 21"day of v t"I 13 - SHARON HACKL Secretary IF BOX IS EMPTY \.�. _.. MID-CONTINENT CASUALTY COMPANY OKLAHOMA SURETY COMPANY STATE OF TEXAS CLAIM NOTICE ENDORSEMENT In accordance with Section 2253.021 (t)of the Texas Government Code and Section 53.202(6)of the Texas Property Code, any notice of claim to the named surety under this bond(s)should be sent to: Mailing: MUD-CONTINEN'C CASUALTY C041PANY OKLAROMA SURETY COMPANY P.O. BOX 1,109 TULSA,OK 74101 TELEPHONE NO. 1-800-722-4994 FAX NO. 1-918-586-0840 E-NIAIL: CLAIIvISLMCG-INS.COM Physical: 1.437 S. BOULDER SUITE 200 TULSA, OKLAHOMA 74119 ATTACH THIS NOTICE TO YOUR BOND UPON EXECUTION OF THE BOND WAVDIY"4) CERTIFICATE OF LIABILITY INSURANCE- ;;31,2 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). RODUCER CONTACT NAME: Jan Maughan 'rederiksen 5 Frederiksen, A Corp. PHONE (972)387-8646 1FAXfaic-No-Egg- AIC. (972)991-9307 :nsurance & Risk Mgmt Services E44AILAppREss.janm@fredsndfred.com 2900 Preston Road, Suite 500 INSURER(S) AFFORDING COVERAGE MAIC# gallas TX 75230 INSURERAMiscellaneous Companies ISURED INSURERB:Travelers Cas & Sr of Illinois 19046 Iradley Douglas Construction Services LLC INSURER CMcClelland 6 Hine 057 001 Brentwood Stair Road, #106 INSURERD:Texas Mutual Insurance Coppany 025 INSURER E:Travelers .Ort Worth TX 76112 INSURER F: OVERAGES CERTIFICATE NUMBER:13-14 Liability REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. R TYPE OF INSURANCE POLICY NUMBER M LK Y EFF MMfDPOLIDr EXP LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,0( X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence S 100,04 L CLAIMS-MADE F_�OCCUR X CP833660 /24/2013 /24/2014 MED EXP Any one ) $ 5,01 PERSONAL&ADV INJURY $ 1,000,01 GENERAL AGGREGATE $ 2,000,0( GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,0( POLICY I X PRO LOC $ AUTOMOBILE LIABILITY CEaccident) ED SINGLE LIMIT 1,000,0( I X ANY AUTO BODILY INJURY(Per person) $ AALL UTOS OWMED SCHEDULED X -9069P921-13-SEL /30/2013 /30/2014 BODILY INJURY(Per accident) i OS NON-OVMVED PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per acrid,, Uninsured motorist combined $ 1,000,0( X UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 5,000,0( EXCESS LIAB CLAIMS-MADE AGGREGATE $ 5,000,0( DED I X I RETENTIONS 5,000 X XONS529513 /24/2013 /24/2014 $ WORKERS COMPENSATIONX -MRY TATLIMITS -TH- AND EMPLOYERS'LIABILITY Y I N ANY PROPRIETOR/PARTNER/EXECUTIVE a NIA E.L.EACH ACCIDENT S 1,000,0 OFFICER/MEMBEREXCLUDED? SF-0001211129 /15/2013 04 (Mandatory in NH) 4/15/2014 E. DISEASE-EA EMPLOYE $ 1 000 0( If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,0 Contractors Equipment 60-IC944622 /6/2013 /6/2014 Scheduled Equpmen $142,91 SCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Athch ACORD 101,AddWonal Remarks Schedule,H more specs In required) coject: Concrete Restoration at Various Locations #GG01-537110-0202002 )e City of Fort north, its officers, employees and servants are additional insured with regard to all )licies above except workers' compensation as required by written contract. Waiver of subrogation )plies in favor of the City of Fort Worth as required by written contract. Insurance is primary and )n-contributory. 30 days notice of cancellation except for non-payment of premium which is 10 days )tics. :RTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Fort Worth ACCORDANCE WITH THE POLICY PROVISIONS. 1000 Throckmorton Street Fort Worth, TX 76102 AUTHORIZED REPRESENTATIVE Mark Frederikeen/13JM ;ORD 25(2010!05) ©1988-2010 ACORD CORPORATION. All rights reserved 5025 poloos).oi The ACORD name and logo are registered marks of ACORD STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:D=m*a21,2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology..........................................................................................................l 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent,Amending,Reuse............................................................................8 _ 3.01 Intent..............................................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data......................... Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental Conditions; Reference Points.........................................................................................................., 11 — 4.01 Availability of Lands...................................................................... ...........11 ................................. 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 F 4.04 Underground Facilities ...............................................................................................................13 4.05 Reference Points .......................................:.................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance,Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance;Option to Replace............................................................19 Article 6—Contractor's Responsibilities..................................................... ................................................... 19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deomdia2l,2012 6.02 Labor;Working Hours................................................................................................................20 6.03 Services,Materials, and Equipment................ ......................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and"Or-Equals".......................................................................................................21 6.06 Concerning Subcontractors, Suppliers,and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas.......................................................................................................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs.............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article 7-Other Work at the Site..................................................................... 35 • 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data r ................................................................................. ................... ................ .36 8.03 Pay When Due ..... . .....36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections,Tests,and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 r 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Representative............................................................................................ ....37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 `= 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dwember2l,2012 Article 10-Changes in the Work;Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work........................................................ 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process.............................................................................................................40 Article 11 -Cost of the Work;Allowances;Unit Price Work;Plans Quantity Measurement......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement...................................... .....45 . ........................................................... Article 12-Change of Contract Price;Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13-Tests and Inspections;Correction,Removal or Acceptance of Defective Work.......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Work...........................................................................................................................48 �. 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 „. 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Work...................................................................................................51 13.09 City May Correct Defective Work.............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization.................................................................. ................55 .t ...................................... 14.05 FinalImpection...........................................................................................................................55 14.06 Final Acceptance.........................................................................................................................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 ..................... 14.09 Waiver of Claims........................................................................................................................57 Article 15-Suspension of Work and Termination ....57 .................................................................................... 15.01 City May Suspend Work.............................................................................................................57 15.02 City May Terminate for Cause...................................................................................................58 11% 15.03 City May Terminate For Convenience.......................................................................................60 Article 16-Dispute Resolution.......................................................................................................................61 16.01 Methods and Procedures..............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dmenker2l,2012 Article17—Miscellaneous..............................................................................................................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................................................................................62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 �I CTrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decembc2l,2012 ' 007200-1 General Conditions Page 1 of 63 ARTICLE 1–DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct,or change the Bidding Requirements or the proposed Contract Documents. �+ 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. . 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award–Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form,if any,and the Bid Form with any supplements. 10. Business Day– A business day is defined as a day that the City conducts normal business, generally Monday through Friday,except for federal or state holidays observed by the City. 11. Buzzsaw–City's on-line,electronic document management and collaboration system. P. 12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight. C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dec®Ua21,2012 .fir 007200-1 General Conditions Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. CityAttorney– The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager – The officially appointed and authorized City Manager of the City of Fort Worth,Texas,or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract.A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations,representations,or agreements,whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: i achieve Y �' () Milestones,if any and(ii)complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deoernber21,2012 007200-1 General Conditions Page 3 of 63 25.Damage Claims — A demand for money or services arising from the Project or Site from a third party,City or Contractor exclusive of a Contract Claim. R 26.Day or day—A day,unless otherwise defined,shall mean a Calendar Day. 27.Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth,Texas,or his duly appointed representative, assistant,or agents. 28.Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth,Texas, or his duly appointed representative,assistant,or agents. 29. Director of Planning and Development— The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative,assistant,or agents. 30.Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly s appointed representative,assistant,or agents. 31.Director of Water Department— The officially appointed Director of the Water Department of the City of Fort Worth,Texas,or his duly appointed representative,assistant,or agents. 32.Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective,but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36.Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded —F work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanba2l,2012 007200-1 General Conditions Page 4 of 63 38. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations—Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item–An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or$25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47.Notice to Proceed A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans–See definition of Drawings. MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deow*cr21,2012 007200-1 General Conditions Page 5 of 63 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising �. the Contractor's plan to accomplish the Work within the Contract Time. 52.Project—The Work to be performed under the Contract Documents. 53.Project Representative—The authorized representative of the City who will be assigned to the Site. 54.Public Meeting – An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55.Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954(42 USC Section 2011 et seq.) as amended from time to time. 56.Regular Working Hours – Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday(excluding legal holidays). 57. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittal. -=A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values---A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deoanba2l,2012 007200-1 General Conditions Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent—The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a y direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water,wastewater,storm water,other liquids or chemicals,or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours—Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday,as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and finishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day—A working day is defined as a day,not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.023 through E are not defined but, when used in the Bidding Requirements or Contract Documents,have the indicated meaning. B. Intent of Certain Terms or Adjectives: pe CITYOFFORTWORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dec®brr21,2012 00 72 00-1 General Conditions Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In t addition, the adjectives "reasonable," "suitable," "acceptable," `proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty,or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install,Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor,materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall fiunish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Daoemba2l,2012 007200-1 General Conditions Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. a ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decen ber21,2012 007200-1 General Conditions Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the rt. Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications,Codes,Laws,and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association,or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants,agents,or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies , A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work. Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work. If, during the performance of the Work,Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual,or code, or(c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not *F proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Dwember2l,2012 �' 007200-1 General Conditions Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies. 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier(whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall r govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and k deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized,by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal(subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions;or 2. reuse any such Drawings, Specifications, other documents,or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:De=nber2l,2012 MW 007200-1 General Conditions Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of-the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies,the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS;REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way,and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed,adjusted,and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deoanber2l,2012 007200-1 General Conditions Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site(except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors,members,partners, employees,agents,consultants,or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data,interpretations,opinions,or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any"technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deo®ber21,2012 007200-1 General Conditions Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an . emergency as required by Paragraph 6.17.A),notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others;and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities,including City,during construction;and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated.- 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:DeDemUa21,2012 007200-1 General Conditions Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall �r protect and preserve the established reference points and property monuments, and shall make no f changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. f 4.06 Hazardous Environmental Condition at Site I A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized. Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors,members,partners, employees,agents,consultants,or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENT'S Revision:D=nba2l,2012 I n 007200-1 General Conditions Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings;or 3. any Contractor interpretation of or conclusion drawn from any"technical data" or any such other data,interpretations,opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible 4M for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers,or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City(and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action,if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited — to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deoember2l,2012 007200-1 General Conditions Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance,Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates oflnsurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured)which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as"Additional Insured"on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Docember2l,2012 007200-1 General Conditions Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement,which shall be identified in the certificate of insurance provided to the City. - 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property&Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of , Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall g be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period,whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage,nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In d* CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Ikoember2l,2012 r00n00-1 General Conditions Page 18 of 63 r lieu of traditional insurance, alternative coverage maintained through insurance pools or risk �r retention groups,must also be approved by City. 11. Any deductible in excess of$5,000.00, for any policy that does not provide coverage on a first-dollar basis,must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled,upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers'Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's * performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability t1' g g (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations,personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis,and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOMIENTS Revision:Dw mbcr2l,2012