Loading...
HomeMy WebLinkAboutContract 45895-A7 CITY SECRETARY AMENDMENT No . 7 CONTRACT NO. 5I TO CITY SECRETARY CONTRACT No. 45895 WHEREAS, the City of Fort Worth (CITY) and CP&Y, Inc . (ENGINEER) made and entered into City Secretary Contract No . 45895, (the CONTRACT) which was authorized by M&C-C -26925 on the 19th day of August, 2014 in the amount of $468 , 966 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $8, 250 which was administratively authorized on December 8, 2014, Amendment Number 2 in the amount of $73, 790. 00 which was authorized by M&C-C-27157 on January 27, 2015, Amendment 3 in the amount of $26, 511 . 00 which was administratively authorized on March 3, 2015, Amendment 4 in the amount of $3, 300 . 00 which was administratively authorized on April 27, 2015, Amendment 5 in the amount of $19, 952 . 90 which was administratively authorized on May 5, 2015; Amendment 6 in the amount of $74, 350 . 17 which was authorized by M&C-C-27511; and WHEREAS, the CONTRACT involves engineering services for the following project : Airport Development Projects at Alliance Airport; and WHEREAS, it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, e n t e r into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 25, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for t h e additional design services to be performed by Engineer totals $ 14, 125 . 65 Q OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX G 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 689, 245 . 72 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECTUED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: CITY OF FORT WORTH ENGINEER 60/ � -fi41j-'5 — Fernando Costa Michael S. Hart ler Assistant City Manager Senior Vice President Date: (p 21 I(o Date : 7� F019 APPROVAL RECOMMENDED: --.1 ��' � William Welstead Aviation Director APPROVED AS TO FORM AND LEGALITY: M&C: N/A 17'1chard McCracken Date: N/A Assistant l.,l LY AI.l.Vtne Flrw� tZ-QS ' NIA ATT OF FO Ya r' 11 ey S $ O creCity tary OFFICIAL RECORD °�� ►y CITY SECRETARY * FT. WORTH, TX CP&Y—) Partners for a Better Quality of Life James A.McKenzie, PE CP&Y 1820 Regal Row Dallas,TX 75235 April 25,2016 Aya Ealy City of Fort Worth Aviation Department 3951 Lincoln Ave Fort Worth,TX 76106 RE: Airport Development Projects at Alliance Airport Amendment No.7 Dear Ms. Ealy: I am requesting an amendment to the Airport Development Projects at Alliance Airport for construction management services on the RTR Duct Bank&Taxiway H Improvements project.The additional expenses were incurred due to construction contract time extensions granted to the contractor.These extensions were granted to account for weather-related construction delays. The contractor also elected to perform night and weekend work to complete the project on time. This night work required additional oversight from the resident project representative.This will be the final amendment for the project. The total contract amendment request is for$14,125.65.A summary of the change to the contract is shown below. Original Contract Amount $468,966.00 Previous Amendments(1-6) $206,154.07 RPR Services by Jacobs $8,569.50 CP&Y 10%Sub Consultant Markup $856.95 CM Services by CP&Y $4,699.20 Amendment#7 Total $14,125.65 New Contract Total $689,245.72 DBE Participation DBE Participation Amount for Original Contract $72,262.00 DBE Participation for Previous Amendments(1-4,6) $62,130.00 Additional DBE Participation for This Amendment $0.00 DBE Participation for New Contract Total $134,392.00 DBE Participation%for New Contract Total 19.5% Thank you for your consideration of this request.Should you have any questions or comments regarding this matter,please feel free to contact me at 214-589-6914 or by email at imckenzie@cDyi.com Sincerely, /�j� ' . 1820 Regal Row,Suite 200 -a. /�" 1 mes A.McKenzie, PE Dallas.Texas 75235 ip)214 638 0500 if'214 638 3'23 www cpyt ccm EXHIBIT "B-3" (Supplement to Attachment B) On Call Agreement for Certain Development Projects at Alliance Airport SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount % Prime Consultant: Program management, 417,429.80 60.6 CP&Y airfield civil design, construction management Proposed MWWBE Sub-Consultants Amount % ANA Consultants, Survey services 30,000.00 4.4 LLC Gorrondona & Geotechnical investigation 30,302.00 4.4 Associates, Inc. & construction materials testing Project Management Resident project 46,520.00 6.7 Associates, LLC representative services Ferguson Consulting, Airfield electrical design 27,570.00 4.0 Inc. Non-MWWBE Consultants: Jacobs Engineering Resident project 137,392.00 19.9 Group, Inc. representative services Project Description Scope of Services Total Fee MWBE Fee Percent Development Projects Engineering Design $689,245.72 $134,392.00 19.5% At Alliance Airport & Construction Management City MWWBE Goal = 17% 0 0 0 0. rn m Q O O ON O^ cn Q N N O m Ln Ln M C` V -V M M -:I- N O o o o r� O � � F- 14 rl rl V} to to to N t/f L► O O 0 P P Ln to O O O D D ko � '~ z z L/ N WW CWC 00 00 � C C Q Q 1h V? Vf iOo O S t0000 D OO N O Z z n n Z N N N N c Q 4.n N Q N Vf CL Ln m 0 S O 1 0 C; C� z z � L CW LU Q Q LU o S m DO S D z O z W? W M M W On � Q Q SP f>!1 O S f> !1 N LAO6 CSO M N z O O z cn W Q d W S N N a a z o No S o o o z 0 $ z J W G W Ln Ln W m u cr Q v► Q ,n W F- m z D O O 00 O C g z oi Let$ z N CW I\ n WWC � C C O Q to N Q to an ri 0 0 0 0 0 0 I� Ln N O O O O O �o t0 WO O O O O 01 tD P J' 0 0 0 0 J rn Nf 0 tD O O r+ O N 0 un to Q O N6 O N Q V w Un m �4 O Ln Ln N Q z O 0) O I� t0 z �o d On N I� Ln M 01 fn -1 N Lr N O V N V1 to 00 00 ry to m Oi q� q� pf 0) io V N N O t3 LO n N N I� 14 r-4 (14 N n O 0) (n aV)- n� � . vJ in in +a 4A. -(n I-,)- +n +n vs v► LU u Ou z 3 J LL m Q O O u W to m y l� O O O O O O O H to U w Q ¢ > z 3 a0z zzzzzz � > z ,= w O 0 m u u w w w w w w w w o N Z J z I.- 0 � O Z D 0 0 0 o o Q� ? Z CL p o m of O CL O m Q > L7 w w w w w w w Z Q ¢ W o z a o_ O z O 2 w m Q O u oa a ¢ ¢ ¢ a ¢ u ¢ � oru cI Lz Proposal for Construction Phase Services Ry RTR DuctbankC Fort Worth Alliance Airport Phase Labor Cost Reimbursables CPBY Fee Total Construction Management CP&Y CM Services $4,272.00 $0.00 $427.20 $4,699.20 Jacobs RPR Services $8,569.50 $856.95 $9,426.45 Total -Cost Plus Fixed Fee $4,272.00 $8,569.50 $1,284.15 $14,125.65 Total Proposal Amount $14,125.65 3/21/2016 � ■ � w CN � ° Q ° a F k � � # 2 & ° 22 613. > CL _ 0 2 CN cfr . � - ■ 22 2 I c ■ k & c / . - p c ; - / C = 4) 0 CL ! @8 ! 7 ) � k k k � « ) § / - k fjt Qom = r- 4) EE _ 2 - � � / ® cc J) � � � kt � � � cm ci:- � � � 'o c c ` 04 o' C20 m ) § k � U 2\ } \ \ \ } \ \ / 2 �) ƒ ) O / \ \ CL J 0 ® « \ j / Construction Phase Services Jacobs Fee Proposal RTR Duct Bank -Additional Services Amendment 3 Alliance Airport, Fort Worth,Texas Fee Proposal Hourly Hours Labor Rate Cost Resident Project Represetative(RPR) $ 81.22 50 $ 4,061.00 Salary Cost $ 4,061.00 Overhead Rate @ 91.84% $ 3,729.45 Sub-Total $ 7,790.45 Profit @ 10% $ 779.05 Labor Cost $ 8,569.50 Expenses Mileage($0.56'280 miles per trip) $156.80 0 $ - Lod in ($550 per month) $550.00 0 $ - Electric $100.00 0 $ - Taxi $0.00 0 $ - Hotel(Per Diem) $0.00 0 $ - Meals Per Diem$56) $56.00 0 $ - AirFare(Per trip) $0.00 0 $ - Parkin (Per Da ) $0.00 0 $ - Rental Car $0.00 0 $ Total Expenses $ Jacobs Total Costj $ 8,569.50 Total Contract Cost $ 8,569.50 March 16,2016 James McKenzie From: Sent: Wednesday, March 2, 2016 2:11 PM To: James McKenzie Cc: Stephen P. Conner Subject: Alliance RTR Duct Bank Project James— Per our conversation yesterday, I am confirming that Billy Jones was given a temporary salary increase of$14.78, from $66.44 to $81.22 per hour, effective September 1, 2015. The increase was necessary to cover his living expenses while at Alliance, and in lieu of paying directly for Billy's remote living expenses. Billy Jones' actual salary rate billed to the RTR duct bank project after September 1, 2015 is less than the rate we used to calculate lump sum fee for the Alliance runway extension construction project he is currently engaged on. The reason is that the runway extension project duration is two years and four months, and we provided for future merit increases for him, averaged over the duration of the project. Effective September 1, 2015, Billy Jones is not being reimbursed for his remote living expenses on either project. Please let me know if you require additional information. R bert G. "Tex" Schmidt, PE I Jacobs I Aviation Manager I Builirgs & Infrastructure 1817.347 7807 817.948-6884 mobile Fwww.iacobs.com NO—ICE ^s cor^ u^Icatlor "la`/ coria ^ corfiCe^tla arC o egeC dt or —at s For "'e sole -se of t"e ^te^ded ecl:Diert, 4^y ew rg, coo\, ^g or d s,, outor of, or is-ce j, ­s —es.age oy ^CeC __o e-ts s si-cty oro^i.,ited ify,-" -ave - ce,ved tris message e--or, olease rotifv is mmeatateiy oy -eory,rg to '^e message and deiet rg t `-= your =outer. 1