Loading...
HomeMy WebLinkAboutContract 46038-A3 CITY SECRETARY AMENDMENT No. 3 CONTRACT WO. 4J U- 'A3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and HDR Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46038, (the CONTRACT) which was authorized by M&C C-26883 on the 22nd -day of July, 2014 in the amount of $915, 000 . 00, which was amendedt on ,September 25, 2015 adding additional scope valued at $187 , 700 and Amendment No. 2, adding additional scope valued at $15, 000; and WHEREAS, the original M&C authorized funding up to. .the . amount of $1, 200, 000 . 00, from which Amendments No. 1 and No. 2 were funded and from which this Amendment No. 3 will be funded; and WHEREAS, the CONTRACT, as amended, involves professional services for the following project : Update to the Master Thoroughfare Plan; and WHEREAS, it has become necessary to execute Amendment No . 3 to the CONTRACT to include an increased scope of work and revised fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT : 1. Article I of the CONTRACT is amended to include the additional engineering services specified on the attached scope of work, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $82,300. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,200, 000. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . OFFICIAL RECORD Page -1- CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City Manager or his designee, below. APPROVED: City of Fort Worth ENGINEER HDR Engineering, Inc. 7y�-7 Fernando Costa LdQ,4 A. Bathurst, PE Assistant City Manager Vice President DATE: W,CAco DATE: AP L OMMEN D: R ndle H wood Director, Planning and Development Department APPROVED AS TO FORM AND LEGALITY: M&C: C-26883 iw�� Date : 7-22-2014 Douglas W. B ack Sr. Assistant City Attorney ATTEST: ORr WO 4 ar J. Kayser ~`�^. �5' ox d' City Secretary NFT ICIAL RECORD Y SECRETARY .WORTH,TX Page -2- ADDITIONAL TASKS City of Fort Worth MTP Update Task 8: On-Call Support The CONSULTANT will provide on-call services to the City (on an as-needed basis) related to implementation and administration of the 2016 Master Thoroughfare Plan and other transportation planning needs. Activities may include, but are not limited to: • Assistance with periodic model runs to update the MTP Lanes Map • Interaction with the NCTCOG regarding travel-demand forecasting • Integration of MTP tools (maps, spreadsheets, etc.)into City processes • Demand and alignment analysis related to proposed MTS amendments • General support related to MTP amends and waivers • Participation in meetings with partner agencies (TxDOT, cou _,. , cities, etc.) or other stakeholders regarding MTP issues and concerns • Updates to the MTP "living document" as necessary to keep it current and accurate Fee Structure For all professional on-call services, the City agrees to pay the CONSULTANT on a reimbursable basis not to exceed $82,300.00. The CONSULTANT is only responsible for those professional services that can be completed within the maximum contract amount of $82,300.00. CONSULTANT will bill the City on a time-and-materials basis for tasks approved by the City according to the rate structure in effect at the time of services. The CONSULTANT may revise the rate schedule on 0anuary 1of each year. HDR may only bill in excess of the established rate ranges With prior written approval by the City. Category Hourly Loaded Rate (Includes Labor, Overhead, and Profit) Project Principal $240-280 Project Manager $200-250 QA/QC $ 180-230 Senior Project1�*rr1anner $ 150-225 Project Engineer/Planner $ 90- 150 EIT/Jr. Planner $45- 100 AftloWbutive Support $45-100 Effective May 1,2016 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fort Worth MTP Scope Tasks 1