Loading...
HomeMy WebLinkAboutContract 43893-A3 CITY SSCRETAW CONTRACT N0. - AMENDMENT No-3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Teague Nall and. Perkins, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43893 , (the CONTRACT) which was authorized by the City Council by M&C C-25936 on the 23rd day of October, 2012 in the amount of $563 , 730 . 92 ; and Amendment No. 1 which was authorized by the City Council by M&C C-26486 on the 7th day of October, 2013 ; and Amendment No. 2 which was administratively authorized by the City on the 8th day of June, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project : Chapel Creek Bridge over Interstate Highway 30 WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 15 , 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $69, 055 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $904 , 936 . 92 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . V RECe1f OFFICIAL RECORD JUN 30 CITY SECRETARY C NSFORrwo Page -1- FT.WORTH,TX ECRETARy EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER 'Teague Nall and Perkins, Inc. Jay Chapa J se W. Atwood, P. E. Assistant City Manager P pal DATE: 6 - .-30— DATE: 06/27/2016 APPRQ�vAL RECOMMENDED: Douglas Wo Wiersig, P.E. Director, Transportation and Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: C-27775 Date : 6-21-16 Douglas W. Black Assistant City Attorney ATTEST: � VORr,y lvfarJ. 06 City Secr tart' rEXAs OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- tnp teaOw nail i parkins wwvvincc m March 15,2016 _GlimmVINVOYM' bx archteos Mr. Michael Weiss, P.E. City of Fort Worth Transportation& Public Works Department 1000 Throckmorton Fort Worth,Texas 76102 RE: IH 30 at Chapel Creek Boulevard Bridge replacement Fee Proposal for Contract Amendment No.3 DOE Number 901 CSJ: 091848-722 Dear Mr. Weiss: Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services that resulted from the revised project schedule, and changes to TxDOT bridge design criteria and standards. The following is a brief description and cost for the additional services to be provided on this project: I. Project Management: Teague, Nall and Perkins will be required to perform additional project management services because the construction letting scheduled milestone has been extended from the original contract date. The current contract schedule concluded November 2016. The projected contract award is May 2017 with construction to conclude in May 2018. This is 18 additional months of administration, invoicing, status reports, monthly meetings, and MWBE reporting. Fee: $9,490.00 II. Supplemental Bridge Design Services: Teague,Nall and Perkins will be required to revise bridge design and standards to conform to the updated TxDOT Bridge Design Manual issued in October 2015. The original scope of services and fee was based on the TxDOT Bridge Design Manual issued in March 2013 and Bridge Design Drawing standards issued in 2011. On October 16, 2015, TxDOT revised the manual to conform to the r Edition of the AASHTO LRFD Bridge Design Specifications. The bridge substructure will require complete redesign including the number of and layout of prestressed 1-girders. Redesign will also include the abutment caps, reinforcement details and bridge slab details. Fee: $48,080.00 Fort Worth-1100 Macon Street a Fort Worth,Texas 76102�817.336.5773 ^ Dallas-17304 Preston Road,Suits 1340-Dallas,Texas 75252&214-461.9867 Dereon-1517 Cm*e Place Drive,Suite 320-Derean,Texas 76205-940.383.4177 A Shernsm-200 Norrh Travis Street,Sucre 500-Shem+a�,Texas 75090-903.870.1089 Registered by rhe Texas board of Professional firghwers,Finn No.F•230- Registered by the Texas Board of Prof 1, -l Surveyor~,Finn No.100116-00 Mr.Michael Weiss,PE March 15,2016 Page 2 of 3 III. Categorical Exclusion (CE) Documentation: Blanton&Associates,Inc.and Teague,Nall and Perkins will assist the City of Fort Worth in preparing scoping forms,categorical exclusion(CE)documentation,and perform related tasks for the proposed IH 30 at Chapel Creek Boulevard project.Additional documentation/tasks are needed to address the current CE determination process required by the Texas Department of Transportation's(TxDOT)Fort Worth District,Fort Worth District comments on scoping forms and technical reports,and current standards required by TxDOT policy to comply with Federal Highway Administration(FHWA)National Environmental Policy Act compliance procedures and Chapter 42 of the Texas Administrative Code. Fee: $9,520.00 4 IV. Other Direct Expenses: Direct Expenses for copies,mailings,&mileage needed for Task items above. Fee: $1,965.00 Summary of Contract Amendment Fee: I. Project Management: Fee: $9,490.00 II. Supplemental Bridge Design Services: Fee: $48,080.00 III. Categorical Exclusion(CE)Documentation: Fee: $9,520.00 IV. Other Direct Expenses: Fee: $1,965.00 Total Contract Amendment Amount: $69,055.00 Mr.Michael Weiss,PE March 15,4016 Page 3 of 3 Schedule: Additional services and revision to project schedule has delayed the project a measurable 18 months. The projected contract award is scheduled for May 2017 with construction to conclude in May 2018. Sincerely, tnp teague nail&perldns lose�pph W. Atwood, P.E. Director Transportation CC File: FTW12583 i