Loading...
HomeMy WebLinkAboutContract 46527-CO2 FORT WURTI-i City of Fort Worth CITY SECRETARY Change Order Request CONTRACT NO. Project Name I Little Fossil Creek Interceptor M-292 Improvements,Part 1 City Sec No. 46527 Project No.(s) P258-701170196083 I DOE No. 7046 City Proj.No. 01960 Project Description: Sanitart sewer improvements from NE Loop 820 north Frontage Road to Missy Lane. Contractor: PM Construction and Rehab, L.P. Change Order: 0 Date: 6/6/2016 City Project Mgr.1 Roberto C. Sauceda City Inspector: I Paul Gieger Phone Number:1 817-392-2387 Phone Number: 817-392-8371 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $2,966,514.00 $2,966,514.00 220 Extras to Date Credits to Date $0.38 $0.38 Pending Change Orders(in MSEC Process) Contract Cost to Date $2,966,513.62 $2,966,513.62 220 Amount of Proposed Change Order $46,348.90 $46,348.90 030 Revised Contract Amount $3,012,862.52 $3,012,862.52 250 Original Funds Available for Change Orders $90,000.00 $90,000.00 Remaining Funds Available for this CO $90,000.38 $90,000.38 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.56% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,708,142.50 The change order will providc for the ailciitiOTi (}f the fol Inwitag Haat are necessary on the }project: • 8-inch pipe enlargement of sanitary sewer line. • Pre and post TV inspection. • Rehabilitation of manholes and sidewalk repairs. ®'� IFO��► ` Staff concurs with the contractor's request for 30 additional calendars on a e � AU M J. se , C- Secretary It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. PM Construction and Rehab, L.P. Robert Donath ?416- D I G zd Ib FFICIAL ii fti M&C Number N/A M&C Date Approved FORT WOaxIII City of Fort Worth Change Order Additions Project Name Little Fossil Creek Interceptor M-292 Improvements,Part 1 City Sec No. 46527 Project No.(s) P258-701170196083 DOE No.F-7-046--1 City Proj.No. 01960 Project Sanitart sewer improvements from NE Loop 820 north Frontage Road to Missy Lane. Description Contractor PM Construction and Rehab,L.P. Change Order: ® Date: 6/6/2016 City Project Mgr. Roberto C. Sauceda City Inspector Paul Gieger ADDITIONS ITEM DEPThilt t11 Thai 22 Remobilization Sewer 1.00 LS $10,000.00 $10,000.00 23 8"Pipe Enlargement Sewer 3369.00 LF $46.00 $154,974.00 24 8"Pre Clean CCTV Sewer 3369.00 LF $4.00 $13,476.00 25 8"Post Clean CCTV Sewer 3369.00 LF $1.75 $5,895.75 26 Manhole rehabilitation Sewer 54.00 VF $330.00 $17,820.00 Sewer $202,165.75 Page 2 of 4 lAdditions Sub Total $202,165.75 F4::1RT NORTH City of Fort Worth Change Order Deletions Project Name Little Fossil Creek Interceptor M-292 Improvements, Part 1 City Sec No. 46527 Project No.(s) P258-701170196083 DOE No. 7046 City Proj. No. 01960 Project Description Sanitart sewer improvements from NE Loop 820 north Frontage Road to Missy Lane. Contractor PM Construction and Rehab, L.P. Change Order: 0 Date 6/6/2016 City Project Mgr. Roberto C.Sauceda City Inspector Paul Gieger DELETIONS ITEM DEWRIPTION DEPT Qty Unit Unit Cost Total 5 Trench Safety Sewer 4723.00 LF $0.01 $47.23 10 6'Chain Link,Aluminum Sewer 150.00 LF $15.00 $2,250.00 12 21"Sewer Pipe,Point Repair Sewer 30.00 LF $500.00 $15,000.00 13 24"Sewer Pipe, Point Repair Sewer 1346.89 LF $58.00 $78,119.62 14 Large Stone Riprap Sewer 419.00 SY $100.00 $41,900.00 15 Portable Message Signs Sewer 34.00 LS $500.00 $17,000.00 18 Exploratory Excavation Sewer 1.00 JEA $1,500.00 $1,500.00 Sewer $155,816.85 Page 3 of 4 Deletions Sub Total 1$155,816.85 M/WBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4