HomeMy WebLinkAboutContract 45309-FP1 Department of TPW Const.Services
DOE#�L Date �.. (o CITY SECRETAW f
Project Manager (C�t.w.. �'� DT WO '
l
Risk Management S.Canady 2—fie' to O CONTRACT N0.
D.O.E. Brothe on
CFA We sterman/Scanned
A41 (0 The P ce in p ople have been Contacted concerning the request TATION AND PUBLIC WORgS -9
for final payment&have released this project for such payment. F PROJECT COMPLETION
Clearance Conducted By Etta Bacy D.O.E.Tho 7121
a,d50 3o
Regarding contract U7121 for TRINITY LIQUOR STORE as required by the WATER DEPARTMENT as `
approved by City Council on N/A through f the WATER DEPARTMENT upon the
recommendation of the Assistant Direct �f e t l lublic Works Department has accepted the project
as complete. I
14
1
Original Contract Prices: JUL 12 2D16 ,` $16,975.00
Amount of Approved Change Orders: t'8y1----7--- - .-- Ns
Revised Contract Amount:
Total Cost Work Completed: $16,975.00
Less Deductions:
Liquidated Damages: Days(e.3$'-10.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $16,975.00
Less Previous Payments: $0.00
Final Payment Due n $16,975.00
fSyr /I.
—�SZ 2.016
men
Recod for Acceptance Date
Asst. Direc or, PW - Infrastructure Design and Construction
1117/
/! 2of 6
Accepted Date
Asst. Director, WATER DEPARTMENT �A//
Asst. City Manager Date -
Comments: P265-541200-605150217583,P275-541200-705130217583 OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
O
JUL 13 2016
baiu*
a
I
5-5401 -
JUL 12 2016 � C.0 a1
City Project Numbers 021751, iDOE Number 7121
Contract Name TRINITY LIQUOR STORE Estimate Number I
Contract Limits "--77:� Payment Number 1
Project Type WATER&SEWER For Period Ending 6/6/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117121
Inspectors LAYER / NIEfO Contract Date
Contractor BEAR CREEK CONSTRUCTION,LTD. Contract Time 30 CD
4950 HANSON DR Days Charged to Date 766 CD
IRVING, TX 75038 Contract is •000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
-----------------------------------------
Total Cost of Work Completed $16,975.00
Less %Retained $0.00
Net Earned $16,975.00
Earned This Period $16,975.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0,00
Balance Due This Payment $16,975.00
Tuesday,June 07,2016 Page 4 of 4
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name TRINITY LIQUOR STORE
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02175
DOE Number 7121
Estimate Number 1 Payment Number 1 For Period Ending 6/62016
CD
City Secretary Contract Number 117121 Contract Time 3aD
Contract Date Days Charged to Date 766
Project Manager Ehia Contract is 100.00 Complete
Contractor BEAR CREEK CONSTRUCTION,LTD.
4950 HANSON DR.
IRVING, TX 75038
Inspectors LAYER / NIEfO
Tuesday,June 07,2016 Page 1 of 4
City Project Numbers 02175 DOE Number 7121
Contract Name TRINITY LIQUOR STORE Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 6/62016
Project Funding
//WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
--------------------------- - ----------
1
----------------------- - ---------
1 10"WATER LINE 33 LF $50.00 $1,650.00 33 $1,650.00
2 1"METER SERVICE INCLUDING TAP,METER 2 EA $1,200.00 $2,400.00 2 $2,400.00
BOX&1"COPPER LINE
3 10"GATE VALVE I EA $2,000.00 $2,000.00 1 $2,000.00
4 12"X 10"TAPPING SLEEVE 2 EA $1,500.00 $3,000.00 2 $3,000.00
5 TRENCH SAFETY 1 EA $2,500.00 $2,500.00 1 $2,500.00
6 TESTING 1 EA $750.00 $750.00 1 $750.00
-- ----------------------------- - -------
Sub-Total of Previous Unit $12,300.00 $12,300.00
EWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------- -------------------------------
I ------- -------------- ----------- -
1 4'DIAMETER MANHOLE 1 EA $3,455.00 $3,455.00 1 $3,455.00
2 8"SDR35 15 LF $48.00 $720.00 15 $720.00
3 POST TV OF SS LINE 1 EA $500.00 $500.00 1 $500.00
-------------------------------- --------
Sub-Total of Previous Unit $4,675.00 $4,675.00
————— —————————————————————————————————
Tuesday,June 07,2016 Page 2 of 4
City Project Numbers 02175 DOE Number 7121
Contract Name TRINITY LIQUOR STORE Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 6/62016
Project Funding
Contract Information Summary
Original Contract Amount S16,975.00
Change Orders
Total Contract Price 516,975.00
Date /b Total Cost of Work Completed 516,975.00
CoLeu %Retained $0.00
n0
z/L� Net Earned 516,975.00
Date
Inspection Supp Earned This Period $16,975.00
_ r I/1 / Retainage This Period 50.00
Date 71 1 ,�j Less Liquidated Damages
Project Manager Q
�P A. &G K Days @ /Day 50.00
Date ZO/L LessPavement Deficiency $0.00
Asst.Dire r - frastructure Design an Cons coon Less Penalty $0.00
e Date 71fLl l(, Less Previous Payment 50.00
Director/Contracting Dep artment f,z� Plus Material on Hand Less 15% 50.00
- 1 & Balance Due This Payment 516,975.00
Tuesday,June 07,2016 Page 3 of 4
A P021 G#C,
O'l r-(�*,re e%R c.,r, r t j
41.150,, Hans-on Drive
1tvirRijexas 15n,"18
A.Firy Bolan K lioldgatc
T rin ily Liqua r Sij r�2
In rc-,-feremi- i(-,. 111�I'S- letter will scree as n,-,titi,,;,qti(1ri to tfi�! City of For,
-orth th,at all vvmk po,,f rrrjt�,d by E)P-a:r .. e Si�4-: Utilities, Ltd. has, been
pe-rfc,mied ltc3 aah5facficirl. iind. that r13 liquidated damzges vAll be
Lk
Presid-ent,
'�%'a zi F C o m,iD rali o n I n-,,
Owncr
CONSENT OF Architect
SURETY COMPANY Contractor
TO FINAL.PAYMENT Surety
AIA DOCUM 51:7'G707 Other
PROJECT: Trinity Liquor Store,Ft.Worth,TX
iname.address) Bond#TXC605761
TO:(owner) ARCHITECT'S PROJECT NO:
Wazir,Inc,dba Trinity Express
CO?vTRACT FOR: Construction
CONTRACT 1)A'L'P:: 3/19/2014
CONTRACTOR:
Bear Creek Site Utilities&Construction,Ltd.dba Bear
Creek Construction
4950 Hanson Drive
Irving,TX 75038
in accordance With the provisions of the Contract between the(homer and the Contractor as indicated above,the
Merchants Bonding Company(Mutual)
15950 North Dallas Parkway,Ste.400 ,Si. COMPANYCOMPANYDallas,Texas 75248 1RETY
on bond of 01cn:insurt name and alddrm of Contractor)
Bear Creek Site Utilities&Construction,Ltd.dba Bear Creek Construction
4950 Hanson Drive
Irving,Texas 75038 CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final pa)Tncnt to the Contractor shall not
relieve the Surety Company of any of its obligations to thea insert rwntc and addrcs.,of Omer)
Wazir,Inc.dba Trinity Express
,OWNER,
as sct forth in the said Surety Company's bond.
1N W MESS WHEREOF,
the Surety Company has hereunto set its hand this 22nd day of April 2016
Surety Company
Merchants Bonding Company(Mutual)
Signature ofAuthuri cd Representative
Attott: ' ���-�
Atwt: Debbie Smith-Attorney-In-Fact
401T..:INs form is to bt uscd as a companion dmumcnt to AIA DOCUMENT 6706.CONTRACTOR'S AFTWAVIT OF P/1, 'T,•., i) ✓ -
D1;BI S AND CLAIMS,Current t:ditiun
ALA tX?CUMFNT G707-CONSLNT OF SURETY COMPANY TO F NAL PAYMENT-APRIL 1970 L'UITION•AIAX �— -
PAGE . 0 U ^ -
4:1970•Tl1F.AMF.RIC:AN 1NSTITU M OF ARC'HITLCTS.1735 NEW YORK.AVE..,NW,WASE IINGTON,U.C.20006
•1t11i,1 '''
MERCHANTS�k
BONDING COMPANY-y
POWER OF ATTORNEY
Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,
INC.,both being corporations of the State of Iowa(herein collectively called the"Companies")do hereby make,constitute and appoint,
individually,
Bea Williams; Dawn Davis; Debbie Smith; Dennis C Dowd; Donnie Doan; Kae Perdue;
Kristi Meek; LaCrisha Wynne; Walter J De La Rosa
their true and lawful Attomey(s)-in-Fact,to make,execute,seat and deliver on behalf of the Companies,as Surety,bonds,undertakings
and other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of.
SEVENTEEN MILLION($17,000,000.00)DOLLARS
This Power-of-Attomey is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the
Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants
National Bonding,Inc.,on October 24,2011.
"The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company
thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship
obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attomey-in-Fact includes any and all consents for the release of retained percentages andior final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation.It is fully understood that consenting to the State ofFlorida
Department of Transportation making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner-
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 30th day of October 2015
...,.u.,,...,
........
tl{31dq .�\t1G Co'•. MERCHANTS BONDING COMPANY(MUTUAL)
`,.�`��A .. ... ( �``- O.-••••..h1,p•• MERCHANTS NATIONAL BONDING,INC.
Pogq�yy�.
- y* 2u+:3 �>= • a r 1933 -c;
's'. �'
`i%�,�• .... ;:,i� vd��•.• .•`,ate. By
STATE OF IOWA .
COUNTY OF Dallas ss. President
On this 30th day of October 2015 before me appeared Larry Taylor,to me personally known,who being by me sworn did say that
he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seals affixed
to the foregoing instrument are the Corporate seals of the Companies;and that the said instrument was signed and sealed in behalf of the
Companies by authority of their respective Boards of Directors.
a'A4sWENDY WOODY
G q Commission Number 784654
Z °"' My Commission Expires llz�l
June 20. 2017
NotaryPub6 Counry,iowa
(Expiration of notary's commission
does not invalidate this instrument)
I,William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is still in full force and effect and has not been amended or revoked.
In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this 22nd day of April 2016
.........
01t%G 00
��.•`�
_ •Z:— v:3� Secretary
'a 1933 c.
�=. 2uv - .tib. :ti• "" - _
N.
:;,� d,;iy••- • .`gar• - _ -°_ :r-
POA 0014 (6/15)
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me,the undersigned authority,a notary public in the state and
county aforesaid,on this day personally appeared Brian K.Holdgate,Member of
General Partner Of Bear Creek Construction,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations,or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort
Worth has been paid in full;
That there are no claims pending for personal injury and/or property
damages;
On Contract described as;
Trinity Liquor Store—Contract No: 02175 - DOE 7121
BY
K.Holdgate
Subscribed and sworn before me on this date 25 of April,2016.
Notary Publics-� �--
Dallas County,Texas
�a7 pL; DAVID TALION
Notary Public.State of Texas
My Commission Expires
„""mss September 21,2019
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Trinity Lich Store
PROJECT NUMBER: 02175
DOE NUMBER: 7121
WATER
PIPE LAID SIZE TYPE OF PIPE LF
10"inch PVC 33 LF
FIRE HYDRANTS: 1 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSTIZES: yes
NEW SERVICES: 4-V inch coPprNr 1501Y
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
8"inch SDR-26 PVC 15 LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
NIA
DENSITIES: yes
NEW SERVICES: 3-4"inch SDR-26 PVC 50 LF
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throchmorron Street•Fort Worth,TX 76012-6311
(817)392-7941 •F=(817)392-7845
FORTWORTHREV:02/20ro'
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
D CONTRACTOR&PROJECT DATA
Name of Conductor Project Name
Bear Creek Constriction Trinity Liquor Store
DOE InVector DOE Number
Garey Houston 7121
E Inspector Project Manager
Q Water ❑Waste Waw ❑Storm Drainage ❑pavement Fred Ehia
Initial Contract Amount Project Difficulty
$16,975.00 O Simple Routine O Complex
Final Contract Amount Date
$16,975.00 4!29/2016
In PERFORMANCE EVALUATION
0-Inadequaft 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING 0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 1 20
10 Citizen's-Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
IID CONTRACTOR'S RATING
Maximum Score(MS)=448 2E sum of applicable element score maximums which= 448
Rating([TS/MS]*100%) 448 / 448 — 100%
Performance Category 13xe411ent
<20%-Inadequate 20%to<40%=DejxkW 40%to<60I i— 1and2rd 60%to<80%=Good ?80'/=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE InspectorCie
Signatuue Contractor
Signature DOE Inspector's Supervisor Ak� �.
CONTRACTOR'S CON84ENTS
TRANSPORTATION AND PUBLIC WORKS
QD The City of Fust Worth•100011rockmorton Street•Fort Worth,TX 760126311
(817)392-7941•Fax(817)392-7845
FoRTWORTH Rv03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.1
NAME OF PROJECT: Trimly Liquor Su=
PROJECT NO.: 02175 CONTRACTQR: Bew Creek Conshvctiion
DOE NO. 7121
PERIOD FROM 04/21/14 TO: 05!25/16 FINAL INSPECTION DATE: 25-May-16
WORK ORDER EFFECTIVE 4212014 CONTRACT TIME 30 O WD®Cl)
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH DURCHARING CREDITED MONTH DURING G CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES * DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS
THIS 0 0 0 0 766 766
PERIOD
PREVIOUS 0 0 0 0 0 0
IPERIOD
TOTALS 0 0 0 0 766 766
TO DATE
*REMARKS:
CO OR DATE INSPEC DATE
ENGINEERING DEPARIIiF.�\
•' The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fm(817)392-7845
FORTWORTH 1E;0V=07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 4/22/2016
Name of Contractor Project Name
Bear Creek Construction Trinity Liquor Store
DOE Inspector Project Manager
Garey Houston Fred Ehia
DOENwnber ProjectDi�Fculty Type of Contract
7121 OO Simple O Routine O Complex O water (]waste water ❑Stam Drainage ❑Pavement
Initial Contract Amount Final Contract Amount
$16,975.00 $16,975.00
11)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMEW RATING ELEMENT RATING
0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setfim&up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 13 Communication
2 Timliness of Contractor Payments 14 Resolution ofUtility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe If
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fns(817)392-7845