Loading...
HomeMy WebLinkAboutContract 46288-FP3 Department of TPW Const. Services DOE#tl(10 Dat / i; SECRET Project Manager " J �oNTRACT N0. 3 Risk Management S. Canady � r'' 1TWORTH. D.0.E*w&-S"4rath>LrtW '1-S—_ CFA Westerman/Scanned ❑ The Proceeding people have been Contacted concerning the request 'ATION AND PUBLIC WORKS for final payment&have released this project for such payment. F PROJECT COMPLETION Clearance Conducted By Etta Bacy �.L114 ifmsL�GZ�ifir!'.L�G� D.O.E.Ns: 7190 C o,z z 3 S/ Regarding contract 317190 for RIVERSIDE PLACE- STREET LIGHTS as required by the 454dele A8 TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $77,171.80 Amount of Approved Change Orders: Ns 1 Revised Contract Amount: $77,171.80 Total Cost Work Completed: $77,171.80 e"' Less Deductions: Liquidated Damages: Days Qa $210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $77,171.80 Less Previous Payments: Final Payment Due $77,171.80 Recommen Acceptance Date As . Director, TPW - Infrastructure Design and Construction l,..1, L.� yl:�A Accepted Date Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT 7vs—"/e Asst. City Manager Date Comments: OFFICIAL RECORD JUL 14 2015 CITY EGRETARY I"MiftL., a A �:T IORTH, TX FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name RIVERSIDE PLACE Contract Limits Project Type STREET LIGHT City Project Numbers 02234 DOE Number 7190 Estimate Number 1 Payment Number I For Period Ending 6/30/2016 CD City Secretary Contract Number 317190 Contract Time XD Contract Date Days Charged to Date 175 Project Manager Ehia Contract is 100.00 Complete Contractor INDEPENDENT UTILITY CONSTRUCTION 5109 SUN VALLEY DRIVE FORT WORTH, TX 76119 Inspectors LAYER / BLEVINS Friday,lune 24,2016 Page I of 4 City Project Numbers 02234 DOE Number 7190 Contract Name RIVERSIDE PLACE Estimate Number i Contract Limits Payment Number 1 Project Type STREET LIGHT For Period Ending 6/30/2016 Project Funding STREET LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 RDWY ILLUM ASSMBLY 17 EA $1,713.00 $29,121.00 17 $29,121.00 2 RDWY ILLUM FOUNDATION 17 EA $1,190.00 $20,230.00 17 $20,230.00 3 2"CONDT PVC SCH 40 3105 LF $8.96 $27,820.80 3105 $27,820.80 _ — —--— - — Sub-Total of Previous Unit — —— -- —$77,171.80-- —- $77,171.80 Friday,June 24,2016 Page 2 of 4 City Project Numbers 02234 DOE Number 7190 Contract Name RIVERSIDE PLACE Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHT For Period Ending 6/30/2016 Project Funding Contract Information Summary Original Contract Amount $77,171.50 Change Orders Total Contract Price $77,171.90 Date b Total Cost of Work Completed $77,171.90 Zr �C"ate7— Less %Retained 50.00 �^ ofNet Earned $77,171.90Earned This Period $77,171.90 Irntpaxtan �`r Retainage This Period $0.00 Less Liquidated Damages Project Manager Days Q /Day $0.00 Date DAG LessPavement Deficiency $0.00 n it PW-Infrastructure Design and Construction Less Penalty 50.00 Date Less Previous Payment $0.00 Direc /Contracting Departmen Plus Material on Hand Less 15% $0.00 Balance Due This Payment $77,171.90 Friday,June 24,2016 Page 3 of 4 City Project Numbers 02234 DOE Number 7190 Contract Name RIVERSIDE PLACE Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHT For Period Ending 6/30/2016 Project Funding Project Manager Ehia City Secretary Contract Number 317190 Inspectors LAYER / BLEWNS Contract Date Contractor INDEPENDENT UTILITY CONSTRUCTION Contract Time 30 CD 5109 SUN VALLEY DRIVE Days Charged to Date 175 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $77,171.80 Less %Retained $0.00 Net Earned $77,171.80 e' Earned This Period $77,171.80 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Bilance Due This Payment $77,171.80 Friday,June 24,2016 Page 4 of 4 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority,on this day personally appeared RICHARD WOLFE,Vice President of INDEPENDENT UTILITY CONSTRUCTION,INC.,known to me to be a credible person, and after being duly sworn by me, upon his oath deposed and said; "That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as: Riverside Place,City Project No.02234 BY: fii� �' Richard Wolfe,Vice President SUBSCRIBED AND SWORN TO BEFORE ME on this 104!�L day of OWL 2016. - � • ,T /to DANA A JETTY Notary Public,state or Texas Notary Public, State of T MY Commission Expires �w June 30, 2019 ��DC�pC�aDC�a� Independent Utility Construction,Inc. 5109 Sun Valley Drive Fort Worth,TX 76119 817-478-4444 office May I v ,2016 City of Fort Worth CFA Administration 1000 Throckmorton St. Fort Worth,TX 76102 Project Name: Riverside Place City Project No.: 02234 D.O.E.No.: 7190 The purpose of this letter is to acknowledge that Independent Utility Construction. Inc. (the "Contractor')has been paid in full by Centurion Acquisitions,L.P. (the"Developer')for the public improvements constructed to serve Riverside Place in Fort Worth,Texas. As a result, we hereby waive, release and relinquish all rights to assert any claim or demand for lien in connection with this project. Please feel free to contact me with any questions you may have. Si rely, Richard Wolfe,Jr. Vice President CTMGT VALLEY RIDGE 11, LLC. 1800 Valley View Lane, quite 300 Farmers Branch TX 7,6234 Office:469-892-7200 Fax:469-80-7201 June 22th,120161 VIA EMAIL DELIVERY City of Fort Worth Attn: David Rolls 8851 Camp Bowie West Fort Worth, Texas 76116 Re: Riverside Place (City Project#02411 /DOE#7358) Please accept this letter as our formal,acknowledgement to the City of Fort Worth that CTMGT Valley Ridge 11, LLC will not pursue liquidated damages against Independent Utility Construction, INC., our Strget Lidht Contractor for Riverside Place. If you need any further information in regards;to this matter feel free to contact me. Regards, Chris Ho gson Project Manager Centurion American (972) 824-6334 r i I i FORTWORTH REV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 6/24/2016 Name of Contractor Project Name Independent Utility Construction Riverside Place DOE Inspector Project,Manager Tommy McKinnon Fred Ehia DOE Number Project Difficulty T}pe ofConntract 2677 O Simple O Routine O Complex ❑ Water ❑ Waste Water ❑ Storm Drainage O Pavement hilial Conlract Amount Final Contract Amount $77,171.80 $77,171.80 11)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity& Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications Cl 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager I Change Order Processing Time tj 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe (� III)COMMENTS&SIGNATURES h— — COMMENTS Signature Contractor Signature DOE Inspector _ Signature DOE Inspector's Superv'so INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Independent Utility Construction,LLC. Riverside Place DOE Inspector DOE Number Tommy McKinnon 7190 DOE Inspector Project Manager El Water El Waste Water O Storm Drainage ❑ Pavement Fred Ehia Initial Contract Amount Project Dcul(y $77,171.80 0 Simple O Routine O Complex Final Contract Amount Date $77,171.80 6/23/2016 II)PERFORMANCE EVALUATION 0-Inadequate l-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 N 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Com Taint Resolution 5 N I I Property Restoration 5 N 12 After Hours Response 5 N 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 323 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 323 111)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 328 Rating([TS/MS]* 100%) 323 / 328 = 98% Performance Category Excellent <20%=Inadequate 20%to<40% rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Riverside Platz PROJECT NO.: 2234 CONTRACTOR- t Utility DOE NO.: 7190 PERIOD FROM:01/11/16 TO: 06/23/16 FINAL INSPECTION DATE: 23-Jan-16 WORK ORDER EFFECTIVE: CONTRACT TIME: 30 DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 175 175 PERIOD PREVIOUS PERIOD TOTALS 175 175 TO DATE *REMARKS: CON DATEINSPECTOR DA E ENGINEERIN DEPAR'nfENT The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 I CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT El ' CONTRACTOR ❑ TO FINAL PAYMENT SURETY ER El (SIMILAR TO AIA DOCUMENT G707) Bond No. 0965573 PROTECT: Street Lighting Improvements to serve Riverside Place, City Project No. 02234 (name,address) Fort Worth, Texas TO (Owner) ARCHITECTS PROJECT NO: City of Fort Worth CONTRACT FOR: Above Project 1000 Throckmorton Street Fort Worth, Texas 76102 CONTRACT DATE: CONTRACTOR: Independent Utility Construction, Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the(here insert name and address of Surety company) Ohio Farmers Insurance Company 555 Republic Drive, Suite 450 Plano, Texas 75074 ,SURETY COMPANY, on bond of(here insert name and address of Contractor) Independent Utility Construction, Inc. 5109 Sun Valley Drive ,CONTRACTOR, Fort Worth, Texas 76119 hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the Surety Company of any of its obligations to(here insert name and address of Owner) City of Fort Worth 1000 Throckmorton Street ,OWNER, Fort Worth, Texas 76102 as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this 4th day of May 2016 OHIO FARMERS IN NCE COMPANY Surety Comp ® �- B Signature uthori epresentative Attest: (Seal): Kyle W. Sweeney Attorney-in-Fact Title Note:This form is intended to-6e usbt,as a'compacion document to the Contractor's Affidavit of Payment of Debts and Claims,Current Edition THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER#AND ISSUED PRIOR TO 04/20/11, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO. 4220052 06 Power Westfield insurance Co. of Attorney Westfield National Insurance Co. CERTIFIED COPY Ohio Farmers Insurance Co. Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a 'Company" and collectively as 'Companies,' duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio,do by these presents make,constitute and appoint CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W.SWEENEY,ELIZABETH GRAY, JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact,with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship- - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - -- - - - -- LIMITATION: .LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President,sealed with the corporate seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHiO FARMERS INSURANCE COMPANY: 'Be It Resolved,that the President, any Senior Executive, any Secretary or any Fidelity&Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company,to execute,acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary.' 'Be it Further Resolved,that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached.' (Each adopted at a meeting held on February 8,2000). In Witness Whereof,WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 20th day of APRIL A.D.,2011 . Corporate ',.w•�W, ♦"`...�..•...,, ww'u.uir Seals C\ s a�NC$<< •,.a�(\ONA<,NSG •rt �Asul1�/�, " WESTFIELD INSURANCE COMPANY Affixed �v: .ai +� p: '�':rC►�'� WESTFIELD NATIONAL INSURANCE COMPANY OHIO FARMERS INSURANCE COMPANY ULLL. SEAL M- it « pro _r: State of Ohio "" *"" " ""', ByRichard L. Kinnaird, Jr., National Surety Leader and County of Medina ss.: Senior Executive On this 20th day of APRIL A.D.,2011 , before me personally came Richard L. Kinnaird, Jr, to me known,who, being by me duly sworn, did depose and say, that he resides"in Medina, Ohio;that he is Senior Executive of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above Instrument;that he knows the seals of said Companies;that the seals affixed to said instrument are such corporate seals;that they were so affixed by order of the Boards of Directors of said Companies;and that he signed his name thereto by like order. Notarial Seal �R\A! Affixed William J: Kahelin,A rney at Law, Notary Public State of Ohio •N � o My Commission Does Not Expire(Sec. 147.03 Ohio Revised Code) County of Medina ss.: q I,Frank A.Carrino,Secretary of WESTFIELD INSURANCE COMPANY,WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby.certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies,which Is still in full force and effect;and furthermore,the resolutions of the Boards of Directors,set out in the Power of Attorney are in full force and effect. in Witness Whereof, I have hereunto set my tiand and affixed the seals of said Companies at Westfield Center, Ohio, this 4th day of May A.D., 2016 •,.,`P�,onn ,N., < � R yam ami• _� w" •��-;: s�r,•'•�'i��T�•���3 �/�"�/� �f' �y r =•d �: SEAL Cm. ?a: / i�"""" L ! f Secretary �: 1848 Frank A. Carrino, Secretary +� BPOAC2 (combined) (06-02)