Loading...
HomeMy WebLinkAboutContract 46343-CO5 FORT WORTH, cmr sECRETAw. N CONTRACT N0. �14 2p16 0City Of Fort Worth Change Order Request Facility and prciect Temrnal Building Renovation Meacham International Airport City Sec No. 46343 Description: Funding(FID)53902-0550435-5740010-C01527-C08180 City Proj.No. C01527 No.(s) Contractor I Imperial Construction Change Order#F-5-� Date: 6/29/2016 City Project Mgr.I Alfonso Meza City Inspector: Fm'-- Phone Phone Number:817-392-8274 Phone Number: 817-392-2297 Contract Time (CD) Original Contract Amount $15,872,750.00 407 Extras to Date $1,994,335.00 186 Credits to Date $0.00 0 Pending Charge Orders(in M&C Process)— $0.00 0 Contract Cost to Date – --- -- $17,867,085.00 593 Amount of Proposed Change Order — $50,503.00 10 Revised Contract Amount $17,917,588.00 603 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) -- 50.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 12.88 % MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $19,840,937.50 Authorize a change in scope to increase the construction contract by$50,503.00 to add a trench drain to the taxiway side of the building due to existing drainage issues. The total amount of change orders 1,2,3,4&5 results in an increase of the on ount by 12.88%.This change order includes PC#92R3.This change order does not include an increase in contract ti a proved PC's through to date. 0 ° J. C Secretary :° °°°� It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or inclndental to the above Change Order. Imperial Construction 7.144 a 7 1L 7d a VA 17-.7 --/ 7- 7- M&C ' 7M&C Number N/A M&C Date Approved N/A OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX v 'RIAL Proposed Change Project: Meacham Terminal Building ICI Job Number: 14-0644 PC No: 092R3 Date: 6/22/2016 Submitted To: Submitted By: Mike Milam Jennifer Collins City of Fort Worth-Property Management Imperial Constructlon,Inc. 401 West 13th Street 400 1-20 West,Suite 200 Fort Worth,Texas 76102 Weatherford,Texas 76086 Reason: ASI-020 Make Drainage Adjustments for GSE(FBO) Scope/Modification/Description: Sawcut and replace approximately 315 SF of 13"Concrete,Adjust Grades to revised elevations, Furnish and Install a 10"Wide 9878 Powerdrain Drain System(Option#1 attached)on the West Tarmac around the GSE Building per ASI-020 with alternate drain system. Note: Per field discussion with CFW,we are submitting option 1 only for design teams approval.If option 1 will not work,we can resubmit option 2 (12"drain).If you want to proceed with a larger drain,please advise. NOTE:This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work required will be submitted under seperate PC. Description Qty LI'M Other(A) Lab(B) Mat(C) Eq(D) Sub(E) Sub Total Miller-Sierra 1 LS $ 8,019.00 $ 8,019.00 Gardner 1 LS $ 30,837.00 $ 30,837.00 'Rockin'CT-Survey/CAD Service 1 LS $ 1,326.00 $ 1,326.00 as requested by Civil Engineer. $ - Associated Direct GC Costs 1 LS $4,610.00 $ 4,610.00 Sub-Total without GC Markup $ 1,326.00 $4,610.00 $ - $ $ 44,792:00 Add 10'%Indirect OH&Fee $ 4,479.20 Subtotal $ 49,271.00 Add P&P Bond 1% $ 492.71 Add Insurance 1.5% $ 739.07 Add Sales Tax Exempt GRAND TOTAL $ 50,503.00 The Contract Time will be INCREASED by 10 Calendar Days Bysigning below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract.If approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change. Su mitt 4ApprovedBY: l� �IA .211kImperi Cons ctio ,Inc. Worth OFFICIAL. RECORD CITY SECRETARY 400 1-20 West,Suite 200,Weatherford,Texas 76086 FT.WORTH,TX