Loading...
HomeMy WebLinkAboutContract 46583-FP1 Depart t f TPW Const.Services DOE# I Da Project Managerek_ —A(b ABY Risk Manage nt S.Canadv IT AVO RT H o Cy smtET D.O.E.�� CONTRACT NO. 4 CFA Westerman/Scanned The Proce i g Oeole have been Contacted concerning the request rATION AND PUBLIC WORKS for final payment&have released this project for such payment. )F PROJECT COMPLETION Clearance Conducted By Etta Bacy ff/t 0,,,.,,qed ?/rl/�4p D.O.E. 274 06 Regarding contract 117406 for OUTLET BLVD& GOLF VIEW DR.as required by the q4583 TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $1,427,034.33 Amount of Approved Change Orders: $33,041.00 Ns 1 Revised Contract Amount: $1,460,075.33 Total Cost Work Completed: $1,460,075.33 Less Deductions: Liquidated Damages: Days®$210.001 Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $1,460,075.33 Less Previous Payments: Final aym t Due $1,460,075.33 Recomm nd d for Acceptance Date Asst. 'rcto , TPW - Infrastructure Design and Construction W. (/✓ Accepted Aa e "Director, RANSPORTATION AND PUBLIC WORKS DEPARTMENT Asst. City Manager Date Comments: FUND ACCT:P265-6041502521-00 .r.MA1 I.LEY, JUL 1 1 2016 !FT. CIAL RECORD Y SECRETARY ^ U� lnitiah'- WORTH 'l ' TX FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name OUTLET BLVD&GOLF VIEW DR Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 02521 DOE Number 7406 Estimate Number I Payment Number I For Period Ending 5/17/2016 City Secretary Contract Number 117406 Contract Time Contract Date Days Charged to Date 303 Project Manager Ehia Contract is 100.00 Complete Contractor SCOTT DENNETT CONSTRUCTION,INC. 2808 W.7TH ST.,#B FORT WORTH, TX 76107 Inspectors LAYER / HABTE Friday,June 24,2016 Pagel of 5 `I'1 City Project Numbers 02521 DOE Number 7406 Contract Name OUTLET BLVD&GOLF VIEW DR Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 5/12/2016 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 21"RCP 47 LF $59.75 $2,808.25 47 $2,808.25 2 7'X5'RCB 536 LF $445.99 5239,050.64 536 $239,050.64 3 78"STORM ABANDONMENT PLUG I EA $1,460.00 $1,460.00 1 51,460.00 4 5 SIDED STORM SEWER MH l EA $8,146.00 $8,146.00 1 58,146.00 5 7'X5'HEADWALL(CO#1) 1 EA $6,130.00 $6,130.00 1 $6,130.00 6 GABION RIPRAP 75 CY $328.00 $24,600.00 75 $24,600.00 7 ROCK RIPRAP 867 SY $61.05 $52,930.35 867 $52,930.35 8 5"CONCRETE PAD 23 SY $56.10 $1,290.30 23 $1,290.30 9 TRENCH SAFETY 583 LF $2.43 $1,416.69 583 $1,416.69 10 TESTING&TV INSPECTION 583 LF $1.66 $967.78 583 $967.78 Sub-Total of Previous Unit $338,800.01 $338,800.01 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 8"REINFORCED CONC ST PVMT 2444 SY $46.76 5114,281.44 2444 $114,281.44 2 7"REINFORCED CONC ST PVMT 2410 SY $44.11 $106,305.10 2410 $106,305.10 3 PAVEMENT HEADER 71 LF $27.21 $1,931.91 71 $1,931.91 4 YSIDEWALK 700 LF $16.63 511,641.00 700 $11,641.00 5 8'SIDEWALK 1556 LF $26.61 $41,405.16 1556 $41,405.16 6 BARRIER FREE RAMPS 6 EA $1,242.00 $7,452.00 6 $7,452.00 7 STREET BARRICADE 2 EA $1,094.00 $2,188.00 2 $2,188.00 8 REMOVE EX ASPHALT PAVING 3753 SY $6.25 $23,456.25 3753 $23,456.25 9 STRIPING 4"STRIPE 1720 LF $1.29 $2,218.80 1720 $2,218.80 10 TRAFFIC HANDLING I LS $14,425.00 $14,425.00 1 $14,425.00 11 CONCRETE TURN AROUND(CO#1) 1 LS $35,669.00 $35,669.00 1 $35,669.00 Sub-Total of Previous Unit $360,973.66 $360,973.66 EXCAVATION Item Description of Items Estimated Unit knit Cost Estimated Completed Completed No. Quanity Total Quanity Total Friday,June 24,2016 Page 2 of 5 City Project Numbers 02521 DOE Number 7406 Contract Name OUTLET BLVD&GOLF VIEW DR Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 5/12/2016 Project Funding I CLEARING&GRUBBING 6 AC $2,224.00 $13,344.00 6 $13,344.00 2 DETENTION POND GRADING 74000 CY $5.05 $373,700.00 74000 $373,700.00 3 POND MAINTENANCE DRIVE ROCK 95 SY $46.00 $4,370.00 95 54,370.00 4 STREET AND RIGHT OF WAY EXCAVATION 1525 CY 55.07 $7,731.75 1525 $7,731.75 5 SILT FENCE 5472 LF $1.83 $10,013.76 5472 $10,013.76 6 CURLEX AFTER PAVING 2665 LF $1.16 $3,091.40 2665 $3,091.40 7 INLET PROTECTION 1 EA $116.00 $116.00 I $116.00 8 CONSTRUCTION ENTRANCE 1 EA $1,513.00 $1,513.00 I 51,513.00 9 EROSION CONTROL MANAGEMENT I EA $2,447.00 $2,447.00 1 $2,447.00 Sub-Total of Previous Unit $416,326.91 $416,326.91 CONDUIT&ST LIGHT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total l 4"CONDUIT 600 LF $23.00 513,800.00 600 $13,800.00 2 IJNDERGROUNDELECTRICAL DISTRIBUTION 1051 LF $14.25 $14,976.75 1051 $14,976.75 3 ST LIGHT COMPLETE AND IN PLACE 6 EA $5,950.00 $35,700.00 6 $35,700.00 4 STREET SIGNS 2 EA $450.00 $900.00 2 $900.00 Sub-Total of Previous Unit $65,376.75 $65,376.75 ALT BID Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I GENERAL CONDITIONS 1 LS $76,594.00 $76,594.00 1 $76,594.00 2 OVERHEAD AND PROFIT 1 LS 585,822.00 $85,822.00 1 $85,822.00 3 PAYMENT&PERFORMANCE BOND 1 LS $17,451.00 $17,451.00 1 $17,451.00 4 MAINTENANCE BOND I LS $3,241.00 $3,241.00 l $3,241.00 5 LANDSCAPING I LS $95,490.00 $95,490.00 1 $95,490.00 Sub-Total of Previous Unit $278,598.00 $278,598.00 Friday,June 24,2016 Page 3 of 5 t City Project Numbers 02521 DOE Number 7406 Contract Name OUTLET BLVD&GOLF VIEW DR Estimate Number 1 Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 5/12/2016 Project Funding Contract Information Summary Original Contract Amount s I,427,034.33 Chanee Orders Change Order Number 1 $33,041.00 Total Contract Price $1,460,075.33 Date 7 L/! Total Cost of Work Completed 61,460,075.33 Co ra or / Less %Retained $0.00 Net Earned $1,460,075.33 ate Inspection Supervisor Earned This Period $1,460,075.33 t Retalnage This Period 60.00 �4 IW4,cv Date dl 16 Less Liquidated Damages 9 g P lqe Manager Days @ I Day so.00 Date 7-&-14 LessPavement Deficiency 60.00 Asstit tor/I'PW-htfrostructure Design and Construction Less Penalty $0.00 _ Date 7/kA Less Previous Payment $0.00 Director/Co6Aacting Departmey Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,460,075.33 Friday,lune 24,2016 Page 4 of 5 City Project Numbers 02521 DOE Number 7406 Contract Name OUTLET BLVD&GOLF VIEW DR Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 5/12/2016 Project Funding Project Manager Ehia City Secretary Contract Number 117406 Inspectors LAYER / HABTE Contract Date Contractor SCOTT DENNETT CONSTRUCTION,INC. Contract Time 2808 W.7TH ST.,#B Days Charged to Date 303 FORT WORTH, TX 76107 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,460,075.33 Less %Retained $0.00 Net Earned $1,460,075.33 Earned This Period $1,460,075.33 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,460,075.33 Friday,June 24,2016 Page 5 of 5 CONSENT OF SURETY ARCHER ❑ ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Conforms with the American Institute of Architects G707 form OTHER ❑ Bond No: PBI 1509800690 TO OWNER: ARCHITECT'S PROJECT NO.: 02409 (Name and address) City Of Fort Worth i CONTRACT FOR: Utilities and Paving 1000 Throckmorton Street g Fort Worth,TX 76102 PROJECT: CONTRACT DATED: 5/15/2015 (Name and address) Utilities and Paving Work on Outlet Boulevard and Golf View Drive Project No. 02409 for Roanoke 35/114 Partners, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Surety) Philadelphia Indemnity Insurance Company One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 SURETY on bond of (Insert name and address of Contractor) SCOTT DENNETT CONSTRUCTION, LC 2313 Cullen Street Fort Worth,TX 76107 ,CONTRACTOR hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert narne and address of Owner) City Of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 OWNER as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: ,June 9,2016 (insert In writing the month followed by the numerk date and year.) P ilodelphia Indemnity Insurance Company ure ) (Sig tr o rhwd representatl ) Attest: ,l�A as w tlioZz `-- Jared You0g.Aft 0-in-fact (Seal): �cv*e (Printed name and Mel 3505 PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No: PB 11509800690 One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS:That PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young and Fred A.Thetford,111 of Contract Bond Agency,LLC., its true and lawful Attorney-in-fact with full authority to execute on its behalf bonds,undertakings, reeognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed 525,000,000.00 This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the 1•day ofluly,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1)Appoint Attorney(s)in Fact and authorize the Attorney(s)in Fact to execute on behalf of the Company bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsim[lc seal shall be valid and binding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 10T"DAY OF JUNE 2013. 1927 Seal Robert D.O'Leary Jr.,President&CEO Philadelphia Indemnity Insurance Company On this 10"day of June 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPH IA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that die said Corporate Seal and his signature were duly affixed. tvMaA wdr sau +h a rrsa aoran Fart uwr NMwTn►Mweaowlr Co."oar rou Notary Public: !Z'a residing at: Bala Cvnwvd.PA (Notary Seal) My commission expires: D"emba.IS,2016 I,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of Directors and this Po%cr of Attorney issued pursuant thereto on this 10T"day of June 2013 true and correct and are still in full force and effect.I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof 1 have subscribed my name and affixed the facsimile seal ofeach Company this 9th day of June 16 1927 Edward Sayago,Corporate Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Shawn Moore, Senior PM Of Dennett Construction, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Champion Circle Phase One Outlet Blvd.and olfyiew BY r- Shawn Moore Subscribed and sworn before me on this date 1 st of July, 2016. 21 2 Notary Publi Tarrant County, Texas DEVELOPER-AWARDED-PROJECT GRANGE ORDER PROJECT NAME: _Champions Circle-Golf View Or.and Outlet BW CHANGE CONTRACT: Water,Paving,Drain d Street LWds ORDER Na: CFA 2015-015 CITY PARTICIPATION: NO CITY PROJECT 0 2521 DOE# 7406 WATER PROJECT# P2t15-6041502521.00 SEWER PROJECT# FILE M INSPECTOR: Rudy Meddellin Phone Na 214-2233503 PROJECT MANAGER: Fred Ehia Phone No: 817-382-8121 CONTRACT UNIT WATER SEWER PANNG DRAINAGE STREETLIGHTS CONTRACT Devewpow Developer r Devolapir Dw*low DAYS stat Cloycest cast a Case cost clycam cost c Coe. Cost Clow cost ORIGINAL COMPACT $00,sia00 $0.00 $$25,3".00 T;341,42s.w $35.700.00 _ to EXTRAS TO DATE CREDITS TO CATE CONTRACT TO DATE $a0,t3100 $0.00 $0.00 $0.00 $325,304.00 $0.00 $304.42$.00 $0.00 $35,706.00 $O.DO 00 AMOUNT OF PROP.CHANGE ORDER $ 35,060.00 $ (2XI-901 0 LASED CONTRACT AMOUNT $66,0]6.00 50.06 $0.00 Moo $360,073.00 50.05 $330.000.00 0.05 $36,700.00 $0.00 00 TOTAL RIVISED CONTRACT AMOUNT PER UNIT 34b$3$.00 $0.00 $3110.117340 $334,800.00 36 700.00 REVISED COST SHARE DO%cost $002,100.00 C ty Cast $0.00 TOTAL REVISED CONTRACT $02,10/.00 Radnd:10.12-1011 Pap 1 You are directed to make the followingthan es in the contact dlxlanents: CITY BID ITEM PAY ITEM N 0 OIIANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 1 LS CONCRETE TURNAROUND S 35.669 00 S 3S.669.00 7 1 EA 77(5'HCADWALL(partial) S (2.628.00) S 2.628 00 Total $ 33.011.00 REASONS FOR CHANGE ORDER Coccrete Turnaround was added at the end of Golf View Of I he haaawall was not completed because it will be removed when the storm line under Oullet Blvd connects to the storm line i RECOILED: APPROVED: APPROVED: j Bury-OM.Inc. Roanoke 351114 Padners•L.P. ��� Scott Donnell Ost .LC By now SW1Mc Consulting Services.Inc Y r! '1�''� y ('.C� '__ B U'I//1 9 Name: 0KN F&A W i Name J William V Boecker Names Scall Dennell Tile:Pdrocislad Td'e. Manager Tdk: Pre��nt Revised:10-12-2011 Page 2 I Roanoke 35/114 Partners,L.P. 201 Main Street,Suite 3100 Fort Worth, Tevas 76102 I June 2016 Scott Dennett Construction, L.C. 2313 Cullen Street Fort Worth,Texas 76107 Attention: Shawn Moore Re: Construction Agreement (Infrastructure) ("Agreement") between Roanoke 35/114 Partners, L.P., a Texas limited partnership ("Owner") and Scott Dennett Construction, L.C., a Texas limited liability company(" ontractor') for the construction of Outlet Boulevard and Golf View Drive at Owner's Champions Circle development in Denton County,Texas Dear Mr. Moore: As you requested, this letter confirms that the above-referenced Agreement between Owner and Contractor does not contain a liquidated damages provision and does not provide for liquidated damages in the event of Contractor's default. If you have any questions concerning this matter,please do not hesitate to contact me. Very truly yours, Roanoke 35/114 Partners,L.P., a Texas limited partnership By: Roanoke 35/114 Genpar,LLC, a Texas limited liability company, its general Aartner By: AV*Ai William V. Boeck •,Vice President cc: Ken Ebeling(via e-mail) I FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I PROJECT INFORMATION Date: 9/2016 Name ofContractor Project Name -- Scott Dennett Construction,LC Champions Circle,Outlet Blvd&Golf View Dr _ DOE Inspector Project Manager Habte Taezaz Fred Ehia DOE Number wculry Ty of Cowract 7406 Q Simpk Routine Q Complex f]Water Q Waste Water ❑Storm Drainage ❑Pavement Initial Contract Amount _ _ Final Contract Amount $1,427,034.33 $1,460,075.33 11)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard_ 3-Good 4-- Excellent ELEMENT ^�~ RATING ELEMENT RATING (0-4) _ (0-4) INSPECTION EVALUATION _ _ PLANS&SPECIFICATIONS 1 Availabili of Inspector _ __ 1 Accuracy Plans to Existing Conditions 2 Knowledge of Ins ector _ 2 Clarity&Sufficiency of Details 3 Accura LL f Measured_Quantities �Y __ 3Applicability of Specifications 4 Display Of Professionalism _ 4 Accuracy of Planuantities 5 Citizen Commllaint Resolution _ PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs l Knowledge And/Or Problem Resolution ADMINISTRATION_ _ 2 Availability of Project Manager 1 Chane Order Processing Time _ 3 Communication 2 Timliness of Contractor Payments _ 4 Resolution of Utili Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector A. 6 Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS _ _TR_ANS_PORTATION AND PUBLICWORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(8]7)392-7845 FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I CONTRACTOR&PROJECT DATA Name of Contractor Project Name Scott Dennett Construction,LC Champions Circle,Outlet Blvd 8c Golf View Dr DOE Inspector DOE Number Habte Taezaz 7406 DOE Inspector Project Afanager ❑.r Water ❑Q Waste Water ❑Storm Drainage ❑Pavement Fred Ehia Initial Contract Amount Project DiQiailty $1,427,034.33 O Simple O Routine Q Complex Final Contract Amount Date $1,460,075.33 6/29/2016 II)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGFIT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 1 20 11 Pro erty Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 426 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(1'S) 426 III)CONTRACTOR'S RATING Maximum Score(MS)=448 gr sum of applicable element score maximums which= 448 Rating(ITS/MSS• 100%) 426 / 448 — 95% Performance Category Excellent <20%_hwdequate 20%to<40%—Deficient 40%to<60%—&andard 60%to<80%—Good ?80%s&cellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor Signature DOE Inspector's Supervisor CONTRACT'OR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throclrmorlon Street-Fort Worth,TX 76012-63110 T (817)392-7941 -Fax:(817)392-7845 FORTWORTHrev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Champions Circle,Outlet Blvd&Golf View Dr PROJECT NO.: #02521 CONTRACTOR: Scott Dennett Construction DOE NO. 7406 PERIOD FROM 07/15/15 TO: 05/12/16 FINAL INSPECTION DATE: 12-May-16 WORK ORDER EFFECTIVE 7/15/2016 CONTRACT TIME 90 O WD ®CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS" CHARGED DAYS THIS 303 PERIOD PREVIOUS PERIOD TOTALS TO DATE 303 *REMARKS CONTRACTOR DATIE INSP CTO DATE ENGINEERING DEPARTMENT The City of Fort Worth•1000 Throckmorton Strut•Fort Worth,TX 76012-6311 C`) 1 (817)392-7941 •Fax:(817)392-7845