The Proceeding pe6ple have been Contacted concerning the request &TION AND PUBLIC WOFM � f
for final payment&have released this project for such payment. F PROJECT COMPLETION q(P p I—l✓W� P�
Clearance Conducted By Etta Bacy D. E.Nt: 7406
E o25t�;�?-l$�'
Regarding contract U7406 for OUTLET BLVD&GOLF VIEW DR.as required by the WATER DEPARTMENT 3
as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the
recommendation of the Assistant Director o blic Works Department has accepted the project
as complete. F.C
�t w
�'
r
Original Contract Prices: JUL 0 S 2016 t $68,02633
Amount of Approved Change Orders: Ns 1
Sy.-----------`-'�
Revised Contract Amount: $68,02633
Total Cost Work Completed: $68,02633
Less Deductions:
Liquidated Damages: Days®$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $68,02633
Less Previous Payments:
Final Pay Due $68,02633
Recorn 4 n ed for Acceptance Date
Asst. Direc or, rPW - Infrastructure Design and Construction
/�z
Accepted Date
Asst. Director, WATER DEPARTMENT
Asst: City Manager Date
Comments: FUND ACCT:P265-6041502521-00
OFFICIAL RECORD
V pjAlLED CITY SECRETARY
JUL 1 Z016 FT. WORTH, TX
initial:
X79&0 l— Coaly 1
"Orfia
City Project Numbers 02521 DOE Number 7406
Contract Name OUTLET BLVD&GOLF VIEW DEstimate Number 1
Contract Limits __ Payment Number 1
Project Type WATER&SEWER For Period Ending 5/12/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117406
Inspectors LAYER / HABTE Contract Date
Contractor SCOTT DENNETT CONSTRUCTION,INC. Contract Time
2808 W.7TH ST.,#B Days Charged to Date 303
FORT WORTH, TX 76107 Contract is •000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Cross Retainage Net
Funded
Total Cost of Work Completed $68,026.33
Less %Retained $0.00
Net Earned $68,026.33
` Earned This Period $68,026.33
eta-nage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $68,026.33
Friday,June 24,2016 Page 4 of 4
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name OUTLET BLVD&GOLF VIEW DR
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02521
DOE Number 7406
Estimate Number I Payment Number 1 For Period Ending 5/12/2016
City Secretary Contract Number 117406 Contract Time
Contract Date Days Charged to Date 303
Project Manager Ehia Contract is 100.00 Complete
Contractor SCOTT DENNETT CONSTRUCCION,INC.
2808 W.7TH ST.,#B
FORT WORTH, TX 76107
Inspectors LAYER / HABTE
Friday,June 24,2016 Page l of 4
City Project Numbers 02521 DOE Number 7406
Contract Name OUTLET BLVD&GOLF VIEW DR Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 5712/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 6"PVC WATERLINE 5 LF $14.18 $70.90 5 $70.90
2 8"PVC WATERLINE 594 LF 517.83 510,591.02 594 $10,591.02
3 12"PVC WATERLINE 461 LF $35.81 516,508.41 461 $16,508.41
4 6"GATE VALVE&BOX 4 EA S1,315.00 55,260.00 4 $5,260.00
5 8"GATE VALVE&BOX 4 EA S 1,610.00 56,440.00 4 $6,440.00
6 12"GATE VALVE&BOX 3 EA $2,502.00 $7,506.00 3 $7.506.00
7 CONNECT TO EX WATER LINE 1 EA 52,382.00 $2,382.00 1 $2,382.00
8 FIRE HYDRANT ASSEMBLY 3 EA 54,851.00 $14.553.00 3 $14,553.00
9 2"WATER SERVICE 1 EA $2,158.00 $2,158.00 1 $2,158.00
10 TRENCH SAFETY 1060 LF $0.55 S583.00 1060 S583.00
Il TESTING 1060 LF $0.55 $583.00 1060 $583.00
Sub-Total of Previous Unit $66,635.33 $66,635.33
SEWER
Item Estimated Estimated Completed Completed
Description of Items Unit [blit Cost
No. Quanity Total Quanity Total
I REMOVE 8"WASTEWATER LINE 78 LF $4.50 $351.00 78 $351.00
2 8"WASTEWATER ABANDONMENT PLUG I EA S480.00 $480.00 1 $480.00
3 REMOVE 4'WASTEWATER MANHOLE I EA $560.00 $560.00 1 $560.00
Sub-Total of Previous Unit $1,391.00 51,391.00
Friday,June 24,2016 Pale 2 of 4
City Project Numbers 02521 DOE Number 7406
Contract Name OUTLET BLVD do GOLF VIEW DR Estimate Number I
Contract Limits Payment Number I
Project Type WATER do SEWER For Period Ending 5/128016
Project Funding
Contract Information Summary
Original Contract Amount S68,026.33
Chance Orders
Total Contract Price S68,026.33
Date AP Total Cost of Work Completed 568,026.33
Co c r Less %Retained $0.00
74 7 Net Earned $68,026.33
Date
n ction Supe sor Earned This Period $68,026.33
�a/6 Retainage This Period $0.00
Date Less Liquidated Damages
Pro anager
Days Q /Day 50.00
( /5V DateV l U LessPavement Deficiency 50.00
Asst Di ctor/rPW-Infrastructure Design and Construction Less Penalty 50.00
11&4 Date -7-1-16 Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment S68.026.33
Friday,June 24,2016 Page 3 of 4
F1.ORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Champions Circle,Outlet Blvd&Golf View Dr
PROJECT NUMBER: 2521
DOE NUMBER: 7406
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 6" PVC 5
Water 8" PVC 594
12" PVC 461
FIRE HYDRANTS: 3 VALVES(161'OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITTES: Yes
NEW SERVICES: 2" Copper 1
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
; ? The City of Fort Worth• 1000 Thzockmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
CONSENT OF SURETY OWNER ❑
ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
Conforms with the American Institute of Architects G707 form OTHER ❑
Bond No: PB115MSM90
TO OWNER: ARCHITECTS PROJECT NO.: 02409
(Name and address)
City Of Fort Worth
1000 Throckmorton Street CONTRACT FOR: Utilities and Paving
Fort Worth,TX 76102
PROJECT: CONTRACT DATED: 5/15/2015
(Name and address)
Utilities and Paving Work on Outlet Boulevard and Golf View Drive Project No. 02409 for
Roanoke 35/114 Partners, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(insert name and address of Surety)
Philadelphia Indemnity Insurance Company
One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004
SURETY
on bond of
(Insert name and address of Contractor)
SCOTT DENNETT CONSTRUCTION, LC
2313 Cullen Street
Fort Worth,TX 76107
,CONTRACTOR
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of owner)
City Of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102
OWNER
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: ,June 9,2016
(Insert In writing the month followed by the numeric date and year.)
Philadelphia Indemnity Insurance Company
(Sure
(Signa te h filed repres ntative)
Attest:
(Seal): �- - vrinte MUM and Me
3505
PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No: PB11509800690
One Bala Plaza,Suite 100
Bala Cynwyd.PA 19004-0950
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS That PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and
existing wider the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint.lared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young
and Fred A.Thetford,III of Contract Bond Agency,LLC., its true and lawful Attorney-in-fact with full authority to execute on its behalfbonds,undertakings,
recognizances and other contracts of indemnity and wTitings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an
amount not to exceed 525,000,000.00
This Power of Attomey is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPFIIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I"day of July,2011,
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company to (I)Appoint Attorney(s) in Fact and authorize the Attorney(s) in Fact to
execute on behalf of the Company bonds and undertakings,contracts of indemnity and
other writings obligatory in the nature thereof and to attach die seal of the Company
thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the
authority given. And,be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attorney or certificate relating thereto by facsimile,and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with the respect to any bond or
undertaking to which it is attached.
IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND
ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 10'"DAY OF JUNE 2013.
(Seal)
Robert D.O'Leary Jr.,President&CEO
Philadelphia Indemnity Insurance Company
On this 10'h day of June 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he
is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the
Corporate seal of said Company:that the said Corporate Seal and his signature were duly affixed.
COMMONWEALTH OF PENNSYLVANIA
Naprlal Seel .�
KlrtiCeAy 4 Ka lgla,Notary Fubl,
LD1/!*MttIDt TnD. ly C01 XY
M/ranmSi0n 6W SDS.lB,2016
hent vr+olsrvru rsoaana oo.orwe; Notary Public:
residing at: Bala Cvriwvd.PA
(Notary Seal)
My commission expires: December IS.2016
1,Edward Sayago,Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution ofthe Board of
Directors and this Power of Attorney issued pursuant thereto on this 10'`I day of June 2013 true and correct and are still in full force and effect.1 do further certify that
Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attomey the duly elected President of
PHILADELPHIA WDEMNiTY INSURANCE COMPANY,
In Testimony Whereof I have subscribed try name and affixed the facsimile seal of each Company this 9th day of June 16
Hdward Sayago,Corporate Secretary
PHILADELPHIA INDEMNITY INSURANCE COMPANY
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid,on this day personally appeared Shawn Moore,
Senior PM Of Dennett Construction,known to me to be a credible person,
who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations,corporations, or other
organizations finishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Champion Circle Phase One Outlet Blv d G if iew
BY
Shawn Moore
Subscribed and sworn before me on this date 1 st of July,2016.
JANELLE MCELYEA
Notary Public.Stole of Texas
My Commission Expires
August 21, 2018
Notary Publi
Ni
Tarrant County,Texas
Roanoke 35/114 Partners,L.P.
201 Main Street,Suite 3100
Fort Worth, Texas 76102
June_,2016
Scott Dennett Construction,L.C.
2313 Cullen Street
Fort Worth,Texas 76107
Attention: Shawn Moore
Re: Construction Agreement (Infrastructure) ("Agreement') between Roanoke
35/114 Partners, L.P., a Texas limited partnership ("Owner") and Scott
Dennett Construction, L.C., a Texas limited liability company ("Contractor")
for the construction of Outlet Boulevard and Golf View Drive at Owner's
Champions Circle development in Denton County,Texas
Dear Mr. Moore:
As you requested, this letter confirms that the above-referenced Agreement between Owner
and Contractor does not contain a liquidated damages provision and does not provide for liquidated
damages in the event of Contractor's default.
If you have any questions concerning this matter,please do not hesitate to contact me.
Very truly yours,
Roanoke 35/114 Partners,L.P.,
a Texas limited partnership
By: Roanoke 35/114 Genpar,LLC,
a Texas limited liability company,
its general rkartner t
By: 4��0 0�X
William V.Boecke'�,Vice President
cc: Ken Ebeling(via e-mail)
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: ;6!2912016 '
Name of Contractor ;Project Name
`Scott Dennett Construction,LC 'Champions Circle,Outlet Blvd&Golf View Dr
DOE Inspector 1 Project Manager
;Habte Taezaz i Fred Ehia i
DOE Number i Project Doculty i T)w of Contract {
7406 0 Simple OQ Routine 0 complex-(Q Water Q Waste Water ❑StDrm Drainage ❑Pavement
'Initial Contract Amount lFinal Contract Amount
568,026.33 J$68,026.33
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
!ELEMENT RATING iELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION ;PLANS&SPECIFICATIONS
I Availability of Inspector 41 1 Accuracy of Plans to Existing Conditions
•2 Knowledge of Inspector '2 Clarity&Sufficiency of Details -
;3 Accuracy of Measured Quantities 1 3 Applicability of Specifications
4 Display Of Professionalism i 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution ;PROJECT MANAGER EVALUATION
i6 Performance-Setting up Valve Crews,Labs { !I Knowled a And/Or Problem Resolution
`ADMINISTRATION 12 Availability ofProject Manager I i
1 Change Order Processing Time ;,3 Conununication i
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 1
13 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
: .•' The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -F=(817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Scott Dennett Construction,LC Champions Circle,Outlet Blvd&Golf View Dr
DOE Inspector DOE Number
Habte Taezaz 7406
DOE Inspector Project Manager
❑water ❑wastewater ❑Storm Drainage ❑Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$68,026.33 0 Simple OQ Routine 0 Complex
Final Contract Amount Date
$68,026.33 6/29/2016
II)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 1 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
ill)CONTRACTOR'S RATING
Maximum Score(MS)=448 gl sum of applicable element score maximums which= 448
Rating([TS/MS)*100%) 426 / 448 95%
Performance Category Excellent
<20%=Inadequate 20%to<40%-Deficient d0%to<60%—Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Ll- A -� Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION.AND PUBLIC WORKS
The City of Fort Worth-1000 11rockmorton Street-Fort Words,TX 76012-6311
QD (817)392-7941 -Fax:(817)392-7845
FoRTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Ch!Mj ions Circle,Outlet Blvd&Golf View Dr
PROJECT NO.: #02521 CONTRACTOR: Scott Dennett Consbuc;tion
DOE NO.: 7406
PERIOD FROM:07/15/15 TO: 05/12/16 FINAL INSPECTION DATE; 12-May-16
WORK ORDER EFFECTIVE:7/15/2016 CONTRACT TIME: 90 0 IRR R m
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD 303
PREVIOUS
PERIOD
TOTALS
303
TO DATE
*REMARKS:
W i-i1
CONTRACTOR DAT INSPECTOR 15ATE
'ENGINEERING DEPARTMENT
The City of Fort Worth-1000 Tlunckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845