Loading...
HomeMy WebLinkAboutContract 46926-CO1 CITY SECRETAW FORT WORTH® City of Fort Worth CONTRACT NO. �o I Change Order Request Breakdown Project Name Hemphill/Berry Urban Village City Sec# 1 46926 Client Project#(s)l CPN#0700 DOE 6055 CSJ 0902 48 829 Contractorl C Green Scaping I PM Lissette Acevedo IInspectorl Roy Scharfenberg Change Order Submittal# 0 Date 5/17/2016 Dept. Planning Contract Time Totals WD Original Contract Amount $670,337.80 $670,337.80 65 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $670,337.80 $670,337.80 65 Amount of Proposed Change Order •$15,565.00 -$15,565.00 60 Revised Contract Amount $654,772.80 $654,772.80 125 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -2.320)10 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $837,922.25 JUSTIFICATION(REASONS) FOR C94g6E OI�D Item 18: 24"Drill Shafts, Were utilized project wide in lieu of the 18"drilled shaft to meet Tx Dot requirements Item 22: BARRICADES, SIGNS&TRAFFIC HANDLING,Project contract time was suspended during the project and extended Item 29: CONDUIT PVC(SCH 80)(2")BORE, (Electrical)2"Bore quantities were extended to avoid damage to existing tree roots between Sta 8+00 35'Lf-Sta 13+00 35'Lf &To avoid damage or removal to Walmart's existing drive ways. Item 30: CONDUIT PVC(SCH 80)(4')BORE,(Irrigation)To avoid damage or removal to Walmart's existing drive ways/to avoid damage to existing tree roots located sta.8+40-Sta 9+50 35'Rt New Line Item: Water Meter Boxes, To replace existing out of compliance damaged water meter boxes, Water meter boxes to be replaced per City of Ft Worth Specification Division#33 C. Green Scaping,LP was unable to perform construction activities during two time suspension periods:(1)October 23,2015 to December 8, 2015 and(2)December 21,2015 to January 11,2016. These time suspensions were the result of the following: 1. Several design issues on original pians related to the street lighting design. 2.City had to resolve several issues with the street lights:what style or model number of pedestrian lights were going to be installed,supply of anchor bolts and templates,relocation of foundations to avoid tree drainage,additional bore on northwest quadrant of project,and removal of additional trees for light installations. 3.City had to work with TxDOT'to revise concrete mix design. 4.Tree and light locations need to be adjusted/omitted to accommodate current businesses drive approaches. 5.Design change on tree species. In addition to the time suspensions above,C.Green Scaping,LP bid this project to work on both sides of the street simultaneously. During a community meeting,the City instructed Green Scaping that they could only work on one half of the road before starting work on the other half. Due to this direction,Green Scaping requests an additional 60 working days to complete the project. The City of Ft.Worth and C.Green Scaping, LP are both in agreeance on the additional 60 working days requested. OFFICIAL RECORD AIN 2 T X16 CITY SECRETARY FT. WORTH, TX ° O T WORTH City of Fort worth Change Order Additions Project Name Hemphill/Barry Urban\nllage City Sec# 46926 CAent Project# CPN#0700 DOE 6055 CSJ 0902 48 829 C Green SCepirg PMJ Lissette Acevedo IMPeCtor Roy W-fenberg Charge Order Submittal# [= Date 5/1712016 ADDITIONS ITEM DESGKIVIIUN DEPT oty LF )Zfu.uu Unit Unit os o a anning 22 BARRICADES,9IGN5 AND TRAF HANuLIN(j 0502.2001 anning on y annug anning xxx ater eter xes anrnng Planning 73,836.00 Sub ota n ns Change Order Additions Page 1 of 1 Fo r Wo City of Fort Worth Change Order Deletions ProjectName /Berry Urban Villap City Sec# 46926 Client Project# CPN#0700 DOE 6055 CSJ 0902 48 829 C Green Scap rg PMj Lamb Acevedo Inspector Roy Scharfenberg Change Order Submittal# 0 Date 5/17/2016 DELETIONS Unit nitosTotal anning 5 anning on 0350.2001 arming 5. on 7 ammwig 7 . L 531.2006 P annmg a 28 CONDUIT PVC(SCH 80)(2-) 0618.2034 Planning 1,035.0000 L Planning $89,401,00 Sub otal a ebons Change Order Deletions Page 1 of 1 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 CFW Change Order Approval CO - 01 - P and D Page 2 of 3 FORT WORTH. city of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: CO - 01 - P and D Date Started: 2016-05-27 City Sec. No.: 46926 Date Due: 2016-07-16 Project Name: 00700 - Urban Villages SW Cluster Hemphill-Berry 00700 DOE Numbers: Project Numbers: 6055 Project Street and Pedestrian lighting, colored stamped concrete Description: sidewalks, landscaping and benches Project Manager: Lissette Acevedo City Inspector: Roy Contractor: Greenscaping COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: $ -15,565.00 31001 0060419 5740010 C00700 C( 60 Total Cost: $ -15,565.00 Total Requested Days: 60 Approval Status: https:Hprojectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?Siteld=51500&Processl... 6/14/2016 CFW Change Order Approval CO - 01 - P and D Page 3 of 3 Approved: Yes Comments: User: Stacy Geigenmiller Date: 2016-05-27 5:17 PM Approved: Yes Comments: User: Lissette Acevedo Date: 2016-05-27 1:25 PM Approved: Yes Comments: User: Patrina Newton Date: 2016-06-02 10:00 AM Approved: Yes Comments: User: Dana Burghdoff Date: 2016-06-09 4:39 PM Approved: Yes Comments: User: Randle Harwood Date: 2016-06-14 3:57 PM ®6C00000 Approved: Yes Comments: ' "` �a0 ° User: Doug Black 070 Date: 2016-06-14 4:18 PM s 8 t 0 Approved: Yes Comments: User: Jay Chapa j. 5ecretwy Date: 2016-06-14 9:22 PM Action Required: =NOQUIRED OFFICIAL RECORD CITY SECRETARY FT= = TX https://projectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=51500&ProcessL.. 6/14/2016 CITY SECRETAW CONTRACT NO. � Form 2146-L (Rer.lonl) CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 1 Page 1 of 1 1.CONTRACTOR: C.GREEN SCAPING,LP CCSJ: 0902-48-829 2.Change Order Work Limits:Sta. 0+00 to Sta. 13+18 Project: HEMPHILL BERRY 3.Type of Change(on federal-aid non-exempt projects): Minor (Major/Minor) Highway: CS 4.Describe the change and the reason for the change order. When necessary,include County: TARRANT exceptions to this agreement. District: FORT WORTH CONTRACT TIME EXTENSION REQUEST,PLEASE REFER TO ATTACHED DOCUMENTS Contract Number: 46926 5.New or revised plan sheet(s)are attached and numbered: N/A Each signatory hereby warrants that each has the authority to execute this Change Order. Bysigningthis change order,thecontractor agrees towaive anyandall The following information must be provided claims for additional compensation due to any and all otherexpenses; additional changes for time,overhead and profit or loss of compensation Time Ext.#: 1 Days added on this C.O.: 60 as a resultof this charge.Further,the contractor agrees that this agreement Is made in accordance with Item 4 and the Contract.Exceptions should be noted in the response for r5 above. Amt.added by this change order: $0.00 For TxDOT use only: THE CONTRACTOR / Date 05/20/16 // Days participating: By CGREEN SCAPING,LP /lam Y"ty Amount participating: Typed/Printed Name TRACY LEMOINf Signature Date Typed/Printed Td1ePROJECT MANAGER Name/Title R O MEND FOR EXECUTION: '5&1400 @14*4& Name�tleOhte Narne7ritle Date EjOPROVED t�i... REQUEST APPROVAL WX !� a�_—ACM S.3 /G Na J Dat Na /Title Date 151CI4 l I � REQUEST APPROVAL N Itle D J. r, City Secretary lle)�- k� '5z�/le ame/Title DAte NameMtle Date Engineer's Seal: OF F-JAPPROVED No M&C REQUIRED ••••• OFFICIAL RECORD LISSE•C7•E •..........:.*.. •• ACE-VE CITY SECRETARY .............�® FT.WORTH,TX �. 199548 •'�� �g S���I��!' ANAL E ��t. '�•h F q��i 1 9�A° S 't i M - ! I ATI 'I of dt.T�) �i1` +hln'+l11 +'m.{f� r 1 z`..� is~• it* 46 LL �, • I.: W r 110-41F � y .. Myra.are•..a - ` . 4 N 0 0 0 0 Z0 z z 0 cc cc } CC W J LU C O O 2 ti V C � O a O co cryo a W I ~ ry 3 0 o z o 0 V F z Q 2 a W r o. O $ o W w p o C J O wl O W Z O lu cc W LU O. IA D .jW o cc z ,p 0 a W oc a N O a Z 0 a = d V E W o V ¢ V M J a � � z Z = l IZ V � 0 ° O O Q u C � V d y H a F o O Z5 ~ �, 0 d V A O a f z e m a o 5 a W 0 W 3 N o m o oac ~ V J Q q Z V C O N LL v E LU Q m LL W J W V O ia a a a ~ 0 0 0 0 zZ as a aw w OZ 0 0 F o 0 fA O U w 3 W Z V V 2 Q CD CD, O O W F o 0 m N U > > w z O F >o LU� ¢N LL! a> 0 +W J� Q O Z LU Z V � � TZ i V � U V .. eC a H z Y Z ON V o Z d O z a w J V O F � m O � a F 4 Z o o+ O Z w V d CL0 z a A o U d N O i F Q: E m r J C ry u E m c LL J w � m ~ Q � F D/M/WBE # HFDB22088YO716 and Small Business Enterprise GREEN SCAPING Grass Establishi-nent • Erosion Conirol • We[lai cd Develc)i,tnenL • ivlitigation • Biotechni(A Fmbankment May 9, 2016 City of Fort Worth Attn: Lissette Acevedo (Project Manager) 1000 Throckmorton Street Ft. Worth, TX 76102 Subject: Hemphilf/Berry Urban Village; CSJ: 0902-48-829; City Project No. 00700— Request for an additional 60 working days to the contract time in addition to time suspensions. Mrs. Acevedo, C. Green Scaping, LP was unable to perform construction activites during two time suspension periods: (1) October 23, 2015 to December 8, 2015 and (2) December 21, 2015 to January 11, 2016. These time suspensions were the result of the following: 1. Several design issues on original plans related to the street lighting design. 2. City had to resolve several issues with the street lights: what style or model number of pedestrian lights were going to be installed, supply of anchor bolts and templates, relocation of foundations to avoid tree drainage, additional bore on northwest quadrant of project, and removal of additional trees for light installations. 3. City had to work with TxDOT to revise concrete mix design. 4. Tree and light locations need to be adjusted/omitted to accommodate current businesses drive approaches. 5. Design change on tree species. In addition to the time suspensions above, C. Green Scaping, LP bid this project to work on both sides of the street simultaneously. During a community meeting, the City instructed Green Scaping that they could only work on one half of the road before starting work on the other half. Due to this direction, Green Scaping requests an additional 60 working days to complete the project. The City of Ft. Worth and C. Green Scaping, LP are both in agreeance on the additional 60 working days requested. If you meed any further information, please feel free to contact us. Thank you, S4. Gei enmtlle' m�'� Project Mina er 1 g 2401 Handley Ederville Rd. • Fort Worth o Texas • 76118 Tel: 81.7.577.9299 - Fax: 817.577.9331 • Web: www.greenscaping.com FIORTWORTH® September 15,2015 Curtis Green, President C.GreenScaping, L.P. 2401 Handley Ederville Road Fort Worth,Texas 76118 RE: Hemphill/Berry Urban Village Streetscape Improvements Project, Contract No.: 46926 Project No.:00700, D.O. E. No.:6055,TxDOT CSJ No.:0902-48-829 Mr.Green: The notice to proceed for the Hemphill/Berry Urban Village streetscape project was issued on August 4, 2015 at the pre-construction meeting for the project. During the meeting,Stacy Geigenmiller and Tracy Lemoine of C.GreenScaping stated that construction would start on September 1, 2015. At a later date, C.GreenScaping, Inc. informed the City that the new construction start date would be September 14, 2015. This letter is to inform you that the City started time on the project effective Monday,September 14, 2015. In accordance with your contract,fully executed DBE and non-DBE subcontracting agreements and/or work and purchase orders are required to be submitted to the City for TXDOTrs approval. Work must not commence by DBE subcontractors until TxDOT has approved the submitted documentation. If you should have questions, please contact me at 817-392-7866. Thank you, Dena Johnson, P.E. Program Manager c: Stacy Geigenmiller,C.GreenScaping, Inc. Eric Fladager,Manager,Planning and Development Department Patrina Newton,Project Manager,Planning and Development Department Charles"Chuck"McLure,Sr.Engineering Technician,Planning and Development Department Irma Saenz,Senior Administrative Assistant, Planning and Development Department Roy Scharfenberg,Inspector,Lamb-Star Billy(Mark)Owen,Senior Construction Inspector,Transportation and Public Works Department Mike Layer,Construction Inspection Supervisor,Transportation and Public Works Department iftekhar All,Project Coordinator,Texas Department of Transportation Project File PLANNING AND DEVELOPMENT DEPARTMENT PROGRAM MANAGEMENT OFFICE THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 817-392-7942 * FAX 817-392-2330 t)Printed on recycled paper FORTWORTH® December 8, 2015 Stacy Geigenmiller Project Manager Green Scaping 2401 Handley Ederville Road Fort Worth,Texas 76118 RE Hemphill/Berry Urban Village CSJ: 0902-48-829 City Project No. 00700 Ms. Geigenmiller: As you are aware,time was suspended on Hemphill/Berry Village project on 10-28-2015. Please be advised that the suspension was lifted effective 12/07/2015 and that Green Scaping is to resume work on the project since all the issues listed below have been resolved: 1. City of Ft. Worth needed to decide on what style or model number of pedestrian lights were going to be installed 2. City of Ft. Worth needed to supply Green Scaping with anchor bolts and templates to be installed with the light piers 3. Design change needed for lights to be adjusted so piers would not penetrate tree drainage 4. Bore needed to be added to save established Red-Oak trees on the northwest of project 5. City of Ft.Worth needs to remove additional trees for light locations 6. Decision change was made for all light foundations to be 24" diameter, no 18" piers will be installed 7. Tree and light locations need to be adjusted/omitted to accommodate current businesses drive approaches 8. Clarification on removing microsurfacing line item Please let me know if you have questions or comments. SingDena �nson, P.E. Program Manager DJ/jcm Cc: Iftekhar Ali, Texas Department of Transportation Todd Estes,Transportation and Public Works, City of Fort Worth Eric Fladager, Planning and Development, City of Fort Worth Mike Layer,Transportation and Public Works, Inspection Division, City of Fort Worth Patrina Newton, Planning and Development, City of Fort Worth Mark Owen,Transportation and Public Works, Inspection Division, ,City of Fort Worth Roy Scharfenberg,Transportation and Public Works, Inspection Division, City of Fort Worth PLANNING AND DEVELOPMENT DEPARTMENT PROGRAM MANAGEMENT OFFICE THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 817-392-7942 * FAx 817-392-2330 t Printed on recycled paper FORTWORTH December 21, 2015 Tracy LeMoine, Project Superintendent C. Greenscaping LP 2401 Handley Ederville Road Fort Worth, TX 76118 RE: Hemphill and Berry Urban Village Streetscape Improvements Project, Project No.: 00700, DOE No. 6055, Contract No.: 46296, TxDOT CSJ No.: 0902-48-829 Dear Tracy: As previously discussed, due to the City needing to change the concrete mix design for the street light pole foundations to a TxDOT approved mix design, the Hemphill and Berry Urban Village Streetscape Improvements project is being suspended until the new concrete mix design has been approved by TxDOT. The suspension dates are from December 21, 2015 to January 11, 2016. Contract time will start on January 12, 2016. Please provide via BuzzSaw the current project schedule and use the email feature to notify the City's Hemphill Berry project members. Prior to the start of construction, a street use permit for the traffic control is required. Please contact Charles "Chuck" McLure, 817-392-7219, for the street use permit. If you have questions about the contract time or matters related to construction, please contact the City's Inspection Division, Roy Scharfenberg (817-675-4004). Thank you, 1 1 Lissette Acevedo, P.E., PTOE Project Manager c: Iftekhar Ali, Project Coordinator, Texas Department of Transportation Patrina Newton, Senior Planner, Planning and Development Department Eric Fladager, Manager, Planning and Development Department Charles"Chuck" McLure, Sr. Engineering Technician, Planning and Development Department Irma Saenz, Senior Administrative Assistant, Planning and Development Department Roy Scharfenberg, Inspector, Lamb Star William Todd Estes, Engineering Manager, Transportation and Public Works Department Project File TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE Cm of Four Women * 1000 THRommowroN Snwzr * Four Womm,Texas 76102 817-392-7913 * Fax 817-392-8092 �,'j Printed on recycled paper 6 FORTWORTH Date: May 1 b,2016 OFFICIAL RECORD To: Iftekhar,Ali CITY SECRETARY TxDOT Representative FT.WORTH, TX From: Lissette Acevedo, P.E., Sr. Project Manager City of Fort Worth Subject: Urban Villages SW Cluster Hemphill Berry Change Order#1 Contract Time Extension The City is submitting this change order to request a time extension of 60 working days to the current contract time of 65 working days. The following summary provides a detailed explanation of the time line of the project and how the schedule has been impacted to justify this request. Dena Johnson, Project Manager, issued official Notice to Proceed for 79/15/2015 construction to begin,and contract time commenced. There are 65 working days in the contract. Time Suspension#1: - Several design issues on original plans related to the street lighting design. 10/23/2015 - City had to resolve several issues with the street lights: what style or — 12/8/2015 model number of pedestrian lights were going to be installed, supply of anchor bolts and templates, relocation of foundations to avoid tree drainage, additional bore on northwest quadrant of project, and removal of additional trees for light installations. Time Suspension#2: - City had to work with TxDOT to revise concrete mix design. 12/21/15— - Trees and light locations need to be adjusted/omitted to accommodate 1/11/2016 current businesses drive approaches. - Design change on tree species 12/16/2015 New City project manager assigned to the project, Lissette Acevedo, P.E. 2/11/2016 Contract time exhausted. In addition to the time suspensions above, C. Green Scaping, LP bid this project to work on both sides of the street simultaneously. During a community meeting in August 2015,the City instructed Green Scaping that they could only work on one half of the road before starting work TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE CnY of FoRT WoRTH * 1000 THRocicnionoN STRm * FoRT WoRm,Texas 76102 817-392-7913 * FAx 817-392-8092 t.')Printed on regcled paper FORTWORTH on the other half. Due to this direction, an additional 60 working days to complete the project is requested. The City project staff has reviewed all these issues and considers this request for time extension fair and reasonable. Please contact me if additional information is needed. Thank u, Lissette Aceve o, P.E. ! Sr. Project Manager Date TRANSPORTATION AND PUBLIC WORKS DEPARTMENT 2 THE CITY of FoRT WORTH * 1000 THRocrhiOR TON STRFEr * FORT WORTH,TuAs 76102 817-392-7913 * FAx 817-392.8092 Q Printed on rw)vW paper