Loading...
HomeMy WebLinkAboutContract 46968-FP1 Department of•'P&W(:oast.Services DOE# Date Project Manag=4., A6, Risk Mana D.O.E. gemrnt C he ZT WO RT H CFA CITY sFcRETAw 4(., � 41 CONTRACT N0. The Proceeding people have been Contacted concerning the request for final payment&have released this 'ATION AND PUBLIC WORKS "Cl 01 project for such payment. )F PROJECT COMPLETION Clearance Conducted By Shameka Kennedy D.00..E.X2: 7506 Regarding contract 117506 for SAGE MEDICAL PLAZA as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete Original Contract Prim: (� ;_ $77,83337 0) VG Amount of Approved Change Orders: ; Ns r1 JUN 2 82916 L Revised Contract Amount: Total Cost Work Completed: = - = $77,83337 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: '`\1 Total Cost Work Completed: $77,83337 Less Previous Payments: $0.00 Final Pay ent ue $77,83337 fi•Z.�•�U Recomme ded or Acceptance Date Asst. Dire or, PW - Infrastructure Design and Construction LX_ -��..�..- Gas-�G Accepted Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: P265-541200-604150264583 EMAIZA D OFFICIAL RECORD CITY SECRETARY JUN h91016 FT. WORTH, TX it G %9isa V JUN 2 8 2016 By_---_.__�__. City Project Numbers 02645 DOE Number 7506 Contract Name SAGE MEDICAL PLAZA Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER For Period Ending 6/6/2016 Project Funding Project Manager Sahu City Secretary Contract Number 117506 Inspectors LAYER / VEGA Contract Date Contractor TRI-STAR CONSTRUCTION,INC. Contract Time 120 CD 3601 YUCCA DRIVE Days Charged to Date 222 CD FLOWER MOUND, TX 75022 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $77,833.37 Less %Retained $0.00 Net Earned $77,833.37 Earned This Period $77,93337 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0,00 Balance Due This Payment $77,833.37 Monday,June 20,2016 Pop 4�of 4 � � o 44Y FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SAGE MEDICAL PLAZA Contract Limits Project Type WATER City Project Numbers 02645 DOE Number 7506 Estimate Number 1 Payment Number 1 For Period Ending 6IN2016 CD City Secretary Contract Number 117506 Contract Time 120:D Contract Date Days Charged to Date 222 Project Manager Sahu Contract is 100.00 Complete Contractor TRI-STAR CONSTRUCTION,INC. 3601 YUCCA DRIVE FLOWER MOUND, TX 75022 Inspectors LAYER / VEGA Monday,June 20,2016 Page 1 of 4 City Project Numbers 02645 DOE Number 7506 Contract Name SAGE MEDICAL PLAZA Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER For Period Ending 6/6/2016 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total — — -- -- ------ - ------------- - 1 MANHOLE VACUUM TESTING 4 EA $110.00 $440.00 4 $440.00 2 TRENCH SAFETY 1098.34 LF $1.58 $1,735.38 1098.34 $1,735.38 3 TRENCH WATER STOPS 4 EA $325.00 $1,300.00 4 $1,300.00 4 DUCTILE IRON WATER FITTINGS 0.7475 TN $4,000.00 $2,990.00 0.7475 $2,990.00 W/RESTRAINT 5 6"WATER PIPE 15 LF $26.00 $390.00 15 $390.00 6 10"WATER PIPE 534.34 LF $33.88 $18,103.44 534.34 $18,103.44 7 FIRE HYDRANT 1 EA $3,050.00 $3,050.00 1 $3,050.00 8 CONNECTION TO EXISTING 4"-12"WATER 1 EA $1,285.00 $1,285.00 I $1,285.00 MAIN 9 1 1/2"WATER SERVICE 1 EA $2,500.99 $2,500.99 1 $2,500.99 10 2"WATER SERVICE 1 EA $2,700.99 $2,700.99 1 $2,700.99 11 6"GATE VALVE 2 EA $850.00 $1,700.00 2 $1,700.00 12 10"GATE VALVE 1 EA $1,432.01 $1,432.01 1 $1,432.01 13 12"X 10"TAPPING SLEEVE&VALVE 1 EA $4,700.00 $4,700.00 1 $4,700.00 14 DUCTILE IRON SEWER FITTINGS 0.3 TN $4,000.00 $1,200.00 0.3 $1,200.00 15 8"PVC SEWER PIPE 0'TO 6' 20 LF $60.00 $1,200.00 20 $1,200.00 16 8"PVC SEWER PIPE 6'TO 8' 459 LF $27.00 $12,393.00 459 $12,393.00 17 8"PVC SEWER PIPE 8'TO 10' 45 LF $27.00 $1,215.00 45 $1,215.00 18 4'MAHOLE 4 EA $4,836.89 $19,347.56 4 $19,347.56 19 4'EXTRA DEPTH MANHOLE 2.5 VF $60.00 $150.00 2.5 $150.00 Sub-Total of Previous Unit $77,833.37 $77,833.37 Monday,June 20,2016 Page 2 of 4 City Project Numbers 02645 DOE Number 7506 Contract Name SAGE MEDICAL PLAZA Estimate Number i. Contract Limits Payment Number 1 Project Type WATER For Period Ending 6/6/2016 Project Funding Contract Information Summary Original Contract Amount $77,833.37 Change Orders Total Contract Price $77,833.37 6 jZ/ W I(,p Total Cost of Work Completed 577,933.37 Contract r Less %Retained $0.00 Net Earned $77,833.37 Date Earned This Period $77,933.37 Superriaw Z�Jc Retainage This Period $0.00 I v Manager Less Liquidated Damages Project Days Q /Day $0.00 Date C .71414 LessPavement Deficiency $0.00 Asst.Direct r W- Design and Construction Less Penalty $0.00 e�zll� Date Less Previous Payment $0.00 Director/Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $77,833.37 Monday,June 20,2016 Page 3 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Sage Medial Plaut PROJECT NO.: 02645 CONTRACTOR: Tri-Star Construction,INC DOE NO.: 7506 PERIOD FROM:10/12115 TO: 05/20/16 FINAL INSPECTION DATE: lWun-16 WORK ORDER EFFECTIVE:10/12/2015 CONTRACT TIME: 120 O WD OM DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 1& 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 222 PERIOD PREVIOUS 0 PERIOD TOTALS 222 TO DATE *REMARKS: CON17RACTOle !GATE INSPECTOR DATE ENGINEERING DEPARTMENT (a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Sage Medical Plaza PROJECT NUMBER: 02645 DOE NUMBER: 7506 WATER PIPE LAID SIZE TYPE OF PIPE LF Yes 6" PVC 15 Yes 10" PVC 534.5 FIRE HYDRANTS: 1 VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Yes NEW SERVICES: 2" copper 15 1 1/2" copper 15 SEWER PIPE LAID SIZE TYPE OF PIPE LF 8" PVC 504 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 4" PVC 20 TRANSPORTATION AND PUBLIC WORKS FORTWORTHRE":02/20/07 '-tet TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Tri-Star Construction,Inc. Sage Medical Plaza DOE Inspector DOE Number Alex Vega 7506 DOE Inspector Project Manager O Water O Waste Water ❑ Storm Drainage ❑ Pavement Patrick Buckley Initial Contract Amount Project Difficulty $77,833.37 0 Simple ® Routine O Complex Final Contract Amount Date $77,833.32 6/8/2016 11)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 3 60 1 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 N 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 346 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(f3) 346 III)CONTRACTOR'S RATING Maximum Score(MS)-4481 sum of applicable element score maximums which— 404 Rating(ITS/MS)•100%) 346 / 408 - 85% Performance Category Excellent <20%=Inadequate 20%to<40%—D&Jent 40%to<60%-Standard 60Y6 to<80%=Good .>_80%—Excellent Iaspeetor's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor low-.,Z Vi gle Signature DOE Inspector's Supervisor ,� Q• CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS '�� The City of Fort Worth•1000 Mnockmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 CONSENT OF OWNER O SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Bond No.PB-02253100026 PROJECT: Sage Medical Plaza (name&address) Fort Worth,TX TO: (Owner) Spelunker Properties VI,LLC PROJECT NO.:CFA No.2015-072 and City of Fort Worth,TX I CONTRACT FOR: Water&Sanitary Sewer Improvements I CONTRACTOR: Huffman&Huffman,Inc, CONTRACT DATE: September 22,2015 243 Ridgeway Circle Lewisville,TX 75067 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the Philadelphia Indemnity Insurance Company One Bala Plaza,Suite 100 I Bala Cynwyd,PA 19004 SURETY, I on Bond of Huffman&Huffman,Inc. CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of Its obligations to Spelunker Properties VI,LLC&City of Fort Worth,TX OWNER, as set forth in the said Surety Company's bond. 1 i IN WITNESS WHEREOF, i the Surety has hereunto set its hand this 24th day of May 2016 i Em to ers t al Casualtv Com an Surety Com an Signature of Authorized Repr ntativ*, Attest: t� O Shannon Lewis Attorney-In-Fact (Seal) Title CONSENTOFSURETY03MPANYTOFINAL PAYMENT ONE PAGE 2684 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza,Suite too Bala Cynwyd,PA 19004 Power of Attorney KNOW A',,PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws ofthe Commonwealth of Pennsylvania,does hereby constitute and appoint: Clint Norris,Steven J.Zineeker,Jessica Luna Montgomery, Shannon Lewis and Charles K.Miller of Southwest Assurance Group,Inc.. Its true and lawful Attomey(s)in fact with full authority to execute on its behalf bonds,undertakings,recognizances and ober contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed 525,000,000 This Power of Attomey is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duty called the 1"day of July,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1) Appoint Attorney(s)in Fact and authorize the Attomey(s) in Fact to execute on behalf of the Company bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon d:e Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 7T"DAY OF FEBRUARY 2013. ,,,t,M,.'w••N -y.•�.�JGf rnY (Seal) Robert D.O'Leary Jr.,President&CEO Philadelphia Indemnity Insurance Company On this 7"day of February 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duty sworn said that j he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company;that the said Corporate Seal and his signature were duly affixed. COM!i 1�P iL NOTARtAf'8FJ1h' DANiE11kPl)RATH,NolaryPtiilc fkttMtiasion �� Cotudy Notary Public: residing at Bala Cynwyd,PA (Notary Seal) My commission expires: March 22.2016 I,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PIIILADELPI[fA INDEMNITY INSURANCE COMPANY,do herbv certify that the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto are true and correct and are still in hill force and effect.1 do further certify that Robert D.O'Leary Jr.,who executed the Power ofAttorney as President,was on the date of execution of the attached Power of Attomey the duly elected President of PHILADELPHIA INDEMNITY LNSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 24th day of May 20 16. i Craig P.Keller,Executive Vice President,Chief Financial Officer&Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY Huffman& Huffman Inc. 243 1 dgewa - C rc?e Lewisville,TX Utilities since 1963 AMDAM STATE OF TEXAS CC,tNT)'OF TARRANT Before me the undersigned-authority,a notary public in the state and cou aforesaid, on this day personally appeared Rod Huffman, Vice President of Huffman&Huffman Inc.,known to me to be a credible person, who being by m duty-sworn, upon his oath deposed and said; That all persons,firms, associations,corporations,or ether organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the Citi- Council in the Cite of Fort V1,b1 has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Sage Medical Plaza DOE# 7506,city Project#0265,CFA #f 2015-072 BY Rod Huffman Subscribed and sworn before me on this date 24th Day of May,2016 i CAl� C"r 11UriiDK My cOMMMIS ON E7CP►RES J�e23,20i8 Spelunker Properties VI,LLC 701 East Bethel School Rd. Coppell,TX 75019 June 3,2016 RE: Heritage Glen Office Park,Lot 4, Block 1 Sanitary Sewer Improvements Community Facilities Agreement#46968-Amendment#1 Dear Mr.Vega, Spelunker Properties VI,LLC,hereby acknowledges that Huffman&Huffman, Inc., contracted under Tri-Star Construction,has completed the scope of work associated with the sanitary sewer connection as outlined in Community Facilities Agreement#46968- Amendment#1. Although the original contractual time was exceeded as a result of weather delay, Spelunker Properties VI,LLC,will not assess any penalties or liquidated damages due to the aforementioned time extensions. If you should have any questions,please feel free to contact our office. Sincerely, Timothy Ritter,M.D.,Manager SPELUNKER PROPERTIES VI,LLC, A Texas Limited Liability Company FORTWORTHRE"-.°2=°' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 6/8/2016 Name of Contractor Project None Tri-Star Construction,Inc Sage Medical Plaza DOE inspector Project Manager Alex Vega Fred Ehia DOE Number Project Difficulty Type of Contract 7506 P Simple ® Routine O Complex O Water O Waste Water O Storm Drainage O Pavement Initial Contract Amount Final Contract Amount 577,833.37 $77,833.37 11)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I 1 Availability of Inspector L4, 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspectors Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845