Loading...
HomeMy WebLinkAboutContract 47324-FP1 Department of TP&W Const.Services DOE# JDate Project Manager �. 1 I r Risk Management Canady tT �r�VO RTH CITY SECRETARY D.O.E. Brotherton ® CONTRACT N0. t- CFA Westerman/Scanne The Proceeding people have been Colliacted concerning the request for final payment 8 have released this protect for such payment. ATION AND PUBLIC WORKS Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION �.O2SJ�g�7439 ,t Regarding contract 117439 for LEFT BANK TRAFFIC SIGNAL IMPROVEMENTS as required by the c-9 73, TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department bas accepted the project as complete. Original Contract Prices: $182,818.00 Amount of Approved Change Orders: NO 1 Revised Contract Amount: Total Cost Work Completed: $182,818.00 Less Deductions: Liquidated Damages: Days Q$210.00/Day Pavement Deficiencies: Total Deduction Amount: *Total Cost Work Completed: $182,818.00 Less Previous Payments: $0.00 Final Payme ue $182,818.00 `7 Recommende f r Acceptance Date Asst Director T W - Infrastructure Design and Construction 7W1,,4 Accepted Date dUlDirectI, T RANSPORTATIX & PUBLIC WORKS Asst. City Manager Date Comments: C205-541200-209710255883 OFFICIAL RECORD E;M. ►..I.LED CITY SECRETARY FT.WORTH, TX JUL 32016 t a t& FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name LEFT BANK TRAFFIC SIGNAL IMPROVEMENTS Contract Limits Project Type TRAFFIC SIGNALS City Project Numbers 02558 DOE Number 7439 Estimate Number I Payment Number I For Period Ending 4127/2016 CD City Secretary Contract Number 117439 Contract Time 23CD Contract Date Days Charged to Date 87 Project Manager Long Contract b 100.00 Complete Contractor EMJ CORPORATION 5525 N.MACARTHUR BLVD.,#400 IRVING, TX 75038-2604 Inspectors LAYER/ CHAMBERS Wednesday,April 27,2016 Page l of 5 City Project Numbers 02558 DOE Number 7439 Contract Name LEFT BANK TRAFFIC SIGNAL IMPROVEMENTS Estimate Number 1 Contract Limits Payment Number 1 Project Type TRAFFIC SIGNALS For Period Ending 4/27/2016 Project Funding TRAFFIC SIGNAL Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ------- - --_ a,. w ----------------- 1 REMOVE SIDEWALK 300 SF $2.00 $600.00 300 $600.00 2 FURNISHIINSTALLELEC SERV PEDESTAL 2 EA $6,500.00 $13,000.00 2 $13,000.00 3 2"CONDT PVC SCH 80 35 LF $12.00 $420.00 35 $420.00 4 2"CONDT PVC SCH 80 104 LF $15.00 $1,560.00 104 $1,560.00 5 3"CONDT PVC SCH 80 375 LF $15.00 $5,625.00 375 $5,625.00 6 3"CONDT PVC SCH 80 465 LF $18.00 $8,370.00 465 $8,370.00 7 4"CONC SIDEWALK 180 SF $8.00 $1,440.00 180 $1,440.00 8 BARRIER FREE RAMP I EA $400.00 $400.00 1 $400.00 i 9 4"SLD PVMT MARKING 270 LF $2.00 $540.00 270 $540.00 10 8"SLD PVMT MARKING 330 LF $2.00 $660.00 330 $660.00 11 8"SLD PVMT MARKING 105 LF $2.00 $210.00 105 $210.00 12 24"SLD PVMT MARKING 303 LF $2.00 $606.00 303 $606.00 13 LANE LEGEND ARROW 4 EA $200.00 $800.00 4 $800.00 14 LANE LEGEND BIKE 2 EA $200.00 $400.00 2 $400.00 15 REMOVE 4"PVMT MARKING 370 LF $1.00 $370.00 370 $370.00 16 REMOVE 8"PVMT MARKING 130 LF $1.00 $130.00 130 $130.00 17 REMOVE LANE LEGEND ARROW 3 EA $150.00 $450.00 3 $450.00 18 REMOVE LANE LEGEND ONLY I EA $150.00 $150.00 1 $150.00 19 REMOVE LANE LEGEND BIKE 2 EA $150.00 $300.00 2 $300.00 20 3-SECT SIGNAL HEAD ASSMBLY 5 EA $950.00 $4,750.00 5 $4,750.00 21 4-SECT SIGNAL HEAD ASSMBLY l EA $1,050.00 $1,050.00 1 $1,050.00 22 5-SECT SIGNAL HEAD ASSMBLY 1 EA $1,250.00 $1,250.00 1 $1,250.00 23 PED SIGNAL HEAD ASSMBLY 4 EA $750.00 $3,000.00 4 $3,000.00 24 2"PED PUSH BTN STATION W/SIGN 4 EA $50.00 $200.00 4 $200.00 25 AUDIBLE PEDESTRAIN PUSHBUTTON 4 EA $1,650.00 $6,600.00 4 $6,600.00 STATION 26 FURNISHANSTALL BBU SYSTEM EXT 1 EA $7,250.00 $7,250.00 1 $7,250.00 MOUNTED 27 FURNISHJINSTALL MODEL 712 PREEMPTION 3 EA $1,785.00 $5,355.00 3 $5,355.00 DETECTOR 28 FURNISH/INSTALL PREEMPTION CABLE 360 LF $2.15 $774.00 360 $774.00 29 FURNISH/INSTALL RADAR CABLE 375 LF $2.65 $993.75 375 $993.75 Wednesday,April 27,2016 Page 2 of 5 FORTWORTH rev 03/03/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.l NAME OF PROJECT:Left Bank Trdk Signal Improvements PROJECT NO.: 2558 CONTRACTOR: EMJ Construction DOE NO. 7439 PERIOD FROM 01/19/16 TO: 04/14/16 FINAL INSPECTION DATE: 22-Apr-16 WORK ORDER EFFECTIVE 1/19/2016 CONTRACT TIME 237 O WD•CD DAY OF DAYS REASON FOR DAYS DAY OF DAYSREASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 87 PERIOD PREVIOUS PERIOD TOTALS TO DATE 87 _] *REMARKS f/ CON COR DA E INbOECTOR bAT9 ENGINEERING DEPARTMENT / The City of Fort Worth•1000 Throckmorton Street•Fore Words,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTHRE02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contractor Project Name EMJ Construction Left Bank Traffic Signal Improvements DOE Inspector DOE Number Kevin Chambers 7439 DOE larpector Project Manager ❑ Water❑ Waste Water❑ Storm Drainage❑ Pavement Aaron Lon Initial Contract Amount Project Difculty $Z.$(8.O O 0 Simple ) Routine 0 Complex Final Contract Amount Date II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 1 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 3 1 20 15 12 After Hours Response 5 Y 4 20 1 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 421 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 431. [[n CONTRACTOR'S RATING Maximum Score(MS)—448 X sum of applicable element score maximums which— 448 Rating([TS I MSJ' 100%) 421 1 448 - 94% Performance Category Excellew <20%—Inadequate 20%to<40%=Dejklent 40%to<60%=Standard 60%to<80%=Good >_80%—Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector &A*AA T• signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throdunorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Roy E. Bean, II, President Of Bean Electrical, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; West 7"' Traffic Signal ; BY zlz Roy E. Bean, II/President Subscribed and sworn before me on this date 24th of May, 2016. CHERYLE R. ESPREE `4tPPt Notary Public.state of Texas Notary Nblic �. Comm.Expires 02-29-2020 �''""'8i �4��, Notary ID 1890225 f*:AIA Document G707 " - 1994 Consent Of Surety to Final Payment PROJECT:(Name and address) AKWMCrS PROJECT NICER: OWNER Left Bank-Traffic Signal Improvements ARCHITECT:❑ Forth Worth Texas CONTRACT FOR:General Construction CFA #2015-115 CONTRACTOR TO OWNER:(Name and address) CONTRACT DATED:August 04,2014 SURETY: City of Fort Worth and Centergy Retail,LLC OTHER:❑ In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert name and address of Swety) Continental Casualty Company 5565 Gknridge Connector NE,6th Floor,Atlanta,GA 30342 ,SURETY, on bond of (Insert name and address of Contraclar) EMI Corporation TX 5525 N.MacArthur Blvd,Suite 400,hving,TX 75038 ,CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of Owner) City of Fort Worth and Centergy Retail,LLC OWNER, as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date:May 5,2016 (Insert in writing the monthfollowed by the numeric dale andyear.) Continental Casualty Company (Sure 7 ) ignature of authorized representative) Attest: Patricia S.Kleelatumsr,Attorrisrio-fltd (Seal): (Printed name and hide) AIA Document G7071'—1904.Copyrgtw 01902 aux!1994 by The American Insthule of Architects.All rights reserved.WARNING:This AIA*Document Is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or dlstribu don of this AIA*Document,or arry portion of it,may result In severe civil and criminal penattles,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 10:48:03 on 05052018 under Order No.9952527211 1 which wares on 04072017,and N not for resale. User Notes: (1903322732) rUr��r�yr eai iviuvnr ArrUMNIINV INDIVIDUAL ATTORNEY-IN-FACT Kpow All Men By These Presents,That Continental Casualty Company,an-Illinois insurance company,National Fire Insurance Company of Hartford,an Illinois insurance company,and American Casualty Company of Reading,Pennsylvania,a Pennsylvania insurance company(herein called "the CNA Companies'),are duly organized and existing insurance companies having their principal offices in the City of Chicago,and State of Minois, and that they do by virtue of the signatures and seals herein affixed hereby make,constitute and appoint Mark R Brock,Dana F Davis,Patricia S Kleehammer,T Michael Langley,Dana Keith Davis, Cecil Ray Vaughan III, Individually of Rossville,GA,their true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on their behalf bonds,undertakings and other obligatory instruments of similar nature -In Unlimited Amounts- and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of said Attorney,pursuant to the authority hereby given is hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-Law and Resolutions,printed on the reverse hereof,duly adopted,as indicated,by the Boards of Directors of the insurance companies. In Witness Whereof,the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this 7th day of November,2013. eAsltg4IMSUAA, Continental Casualty Company QRSF ,�. � National Fire Insurance Company of Hartford 1g �r g `�ora"0a+rro a American Cas ty Company of Reading,Pennsylvania 1491 � 1IAtt�� • Pau]T Bruflat Vice President State of South Dakota,County of Minnehaha,ss: On this 7th day of November,2013,before me personally came Paul T.Bruflat to me]mown,who,being by me duly sworn,did depose and say: bat he resides in the City of Sioux Falls,State of South Dakota;that he is a Vice President of Continental Casualty Company,an Illinois insurance uwVany,National Fire Insurance Company of Hartford,an lllinois insurance company,and American Casualty Company of Reading,Pennsylvania,a Pennsylvania insurance company described in and which executed the above instrument;that he knows the seals of said insurance companies;that the seals affixed to the said instrument are such corporate seals that they were so affixed pursuant to authority given by the Boards of Directors of said nsurance companies and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said insurance ;ompames. IwoJ.MOHR tlPU81lC 7Y?AA1t---) SOUTHOUTH 011KOTA My Commission Expires June 23,2015 J.Mohr Notary Public CERTIFICATE I,D.Bult,Assistant Secretary of Continental Casualty Company,an Illinois insurance company,National Fur.Insurance Company of Hartford,an linois insurance company,and American Casualty Company of Reading,Pennsylvania,a Pennsylvania insurance company do hereby certify that the ower of Attorney herein above set forth is still in force,and further certify that the By-Law and Resolution of the Board of Directors of the insurance ampanies printed on the reve.rag3meof is still in ntasry whereof I have hatunto subscribed my name and affixed the seal of the said ssurance companies this�_ day of Dotw ) %HSU* � Continental Casualty Comby ,�. National Fire Insurance Company of Hartford f , aWro American Casualty Company of Reading,Pennsylvania 1VLY A NA I'D D.Bult Assistant Secretary )rm F6853-4/2012 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: t 26 Name of Contractor Project Name EMJ Construction Left Bank Traffic Signal improvements DOE Inspector Project Manager Kevin Chambers Aaron Lon DOE Number Project Diff—y Type of Contract 7439 0 Simple QQ Routine 0 Complex Q water waste water Storm Drainage) Pavement Initial Contract AmouW197,818.00 Final ContraciAmount !8Z 818.oo ,x'182 SI S.00 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATMG (0-4) (0-4) INSPECTION EVALUATION IPLANS&SPECIFICATIONS 1 Availability of Ins ctor 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 14 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications Pt 4 Display Of Professionalism 4 Accuracy of Plan Quantities 14 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time N 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe 111)COMMENTS&SIGNATURES COMMENT S 9 t ~e- • n i ra (1T ghAd AIr!kSeel L-J:t:h tfedtr. Av%0A AP-- a JAne-/r Signature Contractor Signature DOE Inspector Li qm-Aw Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS ID The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941-Fax:(817)392-7845