Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 47907
Developer and Project Information Cover Sheet: Developer Company Name: Bloomfield Homes,L.P. Address, State, Zip Code: 1050 E. Hwy 114, Suite 210, Southlake, TX 76092 Phone &Email: 817-416-1572, don@bloomfieldhomes.net Authorized Signatory, Title: Donald J. Dykstra, President Project Name and Brief Watersbend North Ph.3 Description: Project Location: Northeast Corner of Wagley Robertson &Magma Drive Plat Case Number: FP-15-116 Plat Name: Watersbend North Ph. 3 Mapsco: 19V Council District: 7 City Project Number: 100228 CFA Number: 2016-037 DOE Number: N/A To be completed by staff—, Received by:iz Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX !DECEIVED City of Fort Worth,Texas .02106 Standard Community Facilities Agreement G11yOFFORT WORV CFA Official Release Date: 10.07.2015 CIV fC ETARY Page 1 of 11 STANDARD COMMUNITY FACH,ITIES AGREEMENT THE STATE OF TEXAS § City Secretary I COUNTY OF TARRANT § Contract No. 4—i i WHEREAS, Bloomfield Homes, L.P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Watersbend North Ph. 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the DevelopeEOFFICIAL #�City of Fort worth,Texas RECORDStandard Community Facilities Agreement SECRETARYCFA Official Release Date: 10.07.2015Page 2 of 11 WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) ©. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a pen od_of-wo-(2)years from the-date-of-fi-nal_acceptance_insuring_the-maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Oficial Release Date: 10.07.2015 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I._ City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4of11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or empfoyees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. Ili. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction-of the Improvements if at the end of two (2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Pace 7 of 11 Cost Summary Sheet Project Name: Watersbend North Ph. 3 CFA No.: 2016-037 DOE No.: 1.;/A An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 231,154.75 2. Sewer Construction $ 178,877.00 Water and Sewer Construction Total $ 410,031.75 B. TPW Construction 1.Street $ 753,450.30 2.Storm Drain $ 310,456.00 3.Street Lights Installed by Developer $ 89,100.00 4. Signals $ - TPW Construction Cost Total $ 1,153,006.30 Total Construction Cost(excluding the fees): $ 1,563,038.05 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,200.64 D. Water/Sewer Material Testing Fee(2%) $ 8,200.64 Sub-Total for Water Construction Fees $ 16,401.27 E. TPW Inspection Fee(4%) $ 42,556.25 F. TPW Material Testing(2%) $ 21,278.13 G. Street Light Inspsection Cost $ 3,564.00 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 67,398.38 Total Construction Fees: $ 83,799.65 Choice FinanciaVGuarantee C dons,choose one - - Amount Mark one - - _ — - Bond= 100% $ 1,563,038.05 Completion Agreement=100%/Holds Plat $ 1,563,038.05 X Cash Escrow Water/Sanitary Sewer-125% $ 512,539.69 Cash Escrow Paving/Storm Drain=125% $ 1,441,257.88 Letter of Credit=125%w/2yr expiration period $ 1,953,797.56 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8ofII ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Bloomfield Homes,L.P. , By: Bloomfield Properties, Inc. �14 Jesus J. Chapa Assistant Ci l �Aanager / _ O J/ Name: Donald J. Dyk4ra Date: (GJ (•C� Title: Preside Recommended by: Date: 7c,( , ATTEST: (Only if required by Developer) Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Water Department Signature Name: Douglasy- Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: ATTEST: Richard A. McCracken Assistant City Attorney 14 �J. lCit ��Xp►� -M&C Na. N1A - -- - - -- - - Date: tsa 11-7�/LX For, 1295 : NIA- City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100228 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 N -HICKS p r W E z J V) a OP C 8 w t9 w PROJECT W L OCA TION a PF z Q N B 7 •_ F PARK A z Q 6 O d Y d w a o HARHON 7 o 1p _N O 9Cr x N 9 F-- ORT ❑RT WORTH CITY LIMIT O SAGINAW CITY LIMIT — BAILEY - BDSWELL O — RARL11 Lo O 9 R T u waft. R V 50 ` PAW O :3 iAi K KA RK r Y+ O L d < / . VIN f 1 MAP U Km& I M N I WATERSBEND NORTH C N PHASE 3 L LMATMM M C= OF FORT WORTH, TIERS m v L 0- DEVIRA EVOWMW PIMABIM BY: s BLOOIRTEM WhM,L.P. GOODVMI 1060 E.HWY 114,SUITE 210 Ry6ARSI3AI�. SOUTHLAKE.TX 75M aver aNGWEEns-PLANNERS SURVEYOFS - Cfl PHONE(B17)418-1572 2y wjmo D*^Qmpwk `Tamen m5l FAX(817)418-1397 MWO 117)3294373 MAY9 2016 W m o M N N g o, Y) N o a L Z< > w O a J z o Z LLI p CC J > Q N 'Cr Q H W F- W LO 0 .1. 0 3 0 O wZ w W Z _ �♦ N Z N N W ~ 1 0 N 0iL 0 N t _ �(A0� a W a W cr W ~ O W �, Q z N z 3 -�-¢ z Q u •• W 3CD { Q) L 0- C:c a� • z N L N g11I1IQ 11�A N Coot) Cl N O M V t q- M N _ N C0 d 1-11 tc) + N Yy IA C m (0 (O W N I W Q ;M z W O YN m lO �? I A > M re O LL1 J M N M (f) M — O 111 Q W NLLJ UJ N N UI W to N — — zm~ N Q z �N_ wZW (1) N a 3Q, Y®9 M V _ w>C�w N I to A New �"•J Lij= N N v M NW N z<<O 3 N N N _ (0 M E v 3� a C NLO � 1 CGd '3 N 10 to m M M M M M M M M M M •7'M 'X3 Wok �ll Alf BV/b co O N H LD �! a O ~W a_W M_ LO Z H Z0 H0 �V O CA® �X~�' ►yam0—Mw N2 0Q NQ W C WJ wr2 WfA _ 2 2 fA q dW Nw aW NW n.w L LU 3: La n�uwi w uWi a cwn w cwn a cwn 0 a 3 W tt Q ,L 3Z � ° Z to cn 0 I � v L t � � C f N Q� 0 M ..._. S cr Cr W u�i 5 W F- s d M _ �::W ¢ M N — ~ mCDT: CL WQ N N N Q C 0�z n- co OD 6—. o ti Z C O M Q W co m — A m `nom[— OC / N d• M Y m Wz W O M M Lo !E? �_ M N r O CL O 1 �p 3i N N N O= I N W CL V) ti W 0J { M N O Q J cli_ M 2? N N N a N —_ ' zpeM d 4 � = N � YN 3�1 M y N C C/6 �� N N N N N mM to co[r. N O _^ � V In 3 (G/ryE N i QdaN 11 OURMI VIA __ O N (C) 3 � g Q 0 3 O �o R 3p 0 s aw LL. eva_b m oWM m w v } aw3 m3�Q S m A I N0Lu PS �0- 0 NpV� L i t7 O Z< r;; 0 �[?Z o f 02 w II Ca 3ZDL) d 3CU Q Z- -� Mcn q 3 c 3 � o s e v c a> M RAraa AMRA fl Afi 10) L m a N Y h N J ti _p to (D a Y CU te) (.0 CID v Y 2S Ile 0 Q M 1/S W m M N � 0 N �y •Ja V � N _ N ti da RAr N k Tmrmm N 1—I Lo � M � Y//�•7 N ` � N Y—V c N O i y/a N M M M M M M M M M / ~ CVO*d NMR30M-AEMVAA i i � O � LU f Z _ i Z � � a z ;t i o .w PH, � A I 2 f i IL w II � LL z v) '� Z V {� •• W M S C l E � e C .8 ' N ..... m m M v_ M gIg v M �- CD Wm 5 N - J a 00 N U �. J N Q N 0 tD cn i - m co m' N p F N lO U N N Nm O) p m L iv v Cfl p MZ� m M N v M N0 N — N N ALJ N — M N m a a N I v N I v ® M v /�/j, N w M Y� V WMA Ivt. SUN N � UNUV JN J N N N N , �, 3 Q� OmM N N !C" M, 1�1CD — v�UccI v �d d W V N O CCN CC¢ Lo 11F--m���ill M'S M N M M M M M M M M M OM M� X a N M c� O N M N 0 p4 O o LO o �rJill w 0O � � � a L W � ~ d O 0 0 �-. d. lu II 0 w - � Q J � _ � A E W a ao z Z o U 3 T CO Q Z M N J W H M N M O L LU a U U n p ��A M rn am N O V'® M N ® ti O (p a w ,i.7 LSS�D Imd — �D co 0 co �f co CL ti UI) Ym m LD m o c0 M r: M W O m M N ►� 0 N N N N ►_ IiLdd XOd N N �yM N N N N ( _ M � -�- f// N M U N UI) ( N vsp N J W V N N N N _ Nco m M �S N V p� O F--J R b N O M N M v l0 f*- M ^AM M M M i O Z N LLI� N z O a � w O o w cr ® ' t N 0O 0 m �► w o a V Oa. s 0 w _]Z� A d �LI9 o Z U w I 3 M X N N o E C N 9 SAM AMHA E)I�AS M M O a. Im l0 CD v � J _ �— O M m M w ad !e !tM N ►` O N N N N _ _ N N M _ SD 0) N N N � N I � M N V ( N (/�L (D N If) i N N cu N N rn N N V �M CD N O � N M M M M M QYOg MIDGMEMIN-xMym s[CnON 40 42 43 D-dV.A-116d Pnjeeu-PROPOSAL FORM UNIT PRICE BID Aaia•ar.he.- t1 sa..Pge.l Ekara syof'oa Il.ud la.sla D-p- sass tln t4�ra Bd Qaaaury' IIan lSia lid VaW 1 3311.0261 8'PVC Water P" LF 2,592 31.00 352. 2 3311.0441 12"Water 873 3.00 $37.539. 3 3312.3003 8'Gate Valve d Valve Bo> EA 8 $1,100.00 $8.800.0 4 3312.3005 12'Gate Valve d Valve Bo> EA 2 $2,200.0 400.0 8 3312.0001 S1O.Fie H rant Assembl wl 8"Gale Valve d Valve Bol 331240 EA 5 525.0 17 825. 7 3311.0001 Dudib Iron Water Fittings wl Restraint TON 1.9 $7.395.00 $14.050.501 8 3305.0109 Trench Safe 330510 LF 3.465 .25 6.2 9 3312.2103 l'Domestic Wetm Services 3311210 EA 79 0.0 3 D0. 10 3312.0117 Conned to 12"W.L.Stub-oul 33 12 25 EA 5 00.0 2500. 11 0241.1013 Remove 8"PVC C900 W.L. 02 41 14 LF 91 $12.00 51 092.0 12 10241.1015 Remove 12'PVC C9D0 W.L. 0241 14 LF 40 512.00 $480. 13 3305.0116 Concrete Encasement for Utility Pi 33 05 10 LF 10 525.00 $250. Water Subtotal 5231 154.7 Sanitary Sewer Facilities 3311 10,3 14 31 12,33 31 LF 3331.4115 8'SDR-26 PVC Sewer Pie 2,433 $38.00 $87,588.0( 15 3331.3313 Connect to Exist Stub-out 3331 50 EA 1 $1.00 $1.000.0( 16 3331.3101 SDR-25 4'Sewer Services 33311 3 31 50 EA 79 5550.0 $43,450. 333910.33 17 3339.1001 4'Std.Dia.Manhole 3920 10 $3,DOO.00 $30.000.0( 33 39 10,33 EA t0 3339.1002 4'Dia.Drop Manhole 3920 1 $4,000.0 S4,000.0( 333910, 19 3339.1003 4'Extra D Manhole 33 39 20 VF 30 $50.00 $1,500.0 33 11 10,3 20 3331.4118 S'PVC Sewer Pipe,CSSBackfill 31 12,33 31 LF In 102 $20.00 S2 040. 21 3305.0109 Trench Safety 330510 LF 2.433 $1.00 S2,433.001 22 3301.0002 Post-CCTV Inspection 3301 31 LF 2,433 $2.00 $4,866.0 23 3339,0001 Epoxy MH Liner 33 39 60 EA 1 $2,D00.0 $2,000.0 Sanitary Sewer Subtotal $1173,577.0111 Storm Drain Facilities 24 3349.5001 10'Depressed Curb Inlet 33 49 20 EA 9 $3.400.0 $30,W0.0 25 3349.8001 1 O'Type 2 Inlets 33 49 20 EA 1 $4.000.0 $4.000. 28 3341.0201 21'Class 111 RCP 3341 10 LF 680 $53.00 $36.D40.00I 27 3341.0205 24'Class III RCP 3341 10 LF 165 558.00 $9,240.001 28 3341.0208 27'Class III RCP 3341 10 LF 125 $62.00 $7,750.001 29 3341.0302 30'Class III R.C.P. 3341 10 LF 1,301 $88.0 $88.468.001 30 3341.0309 36'Class III R.C.P. 3341 10 LF 182 $85.0 $15,470.001 31 3341.1001 3'x2'Box Culvert 3341 10 LF 311 $130.0 $40.430.001 32 3341.1101 4'x2'Box Culvert 3341 10 LF 154 $150.0 $23.100.001 33 902-000134'D P inlet 00 00 00 EA 1 $3,500.0 _$3,500.001 . 3349.0001 4'Slone Junction Box 33 49 10 EA 2 $4,000.0 $8.000.001 35 9999.0002 514'Storm Junction Box 33 49 10 FA 1 $ $5,000.001 36 9999.0003 10'x4'Stone Junction Box 33 49 10 EA 1 $7,500.00137 9999.0004 1015'Storm Junction Box 334910 FA 1 $8,000.0438 3305.0109 Trench Safe 33 05 10 LF 2 918 $2,918.0(439 9999.0005 312'Headall 00 DO 00 FA 2 $7.000.9440 9999.0006 4'x2'Headwall 00 00 00 FA 1 $4500. 3305.0112 Concrete Collar 330517 EA 3 St 50042 3138.0104 Gabon Mattress 31 3600 SY 48 $7.440.001 Storm Drain Subtotal $310,466.9A WaterlSanitary Savwr/Stonn Drain Facilities Subtotal 5720 457.7 Paving Facilities 43 13213.0101 8"Concrete Pavement(Residential) 32 13 13 BY 13.213 $34.00 $449,242. 44 3211.0501 6'Line Treated Su rade Residential 32 11 29 SY 14,044 $3.00 $42,132.0 45 3211.0400 Hydrated Lime do 30 lbs./S.Y.(Residential) 32 11 29 TON 211 $175.0 SM.925.001 48 3213.0101 10.5'Concrete Pavement(Residentiao 321313 SY 2.784 $47.00 $ 730 848. 47 3211.0501 8'Lime Treated Su rade esidentia 32 11 29 BY 2,983 $3.50 510440.5 48 3211.0400 H atad Lime 42 IbsJS.Y.(Residential) 32 11 29 TON 63 $175.0 511 025.0 49 3213.0508 P-1 Ramp 32 13 20 EA 18 St 000.0 $18,000.01: 50 3213.0504 M-1 Ra 32 13 20 EA 4 $1.200.0 $4,800A 51 3213.0301 4'Concrete Sidewalk 32 13 20 LF 2,474 $16.20 $40,078.8( 52 9999.0007 Connect to Curb 8 Gutter 00 00 00 LF 270 $18.90 $4,563.0( 539999.00 IS Endof--Road Barricades 00 00 00 EA 2 $1,000.0 $2000.0( 54 9999.0009 Remove End of Road Barricade 00 00 00 EA 5 S21)0.00 $1,000. 55 19999.0010 Concrete Header 00 00 00 LF 56 518.00 E898.0 56 13471.DOOI Traffic Control 34 71 13LS 1 si.566.66 $1,500.0 Paving Subtotal 5763 450.3 Street Litififino Facilities 57 3441.3201 LED Lighting Fbdure 34 41 32 1 EA 1 141 3.800.DOI S53.200*0 58 2605.3011 2'Condul PVC SCH 40 26 05 33 1 LF 1.2131 12.001 56. 59 3441.1408 No.6 Insulated Elec Condo 2j±1_14 LF 3 639 3.DO $10,917. 60 9999.0011 St Sign w/Sto Sign 00 00 00 EA 101 550.00 $5,500. 81 9999.0012 St Sion w/o Stop Sion 000000 1 EA 11 450.00 $450. 62 9999.0013 Sl Marker Blade 1 000000 1 EA 221 203.50 $4,477.091 Street Lighting Subtotal Seg 100. Bid Summary Water/Sanitary Ser~/Storm Drain Facilities Subtotal $720,487.7 Pauling Facilities Subtotal $753,450-3 Street ' hti Faciaties Subtotal $89,100. Total Bi $1,663,038.051 Perfortnance/Pa Ment and 2-year Maintenance Bond $14 861.4 Grand Total $1.577,399A 1 577 899.5 olrfo, r. nrcwocvanuctrwsmrawaaN..oavaoau,w4®raua[:ra wr,re rrw.rr� IaawlArdlldae P!1 d I ggAeAq� FILED In the Office of the Secretanf �;►--tp of Texas CERTIFICATE OF LIMITED PARTNERSHIP SEP 0 8 OF 2004 BLOOMFIELD HOMES,L.P. COrPorations Section THIS CERTIFICATE OF LIMITED PARTNERSHIP (this "Certificate") of BLOOMFIELD HOMES, L.P. is dated to be effective as of September3, 2004,and is made by Bloomfield Properties, Inc., a Texas corporation, for the purpose of complying with Section 2.01 of the Texas Revised Limited Partnership Act(the "Act"): 1. The name of the limited partnership is Bloomfield Homes, L.P. 2. The address of the registered office of the Partnership is 807 Potomac Place, Southlake, Texas 76092, and the name and address of the registered agent for service of process is Glen A. Bellinger, Bellinger& DeWolf, L.L.P, 10,000 North Central Expressway, Suite 900, Dallas,Texas 75231. 3. The address of the principal office of the Partnership in the United States where records are to be kept or made available under the Act is 807 Potomac Place, Southlake,Texas 76092. 4. The name and the street address of the General Partner of the Partnership is as follows: Bloomfield Properties, Inc. 807 Potomac Place Southlake, Texas 76092 EXECUTED this the day of September, 2004. BLOOMFIELD PROPERTIES, INC. a Texas corporation By: –_----- /JL I — Donald J. Dykq6a,P sident \\BD_NT_SER VER\wpprolaw\2920.001\88824.doc Last Revised: 9/3/04 BUSINESS ORGANIZATIONS INQUIRY-VIEW ENTITY Page I of I TEXAS SECRETARY of STATE CARLOS H. CASCOS UCC I Business Organizations I Trademarks I Notary I Account I Help/Fees I Briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY-VIEW ENTITY Filing Number: 800386867 Entity Type: Domestic For-Profit Corporation Original Date of Filing: September 8,2004 Entity Status: In existence Formation Date: N/A Tax ID: 32015762365 FEIN: Duration: Perpetual Name: Bloomfield Properties, Inc. Address: 1050 E. HIGHWAY 114, SUITE 210 SOUTHLAKE,TX 76092 USA ASSOCIATED REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ENTITIES Last Update Name Title Address September 21,2014 DONALD J DYKSTRA PRESIDENT 807 POTOMAC PLACE SOUTHLAKE,TX 76092 USA September 21,2014 DONALD J DYKSTRA DIRECTOR 807 POTOMAC PLACE SOUTHLAKE,TX 76092 USA September 21,2014 DONALD J DYKSTRA SECRETARY 807 POTOMAC PLACE SOUTHLAKE,TX 76092 USA September 21,2014 DEBORAH B DYKSTRA VICE PRESIDENT 807 POTOMAC PLACE SOUTHLAKE,TX 76092 USA September 21,2014 DEBORAH B DYKSTRA DIRECTOR 807 POTOMAC PLACE SOUTHLAKE,TX 76092 USA September 21,2014 TIMOTHY M STEWART VICE PRESIDENT 441 CHAPEL DOWNS CT. SOUTHLAKE,TX 76092 USA September 21,2014 TIMOTHY M STEWART DIRECTOR 441 CHAPEL DOWNS CT. SOUTHLAKE,TX 76092 USA September 21,2014 ATSUSHI KAWAMURA DIRECTOR 1050 E HIGHWAY 114,SUITE 210 SOUTHLAKE,TX 76092 USA Order Return to Search Instructions: 0 To place an order for additional information about a filing press the'Order button. https://direct.sos.state.tx.us/corp_inquiry/Corp_inquiry-entity.asp?spage=mgmt,&:Spagefro... 6/17/2016 } CERTIFICATE OF CORPORATE RESOLUTION We, DONALD J DYKSTRA, President of BLOOMFIELD PROPERTIES INC., a Texas corporation (the "Corporation"), DEBORAH B. DYKSTRA, Vice President of the Corporation, and ATSUSHI IWASAKI, Director of the Corporation, as the General Partner of BLOOMFIELD HOMES, L.P., a Texas limited partnership (the "Partnership"), do hereby certify that (i) the Corporation is duly organized and existing under the laws of the State of Texas,(ii)all franchise and other taxes required to maintain its corporate existence have been paid when due and that no such taxes are delinquent, (iii) no proceedings are pending for the forfeiture of the Corporation's Certificate of Incorporation or for its dissolution,voluntarily or involuntarily,(iv)the Corporation is duly qualified to do business in the State of Texas and is in good standing in such State, (v) there are no provisions of the Corporation's Articles of Incorporation or Bylaws limiting the power of the Corporation's Board of Directors to pass the resolutions set out below and that same is in conformity with the provisions of said Articles of Incorporation and Bylaws, (vi)the Secretary is the keeper of the records and minutes of the proceedings of the Corporation's Board of Directors, and(vii) a meeting of the Corporation's Board of Directors was held, which was duly called and held in accordance with Texas laws and the Corporation's Bylaws,at which meeting all of the Directors were present,and that at said meeting the following resolution was duly and legally passed and adopted and that the same has not been altered, amended, rescinded or repealed and is now in full force and effect: BE IT RESOLVED, that each and any of the following officers of the Corporation, for and on behalf of the Corporation and the Partnership, are hereby duly authorized to execute and deliver any and all instruments,including but not limited to contracts,escrow instructions,deeds,deeds of trust,sales agreements and all other instruments necessary or appropriate in connection with any and all real estate sale transactions,by and for the Corporation for itself and as General Partner of the Partnership: f Donald J.Dykstra President/Chief Executive Officer Atsushi Iwasaki Director Deborah B.Dykstra Vice President/Chief Finance Officer Timothy M. Stewart Vice President/Chief Operating Officer Michael L.McCord Authorized Agent and Attorney in Fact Scott Onderdonk Authorized Agent and Attorney in Fact Marsalyn Motley Authorized Agent and Attorney in Fact IN WITNESS WHEREOF,I have hereunto set my hand as PRESIDENT of said Corporation on this 24th day of April,2015. DONALD L D STXA IN WITNESS WHEREOF,I have hereunto set my hand as VICE PRESIDENT of said Corporation on this 24th day of April,2015. DEBORAH B.DYKSTRA IN WITNESS WHEREOF,I have hereunto set my hand as DIRECTOR of said Corporation on this 24th day of April,2015. ATSUSHI IWASAKI STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged before me on this 24th day of April, 2015 by DONALD J. DYKSTRA, President/Chief Executive Officer of BLOOMFIELD PROPERTIES, INC., a Texas corporation, as General Partner of BLOOMFIELD HOMES,L.P.,a Texas limited partnership,on behalf of said entities,and in the capacity herein stated. JAN E.BAILEY NOtory Public State of Texas " My Commission Expires Notary ublic in and for the State of Texas January O6,2016 STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged before me on this 24th day of April, 2015 by DEBORAH B. DYKSTRA, Vice President/Chief Finance Officer of BLOOMFIELD PROPERTIES,INC.,a Texas corporation,as General Partner of BLOOMFIELD HOMES,L.P.,a Texas limited partnership,on behalf of said entities,and in the capacity herein stated. JAN E.BAILEY Notary Public,State of Texas My Commission Expires Notary Public in and for the State of Texas Januafy 06,2016 STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged before me on this 24th day of April, 2015 by ATSUSHI IWASAKI, Director/General Manager of BLOOMFIELD PROPERTIES, INC., a Texas corporation, as General Partner of BLOOMFIELD HOMES,L.P.,a Texas limited partnership,on behalf of said entities,and in the capacity herein stated. Notary Public m and for the State of Texas JAN E.6AILEY r= � Notary Public,State Of iexos - My commission Expbts January 06,2010