HomeMy WebLinkAboutContract 47000-CO1 CITY SECRETAW
FORT WORTH CONTRACT N0.
City of Fort Worth
Change Order Request Breakdown
Project Namel CONCRETE STREET RESTORATION AT 4 LOCATIONS 2015-09 City Sec# 1 47000
Client Project#(s)l CPN 02573
50ntractor WESTHILL CONSTRUCTIO PM T.ISLAM Inspectors GARY DEYON
Change Order Submittal# Date 1 4126/2016
W
Dept T1PW Contract Time
Totals CD
Original Contract Amount $682,566.40 $682,566.40 150
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $682,566.40 $682,566.40 150
Amount of Proposed Change Order $98,482.00 $98,482.00 35
Revised Contract Amount $781,048.40 $781,048.40 185
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $98,482.00 $98,482.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 14.43%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $853,208.00
This change order is to cover the costs for additional panel replacement on Meadowbrook Drive.The additional panel replacements were
needed to alleviate ponding water which was not identified during the initial street evaluation.35 days are being added to the contract for the
additional work.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fo T� WOWTH City of Fort Worth
-v- Change Order Additions
Project Name CONCRETE STREET RESTORATION AT 4 LOCATIONS 2015-09 City Sec# 47000
Client Project# CPN 02573
ContractorF yYESTHILL CONSTRUC110 PM T.ISLAM lnspeclorFGARYDEYON
Change Order Submittal# 0 Date 4r2fiJ2016
ADDITIONS
Unit Unit Cost Total
remove Concrete and Replace with Concrete avemen
5 Flex Base,Type
Concrete extra depth)
7—Block Sod Placement
aneous tnrcture lustment tone ram Inlet op
11 Geogrid Tenser
Remove and Replace Sidewalk
TIPW 98482.00
u otal Additions
Change Order Additions Page 1 of 1
r Wo H City of Fort Worth
Change Order Deletions
Pmjed Name I CONCRETE STREET RESTORATION AT 4 LOCATIONS 2015M City See# 4)000
Client Project# F CP 002573
CW.Wblr WESTHILL CONSTRUCTIO PM T.ISLAM Inspector GARY DEYON
Change Order Submittal# Date 4/26@0 t6
DELETIONS
1TEM UFSGRIPTION DEPT Qty Unit ni t Gost Total
TIPW 0.00
Sub ota Deletions
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
CFW Change Order Approval St-COApp01 Page 1 of 4
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 2
fortworthoov/Infrastructure Proiects/02573 - Concrete Restoration (2015-9)/Contractor/Chanae Orders/MBE Commitment
Form 2015-9 5-2-16.pdf
fortworthoov/Infrastructure Proiects/02573 - Concrete Restoration (2015-9)/Contractor/Change Orders/Chanae Order
Breakdown#1 02573 (2).xls
A twbmw b Le
No Attachments have been added to this form.
https://projectpoint.bi,7 aw.com/—bz—web/Forms/FonnPrint.aspx?SiteId=51500&Processld... 7/1/2016
CFW Change Order Approval St-COApp01 Page 2 of 4
FORT WORTH. city of Fort Worth
-•.•�q� Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: COSub01
Change Order No.: St-COApp01 Date Started: 2016-05-09
City Sec. No.: 47000 Date Due: 2016-05-20
Project Name: Concrete Restoration (2015-9)
02573 DOE Numbers:
Project Numbers:
Project Replace failed panels on Citywide concrete streets
Description:
Project Manager: Tariqul Islam City Inspector: Gary Deyon
Contractor: Westhill Construction
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 85,492.00 30100-0200431-5740010- 35
100432-003380
TPW $ 12,990.00 39408-0200431-5740010-
100432-003380
Total Cost: $ 98,482.00 Total Requested Days: 35
Approval Status:
https://projectpoint.bu7 aw.com/—bz—web/Forms/FormPrint.aspx?Siteld=51500&ProcessId... 7/1/2016
CFW Change Order Approval St-COApp01 Page 3 of 4
Approved: Yes
Comments:
User: Katie Newby
Date: 2016-05-25 11:38 AM
Approved: Yes
Comments:
User: Katie Newby
Date: 2016-06-16 10:15 AM
Approved: Yes
Comments:
User: Tarigul Islam
Date: 2016-06-16 10:36 AM
Approved: Yes
Comments:
User: Riad Nusrallah
Date: 2016-06-16 4:06 PM
Approved: Yes
Comments:
User: Todd Blomstrom
Date: 2016-06-21 2:15 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2016-06-21 2:35 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2016-06-29 3:03 PM ' / ®�����
Approved: Yes O
Comments:
User: Doug Black Ary J• s city
Date: 2016-06-30 9:42 PM 0000
Approved: Yes
Comments:
User: Jay Chapa NO M&C REQUIRED
Date: 2016-07-01 1:38 PM
OFFICIAL RECORD
CITY SECRETARY
• 9
https://projectpoint.bilzzsaw.com/—bz—web/Forms/FomiPrint.aspx?SiteId=51500&Processld... 7/1/2016
CFW Change Order Approval St-COApp01 Page 4 of 4
4
Action Required:
https://projectpoint.buzzsaw.com/ bz web/Forms/FormFrint.aspx?Siteld=51500&ProcessId... 7/1/2016
City of Fort Worth
ACCEPTANCE OF PREVIOUS MBE COMMITMENT FORM A
(for use with CHANGE ORDERS of AMENDMENTS greater than$50,000)
To be.Comollot e y" ityproject Manager
ge dtder(for Construction Contract)
project Nome: City`Project Niimtier
: .. w
Concrete Restoration(2015-9) 02573
City Pro)eet Manger t7o
CbntraEtor.
.. . . . .... . . . Taariqul(slam
Westhill Construction Inc, Clty'$MBf~Projeot'Goal: 13 %
OnginalAf i6uht of Contract ;682,668.40 Accepted MBE Commitment: 16
Total of.pfovious Chap0e Orders .. $0.00 Date of Last MOE Report:. 3/30/2016 ;
Amo ntfoethls Change Order '' $98,482.00 Change Order#: 1 `
Re ised_Amourt•of Contract: $781,048.40 _ Date: 4/29/2018 .
Language to be inserted In the M&C for this Contract
Westhill Construction Inc. agrees to maintain its Initial MBE commitment of 16%that It'made on
the original contract and extend and maintain that same MBE commitment of 180!to this first
change order. Therefore Westhill Construction Inc. remains in compliance with the City's BDE
Ordinance and attests to its commitment by Its signature on the Acceptance of Previous MBE
Commitment form,executed by an authorized representative of Its company. k.
To be Completed by the Representative f the Contractor
Print Signature Title hofted gnature/Date -�
Westhill Construction Inc.
Company Name Contact Name(if.. erent)
Address E=mall address
n
%_CA x
City/Statoalp Phone number Fax Number
as of 1�1 hs 1 I1.,.
i MBE fit;Paid to Date Date
;S
I y roles : anager as rev ewe a war associa e. wit s tinge r..er,
con§dare'It the same or similar to work In;tl�e original Contract, and recommends Ehat the
(Gohiractor.heve the option to r�t In an f'rm ItS a tlsting iat co�mitment.. h
Taariqullslam Z l6
City Protect Manager Glty Pr6lec Manaper,Signature . Date
Attach Con0lote:Change Oid4i v.
to office
f
To be Completed by • •
's
icn lit: Sim-:. AV Q
BE ptla ee Staff ID# MBE urrent% Level via ast Report Ree'd
M BE nature Date 4�
4: